COVER SHEET AND DRAWING LISTGENERAL NOTESLEGEND AND GENERAL SYMBOLSABBREVIATIONS
OVERALL SITE PLAN, STAGING, AND ACCESS,AND TREE REMOVALEXISTING ODOR CONTROL DEMOLITION PLANODOR CONTROL SITE PLANCIVIL DETAILSEROSION AND SEDIMENT CONTROL COVER SHEETEROSION CONTROL PLANEROSION CONTROL DETAILS 1EROSION CONTROL DETAILS 2EROSION CONTROL DETAILS 3EROSION CONTROL DETAILS 4EROSION CONTROL DETAILS 5EROSION CONTROL DETAILS 6
STRUCTURAL NOTESMISCELLANEOUS STRUCTURAL DETAILSODOR CONTROL BIOFILTER PLANS AND SECTIONS
1. HORIZONTAL CONTROL: COORDINATES ARE BASED ON PRIOR WORK ON SITE.COORDINATES ON STRUCTURES DEPICT THE EXTERIOR FACE OF THE CONCRETESUBSTRUCTURE FOUNDATION WALL OR FOOTING WALL, UNLESSSHOWN OTHERWISE.
2. VERTICAL CONTROL: ELEVATIONS ARE BASED ON NGVD 29.BENCHMARKS AND/OR STRUCTURE ELEVATIONS FROM EXISTINGSURVEYS OR REFERENCE DRAWINGS MAY RESULT IN VARIANCESWITH ELEVATIONS INDICATED ON THE DRAWINGS FOR EXISTINGFACILITIES.
3. HORIZONTAL AND VERTICAL CONTROL ESTABLISHED ASSHOWN ON C102. THE PROJECTED 100 YEAR FLOOD ELEVATION IS 131.0 ANDTHE PROJECTED 500 YEAR FLOOD ELEVATION IS 132.3, PER WASHINGTONCOUNTY FLOOD INSURANCE STUDY, NOVEMBER 2016.
4. EXISTING UTILITIES AND STRUCTURES (UNDERGROUND, SURFACE, OROVERHEAD) ARE INDICATED ONLY TO THE EXTENT THAT SUCH INFORMATIONWAS KNOWN, OR MADE AVAILABLE TO, OR DISCOVERED BY THE ENGINEERIN PREPARING THE DRAWINGS. THE LOCATIONS, CONFIGURATIONS, ANDELEVATIONS OF SUBSURFACE FACILITIES AND UTILITIES ARE APPROXIMATE,AND NOT ALL UTILITIES AND FACILITIES MAY BE INDICATED. OVERHEADUTILITIES ARE NOT INDICATED IN ARCHITECTURAL ELEVATIONS, PROFILEOR SECTION DRAWINGS. THE ENGINEERING INVESTIGATIONS, LOCATION,AND DESIGNATION OF SUBSURFACE UTILITIES INDICATED IN THESE CONTRACTDOCUMENTS HAS BEEN PERFORMED TO QUALITY LEVEL C IN ACCORDANCE WITHGENERALLY ACCEPTED ENGINEERING PRINCIPLES AND PRACTICES AS OUTLINEDIN ASCE STANDARD AND GUIDELINE BULLETIN CI/ASCE 38-02 UNLESSOTHERWISE DESIGNATED. WHERE SUCH ACTIVITIES HAVE BEEN TO A HIGHERLEVEL OF QUALITY, THE HIGHER QUALITY LEVEL FOR THE AFFECTED AREASIS INDICATED IN THE CONTRACT DOCUMENTS.
5. "SCREENED" (LIGHT) DELINEATION INDICATED ON THE DRAWINGS DENOTESEXISTING FACILITIES. "SCREENED" INFORMATION WAS TAKEN FROM EXISTINGCONSTRUCTION DRAWINGS AND DATA, IS FOR REFERENCE ONLY, AND SHALL BEFIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE ORDERING OF MATERIALSAND BEGINNING OF CONSTRUCTION. "BOLD" DELINEATION IS NEW WORK TO BECONSTRUCTED UNDER THIS CONTRACT.
6. CONTRACTOR'S STAGING, PARKING AND MATERIAL STORAGE SHALL BE LIMITEDTO THE SPACE(S) DESIGNATED ON THE DRAWINGS. PROVIDING ADDITIONALSTORAGE OR PARKING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. CALL BEFORE YOU DIG. CONTRACTOR SHALL VERIFY PRECISE LOCATIONS ANDELEVATIONS OF ALL UTILITIES AND STRUCTURES, WHETHER INDICATED ON THEDRAWINGS OR NOT, IN THE FIELD IN ADVANCE OF EXCAVATING, BY CONTACTINGALL UTILITIES AND OTHER AGENCIES, AND BY PROSPECTING. CONTRACTORSHALL BE RESPONSIBLE FOR REMOVAL, DEMOLITION, RECONSTRUCTION, ANDRECONNECTION OF EXISTING FACILITIES AS REQUIRED TO COMPLETE THE WORK.IF REQUIRED AFTER FIELD VERIFICATION, CONTRACTOR SHALL COORDINATEWITH THE ENGINEER TO DETERMINE ANY NECESSARY MODIFICATIONS TOPROPOSED NEW WORK.
8. BEFORE CONSTRUCTION IS STARTED, CONTRACTOR SHALL COORDINATE WITHTHE OWNER OF EACH UTILITY AND DEFINE THE REQUIREMENTS AND METHODSTO ACCOMMODATE THE PROTECTION, TEMPORARY SUPPORT, ADJUSTMENT, ORRELOCATION OF ANY UTILITIES AFFECTED BY THE PROPOSED NEW WORK.
9. CONTRACTOR SHALL COMPLY WITH THE GOVERNING AGENCY NPDES
CONSTRUCTION REQUIREMENTS, AND SHALL PROVIDE APPROPRIATE MITIGATIONMEASURES OR PROTECTION AND RESTORATION AT ALL LOCATIONS AS REQUIREDBY THEIR OPERATIONS, AND AS INDICATED BY ENGINEER. SPECIALCONSTRUCTION REQUIREMENTS, TEMPORARY PROTECTIVE FENCING ORBARRICADES, SHEETING, SHORING, EROSION PROTECTION, AND SURFACERESTORATION AT CERTAIN LOCATIONS ARE INDICATED ON THE DRAWINGSTO BRING CONTRACTOR'S ATTENTION TO SENSITIVE AREAS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY CORNER MARKERS. PROPERTY CORNER MARKERS DAMAGED BY
CONSTRUCTION ACTIVITIES SHALL BE REESTABLISHED BY A PROFESSIONALSURVEYOR LICENSED IN THE STATE OF OREGON.
11. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING TREES, SHRUBS,AND PLANTS UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL INSTALL ALL PIPELINES, PAVING, WALKWAYS, AND CURBAND GUTTER AT A UNIFORM GRADE BETWEEN ELEVATIONS DEPICTED ON THEDRAWINGS.
13. FOR ALL SITE GRADING, SMOOTH PARABOLIC TRANSITIONS SHALL BE MADEBETWEEN CHANGES IN SLOPE. PARABOLIC ROUNDING SHALL APPLY TO ALLCUT AND FILL SECTIONS.
14. FINISHED GRADE ELEVATION AT THE BUILDING FACE, WHERE NOT ADJACENTTO PAVEMENT, SHALL BE APPROXIMATELY 6 INCHES BELOW FINISHED FLOORELEVATION UNLESS OTHERWISE NOTED. FINISHED GRADE ELEVATIONADJACENT TO BASINS SHALL BE APPROXIMATE AS INDICATED BY CONTOURS, ORAS REQUIRED TO MEET STAIR LANDINGS.
15. ALL PIPE SUPPORTS, HANGERS, BRACKETS, INSERTS OR BRACES ARE NOT SHOWN. CONTRACTOR SHALL REFER TO THE SPECIFICATIONS
AND PROVIDE A COMPLETE SUPPORT SYSTEM AS REQUIRED.
