Top Banner

of 29

ClearGreenCPM Presentation

May 30, 2018

Download

Documents

pablodiazpro
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/14/2019 ClearGreenCPM Presentation

    1/29

    Performance ManagementWith The Earth In Mind

  • 8/14/2019 ClearGreenCPM Presentation

    2/29

    Objectives Improves Competitiveness (IAR, Profit) Optimize the Utilization of Resources

    (Productivity, IPY and Cash Tied Up) Improve Responsiveness to the Customer

    Methodology TPM/AIM Transition Process

    Measurements DPT Measurement Charts Transition Process BarometerTeam Activities

    Obstacle Identification Root Cause Analysis Obstacle Removal WIP TIP Management Learning Cycles

    Skills Required TPM Mindset/Understanding Problem Solving Abilities Use of LearningCycles

    Tools Required Process Maps Pareto Charts TIP Management Techniques Root Cause Analysis (Fishbone) Dynamic Process Time Measurements Initial Pass Yield Disciplined Strategic Process

    Competitiveness Improvement Team Develops Vision of Resource Optimization Drives and Forces Improvement Empowers the Organization

    Leverages TPM in Marketplace

    Input

    Baseline Performance Resource Optimization Performance

    Output

    CPM Implementation Plan

  • 8/14/2019 ClearGreenCPM Presentation

    3/29

    1. Identify each critical path processes

    2. Establish the scope of each process3. Identify and bring together the key players

    4. Validate scope and determine process boundaries

    5. Map the relationship of the processes

    6. Establish baseline performance

    7. Determine value-added and non-value-added process steps andactivities

    8. Remove non-value-added steps and create a resource optimization map

    9. Determine measurements

    Design the measurement system

    Establish initial resource optimization goal

    Identify the obstacles

    Develop Cause and Effect diagram to find root cause obstacles

    Rank-order root cause obstacles

    Assign and schedule obstacle removal actions

    Track progress through measurement systems

    Process Management Road Map

  • 8/14/2019 ClearGreenCPM Presentation

    4/29

    Process/Activity Road MapProcess Name

    Scope

    COST

    IPY

    PT

    ProcessInputs

    WhoDefines Reqts

    Perform.Stds.

    WhoDefines Reqts

    Information

    ProcessOutputsCustomersReqts

    ResourcesWhoProvides Reqts

    WhoProvides

    InputReqts

    OutputsReqts SubProcesses

    WhoDefines

    InputsReqts

    OutputsReqts

    ProcessMap

    Process Map

    Long Dock-to-Stock Cycle Time Example

    MRB

    Re-inspect

    Search For

    ECO

    Request

    Deviation

    Wait

    Request 2ndCopy

    from Vendor

    Request

    Deviation

    Search for P.O.

    at Purchasing

    PartNot

    toSpec

    ECOLate

    Vendor Not

    onAVL

    Waiting

    DeviationPartsRej.

    at Incoming

    Paperwork

    Lost

    P.O.Not

    in System

    System

    Down

    Batching

    Order

    StoppedReceiving

    Causes

    EffectLongCycle Time

    in DocktoStock

    Workaround

    Processes/Resources

    Workaround

    Processes/Resources

    8 Ms

    Man

    Money

    MethodMachine

    MaterialMotivation

    ManagementMeasurement

    Fishbone Diagrams

    OBSTACLE REMOVAL

    PRIORITIES WORKSHEET

    Obstacle:

    DIFFICULTY OF REMOVAL

    IMP

    ACT

    OF

    OBSTACLE

    10

    9

    8

    7

    6

    5

    4

    3

    2

    1

    High

    Low

    Easy Dif ficult

    1 2 3 4 5 6 7 8 9 10

    Obstacle Selection

    OBSTACLE RANKING WORKSHEET

    PROCESS:

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    REMOVALDIFFICULTY

    OBSTACLEIMPACT

    WHOREMOVESOBSTACLE DESCRIPTION

    Impact: 1= Low,10= High Difficulty: 1 = Easy,10 = Difficult

    Obstacle Ranking

    Problem Statement :

    Program Goal :

    Owner:

    Key Action Items By Whom Completion Date

    Averageinstallationprocess timehas increasedtosix timeof our best practicegoal.

