Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation. Introduction. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Clean Development Mechanism

Presentation By

Chairman & Managing Director

Rajasthan Renewable Energy Corporation

Page 2: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

IntroductionIntroduction

Clean Development Mechanism(CDM) is a unique instrument based on understanding and cooperation among the nations for adopting a new outlook for economic activities aiming at protecting the world eco-system.

Page 3: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Green House GasesGreen House Gases

Accumulation of Carbon Di Oxide (CO2), Chloro Floro Carbons (CFC), Methane (CH4) & Nitrous Oxide (NOx) in the atmosphere cover the Green House Gases (GHG)

GHGs are accumulated in the atmosphere due to combustion of fossil fuels like coal, oil and natural gases etc.

Page 4: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Kyoto ProtocolKyoto Protocol

Industrialization since 18th century, generation of Green House Gases has resulted in progressive global warming.

Kyoto Protocol drafted at Kyoto, in 1992 to combat global climate change . Joint implementation (Developed Countries) Clean Development Mechanism (Developing

Countries) International Emission Trading (Emission

Credit through special market)

Page 5: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

SustainableSustainable DevelopmentDevelopment This calls for balanced outlook between the pace of

economic development & environmental conservation & discourages activities that could hurt the Environment.

Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.

The primary objective of sustainable development is to reduce the absolute poverty of the world’s poor through providing lasting & secure livelihoods that minimise resources depletion, environmental degradation, natural disruption & social instability.

Page 6: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

CDMCDM ObjectivesObjectives

To assist developing countries in achieving sustainable development & in contributing to ultimate objectives of United Nations Framework Convention on Climate Change (UNFCCC )

To assist developing countries in achieving compliance with their qualified emission limit & reduction commitments.

Page 7: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

EligibilityEligibility CriterionCriterion

Social well being

Economic well being

Environmental well being

Technological well being

Page 8: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Indian ScenarioIndian Scenario Formation of an Advisory Group on Climate

Change under Ministry of Environment and Forest (MoEF) which is the nodal agency on climate change issue in India.

Energy Sector is main CO2 emitter accounting for 87% of CO2 emissions.

Biomass burning and agriculture sector main source of NOx emission.

GHG emission in India is 3% of the world.

Page 9: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Continue…Continue…

Because of high potential of GHG reduction, India can avail new opportunity through CDM projects.

India can capture 10% of Global CDM mark.

Annual revenue estimated range from US$ 10 million to 330 million

Page 10: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Benefits from Estimated Emission Reduction Benefits from Estimated Emission Reduction from the Renewable Energy Projectsfrom the Renewable Energy Projects

Type of Project Tones of CO2/ MW/Year

Monetized ER benefits/MW/Yea

r

5MW project for the crediting

period of 7 years

Biomass(90% PLF)(50% PLF)

7,0003,850

Rs. 14 lacsRs. 7.70 lacs

Rs. 10 CroresRs. 5.5 Crores

Small Hydel (35% PLF)

3,000 Rs. 6 lacs Rs. 2 Crores)

Solar (Thermal)

10 per solar thermal pump (3 HP) per year

Rs. 2,000 per solar thermal pump (3HP) per year

Project specific

Wind Farm (20% PLF)

1,750 Rs. 3.5 lacs Rs. 1 Crore

Page 11: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

CDM OptionsCDM OptionsProjects prioritised for CDM

Coal power plant using IGCC (Integrated Gasification Combined Cycle)

Coal Power Plant using PFBC (Pressurised Fluidised Bed Combustion)

Renovation and Modernization of Power Plants

Wind based power generation

Solar Thermal Energy for Power generation

Underground Coal gasification technology projects

Page 12: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Continue…Continue…

Wind Pumps for agriculture

Direct reduction process in the iron & steel industry

Continuous pulp digesters in the pulp & paper industry

Demand side management by efficient motors

Page 13: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

BarriersBarriers Clear methodologies yet to be defined. Procedures and process still to be finalised. Others barriers perceived by many countries are

Lack of awarenessFinancial barriers due to present low and

uncertain returns Technology barriersInstitutional barriersInfrastructure limitationsHigh transaction cost

Page 14: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Small-Scale ProjectsSmall-Scale Projects

The following categories of projects qualify for fast-track approval procedureRenewable Energy projects with minimum

output capacity equivalent up to 15 MWEnergy efficiency improvements which reduce

energy consumption on supply or demand side by up to 15 Gwh/yr

Other project activities that both reduce emission and directly emit less than 15kt of CO2 annually.

Page 15: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Horizon for RenewablesHorizon for Renewables

Multi technology development programmes initiated by GOI define best options for GHG emission reductions.

MNES suggested for a study and development of overall methodology for Renewable Energy Project under CDM.

Wind, Solar, Hydel & Biomass Projects suggested to be brought under positive list of CDM.