16. THE EXISTING PROCESS FACILITIES SHALL REMAIN IN OPERATIONCONTINUOUSLY THROUGHOUT THE CONSTRUCTION ACTIVITIES. INDIVIDUALPROCESS FACILITIES CAN BE TAKEN OUT OF SERVICE FOR LIMITED PERIODSOF TIME TO FACILITATE CONSTRUCTION AS SPECIFIED IN THE CONTRACTDOCUMENTS.
17. STRUCTURES SUCH AS CURBS AND GUTTERS, CONCRETE AND ASPHALT DRIVESAND WALKWAYS, PAVING BRICKS, FENCING, RETAINING WALLS, ETC., CROSSEDBY THE PIPELINE ARE NOT ALL INDICATED IN PROFILE. CONTRACTOR SHALLRESTORE ANY EXISTING STRUCTURES THAT ARE DISTURBED, DAMAGED ORREMOVED BY CONSTRUCTION.
18. DIMENSIONING ALONG THE PIPELINE ALIGNMENT IS FOR LEVEL LINEMEASUREMENT AND FOR PAYMENT OF THE PIPELINES. CONTRACTOR SHALLPROVIDE THE ACTUAL PIPE LENGTH TO BE DETERMINED BY THE SLOPE ORCURVE ON WHICH THE PIPE IS INSTALLED.
19. UNLESS OTHERWISE SPECIFIED, INDICATED ON THE DRAWINGS, OR INDICATED BYTHE ENGINEER, INSTALL PIPELINES WITH A MINIMUM COVER OF 3'0". MINIMUM PIPECOVER SHALL BE FROM THE EXISTING, PROPOSED, OR FUTURE GROUND SURFACEOR ROAD PROFILE, WHICHEVER GROUND SURFACE OR ROAD PROFILE IS APPLICABLE AS INDICATED ON THE DRAWINGS. IF THE PROPOSED GROUND SURFACE IS ABOVE THE EXISTING GROUND SURFACE INDICATED ON THE DRAWINGS AND IS NOT THE ACTUAL GROUND SURFACE AT THE TIME OF PIPELINE
INSTALLATION, INSTALL THE PIPELINE TO PROVIDE MINIMUM PIPE COVER FROM THEACTUAL GROUND SURFACE IF ACCEPTABLE TO THE ENGINEER. HIGH POINTS IN THEPIPELINE WILL NOT BE PERMITTED EXCEPT AT LOCATIONS OF AIR VALVES AS INDICATED ON THE DRAWINGS. REVIEW THE PIPELINE PROFILE REQUIREMENTS WITHTHE ENGINEER PRIOR TO PREPARING LAYING SCHEDULES AND PERFORMING FIELDSTAKING.
20. CONTRACTOR SHALL FIELD VERIFY PRECISE LOCATION, ELEVATION, ANDARRANGEMENT OF CONNECTIONS OF NEW PIPELINES WITH EXISTING PIPELINESBASED ON FIELD CONDITIONS, INCLUDING EXPOSING EXISTING PIPING PRIOR TOFABRICATING NEW PIPING. CONTRACTOR SHALL PROVIDE FITTINGS, ADAPTERS,SOLID SLEEVE CLOSURES, AND HARNESSED MECHANICAL COUPLING; ROTATEFITTINGS; DEFLECT JOINTS; AND MODIFY EXISTING PIPING AS APPLICABLE ANDAS REQUIRED TO MAKE CONNECTIONS, INCLUDING ADJUSTMENTS FOR ANY OFFSETSIN CENTERLINE ELEVATIONS BETWEEN PIPELINES. CONTRACTOR SHALL COORDINATE MAKING EACH CONNECTION WITH THE OWNER.
NOTE :SYMBOLS ON THIS SHEET WHICH ARE TO BE SHOWN AS EXISTING SHALL BE DELINEATED AS SCREENEDTHOSE SYMBOLS WHICH ARE TO BE SHOWN AS NEW SHALL BE DELINEATED AS SOLID (HEAVY)
EQUIPMENT NUMBER
EQUIPMENT OR VALVEIDENTIFICATION CODE
UNDERGROUND PIPINGEXISTING PIPINGFUTURE PIPING
A AIR (COMPRESSED),
CRW CHEMICAL RESISTANT
CRVTEMPERED OR BLENDED WATERTW
CW CARRIER WATER
FECl FERROUS CHLORIDE
G GAS, NATURAL
HW HOT WATERHWC HOT WATER CIRCULATING
INSTRUMENT AIRIAIR
SD STORM DRAINSUMP PUMP DISCHARGEPD
SS SANITARY SEWER
VNT VENTVAC VACUUM1W WATER, POTABLE CITY WATER
NEW PIPING
SODIUM HYPOCHLORITENAOCLCHEMICAL RESISTANT ACID WASTE VENT OR TREATED WATER
DRN DRAIN
SPL SAMPLESPW SAMPLE WASTE
OF OVERFLOW
ACID WASTE
AERATION AIR
FE FINISHED EFFLUENTFA FOUL AIR
ML MIXED LIQUOR
PD PUMPED DRAINAGE
RAS RETURN ACTIVATED SLUDGERS RAW SEWAGE
RWR RECLAIMED WATERSE SECORDARY EFFLUENT
2W WATER, NONPOTABLE CITY WATER3W WATER, PLANT EFFLUENT
DAMPER, ANODEADD ADDITIONALADH ADHESIVEADJ ADJUSTABLE, ADJACENTADW AVERAGE DAY WEATHERADMIN ADMINISTRATIONAF AIR FLOWAFF ABOVE FINISH FLOORAH AHEADAHU AIR HANDLING UNITAL ACTIVE LEAFALT ALTERNATE, (IVE)ALUM ALUMINUM, ALUMINUM SULFATEAM AMMETERAMP AMPEREANOD ANODIZEDAP ACCESS PANELAPPR APPROACHAPPROX APPROXIMATE, (LY)AR ALARM RELAYARCH ARCHITECTURALAS AMMETER SWITCHASSY ASSEMBLYAUTO AUTOMATICAUX AUXILIARYAVS AUTOMATIC VALVE STATIONAWG AMERICAN WIRE GAGEAWW AVERAGE WET WEATHER
B BEAMB TO B BACK TO BACKBA BEARING AREABAL BALANCEBAT BATTERYBC BEGIN CURVEBD BOARDBEJ BRICK EXPANSION JOINTBF BLIND FLANGEBHP BRAKE HORSEPOWERBITUM BITUMINOUSBKR BREAKERBLDG BUILDINGBLK BLOCKBM BENCHMARKBOF BOTTOM OF FOOTINGBOT BOTTOMBP BACK PRESSUREBPMK NO BASEPLATE MARK NUMBERBRG BEARINGBRK BRICKBS BOTH SIDESB&S BELL AND SPIGOTBSMT BASEMENTBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNIT-HOURBU BELL-UPBUR BUILT UP ROOFINGBVC BEGIN VERTICAL CURVE
C COUNTERC TO C CENTER TO CENTERCB CATCH BASINCD CEILING DIFFUSERC/EJ CONTRACTION/EXPANSION JOINTCFM CUBIC FEET PER MINUTEC&G CURB AND GUTTERCHKD CHECKEREDCI CAST IRONCIMH CAST IRON MANHOLECIMHS CAST IRON MANHOLE STEPSCIP CAST IRON PIPECISP CAST IRON SOIL PIPECJT CONTROL JOINTCKT CIRCUITCL CLASS
CONTROLCONTR CONTRACTORCOR CORNERCORR CORRIDOR, CORRUGATEDCP CONTROL PANELCPLG COUPLINGCPT CONTROL POWER
TRANSFORMERCRS COURSES, (ING)CS CONTROL SWITCH, CONTROL
STATION, CUP SINKCSK COUNTERSUNK, (INK)CT CERAMIC TILE, CYCLE TIMERCT CURRENT TRANSFORMERCTR(S) CENTER(S)CU CUBICCU YD CUBIC YARDCW COLD WATERD DOORDBL DOUBLEDC DIRECT CURRENTDEG DEGREEDEPT DEPARTMENTDET DETAILDF DRINKING FOUNTAINDH DOOR HEIGHTDI DROP INLET, DUCTILE IRONDIA DIAMETERDIFF DIFFUSERDIM DIMENSIONDIP DUCTILE IRON PIPEDISCH DISCHARGEDISP DISPENSERDIST DISTRIBUTIONDIV DIVISIONDL DEAD LOADDM DAMPER MOTORDMJ DOUBLE MECHANICAL JOINTDN DOWNDO DOOR OPENING, DISSOLVED