    Reduceaverageprocesstimeinstallations to threemonthbyyear end1997.

    I d en t if y a ll p r od u ct s in W I P $ s ta tu s M gr . ./ Su p er v is o rs 3 / 11 /9 7S i gn o ff a l li ns t al ls > 1 5 0 da ys M gr . /S u pe r vi so r s Q 2 E NDSignoffa l l inst a ll a t ions> 120days Mgr./Supervi sors Q3 ENDSignoffa l l inst a ll a t ions> 90days Mgr./Supervi sors Q3 END

    T H E C J 9 6 ' FE R P R Y J U J U L U G S E P C T E C J 9 7 ' FE R

    I C SSI ST L L T I S 1 8 8 1 8 2 1 9 3 1 8 1 1 6 9 1 8 5 1 5 2 1 8 1 5 5 1 2 6 1 0 1 1 0 8 9 8 9 6

    C L T I S T L LT I S 3 1 2 7 2 7 2 6 3 0 7 1 7 2 5 3 3 3 1 1 6 1 8 1 1 8

    SELI E 6.1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1 6 . 1

    B E S T P R A CT I C E 2 .0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0P LAN 6.1 5 . 9 5 . 7 5 . 5 5 . 3 5 . 1 4 . 9 4 . 7 4 . 5 4 . 3 4 . 1 3 . 9 3 . 7 3 . 5 3 . 3 3 . 1 2 . 9

    YNAMICPROCESSTIM E 6 .1 6 .9 6 .9 7 .2 5 .8 3 .8 9 .9 6 .0 4 .6 4 .5 7 .1 5 .8 9 .4 12 .1

    LONGESTCOMPLETEDINSTALLATION 8.1 1 2 .7 1 0 .7 1 4 .8 1 4 .2 1 4 .6 1 6 .0 1 5 .6 1 6 .7 1 4 . 8 1 4 . 3 1 9 . 6 2 1 . 3 9 . 4MEANCOMPLETEDINSTALLATIO NS 5 .4 4 .9 4 .6 5 .5 4 .6 4 .7 4 .3 6 .8 5 .4 5 .1 5 .8 6 .9 6 .3 6 .3

    SHORTESTCOMPLETEDINSTALLATION 1.8 1 . 5 1 . 4 2 . 1 1 . 3 1 . 1 0 . 0 2 . 3 0 . 0 2 . 1 1 . 7 3 . 0 0 . 9 4 . 8

    FO RECASTE DWI P 98 100 105PL ANNE DSH I P MENT S 13 14 11

    PTFO REC AS T 12. 1 10. 3 10. 5 11. 0

    CVDPRECISION 5000INSTALLATIONPROCESS TIME

    (Shipthru Signoff Dates, Systems Only)

    0

    2

    4

    6

    8

    1 0

    1 2

    1 4

    1 6

    1 8

    2 0

    2 2

    2 4

    N O V D E C J A N

    96'

    F EB M AR A PR M AY J UN J UL A U G S E P O C T N OV D E C J A N

    97'

    F E B M A R

    PROCESSTIME

    (inmonths)

