CLEAVER-BROOKS 600 HP, 150 PSI BOILER Constructed 1981 in strict accordance with ASME Section I standards, stamped for 150 psi operation, four pass dry back design. Gas/#2 can be converted to heavy oil. Guaranteed to pass hydro, good tubes, good paint, available with new paint. MM-193 LWCO for modulating feed water. Ser. L-71106. Input: 25,200,000 BTU Gross Output: 20,100,000 BTU Steam Output: 20,700 pounds per hour MAWP: 150 psi Fuel: Natural Gas/ #2 oil Equipment List: ASME Section I shell, 3000 sq. ft. heating surface 2” insulation Painted galvanized jacket Full modulation Fireye E-110 Honeywell three pressuretrol set up, L404A, L404C, L91 McDonnel Miller 193 LWCO, MM 157 SLWCO Two new Kunkle safety relief valves Feedwater isolation and check valves 1 slow, 2 quick opening blowdown valves 8“ 300# flanged steam line connection, w/ valve 24” nominal stack diameter (flanged w/ damper) Dimensions: 284” overall length 128” height at stack (add approx. 8” for FWT) 118” width w/ controls 47,000 pounds shipping weight 480/60/3ph blower voltage, 120V control circuit BOYLE SERVICES, INC. 701 W. 41 st ST. TULSA, OK. 74107 1-800-772-6953 FAX: 918-446-1408 EMAIL: [email protected] Web: www.boyleservices.com