OXYGENDPDT DOUBLE POLE DOUBLE THROWDR DRAINDS DOWNSPOUTDT DISTRIBUTION TRANSFORMERDV DRAIN VALVEDWG(S) DRAWING(S)DWL(S) DOWEL(S)
E EAST, ELECTRICALEA EACHEAT ENTERING AIR TEMPERATUREEC END CURVEECC ECCENTRICECC RED ECCENTRIC REDUCEREEW EMERGENCY EYEWASHEF EACH FACE, EXCESS FLOWEFF EFFLUENTEJ EXPANSION JOINTEL ELEVATIONELB ELBOWELEC ELECTRIC, (AL)ELEV ELEVATOREMER EMERGENCYENC ENCASEMENTENCL ENCLOSURE|ENT ENTRANCEEOL END OF LINEEQ EQUALEQUIP EQUIPMENTEW EACH WAYEW EMERGENCY EYEWASHEWEF EACH WAY EACH FACE
F FANF TO F FACE TO FACEFB FACE BRICKFC FLEXIBLE CONNECTION, FLOW
CONTROLFCA FLANGED COUPLING ADAPTERFD FLOOR DRAINFDN FOUNDATIONFDPR FIRE DAMPERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFEF FILTER EXCESS FLOWFH FLAT HEAD, FIRE HYDRANTFHMS FLAT HEAD MACHINE SCREWFIG FIGUREFIN FINISHFIN GR FINISH GRADEFL FLOOR, FLOW LINEFLEX FLEXIBLEFLG FLANGE, FLASHINGFM FORCE MAINFO FUEL OIL, FIBER OPTICFOB FLAT ON BOTTOMFOM FACE OF MASONRYFOS FACE OF STUDSFOT FLAT ON TOPFRP FIBERGLASS REINFORCED
COUPLINGHMD HOLLOW METAL DOORHMJ HARNESSED MECHANICAL JOINTHORIZ HORIZONTALHP HIGH POINT, HORSEPOWERHPA HIGH PRESSURE AIRHPNPW HIGH PRESSURE NONPOTABLE
WATERHR HOUR, HANDRAILHS HIGH STRENGTHHV HOSE VALVEHVAC HEATING,VENTILATING AND AIR
CONDITIONINGHW HOT WATERHWR HOT WATER RETURNHWS HOT WATER SUPPLYHWY HIGHWAYHYDRO HYDROPNEUMATICHYPO SODIUM HYPOCHLORITE
I INDICATOR
ID INSIDE DIAMETERIF INSIDE FACEI/I CURRENT TO CURRENT BOOSTERIN INCHESINC INCORPORATEDINCL INCLUDINGINCR INCREASEINST INSTRUMENT, (ATION)INSUL INSULATE, (ED), (ING)INT INTERIOR, INTERNALINV INVERTIRR IRRIGATIONIPS IRON PIPE SIZE
L LOUVERLAB LABORATORYLAM LAMINATE(D)LAT LEAVING AIR TEMPERATURELAT LATERALLAV LAVATORYLB(S) POUNDSLG LENGTH, LONGLH LEFT HANDLIN LINEAL, LINEARLL LIVE LOADLO LOUVER OPENINGLPA LOW PRESSURE AIRLS LEVEL SWITCHLT LEFT, LAB TABLE
MA MILLIAMPEREMACH MACHINEMAINT MAINTENANCEMAN MANUALMAS MASONRYMAX MAXIMUMMB MACHINE BOLTMC MECHANICAL COUPLINGMCC MOTOR CONTROL CENTERMDWW MAX DAY WET WEATHERMECH MECHANICALMED MEDIUMMET METALMEZ MEZZANINEMFM MAGNETIC FLOWMETERMFR(S) MANUFACTURER(S)MG MILLION GALLONSMGD MILLION GALLONS PER DAYMH MANHOLEMHWW MAX HOUR WET WEATHERMIN MINIMUM, MINUTEMISC MISCELLANEOUSMJ MECHANICAL JOINTMJRG MECHANICAL JOINT RETAINER
GLANDMJTR MECHANICAL JOINT WITH
TIE RODML MIXED LIQUORMLR MIXED LIQUOR RECYCLEMMDW MAX MONTH DRY WEATHERMMWW MAX MONTH WET WEATHERMO MASONRY OPENING, MOTOR
OPERATEDMP METERING PUMPMRD METAL ROOF DECKMS MACHINE SCREWMSL MEAN SEA LEVELMTD MOUNTEDMTL MATERIALMTR MOTOR
N NORTHN/A NOT APPLICABLENBC NAIL IN BOTTLE CAPNC NORMALLY CLOSED
NEUT NEUTRALNF NEAR FACEN.O. NORMALLY OPENNO.(S) NUMBER(S)NOM NOMINALNORM NORMALNPT NATIONAL PIPE THREADNPW NONPOTABLE WATERNS NEAR SIDENTS NOT TO SCALE
OC ON CENTER, ODOR CONTROLOD OUTSIDE DIAMETEROF OUTSIDE FACE, OVERFLOWOH OVERHEADOL OVERLOADOPER OPERATINGOPNG OPENINGOPP OPPOSITEOSL OUTSTANDING LEGOZ OUNCE
PC POINT OF CURVEPCC POINT OF COMPOUND
CURVATUREPCCP PRESTRESSED CONCRETE
CYLINDER PIPEPCP PIER CUTOFF POINTPD PLAN DIMENSION, PUMPED
DRAINAGEPE PRIMARY EFFLUENT, PLAIN ENDPEF PRIMARY EXCESS FLOWPG PRESSURE GAUGEPH PIPE HANGER, PENTHOUSEPI POINT OF INTERSECTIONPIVC POINT OF INTERSECTION ON
VERTICAL CURVEPL PLATEPLYWD PLYWOODPNL(S) PANEL(S)POLY POLYMERPOT POINT ON TANGENTPP POWER POLEPR PAIRPROJ PROJECTIONPRS PRESSURE REDUCING STATIONPRV POWER ROOF VENTILATORPS PIPE SUPPORTPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINT, POINT OF TANGENCYPVC POLYVINYL CHLORIDE, POINT ON
VERTICAL CURVEPVCP POLYVINYL CHLORIDE PIPEPVMT PAVEMENTPW POTABLE WATER
DISTRIBUTION STRUCTURESEF SECONDARY EXC ESS FLOWSER SK SERVICE SINKSG SLUICE GATE, SUPPLY GRILLESH SHEETSHR SHOWERSHD SHOWER DOORSIM SIMILARSKL SKYLIGHTSM SHEET METALSSC SECONDARY SCUMSP SUMP PUMPSPA SPACING, SPACESSPEC(S) SPECIFICATION(S)SPLY SUPPLYSQ SQUARESR SUPPLY REGISTERSS STAINLESS STEELSS STORM SEWER (DRAINS TO
PLANT)SSK SERVICE SINKSSR SIDE STREAM RASST SELF TAPPINGSTA STATIONSTD STANDARDSTL STEELSTOR STORAGESTR STRUCTURALSUP SUPPLYSUSP SUSPENDEDSV SHUTOFF VALVESW SWITCHSWBD SWITCHBOARDSWGR SWITCHGEARSWS SEAL WATER SOLENOIDSYM SYMMETRICALSYS SYSTEM
T THERMOSTAT, TREAD, TOTALIZERT TRANSFORMER, TELEPHONE, TOPTAN TANGENTTB TERMINAL BOXT&B TOP AND BOTTOMTBE THREAD BOTH ENDSTBM TEMPORARY BENCHMARKTC TOWEL CABINET, TOP OF CURBTC TERMINAL CABINETTEL TELESCOPINGTEMP TEMPERATURE, TEMPORARYTERM TERMINALT&G TONGUE & GROOVETH TEST HOLETHK THICK, THICKNESSTHR THRESHOLDTI TOTALIZING INDICATOR,
TEMPERATURE INDICATORTIR TOTALIZING INDICATING
RECORDERTOF TOP OF FOOTINGTOM TOP OF MASONRYTOS TOP OF STEELTP TWISTED PAIR COUPLE,
TOWEL PINTRANS TRANSFORMER, TRANSMITTER,
TRANSFER
TS TEMPERATURE SWITCHTV TELEVISIONTYP TYPICAL
UDM ULTRASONIC DENSITY METERUGND UNDERGROUNDUH UNIT HEATERUNO UNLESS NOTED OTHERWISEUR URINALUSGS UNITED STATES GEOLOGICAL