    0

    2

    4

    6

    8

    1 0

    1 2

    1 4

    1 6

    1 8

    2 0

    2 2

    2 4

    D YN AM IC PR OC ES ST IM E S HO RT ES TCOMPLETED INSTALLATION

    M E AN C O MP L ET E D I N ST A LL A T IO N S L O N GE S TCOMPLETED INSTALLATIONBASE LINE B EST PRA CTIC E

    PL AN D PT FORE CAST

    BAS ELINE

    BEST PRACTICE

    P LA

    N

    Specific Action Plans

    17

    6

    12

    18

    24

    30

    36

    42

    48

    M J J A S O N D J F M A M J

    B

    E

    Months

    0

    1

    2

    3

    4

    5

    6

    7

    M J J A S O N D J F M A M J

    B

    E

    $M

    5000

    6000

    7000

    8000

    M J J A S O N D J F M A M J

    1200

    1400

    1600

    1800

    $ K He ad c ou nt

    o Sa les

    x Hea dcount

    15

    20

    25

    30

    35

    M A M J J A S O N D J F M A M J

    B

    E

    %

    0

    1

    2

    3

    M J J A S O N D J F M A M J

    B

    E

    E

    0

    20

    40

    60

    80

    100

    M J J A S O N D J F M A M J

    B

    %

    50

    70

    90

    110

    130

    150

    170

    190

    M J J A S O N D J F M A M J

    B

    E

    Da ys

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    M J J A S O N D J F M A M J

    B

    E

    %

    IAR%

    PRODUCTIVITY*

    SALESANDHEADCOUNT

    PRODUCTDEVELOPME NT PT

    O RD ER M AN AG EM EN T P T N ET I NC OM E(Annualized)

    ORDERMANAGEMENT IPY CUSTOMERSERVICEON-TIMEDELIVERY

    *SALES- MATERIAL + PROFIT

    TOTAL PEOPLECOSTS

    Process/Activity

    Indices

    Sustaining Metrics

    CPM Change Process Overview

  • 8/14/2019 ClearGreenCPM Presentation

    5/29

    1. Culture constrains business process performance that in turn constrains

    subject matter performance.2. Not removing culture and subject matter obstacles will create workaround

    processes.

    3. Obstacles/workaround processes often overlap and are sometimes mutuallyreinforcing.

    4. Business Process constraints negatively impact energy conservation

    1

    1

    2

    2

    3

    2

    CultureObstacles

    WorkaroundProcesses

    BusinessProcess

    Obstacles

    SubjectMatter

    Obstacles Are Inter-related

    4

  • 8/14/2019 ClearGreenCPM Presentation

    6/29

    6

    TIME

    A High Leverage Business Processor Culture Obstacle is Removed

    Baseline

    An Improvement Stall SurfacesProblems to be Solved

    Resource Optimization(Realizable Performance)

    PR

    OCESS

    T

    IME

    Typical Experience Of Process Time Reduction

  • 8/14/2019 ClearGreenCPM Presentation

    7/29

    ContinuousImprovement

    & SystemEnablement

    RealizablePerformancewith CurrentResources

    Baseline Motivation

    Categorization

    Process Improvement Phase

    Implementation

    Training

    Continuous Improvement& System Enablement

    Embracement

    Resource Optimization

    GlobalCompetitiveness

    TIME

    Analysis

    CPMThe Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    8/29

    MOTIVATIONTo help critical decision makers and implementers understand thatTotal Process Management is the driver and result of makingbusiness competitive.

    Exposure to Total Process Management Concepts.

    Formation of multi-functional teams.

    Regular meetings of teams and top management.

    Meeting attendance.

    Degree of commitment to Total Process Management program

    How your carbon footprint is affected

    The Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    9/29

    TRAININGDevelop a Total Process Management mindset throughout the organizationand to provide the skills/knowledge to meet and maintain ResourceOptimization.

    Employees receive in-depth training in Total Process Management

    Plan to reach Resource Optimization.

    Degree of Total Process Management mindset.

    Demonstrated use of Total Process Management skill and tools.

    The Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    10/29

    CATEGORIZATIONDetermine Baseline, Resource Optimization, and Obstacles tomeeting Resource Optimization, as well as quantifying theimpact of reaching Resource Optimization.

    Baseline established and measurements defined.

    Baseline" process map completed.

    "Resource Optimization" process map completed.

    Major obstacles identified.

    Impact of Resource Optimization quantified.

    Resource Optimization established.

    The Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    11/29

    IMPLEMENTATIONAchieve Resource Optimization and ongoing obstacleremoval.

