Clean Up Plan Powell River and Tributaries Watershed Water Quality Improvement Plan/TMDL Implementation Plan Stephanie Kreps Virginia Department of Environmental Quality April 11, 2017: 1 st Public Meeting Pennington Gap, VA
38

Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Jun 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Clean Up Plan Powell River and Tributaries Watershed Water Quality Improvement Plan/TMDL Implementation Plan

Stephanie Kreps

Virginia Department of Environmental Quality

April 11, 2017: 1st Public Meeting

Pennington Gap, VA

Page 2: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15
Page 3: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Powell River and Tributaries

TMDL Implementation Plan

First Public Meeting

April 2017

Page 4: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

What is a TMDL?

4 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

TMDL – Total Maximum Daily Load

A pollutant “budget” study to determine the maximum amount of a pollutant a water body can receive and still meet water quality standards

A TMDL Includes:

Source Assessment

Modeling

Hydrology

Water Quality

Load Allocation

Page 5: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

5 April 11/13, 2017

TMDL Process

Assessment

TMDL Development

Implementation Plan Development

Implementation

Unacceptable Water Quality

Acceptable Water Quality

- Determine Pollutant Load

- Determine Course of Action

- Implement Corrective Measures

Implementation Plan for the Powell River and

Tributaries

Page 6: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

TMDL Implementation Plan

A Document that details actions or strategies that

must be undertaken to achieve load reductions

as defined by the TMDL.

6 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Page 7: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

7 April 11/13, 2017

Components of an Implementation Plan

• Review of TMDL

• Corrective Actions

– Best Management Practices (BMPs), educational programs, regulatory authority, incentives

• Cost/Benefit Analysis

• Measurable Goals

• Timeline to Achieve Water Quality Objectives

– Includes monitoring plan to assess progress

• Public Participation

Implementation Plan for the Powell River and

Tributaries

Page 8: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

April 11/13, 2017 8

Implementation Plan for the Powell River and

Tributaries

Study

Area

Page 9: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

TMDL Review

* Delisted for bacteria in 2010

** Delisted for bacteria in 2012; listed for benthic in 2012 and nested in 2012.

***Nested in 2014

Impairment Year Listed Reason Listed Date TMDL Completed

Butcher Fork VAS-P18R_BUH01A04

2004 E. coli March 2011

South Fork Powell River VAS-P18R_PLL02A00

2004 E. coli March 2011

South Fork Powell River VAS-P18R_PLL01A02

1998 Benthic March 2011

South Fork Powell River VAS-P18R_PLL01A98

1998 Benthic March 2011

North Fork Powell River VAS-P20R_PWL01A00

1996, 2004 Benthic, E. coli March 2011

Powell River (near Big Stone Gap) VAS-P17R_POW01A94

1996, 1996 Benthic, E. coli March 2011

Powell River (near Dryden) VAS-P19R_POW03A00

2004 Benthic* March 2011

Powell River (near Jonesville) VAS-P21R_POW02A02

2012 Benthic** March 2011

Powell River (outlet) VAS-P23R_POW02A00

2002 Benthic March 2011

Powell River (headwaters) VAS-P17R_POW03C14

2014 Benthic*** March 2011

April 11/13, 2017 9

Implementation Plan for the Powell River and

Tributaries

Page 10: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

April 11/13, 2017 10

Implementation Plan for the Powell River and

Tributaries

Impairments

Page 11: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Why are we here today?

11 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Two Problems!

#1 Bacteria

Bacteria levels are excessive

The condition of the stream is

harmful/deadly to aquatic life

#2 Aquatic Life

Page 12: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

12 April 11/13, 2017

• Fecal Bacteria in the Powell River and Tributaries

– What’s Fecal Bacteria?

• Bacteria associated with feces from humans and warm blooded animals

• (fecal coliform, E. coli)

– Why should stakeholders care?