1. AERIAL IMAGE BACKGROUND TAKEN FROM GOOGLEEARTH, DATED 8/13/2020.
2. CONTRACTOR TO RESTORE AREA USED FOR STAGINGOR MATERIAL STORAGE TO EXISTING CONDITION.
3. CONTRACTOR SHALL MAINTAIN ACCESS TO THISPORTION OF ROAD AS MUCH AS POSSIBLE, USING ITONLY TO COMPLETE WORK AS NECESSARY. STORINGMATERIALS OR EQUIPMENT IN THIS AREA SHALL NOTBE PERMITTED.
4. AS REQUIRED FOR CONSTRUCTION, CONTRACTOR MAYREMOVE TREES WITHIN THIS AREA AT NO ADDITIONALCOST TO OWNER. CONTRACTOR SHALL PROTECT INPLACE ALL TREES THAT ARE NOT REMOVED.CONTRACTOR SHALL PROTECT IN PLACE ALL TREESOUTSIDE OF TREE REMOVAL AREA.
5. CONTRACTOR MAY USE SW 85TH FOR PERSONALVEHICLE PARKING. STORAGE OF OTHER EQUIPMENTOR MATERIALS IS NOT PERMITTED ON SW 85TH.
FD19
5757
TLK
JMS
JDB
SDG
CLEAN WATER SERVICESDURHAM AWWTF
IPS BIOFILTER RETROFIT
CIVILOVERALL SITE PLAN,STAGING, ACCESS,
AND TREE REMOVALC101
MARCH 2021
7094
MAR 2021
C101
C101.dwg
AS SHOWN
50.7
040
- Dra
win
gsKE
L089
30, 3
/25/
2021
10:
29:1
5 AM
DU
N57
072,
3/9
/202
1 3:
41:0
10'20'30' 0 30' 60'
APPROXIMATE SCALE IN FEET
CONTRACTOR SITE ACCESS
CONTRACTOR ALLOWABLE STAGINGAREA AND MATERIAL STORAGE
LEGEND:
UNPERMITTED AREANO CONTRACTOR ACCESS
5 22Digitally Signed
XX
X
XX
X
STST
ST
SASA
SASA
SA
STST
ST
158
157
CE
CE CE
CE
G G
CE
CE
CE
CE
CE
G
CECE
CECE
CECE
CECE
CECE
CECE
CECE
CECE
CE
CE
G
G
G
G
G
PT# 6002BM-CN 639840E 7620100EL 155.87
PT# 59F-MM-IRN 639795.74E 7620510.96EL 140.47
DEMO EXISTINGDRAIN LINE,SEE NOTE 5
DEMO EXISTINGBIOFILTER,SEE NOTE 5
DEMO EXISTINGDUCT WORK,SEE NOTE 4
PROTECT EXISTINGELECTRICAL DUCT
PROTECT TEMPORARY ODORCONTROL, SEE NOTE 1
PROTECT EXISTINGIRRIGATION SYSTEMCONTROL PANEL
PROTECT EXISTINGSANITARY MANHOLE,SEE NOTE 3
PROTECT INPLACE
x142.00
x
x
x
x
x
141.00
142.00
142.00
142.00
141.75REMOVE ANDSALVAGE EXISTINGPERMEABLE PAVERBLOCKS, SEE NOTE 8
PROTECT EXISTINGELECTRICAL DUCT, SEE NOTE 1
PROTECT EXISTING PULLBOX CONTROL PANELS
PROTECT EXISTINGIRRIGATION CONTROLVALVES, SEE NOTE 2
DEMO DOWNSTREAMSECTION OF EXISTING30" FA LINE, SEE NOTE 6
DEMO EXISTINGPRESSURE TAP VALVEBOX (TYP OF 2)
DEMOLISH EXISTINGDRAIN LINE TO MANHOLE,SEE NOTE 7
PROTECT IN PLACE TEMPORARYELECTRICAL RISER AND POWER CABLINGFOR TEMPORARY ODOR CONTROL
1. PROTECT IN PLACE TEMPORARY ODOR CONTROL ANDCONDUIT NORTHWEST OF ODOR CONTROL BIOFILTER.CONTRACTOR TO LOCATE CONDUIT IN FIELD.TEMPORARY ODOR CONTROL SYSTEM SHALL REMAINOPERATIONAL UNTIL COMMISSIONING OF NEWBIOFILTER ODOR CONTROL SYSTEM IS COMPLETE.
2. PROTECT IN PLACE IRRIGATION CONTROL VALVES.PROTECT TIE IN DOWNSTREAM OF IRRIGATIONCONTROL VALVES. NEW IRRIGATION LINE SHALL TIEINTO SOUTHERN EXISTING IRRIGATION CONTROLVALVE. PROTECT NORTHERN EXISTING IRRIGATIONCONTROL VALVE FOR FUTURE CONNECTION.
3. PROTECT IN PLACE EXISTING SANITARY MANHOLE.NEW DRAIN LINE WILL TIE INTO EXISTING MANHOLE.
4. DEMOLISH ALL EXISTING ODOR CONTROL DUCT WORK ,EQUIPMENT, PIPES, AND PANELS UNLESS DRAWINGSTATES OTHERWISE.
5. DEMOLISH EXISTING BIOFILTER AND EXCAVATE TOSUBGRADE INCLUDING ALL EXISTING BIOFILTER MEDIA,GRAVEL MATERIAL, DRAIN PIPES, AND OTHERASSOCIATED OBSTRUCTIONS. CONTRACTOR TOBACKFILL EXCAVATED AREA NOT USED FOR NEWBIOFILTER TO GRADE, SEE C103.
6. DEMOLISH EXISTING 30" FA LINE TO TIE IN POINT(REFER TO C103). DEMOLITION OF EXISTING FA SHALLBE SEQUENCED TO MAINTAIN OPERATION OF EXISTINGTEMPORARY ODOR CONTROL UNIT. REFER TO 01140FOR WORK RESTRICTIONS.
7. DEMOLISH EXISTING DRAIN LINE TO EXISTINGMANHOLE BELOW GRADE. CONTRACTOR SHALL FILLWITH GROUT AND VERIFY LOCATION IN FIELD.
8. REMOVE PERMEABLE PAVER SURROUNDING EXISTINGBIOFILTER AND SAFELY STORE ON PALLETS TO BEREUSED FOR NEW BIOFILTER.
FD19
5757
TLK
JMS
JDB
SDG
CLEAN WATER SERVICESDURHAM AWWTF
IPS BIOFILTER RETROFIT
CIVILEXISTING ODOR CONTROL
DEMOLITION PLAN C102MARCH 2021
7094
MARCH 2018
C102
C102.dwg
AS SHOWN
50.7
040
- Dra
win
gsKE
L089
30, 3
/25/
2021
1:3
6:23
PM
DU
N57
072,
3/9
/202
1 5:
23:3
40'20' 10' 20'0
1"=20'
6 22Digitally Signed
ST
N 639755.87E 7620284.91
N 639772.35E 7620306.29
147
146
148
148NEW 4" DRAIN LINE(NOTE 8)
NEW BIOFILTER TANKTOC EL 151.00
EXISTING ELECTRICAL DUCT
EXISTING IRRIGATIONSYSTEM CONTROL PANEL
EXISTING IRRIGATIONCONTROL VALVES
NEW 30" FA
EXISTING 30" FA
TEMPORARY ODOR CONTROL
CONNECT NEW 30" FATO EXISTING 30" FA,SEE NOTE 2
EXISTING PULL BOXCONTROL PANELS
FILL EXCAVATED AREA,SEE NOTE 3
EXISTING ELECTRICAL DUCT
YARD CLEANOUT, SEEDETAIL B ON C501
FOR DRAIN LINE CONTINUATIONDETAILS, SEE MO101
SEE NOTE 6
3' WIDE PERMEABLEPAVERS, SEE NOTE 4
149' GRADEELEVATIONAROUNDBIOFILTER
INSTALL TEE DRAIN INSIDE EXISTINGMANHOLE, SEE DETAIL A ON C501
N 639805.16E 7620286.48INV EL 149.5±(VERIFY IN FIELD)
2. FUSION WELD NEW 30" FA LINE TO EXISTING 30" FALINE. CONTRACTOR SHALL VERIFY EXISTING FALOCATION IN FIELD PRIOR TO ORDERING MATERIALS.