    Regular measurements of dynamic process time and

    initial pass yield

    Progress to Resource Optimization in process time

    Progress to Resource Optimization in initial pass yield.

    Progress in obstacle removal.

    Existence of feedback loops

    The Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    12/29

    EMBRACEMENTCreation of a culture in the organization which depends on TotalProcess Management Methodology to remain competitive and

    continuously improve performance.

    Hierarchical measurements in place. Focus on business process, not functions. Continued results.

    The Transition Process

  • 8/14/2019 ClearGreenCPM Presentation

    13/29

    Client Senior Management Implementation Team

    Total Process ManagementCompetitiveness Improvement

    Team (CIT)

    Multi-Functional Teams(Composed of)

    DesignEng.

    OrderEntry

    ProjectEng.

    Forecasting

    ProductAssurance

    MaterialPlanning

    MIS

    Procurement

    Manufacturing Customer Service/Product Support

    HumanResources

    ProgramManagement

    Multi-Functional Teams Structure

    MFTs create Obstacle Removal Teams (ORTs) as necessaryto remove specific obstacles.

    Organizational Relationships

  • 8/14/2019 ClearGreenCPM Presentation

    14/29

    DefineProcesses

    InstallMeasuresTPMWorkshop

    Establish

    ImprovementObjectives

    Embracement

    1 WEEK 6 WEEKS 1 WEEK 4-10 MONTHS 2 MONTHS

    TOTAL TIME = 8 - 14 MONTHS

    Rapid Implementation Architecture

    AchieveObjectives

    Timetable to Achieve Improvements

  • 8/14/2019 ClearGreenCPM Presentation

    15/29

    Top-down commitment - must have CEOs support ateach level.

    Top-level active involvement.

    Change through current operational managementstructure.

    Involvement of outside objective team players withhands-on experience.

    Well-trained internal implementers working with outsideassistance.

    Frequent top management/outside change agent

    obstacle removal meetings. Simplifying and revising measurements to minimum set

    that drives competitiveness.

    Communication, Communication, Communication.

    What Works

    Organizational Team Structure

  • 8/14/2019 ClearGreenCPM Presentation

    16/29

    Self medication (typically stalls at 25% to 30% ofpotential).

    Lack of top management involvement.

    Assigning responsibility to internal staff as

    leaders of Total Process Management culturalchange.

    Continuing with todays measurements.

    Program of the Year.

    Edicts of performance change. Partial cultural changes.

    What Doesnt Work

  • 8/14/2019 ClearGreenCPM Presentation

    17/29

    Real-Life Solution Examples

  • 8/14/2019 ClearGreenCPM Presentation

    18/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Reduced ECOs

    Increased product gross margin by 7% Accelerated product time-to-market by 15days (x%) Increased first pass yield by 2%Increased accuracy and timeliness ofinformation for engineering and quickdecision making

    Capture larger market share in industry

    with short product life cycles and declining

    product margins

    Accelerate new product time-to-market

    Reduce product development cost

    Increase customer satisfaction

    Improve pre-production yield

    1

    2

    4

    3

    How do I effectively andefficiently collaborate with

    customers, suppliers, andpartners in the productdevelopment process?

    Integrated knowledge and team design

    collaboration across global team

    Integration of back office systems

    Yield mgmt., yield failure and test failure analysis

    Trend tracking and product alerts to engineering

    Personalized user tools and information

    Streamline qualification and handoff to

    manufacturing

    Automated data flows, full cycle accountability

    Effective Collaborative Product Development

    Eli i i E & Ob l I

  • 8/14/2019 ClearGreenCPM Presentation

    19/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Reduced total inventory by 20-30% Reduced inventory financing andcarrying costs > 25% Reduced Order-to-Cash time > 30% Shorter-time-to-ROI of targeted projects Clear ownership of enterprise-widemetrics

    Match inventory levels with productiondemands

    Eliminate excess and obsolete inventory

    write-off cost

    Reduce inventory holding costs

    Increase sales by carrying saleable items

    Increased cash reserves by reducing

    inventory requirements

    1

    2

    4

    3

    How do I eliminate excess andobsolete inventory?