• Pathogens (including some strains of E. coli)

• Parasites

– Water Quality Standard

• Primary contact recreation - swimming

• Single Sample Max: 235 cfu/100 ml E. coli (10% violations allowed)

• Monthly Geometric Mean: 126 cfu/100 ml E. coli

Implementation Plan for the Powell River and

Tributaries

#1 Bacteria

Page 13: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

#1

Bacteria Impairments

April 11/13, 2017 13

Implementation Plan for the Powell River and

Tributaries

Page 14: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

2010

Land

Use

April 11/13, 2017 14

Implementation Plan for the Powell River and

Tributaries

Page 15: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Bacteria Monitoring ID Date Range Count Average Minimum Maximum Exceedence

6BBUH000.76 2/15/2007 - 3/26/2008 9 132 6 350 22%

6BPLL004.24 2/15/2007 - 12/3/2007 6 158 25 300 50%

6BPLL006.38 1/15/2008 - 3/26/2008 3 15 1 25 0%

6BPOW179.20 1/4/2007 - 12/6/2012 34 326 25 2,000 35%

6BPOW184.19 4/10/2007 1 10 10 10 0%

6BPOW193.38 1/4/2007 - 11/4/2008 12 388 50 1,100 75%

6BPOW194.75 1/4/2007 - 11/4/2008 12 88 25 280 8%

6BPWL001.49 2/26/2009 - 10/20/2010 11 189 25 450 27%

6BPWL004.10 2/26/2009 - 10/20/2010 11 249 25 920 45%

6BPWL006.59 2/26/2009 - 10/20/2010 11 34 25 100 0%

6BPWL010.36 2/26/2009 - 10/20/2010 11 27 25 50 0%

6BPWL017.03 2/26/2009 - 10/20/2010 11 32 25 75 0%

15 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

#1

Page 16: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

16 April 11/13, 2017

Bacteria Reduction Goals for

Implementation Plan

Implementation Plan for the Powell River and

Tributaries

Impairment Livestock

Direct

Cropland and

Pasture

Straight

Pipes

Urban and

Residential

Butcher Fork 100 % 0 % 100 % 0 %

South Fork Powell River 0 % 0 % 100 % 0 %

North Fork Powell River 0 % 0 % 100 % 0 %

Powell River 0 % 0 % 100 % 0 %

#1

Page 17: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Residential Source Estimates

17 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Impairment

Potential

Straight

Pipes

Butcher Fork 15

South Fork Powell River 14

North Fork Powell River

(not including Straight Creek)

144

Powell River

(not including Callahan Creek

85

Total 258 #1

Page 18: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Livestock Estimates

18 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

TMDL Watershed Beef

Cows

Beef

Calves Horse Sheep Hog

Butcher Fork 110 105 37 3 1

South Fork Powell River 62 60 21 1 0

North Fork Powell River

(not including Straight Creek) 168

245

16

3

1

Powell River

(not including Callahan Creek) 6

5

2

0

0

#1

Page 19: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

• How healthy is the benthic macro-invertebrate

community?

– Benthic (on the bottom)

– Macro (visible without a microscope)

– Invertebrate (no backbone)

• How many bugs/critters on the bottom of the

stream? And what kind?

• General indicator of water quality.

• Canary in the coal mine.

19 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

#2 Aquatic Life

Page 21: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

• VA Stream Condition Index (VASCI)

– Standardized sample collection and analysis

methodology

– Multimetric

– Rating scale (0 – 100)

– Less than 60 indicates an impaired benthic

community

21 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

#2 Aquatic Life

Page 22: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Benthic Sampling StationID StreamName Location Sample Season VASCI

6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Spring 2013 41.1

6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Spring 2013 43.4

6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Fall 2013 64.6

6BPWL004.40 N. F. Powell River At Leeman Field Spring 2013 48.0

6BPWL004.40 N. F. Powell River At Leeman Field Fall 2013 67.9

6BPWL004.40 N. F. Powell River At Leeman Field Fall 2013 61.9

6BPOW145.95 Powell River Off Rt. 683 Fall 2010 41.1

6BPOW166.97 Powell River Rt. 58 Bridge Spring 2013 50.9

6BPOW166.97 Powell River Rt. 58 Bridge Fall 2013 78.6

1199.01-PR1-ATS Powell River Above haul road crossing Spring 2011 58.2

1199.01-PR1-ATS Powell River Above haul road crossing Fall 2011 52.9

22 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Page 23: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

#2

Sediment

Impairments

April 11/13, 2017 23

Implementation Plan for the Powell River and

Tributaries

Page 24: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Sediment Reduction Goals for

Implementation Plan • 100% removal of straight pipes

• 23% reduction in sediment loads from

– Abandoned Mine Land (AML)

– Barren Areas

– Conventional Tillage Crops

– Disturbed Forest

– Residential

– Unimproved Pasture

– Streambank Erosion

24 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

#2

Page 25: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

25 April 11/13, 2017

Potential Corrective Actions Agricultural

Livestock Fencing Pasture Management Conservation Tillage Vegetated Stream Buffer