3. FILL EXCAVATED AREA NOT USED FOR NEW BIOFILTER.SLOPES STEEPER THAN 4:1 SHALL RECEIVE EROSIONCONTROL BLANKETS. REFER TO SPECIFICATION 02370SOIL STABILIZATION FOR GRADE TREATMENT.
4. REUSE STORED PERMEABLE PAVER TO SURROUNDNEW BIOFILTER ODOR CONTROL AT A FINISHED GRADEOF 149.0. INSTALL PAVERS ON 6" AGGREGATE BASEAND 1" SAND LEVELING COURSE. PAVER PATTERNSHALL MATCH EXISTING.
5. SEE DETAIL A ON C501 FOR TEE DRAIN DETAIL. SEEDETAIL B ON C501 FOR YARD CLEANOUT DETAIL.
6. CONNECT NEW IRRIGATION LINE TO EXISTINGIRRIGATION LINE DOWNSTREAM OF EXISTINGIRRIGATION CONTROL VALVE.
7. 30" FA SHALL HAVE MIN 3 FEET OF COVER AND SLOPECONTINUOUSLY TOWARD BIOFILTER WITHOUT LOWPOINTS.
8. 4" DRAIN LINE SHALL HAVE CONSTANT SLOPE FROMBIOFILTER TO MANHOLE. REFER TO MECHANICALDRAWINGS AND DETAIL A ON C501 FOR CONNECTIONPOINT ELEVATIONS.
TAX LOTS 25113B000600 LOCATED IN THENORTHEAST 1/4 OF SECTION 13, TOWNSHIP 2 SOUTH,RANGE 1 WEST, WILLAMETTE MERIDIAN, WASHINGTONCOUNTY, OREGON
BLACK & VEATCH5885 MEADOWS RD. SUITE 700LAKE OSWEGO, OR 97035TELEPHONE: 503/443-4400
EXISTING SITE CONDITIONS
CLEAN WATER SERVICES, DURHAM ADVANCED WASTEWATERTREATMENT PLANT WITH TEMPORARY ODOR CONTROL
DEVELOPED CONDITIONS
DURHAM ADVANCED WASTEWATER TREATMENT PLANT WITHPERMANENT ODOR CONTROL
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATEDTIME TABLE
* CLEARING (DATES, FROM & TO: JUNE 2021 - JULY 2021)* EXCAVATION (DATES, FROM & TO: JUNE 2021 - JULY 2021)* STRUCTURES (DATES, FROM & TO: JULY 2021 - AUG 2021)* UTILITIES AND SITE WORK (DATES, FROM & TO: AUG 2021 - SEPT 2021)* FINAL GRADING (DATES, FROM & TO: SEPT 2021)
TOTAL SITE AREA = 23,234 SF = 0.53 ACRES
TOTAL DISTURBED AREA = 23,234 SF = 0.53 ACRES
SITE SOIL CLASSIFICATION:
HILLSBORO LOAM3 TO 12 PERCENT SLOPES
RECEIVING WATER BODIES:
NEAREST WATER BODY: TUALATIN RIVER
THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE 1200C PERMIT.THIS ESCP AND GENERAL CONDITIONS HAVE BEEN DEVELOPED TO FACILITATECOMPLIANCE WITH THE 1200C PERMIT REQUIREMENTS. IN CASES OF DISCREPANCIESOR OMISSIONS, THE 1200C PERMIT REQUIREMENTS SUPERCEDE REQUIREMENTS OFTHIS PLAN.
2. PRIOR TO THE SITE BECOMING INACTIVE OR IN ANTICIPATIONOF SITE INACCESSIBILITY
ONCE TO ENSURE THAT EROSION ANDSEDIMENT CONTROL MEASURES ARE INWORKING ORDER.ANY NECESSARYMAINTENANCE AND REPAIR MUST BEMADE PRIOR TO LEAVING THE SITE.
3. INACTIVE PERIODS GREATERTHAN FOURTEEN (14) CONSECUTIVECALENDAR DAYS.
ONCE EVERY MONTH.
4. PERIODS DURING WHICH THESITE IS INACCESSIBLE DUE TOINCLEMENT WEATHER.
IF PRACTICAL, INSPECTIONS MUST OCCURDAILY AT A RELEVANT AND ACCESSIBLEDISCHARGE POINT OR DOWNSTREAM LOCATION.
DAILY WHEN STORMWATER RUNOFF, INCLUDINGRUNOFF FROM SNOW MELT, IS OCCURRING.
AT LEAST ONCE EVERY FOURTEEN (14)CALENDAR DAYS REGARDLESS OF WHETHERSTORMWATER RUNOFF IS OCCURRING.
5. PERIODS DURING WHICHDISCHARGE IS UNLIKELY DUETO FROZEN CONDITIONS.
MONTHLY. RESUME MONITORING IMMEDIATELYUPON MELT, OR WHEN WEATHER CONDITIONSMAKE DISCHARGES LIKELY.
1. HOLD A PRE-CONSTRUCTION MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES THE INSPECTOR TODISCUSS EROSION AND SEDIMENT CONTROL MEASURES AND CONSTRUCTION LIMITS. (SCHEDULE A.8.C.I.(3))
2. ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS. (SCHEDULE A.12.B ANDSCHEDULE B.1)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200-C PERMIT REQUIREMENTS. (SCHEDULE B.1.C ANDB.2)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, ORTHE LOCAL MUNICIPALITY. DURING INACTIVE PERIODS OF GREATER THAN SEVEN (7) CONSECUTIVE CALENDAR DAYS,THE ABOVE RECORDS MUST BE RETAINED BY THE PERMIT REGISTRANT BUT DO NOT NEED TO BE AT THECONSTRUCTION SITE. (SCHEDULE B.2.C)
5. ALL PERMIT REGISTRANTS MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURESOR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SCHEDULE A 8.A)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SCHEDULE A.12.C.I)7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER
SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS. (SCHEDULE A.12.C.IV.AND V)
8. PHASE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE AREAS FROMBECOMING A SOURCE OF EROSION. (SCHEDULE A.7.A.III)
9. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN AREAS ANDVEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BEPRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), ANDOTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SCHEDULE A.8.C.I.(1) AND (2))
10. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREASWHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF VEGETATIVE SEED MIXUSED. (SCHEDULE A.7.A.V)
11. MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE STATE.(SCHEDULE A.7.B.I.AND (2(A)(B))
12. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL SEDIMENTBASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SCHEDULE A.8.C.I.(5))
13. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT OUTLETS ANDDOWNSTREAM CHANNELS AND STREAMBANKS. (SCHEDULE A.7.C)
14. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAININLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE BOUNDARY. (SCHEDULE A.7.D.I)
15. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING CONCRETEWORK. (SCHEDULE A.8.C.I.(6))
16. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS ASGRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATIONS MEASURES ARE NOT REQUIRED FOR AREASTHAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR UTILITY POLE PADS.(SCHEDULEA.8.C.II.(3))
17. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SCHEDULEA.8.C.I.(7))
18. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS: CONSTRUCTIONENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, ORUSE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING ACTIVITIES. (SCHEDULE A 7.D.IIAND A.8.C.I(4))
19. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS ON SITE.(SCHEDULE A.7.D.II.(5))
20. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT,WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SCHEDULE A.6)
21. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE ANDEQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTEHANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES ANDMACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURINGCOMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS. (SCHEDULE A.7.E.I.(2))
22. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES,EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES,REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS,TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. (SCHEDULE A. 7.E.III.)
23. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID WIND-BLOWN SOIL.(SCHEDULE A 7.A.IV)
24. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'SRECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USINGTIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SCHEDULE A.9.B.III)
25. IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FORSEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN(INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGEDISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM.OBTAIN PLAN APPROVAL BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE TREATMENTSYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SCHEDULE A.9.D)
26. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED. THEREGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL TIMES OF THEYEAR. (SCHEDULE A 7.B)
27. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BESTABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE WATERSOR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SCHEDULE A 7.E.II.(2))
28. CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND BARE GROUND ACTIVITIES DURING WETWEATHER. (SCHEDULE A.7.A.I)
29. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND FENCEHEIGHT AND BEFORE FENCE REMOVAL. (SCHEDULE A.9.C.I)
30. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES DEPTHABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SCHEDULE A.9.C.I)
31. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS ANDSEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENTAND AT COMPLETION OF PROJECT. (SCHEDULE A.9.C.III& IV)
32. WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED.INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THEDISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN-UP OF SEDIMENT SHALL BE PERFORMEDACCORDING TO THE OREGON DIVISION OF STATE LANDS REQUIRED TIMEFRAME. (SCHEDULE A.9.B.I)
33. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR. VACUUMINGOR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEANUP RELEASED SEDIMENTS. (SCHEDULE A.9.B.II)
34. THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION OR A HEAVY MULCH LAYER, TEMPORARYSEEDING, OR OTHER METHOD SHOULD ALL CONSTRUCTION ACTIVITIES CEASE FOR 30 DAYS OR MORE. (SCHEDULEA.7.F.I)
35. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASEFOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATECOVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE. (SCHEDULE A.7.F.II)
36. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OFEXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARYEROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS DOING SOCONFLICTS WITH LOCAL REQUIREMENTS. (SCHEDULE A.8.C.III(1) AND D.3.C.II AND III)
1. A MINIMUM 28 DAY COMPRESSIVE STRENGTH (f'c) OF 4,500 PSI WAS UTILIZED IN THE DESIGN OF STRUCTURAL REINFORCED CONCRETE. SEE SPECIFICATIONS FOR CONSTRUCTION STRENGTH REQUIREMENTS.
2. THE LOCATION OF ALL CONSTRUCTION JOINTS AND OTHER TYPES OF JOINTS, OTHER THAN THOSE SPECIFIED OR SHOWN ON THE PLANS, SHALL BE ACCEPTABLE TO THE ENGINEER PRIOR TO PLACING CONCRETE.
1. ALL REINFORCING BAR SHALL BE GRADE 60, DEFORMED, ASTM A615, UNLESS NOTED OTHERWISE.
2. DIMENSIONS TO REINFORCING BARS ARE TO BAR CENTERLINES, UNLESS NOTED OTHERWISE. BAR COVER IS THE CLEAR DISTANCE BETWEEN THE BAR AND THE CONCRETE SURFACE.
3. NO WELDING OF REINFORCING BARS SHALL BE PERMITTED UNLESS APPROVAL IS OBTAINED FROM THE ENGINEER PRIOR TO CONSTRUCTION.
4. FOR CONCRETE SLABS THAT HAVE A SLOPING TOP FACE, THE TOP LAYERS OF REINFORCEMENTSHALL BE PLACED ON A SIMILAR SLOPE SO THAT SPECIFIED COVER IS MAINTAINED.
1. STAINLESS STEEL BOLTS SHALL CONFORM TO ASTM F593, ALLOY GROUP 1 OR 2,UNLESS NOTED OTHERWISE. MAXIMUM YIELD STRENGTH SHALL BE 45 KSI.
2. STAINLESS STEEL PLATES SHALL CONFORM TO ASTM A240, TYPE 316L.
3. STAINLESS STEEL STRUCTURAL SHAPES SHALL CONFORM TO ASTM A1069 ORASTM A276, TYPE 316L.
1. UNLESS NOTED OTHERWISE, ALUMINUM ALLOY IN ALL ALUMINUM STRUCTURAL MATERIALS SHALL BE 6061-T6. PIPE AND TUBING FOR GUARDRAIL AND HANDRAIL SHALL BE ALLOY 6061-T6.
2. ALL ALUMINUM SURFACES IN CONTACT WITH CONCRETE OR DISSIMILAR METALS SHALL BE COATED OR COVERED WITH A HEAVY COAT OF EPOXY ENAMEL TO PREVENT ALUMINUM- CONCRETE REACTION OR ELECTROLYTIC ACTION.
1. ROLLED WIDE FLANGE SHAPES SHALL HAVE A MINIMUM YIELD STRENGTH OF 5O KSI; CHANNELS, PLATES, AND ANGLES A MINIMUM OF 36 KSI; STRUCTURAL PIPES A MINIMUM OF 35 KSI; ROUND STRUCTURAL TUBES A MINIMUM OF 46 KSI, AND RECTANGULAR STRUCTURAL TUBES A MINIMUM OF 50 KSI.
2. WELDING SHALL BE DONE WITH A FILLER MATERIAL HAVING A MINIMUM TENSILE STRENGTH OF 70 KSI.
3. BOLTED CONNECTIONS SHALL USE 3/4" DIA ASTM A325 BOLTS WITH THE THREADS EXCLUDED FROM THE SHEAR PLANE, UNLESS NOTED OTHERWISE.
4. ALL ANCHOR RODS AND BOLTS SHALL BE STAINLESS STEEL CONFORMING TO ASTM F593.
5. HOLES FOR ANCHOR RODS AND ANCHOR BOLTS IN COLUMN BASE PLATES SHALL BE AS FOLLOWS:
BOLT/ROD 3/4" TO 1" - 5/16" OVERSIZE BOLT/ROD 1" TO 2" - 1/2" OVERSIZE BOLTS/RODS OVER 2" - 1" OVERSIZE
AT THE CONTRACTOR'S OPTION, OVERSIZE HOLES LARGER THAN THOSE LISTED ABOVE MAY BE USED, PROVIDED THAT 3/8" PLATE WASHERS ARE ALSO USED AND FIELD WELDED WITH A 5/16" FILLET TO THE BASE PLATE ALONG A MIN OF 3 SIDES.
1. FOUNDATION CONSTRUCTION SHALL NOT BEGIN UNTIL ANY REQUIRED SPECIAL INSPECTION HAS BEEN COMPLETED AND THE CONTRACTOR NOTIFIED TO PROCEED.
2. TO FACILITATE SCHEDULING, AT LEAST 48 HOURS ADVANCE NOTICE SHALL BE GIVEN TO THE ENGINEER PRIOR TO THE REQUIRED INSPECTIONS.
3. UNLESS NOTED OTHERWISE, BACKFILL SHALL NOT BE PLACED AGAINST WALLS WHICH SUPPORT A CONCRETE SLAB OR WALKWAY UNTIL THE TOP SLAB OR WALKWAY HAS BEEN PLACED IN ITS ENTIRETY AND ALL CONCRETE HAS REACHED THE SPECIFIED DESIGN STRENGTH.
4. OVER-EXCAVATION OF SOIL, OR OVER-BREAKING OF ROCK, THAT WOULD RESULT IN A STRUCTURAL CONCRETETHICKNESS GREATER THAN INDICATED ON THE DRAWINGS SHALL BE CLASSIFIED AS UNAUTHORIZED EXCAVATION.CONTRACTOR SHALL SELECT ONE OF TWO METHODS TO ADDRESS UNAUTHORIZED EXCAVATION.
* REPLACE UNAUTHORIZED EXCAVATION MATERIAL WITH LEAN CONCRETE THAT IS PLACED SEPARATELY FROMTHE STRUCTURAL CONCRETE INDICATED ON THE DRAWINGS. CONTRACTOR WILL RECEIVE NO ADDITIONALPAYMENT FOR THE LEAN CONCRETE.