    Comprehensive, real-time global view

    Inventory-based suggestive selling

    process Alerts, decision analysis, and reporting

    Bill of Materials data aggregation

    Obsolesce management

    Continuous KPI and account monitoring

    Eliminating Excess & Obsolete Inventory

    Eff i C M f i M

  • 8/14/2019 ClearGreenCPM Presentation

    20/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Reduced cost of goods sold by 10%

    Increased inventory visibility by 40%

    Reduced inventory days 4 days / year

    Increased supplier performance levels

    Increased ability to scale for biz growth

    Reduced handling, shipping, and

    transaction costs by 30%

    Improve OTD by 20%

    Reduce product procurement cost

    Increase inventory turns resulting from JIT

    replenishment from Contract Manufacturer

    Increase sales resulting from increased

    visibility to CM fulfillment capabilities

    Reduce handling, shipping and transaction

    costs resulting from increased accuracy of

    communication1

    2

    4

    3

    How do I effectively andefficiently manage my contract

    manufacturers?

    Metric definition

    Accountable buyers/planners/facilities

    Clean data

    Lower min/max settings

    Good reporting tools

    Formalized training program

    Continuous KPI and Account Monitoring

    Effective Contract Manufacturing Management

    Gl b l & Ti l P f M it i

  • 8/14/2019 ClearGreenCPM Presentation

    21/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    $100Ms reduction in parts inventory $10Ms reduction in Inventory Carrying

    Costs

    Reduced component and raw material

    inventory

    Revenue increase resulting fromimproved customer service levels

    Reduce holding and write-off costs

    resulting from increased component

    Inventory turns while balancing

    continuity of supply

    Reduce liability for over-purchased

    components at suppliers and partners1

    2

    4

    3

    How do I perform global andtimely performance monitoring

    within and outside theenterprise?

    Performance metrics tracking on buyer

    Standardize purchasing methodology

    Provide buyers with automated on-handinventory volume & value numbers by

    part

    Mandate Inventory allowance by volume

    and value so buyers can manage excess

    Global & Timely Performance Monitoring(Inventory & Fulfillment)

  • 8/14/2019 ClearGreenCPM Presentation

    22/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Decreased inventory levels by 5% Increased supplier number of supplierrelationships and ease of doing business > 20% reduction in sales cycle time > 10% reduction in costs of servicingsales > 25% reduction in order to cash cycletime

    Increased OTD to > 98% to originalcommitment

    Increase customer retention and total sales

    Increase responsiveness to customer and

    market opportunities requiring new capabilities

    Reduce order processing administrative costs

    Reduce inventory holding costs

    Improve customer experience to result in

    increased customer loyalty producing

    increased revenue per customer

    1

    2

    4

    3

    How do I effectively manageorders from Order through

    Account Receivables?

    Sales reports and forecasting Online promotional management Integration to supplier and partner

    internal systems Quick quoting and self-serviceordering

    Product data sheets and productsearch

    Real-time stock status and orderstatus

    Effectively Manage Order Capture Through Fulfillment

    A t & Ti l D d Pl i

  • 8/14/2019 ClearGreenCPM Presentation

    23/29

    Problem Area:

    Size of Opportunity:Solution Impact:

    Enablers:

    Improved deal and product salesforecasting accuracy from 25% to 5%error rate

    Reduction in inventory of 5%

    Improved sales closing rates

    Increase sales by ensuring that the rightproduct is available at the right time andat the right place Reduce inventory costs by accuratelypredicting demand Reduce risk of lost deals because ofproduct unavailabilityTransition from BTS to BTO or CTO1

    2

    4

    3

    How do I improve my demandplanning process?