Page 16: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Development in RajasthanDevelopment in Rajasthan(RREC Activities)(RREC Activities)

RREC has taken up work of propagation of SPV based technology in the state by organising installation of SPV system as under : Decentralized Systems:

SPV Home Lighting System SPV Street Lighting System SPV Pumping System

Centralized Systems: Remote village electrification through SPV stand

alone Power Plants Grid Interactive SPV Power Plants

Page 17: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

SPV Decentralised Systems:SPV Decentralised Systems:

S. No.

System Achievements (Nos.)

Total PV capacity(MW)

Energy Produced so

far(Units)

1 HLS 60864 2.25 66.48 lacs

2 SLS 2135 0.15 5.37 lacs

3 Pumps 116 0.11 10.28 lacs

Total 2.51 82.13 lacs

Page 18: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

SPV Centralized SystemsSPV Centralized SystemsGrid Interactive Solar Power UnitsGrid Interactive Solar Power Units

S. No.

System Total PV capacity

(KW)

Year of Installation

Energy Produced so

far(Units)

1 Govt. Secretariats

25 2001 0.89 lacs

2 Vidhan Sabha 25 2001 0.88 lacs

3 Gorir, Jhunjhunu 100 2004 0.06 lacs

Total 150 1.83 lacs

Page 19: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

SPV Centralized SystemsSPV Centralized Systems

Remote Village Electrification

Work of 48 villages has been completed and of 40 other villages in progress.

Page 20: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Wind Energy Based SystemsWind Energy Based Systems

Wind Projects : 253 MW Capacity (3808 lac units)

Sanctioned Projects 320 MW

Installed Projects 253 MW

Projects in Pipeline 67 MW

Investment in the state Rs. 1200 Crore

Electricity produced 2003-04 141 M. Units

Electricity produced 2004-05 240 M. Units

Reduction in carbon emission 332500 Tons

Page 21: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Biomass Based Power Projects in Rajasthan

Rajasthan State has immense potential in form of Juli-flora (Vilayati Babool), Mustard husk,

Rice- husk and other agriculture residues for the biomass fuel.

Based on the biomass fuel, power project of IPPs, totalling to 113 MW have been registered

with RREC.

Out of this, 7.8 MW (7 MW net) proejct of M/s. Kalptaru Power Transmission Ltd. have been comissioned at Padampur, Sri Ganganagar District on 15th July, 2003.

Biomass Energy Based SystemsBiomass Energy Based Systems

Page 22: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Future plans for SPV SystemsFuture plans for SPV Systems

RREC plan to propagate SPV based systems in the state to achieve targets of systems during coming years as under :-

Year SPV Home lighting systems

SPV Street Lighting System

SPV pumping systems

2004-05 15000 100 50

2005-06 20000 100 100

2006-07 25000 100 200

Page 23: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Future Projection for Biomass EnergyFuture Projection for Biomass Energy

7.5 MW power project of M/s. Chambal Power Ltd., is expected to be commissioned at village Rangpur, Kota in March, 2005.

Other power projects are in Pipeline and are expected to be commissioned in March, 2006.

Page 24: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Village Energy Security Through Biomass MNES, GOI, has launched a National Programme on Village

Energy Security through Biomass. The Programme aims at meeting energy requirements of a

village through locally available biomass resources with full participation of the local community.

The programme will provide quantum jump to rural economy and contribute to growth with equity and employment generation.

Under the programme, RREC has identified 19 locations to implement the test projects.

The location selected are un-electrified remote villages / hamlets of the electrified villages which would not be electrified by conventional means upto 2012.

Continue..Continue..

Page 25: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Future projection towards ULG projects Future projection towards ULG projects

Rajasthan has large reserves of ligniteTill now 3173 million MT Geological reserve of Lignite have been assessed in Barmer, Bikaner, Nagaur & Jaisalmer District.The deposits so far assessed in Rajasthan have potential to generate 2500 MW power from shall on deposits (through CBM technique) and more than 15000 MW from deep seated lignite (through ULG process) sustainable for more than 100 years.

Page 26: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Continue …..RREC has selected a site in village Bharka-Bothiya in Barmer District and applied for prospecting licence to Mines & Mineral Deptt., GoR for exploration of Petroleum Product and setting up of Power Project based on syn GasThe cost of power generation would be very less in compare to other forthcoming power projects based on Coal, Natural Gas etc.Green House Gases would be reduced to a great extent and as such, this would be a qualified candidate for CDM project.

Page 27: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Capacity - 155 MWo CC Block - 125 MWo Solar Block - 30 MW

Out puto CC Block - 853 GWho Solar Block - 63 GWh

CO2 Abatemento Solar Portion - 65100 Tons/ao Total abatement of

CO2 in plant life - 13.96 Million Tons Cost of the project - Rs. 822 Crore Cost of power produced- Rs. 2.64 per/kwh (LEC)

ISCC MathaniaISCC Mathania

Page 28: Clean Development Mechanism Presentation By Chairman & Managing Director Rajasthan Renewable Energy Corporation

Thank YouThank You