* REPLACE UNAUTHORIZED EXCAVATION MATERIAL WITH STRUCTURAL CONCRETE THAT IS PLACEDMONOLITHICALLY WITH THE STRUCTURAL CONCRETE INDICATED ON THE DRAWINGS, CREATING AN ENLARGEDSECTION. CONTRACTOR SHALL NOTIFY ENGINEER FOR DIRECTION PRIOR TO PERFORMING THIS WORK. THEINCREASED CONCRETE THICKNESS MAY REQUIRE ADDITIONAL REINFORCEMENT AND/OR OTHER DESIGNMODIFICATIONS. IF THE INCREASED CONCRETE THICKNESS EXCEEDS 36 INCHES, ENGINEER MAY REQUIRECONTRACTOR TO IMPLEMENT MASS CONCRETE HEAT MITIGATION PROCEDURES. CONTRACTOR WILL RECEIVENO ADDITIONAL PAYMENT FOR EXTRA STRUCTURAL CONCRETE, ADDITIONAL REINFORCEMENT, OTHER DESIGNMODIFICATIONS, OR MASS CONCRETING PROCEDURES.
5. THE FOLLOWING NET ALLOWABLE BEARING PRESSURES WERE UTILIZED IN THE DESIGN OF THE FOUNDATIONS.
SPREAD FOOTINGS ........................ 2000 PSF
1. THE APPLICABLE BUILDING CODE IS THE 2019 OREGON STRUCTURAL SPECIALITY CODE (OSSC)BASED ON 2012 INTERNATIONAL BUILDING CODE (IBC).
2. THE REQUIREMENTS INDICATED ON THIS SHEET ARE INTENDED AS A BASIC SUMMARY OF THE MATERIALAND CONSTRUCTION REQUIREMENTS FOR THE PROJECT. ADDITIONAL, MORE STRINGENT REQUIREMENTSARE GIVEN IN THE PROJECT DETAIL DRAWINGS AND SPECIFICATIONS.
3. ALL STRUCTURAL RELATED SHOP DRAWINGS SHALL BE REVIEWED BY THE ENGINEER PRIOR TO CONSTRUCTION.
POST-INSTALLED ANCHORS
1. DEAD LOAD .............................................................................................................. CALCULATED
2. LIVE LOADS: COVER SLAB........................................................................................................... HS 20 WHEEL LOAD
4. LATERAL SURCHARGE.......................................................................................... EQUIVALENT TO 2 FEET OF SOIL WHERE ADJACENT TO A ROADWAY
5. COMPACTIVE SURCHARGE LOAD........................................................................ 400 PSF AT FINISH GRADE ELEVATION
DECREASING LINEARLY AT SAME RATE AS BACKFILL LOAD INCREASES. FOR WALLS 8 FEET OR LESS IN HEIGHT, USE CRITERIA 4 ABOVE AS COMPACTIVE SURCHARGE.
7. WIND LOAD: ULTIMATE DESIGN WIND SPEED.......................................................................... 130 MPH NOMINAL DESIGN WIND SPEED........................................................................... 101 MPH EXPOSURE.............................................................................................................. C RISK CATEGORY..................................................................................................... IV
8. SEISMIC LOAD: MAPPED MCE SHORT PERIOD SPECTRAL RESPONSE ACCELERATION (Ss)...........................................................................0.961g MAPPED MCE ONE SECOND PERIOD SPECTRAL RESPONSE ACCELERATION (S1).......................................................................... 0.419g DESIGN SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS (Sds)..................................................................................... 0.715g DESIGN SPECTRAL RESPONSE ACCELERATION AT ONE SECOND PERIOD (Sd1)............................................................................ 0.441g SITE CLASS..............................................................................................................D
1. POST-INSTALLED ANCHORS SHALL INCLUDE ADHESIVE ANCHORS (THREADED RODS, BOLTS OR REINFORCING BARS), EXPANSION ANCHORS, AND UNDERCUT ANCHORS INSTALLED INTO HARDENED CONCRETE OR MASONRY. SEE THE ANCHORAGE IN CONCRETE AND MASONRY SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS.
2. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE INDICATED ON THE DRAWINGS. CONTRACTOR SHALL OBTAIN APPROVAL FROM ENGINEER PRIOR TO USING POST-INSTALLED ANCHORS FOR MISSING OR MISPLACED CAST-IN-PLACE ANCHORS.
3. CARE SHALL BE TAKEN TO AVOID CONFLICTS WITH EXISTING REINFORCING STEEL AND OTHER EMBEDDED ITEMS WHEN DRILLING HOLES. REINFORCING BARS SHALL NOT BE DAMAGED DURING DRILLING OR ANCHOR INSTALLATION. HOLES SHALL BE DRILLED AND CLEANED PER THE PRODUCT MANUFACTURER'S INSTRUCTIONS. ANCHORS SHALL BE INSTALLED PER THE PRODUCT MANUFACTURER'S INSTRUCTIONS AT NOT LESS THAN MINIMUM EDGE DISTANCES AND/OR SPACINGS INDICATED IN THE MANUFACTURER'S LITERATURE.
4. SUBSTITUTION REQUESTS FOR PRODUCTS OTHER THAN THOSE LISTED IN THE SPECIFICATION OR INDICATED ON THE DRAWINGS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL. PRODUCT ICC-ESR EVALUATION REPORTS SHALL BE INCLUDED WITH THE SUBMITTAL PACKAGE. IF REQUESTED, CALCULATIONS PREPARED BY A REGISTERED PROFESSIONAL ENGINEER USING METHODS AND PROCEDURES REQUIRED BY THE BUILDING CODE MAY BE REQUIRED AS PART OF THE SUBMITTAL PACKAGE.
5. UNLESS NOTED OTHERWISE, THE MINIMUM EMBEDMENT PROVIDED FOR ADHESIVE ANCHORED REINFORCING BARS SHALL DEVELOP THE FULL TENSILE STRENGTH OF THE BAR.
6. SPECIAL INSPECTION WILL BE PROVIDED FOR ALL POST-INSTALLED ANCHORS.
NO SCALE0 06/2018 JDM SDG ADDENDA #1-4 INCORPORATED
17 22
12/31/2022
19461PE
OREGON
EXPIRES:
M
A
R
K
A
L
BE
R
T
L
O
W
E
S
E
P
T
,
16
,
1
9
9
7
E
N
G
IN
E
E
R
R
E
G
I
S
T
E
R
E
D PR
O
F
E
S
S
I
O
N
A
L
S
T
R
U
C T
U
R
A
L
Digitally Signed
TYPICAL EXTRA REINFORCING AT OPENINGS 12" TO <= 54"TYPICAL HORIZONTAL CORNER REINFORCING DETAILS
CONCRETE COVER FOR REINFORCEMENT
BEAMS & COLUMNS WALLS & SLABS
SPACERS FORWALL REINFORCEMENT
NOTES
LENGTH OF LAPPED SPLICESFOR REINFORCEMENT (INCHES)
MAIN REINFORCEMENT FOR ALL STRUCTURES
**TOP BARS OTHERS **TOP BARS OTHERS
LOCATION SPECIFIED COVER
BARSIZE
*
BARSIZE
*
NOTE A(ALT)
NOTE C
WALL 1
NOTE A
NOTE D
WALL 2
WALL 2NOTE A NOTE A
WALL 3
WALL 1
NOTE A
NOTE D
NOTE C
UNLESS NOTED OTHERWISE ON THE DRAWINGS
42557
12211
89
10
6984
10394
536579
3 16456
19
3324
1616
2618
3748
108
607491
83
465770
1619
2924
1616
2218
7
11
89
10
34
65
#5 BAR x 4'-0" LONG EACHCORNER IN CENTER FORCONCRETE THICKNESS 12"OR LESS, EACH FACE FORCONCRETE THICKNESS > 12"
* LAP SPLICE LENGTH FOR BARS OF DIFFERENT SIZES SHALL BE THE GREATER OF THE SMALL BAR LAP LENGTH OR 0.75x THE LARGER BAR LAP LENGTH.