    Centralized and common global demand

    planning and sales forecasting structure

    Automated forecasting process that collectssales info. in a timely manner

    Implemented global standardized policies andpractices

    Centralized repository for data and salesresources including account planning

    Mass Customization

    Accurate & Timely Demand Planning

    Bill f M t i l I t it

  • 8/14/2019 ClearGreenCPM Presentation

    24/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Improved BOM accuracy by 35% Reduced BOM processing by 15

    days

    Integrated 36 different BOM lists into

    one global unified BOM list

    Reduce scrap parts inventory Reduce administrative costs associated

    with BOM maintenance

    Reduce procurement costs resulting from

    increased ability to pool orders by resolving

    part number duplications

    Reduce part inventory based on increased

    ability to use equivalent parts

    1

    2

    4

    3

    How do I improve the integrityof my Bills of Materials?

    Unified BOM / Parts list

    Unified Supplier list

    Common Information Model

    Integration between various systems

    holding BOM information

    Link ECOs to BOMs effectivity changes and

    dates

    Bills of Material Integrity

    V d M d I t

  • 8/14/2019 ClearGreenCPM Presentation

    25/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Reduced total inventory by 20-30%

    Reduced inventory financing and

    carrying costs > 25%

    Reduced order fulfillment time > 30%

    Increase sales and customersatisfaction through improved OTD

    Eliminate $Millions in excess and

    obsolete inventory by increased

    collaboration and management of top

    customer(s) inventory

    Reduce order to cash cycle time by

    reducing inventory requirements1

    2

    4

    3

    How do I manage theinventory of my customers?

    Comprehensive, real-time global view Customer demand data aggregation

    and forecasting Alerts, decision analysis, andreporting Bill of Materials data aggregation Obsolesce management Continuous KPI and accountmonitoring

    Vendor Managed Inventory

    Q lit T ki & P ti R di ti

  • 8/14/2019 ClearGreenCPM Presentation

    26/29

    Quality Tracking & Pro-active Remediation

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Increased supplier recoverable costsby 50%

    Reduced warranty costs by $10M

    Reduced scrap costs by $10Ms

    Reduced standby engineering costs

    by $10Ms

    Reduced field failure rate (FFR) by 8%

    Reduce high Cost of Quality by reducingroot cause defects Capture timely quality related information Detect and correct field failures earlier(current lag time is 6 mos.) to reducewarranty exposure Incorporate field and manufacturingexperience into design and procurement

    How do I track my enterprise-wide quality data and react

    quickly to quality problems?

    Consistent purchasing, design and mfg.

    feedback loop

    Tighter control of parts inventory Own a product throughout lifecycle incl. endof warranty Defect tracking Analyze Cost of Poor Material data gatheringroot causes Minimized number of company wide metrics Integration of disparate data in existingsystems

    1

    2

    4

    3

    Ti l BTO/ETO P du t

  • 8/14/2019 ClearGreenCPM Presentation

    27/29

    Problem Area:

    Size of Opportunity: Solution Impact:

    Enablers:

    Reduced inventory, scrap, rework

    and administrative costs

    Increased working capital utilization

    Capture larger market share with

    accelerated BTO/ETO capabilities

    Reduce product development cost

    Increase customer satisfaction

    Reduce inventory by building to

    customer specifications (BTS vs.

    BTO/ETO)1

    2

    4

    3

    How do I build my product to

    customers specifications(BTO/ETO) in a timely fashion?

    Comprehensive, real-time global view

    Alerts, decision analysis, and reporting

    Mass customized components Continuous KPI and account monitoring

    Real-time communications with suppliers

    Automated data flows, full cycle

    accountability

    Product configurator linked to BOM, ECO,

    production capacities, and margin analysis

    Timely BTO/ETO Product

    d i l

  • 8/14/2019 ClearGreenCPM Presentation

    28/29

    Our Green Credentials

  • 8/14/2019 ClearGreenCPM Presentation

    29/29

    Eco-Technology in Real-Time

    Performance ManagementWith The Earth In Mind