Residential Septic System Installation Alternative Waste Treatment Sewer Connection Bioretention Basins Rain Gardens Street Sweeping Vegetated Stream Buffer

Implementation Plan for the Powell River and

Tributaries

Page 26: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

26 April 11/13, 2017

Potential Corrective Actions

Implementation Plan for the Powell River and

Tributaries

AML, Barren, Disturbed Forest Regrading and Revegetation on

Critical Areas Vegetated Stream Buffer Reforestation of Erodible Land Re-mining Abandoned Mine Land Haul road stabilization

Other Streambank

Stabilization/Protection Storm Pond Design Wetland Development

Page 27: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

27 April 11/13, 2017

Cost/Benefit Analysis

• Assess cost for implementation

• Evaluate environmental benefits through modeling

• Compare cost-effectiveness of various practices

• Identify/Evaluate economic benefits of Implementation

• Identify funding sources

Implementation Plan for the Powell River and

Tributaries

Page 28: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

28 April 11/13, 2017

Measurable Goals/Timeline

• Phased approach

– Targeting

• Bang for the buck

• Spatial Analysis/Modeling

• Implementation milestones

• With input from Stakeholders

• Interim water quality milestones

• Modeling

• 5 - 15 year timeframe to meet water quality standard

Implementation Plan for the Powell River and

Tributaries

Page 29: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

29 April 11/13, 2017

Public Participation

• Public Meetings

– Informational

– Solicit public participation

– Provide a forum for public comment

• Steering Committee

– Direct the overall process

– Review output from working groups

– Review future implementation

• Working Groups

– Address “community” issues/concerns

Implementation Plan for the Powell River and

Tributaries

Page 30: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Steering Committee • Includes:

– Agencies: DEQ, SWCD, VDH, DMME, NRCS

– County Representatives

– Working Group Representatives

• Responsibilities:

– Review contractor’s results

– Assess input from working groups

– Address community concerns/suggestions

– Help guide the process:

• Is there “representative” input?

• How can the process be improved?

30 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Page 31: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Working Groups

• Agricultural

• Residential

• Industrial

• Meet 1-2 times

31 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

} Government

Representation

Included

Page 32: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Agricultural Working Group

Responsibilities:

• Review implementation strategies from an agricultural

perspective

• Identify

32 April 11/13, 2017

o Potential constraints/opportunities

o Available technical resources

o Alternative funding

sources/partnerships

o Outreach methods

o Appropriate “measurable goals”

o Regulatory controls

o Implementation coordinator

Implementation Plan for the Powell River and

Tributaries

Page 33: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Residential Working Group Responsibilities:

• Review implementation strategies from a homeowner’s perspective

• Identify

33 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

o Potential constraints/opportunities

o Available technical resources

o Alternative funding

sources/partnerships

o Outreach methods

o Appropriate “measurable goals”

o Regulatory controls

o Implementation coordinator

Page 34: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

Industrial Working Group Responsibilities:

• Evaluate various corrective actions, costs, tracking procedures, and technical assistance needs

• Identify

34 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

o Existing efforts

o Potential constraints/opportunities

o Available technical resources

o Alternative funding

sources/partnerships

o Appropriate “measurable goals”

o Regulatory controls

o Implementation coordinator

Page 35: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

“Sign-up” Cards

35 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Page 36: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

TMDL Implementation Plan Schedule

1. Working Group meetings: April-May

2. Steering Committee meetings: April-June

3. Draft Technical Document: August

4. Final Public meeting: September

36 April 11/13, 2017

Implementation Plan for the Powell River and

Tributaries

Page 37: Clean Up Plan - Virginia DEQ...Clean Up Plan Powell River and Tributaries Watershed ... Source Assessment Modeling ... • Interim water quality milestones • Modeling • 5 - 15

Natural Resource Solutions

Through Science and Engineering MapTech

37 April 11/13, 2017

Contact Information

• Virginia Department of Environmental Quality

– Stephanie Kreps, TMDL Nonpoint Source Coordinator

[email protected]

– (276) 676-4803

• MapTech, Inc.

– Jim Kern

[email protected]

– (540) 961-7864

Implementation Plan for the Powell River and

Tributaries

http://bit.do/DEQPowell-ImplementationPlanProgress