** TOP BARS ARE HORIZONTAL BARS SO PLACED THAT MORE THAN 12" OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR. HORIZONTAL BARS IN WALLS ARE TO BE PROVIDED WITH LAP LENGTHS AS REQUIRED FOR TOP BARS. VERTICAL BARS MAY BE CONSIDERED AS OTHER BARS.
UNFORMED SURFACES ADJACENT TO EXCAVATION....................3"
SURFACES INSIDE OF OZONE CONTACTORS EXPOSEDTO OZONE IN WATER OR AIR.............................................................3"
FORMED SURFACES THAT ARE SUBMERGED, AND FORMEDOR TOP SURFACES EXPOSED TO WEATHER, SATURATEDAIR, OR EARTH.....................................................................................2"
OTHER LOCATIONS:
BEAMS AND GIRDERS......................................................................1 1/2"
SLABS, WALLS AND JOISTS#6 AND LARGER.............................................................................1 1/2"#5 AND LARGER.............................................................................1"
NOTES:
1. COVER IS MEASURED TO NEAREST BAR, STIRRUP, TIE, OR SPIRAL, AS APPLICABLE.
2. TOLERANCES FOR CONCRETE COVER AND THE FABRICATION AND PLACING OF REINFORCEMENT SHALL CONFORM TO ACI 117.
EXTRA BARS EQUAL IN TOTAL AREA TO REGULARREINFORCING CUT BY OPENING. PLACE ONE HALF TOTALAREA TO EACH SIDE OF OPENING AND IN THE SAMETRANSVERSE POSITION AS REGULAR REINFORCING
ONE EXTRA BAR EACH CORNER PER LAYER OFREGULAR REINFORCING (SEE TABLE BELOW).PLACE IN SAME TRANSVERSE POSITION ASREGULAR REINFORCING
THICKNESSOF CONCRETE
DIAGONALBAR SIZE
RECTANGULAROPENING
CIRCULAROPENING
DIAGONAL BAR LENGTH
B = THE REQUIRED LENGTH FOR LAPPEDSPLICE FOR TOP BARS AS SHOWN ON THIS SHEET
< 12"12" TO 18"
> 18"
456
3'-0"3'-0"3'-0"
D+12"D+12"D+12"
A = VERTICAL CONSTRUCTION JOINT NEAREST TO WALL CORNER.
A (ALT) = ALTERNATE VERTICAL CONSTRUCTION JOINT NEAREST TOWALL CORNER IN T WALL JOINT WHICH DOES NOT REQUIRE WATERSTOP.
A = DISTANCE FROM INSIDE CORNER FACE TO NEAREST VERTICALCONSTRUCTION JOINT IN SIMILARLY NUMBERED WALL. A SHALL NOT BELESS THAN DIMENSIONS INDICATED BY THESE DETAILS; NOR GREATER THANINDICATED ON PLAN DRAWINGS; BUT IN ANY CASE SHALL NOT EXCEED 30FEET IN LIQUID CONTAINMENT STRUCTURES OR 40 FEET IN OTHERSTRUCTURES. IN T WALL JOINTS WHICH DO NOT REQUIRE WATERSTOP, A1 MAYBE ZERO.
x
x
NOTES:
1. VERTICAL REINFORCING NOT SHOWN.
2. THESE DETAILS SHALL BE APPLICABLE TO ALL WALL CORNERS UNLESSNOTED OTHERWISE ON THE DRAWINGS.
Z-BAR SPACERS AT 8'CENTERS EACHDIRECTION. MINIMUMONE ROW. FABRICATEFROM #2 OR HEAVIERBARS. TIE TOOUTSIDE LAYER OFREINFORCING
1. DETAILS ON THIS DRAWING APPLY TO ALL DRAWINGS UNLESS OTHERWISE NOTED.
A1
3"
MIN
IMU
MB
3"
MIN
IMU
M
A2
3" MINIMUM B 3" MINIMUM
A3A2
A1
3"
MIN
IMU
MB
3"
MIN
IMU
M
3" MINIMUM B
3" MINIMUM3" MINIMUM
B 3" MINIMUM
B
D B
B
D BD
FOR CIRCULAR OPENINGS21" < D < = 54"
FOR OPENINGS12" < = D < = 21"
FOR RECTANGULAR OPENINGS21" < D < = 54"
TOP SURFACES OF SLABS THAT ARE SUBMERGED.......................3"
NO SCALE
UNLESS NOTED OTHERWISE ON THE DRAWINGS
A
-
B
-
FLG x PE FLOOR PIPENO SCALE
C
-
PE
R D
WG
S
TH
ICK
NE
SS
30 INCH FABRICATEDFLANGE FLOOR PIPEOR CASTING
DRILL AND TAP FLANGEBOLT HOLES AS REQ'D(SEE NOTE 1)
EXTERIOR
INTERIOR
NOTES:
1. FLOOR PIPE MATERIAL SHALL BE DUCTILE IRON ANSI/AWWA C151/A21.5,TABLE 1 OR TABLE 3. FLANGE, DUCTILE IRON, FLAT FACED, ANSI/ASMEC115/A21.15, CLASS 125 DIAMETER AND DRILLING.
1. THE SUBGRADE BELOW MAT SHALL BE 2'-0" THICK CRUSHED ROCK LAYER. THE TOP6" OF CRUSHED ROCK LAYER SHALL BE WORK MAT LEVELING COURSE. CRUSHEDROCK LAYER IS NOT USED AS UNDERDRAIN. THE CRUSHED ROCK LAYER SHALLEXTEND HORIZONTALLY BEYOND THE FOUNDATION EDGE BY 3 FEET.
2. FOR STRUCTURAL NOTES, SEE SHEET S001.
3. FOR STANDARD CONCRETE DETAILS, SEE SHEETS S002.
4. FOR PIPING ELEVATIONS AND LOCATION, SEE MECHANICAL DRAWINGS.3D PERSPECTIVE
1. WALL SLEEVE, SCHEDULE 40 STEEL PIPE FOR 12" AND SMALLER SLEEVES, 1/4" STEEL PIPE FOR SLEEVES LARGER THAN 12", AND HOT DIP GALVANIZED AFTER FABRICATION,304 SS, OR OTHER MATERIAL AS SPECIFIED OR INDICATED ON DRAWINGS. COORDINATE WALL SLEEVE DIAMETER WITH MODULAR CASING SEAL MANUFACTURER.
2. FOR PIPE LARGER THAN 6", DIP MJ WALL SLEEVE AND PLASTIC PIPE WITH EQUIVALENT DIP OUTSIDE DIAMETER MAY NE USED AS AN ALTERNATE TO STEEL WALL SLEEVE.
3. FOR BURIED PVC PIPING, CONTRACTOR SHALL PROVIDE AN ADDITIONAL FIELD JOINT AS CLOSE AS PRACTICAL TO FACE OF WALL, BUT NOT CLOSER THAN 5 FEET.
FOR PIPE DIAMETER LARGER THAN 6 INCH
EXPOSEDBURIED EXPOSED
NON-RESTRAINED NON-RESTRAINEDTHICKNESSWALL
1/4"x1 1/2" COLLARIN CENTER OF WALL
FOR PLUGGED WALL SLEEVE,EXTEND SLEEVE AND PROVIDE1/4" CLOSURE PL WELDED TOSLEEVE ON EXTERIOR SIDE
PIPE SIZE REFERENCEDON DWGS
MODULAR CASINGSEALS AT EACH FACEOF WALL
1/4
FOR PIPE LESS THAN 1 1/2"DIA, BACKUP AND CAULK ALLAROUND (BOTH SIDES). FORPIPE LESS THAN 6" DIA USEMODULAR SEAL CASINGSEALS (WALL SLEEVES ONLY)
WALL
WALL SLEEVE (SEENOTE 1 AND 2)
1/42"
8"
2" GALV PIPE, SCHD 40
MODULARCASING SEAL
PROVIDE CAP ON END OFWALL SLEEVE FOR FUTUREPIPING AS REQ'D
PIPE SIZEREFERENCEDON DWGS
SCHEDULE 40 GALV STL PIPESLEEVE, COORDINATE SIZEW/ CASING SEAL MFR