Presented By: Neil McMillan President & CEO
May 16, 2015
1
Presented By: Neil McMillan President & CEO
2
Cautionary Note Regarding Forward-Looking Information This document contains certain forward-looking statements relating but not limited to the Company’s expectations, intentions, plans and
beliefs. Forward-looking information can often be identified by forward-looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intent”, “estimate”, “may” and “will” or similar words suggesting future outcomes or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information may include reserve and resource estimates, estimates of future production, unit costs, costs of capital projects and timing of commencement of operations, and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of mined ore varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ materially from expected results.
Potential shareholders and prospective investors should be aware that these statements are subject to known and unknown risks,
uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking statements. Shareholders are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Claude Resources undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.
Cautionary note to U.S. investors concerning resource estimate The resource estimates in this document were prepared in accordance with National Instrument 43-101, adopted by the Canadian
Securities Administrators. The requirements of National Instrument 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”). In this document, we use the terms “measured”, “indicated” and “inferred” resources. Although these terms are recognized and required in Canada, the SEC does not recognize them. The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that constitute “reserves”. Under United States standards, mineralization may not be classified as a reserve unless the determination has been made that the mineralization could be economically and legally extracted at the time the determination is made. United States investors should not assume that all or any portion of a measured or indicated resource will ever be converted into “reserves”. Further, “inferred resources” have a great amount of uncertainty as to their existence and whether they can be mined economically or legally, and United States investors should not assume that “inferred resources” exist or can be legally or economically mined, or that they will ever be upgraded to a higher category.
Cautionary Statement
3
Claude Resources Inc. has three Canadian Gold Projects: Seabee, Amisk and Madsen.
Each project is expected to host multi-
million ounce ore bodies and has the potential to produce over 100 thousand ounces per year.
What is Claude All About?
4
Corporate Overview
Stock Exchanges: TSX CRJ NYSE Amex CGR Shares Outstanding (March 13, 2012): Basic 173.7 million Fully Diluted 180.1 million Market Cap $185 million CDN Analyst Coverage: Brian Christie Desjardins Securities Cosmos Chui CIBC Paolo Lostritto National Bank Paul Burchell Dundee Securities Sam Crittenden RBC Wendell Zerb Canaccord Genuity
Cash & Short Term Investments: $35.2 (September 30, 2011) Debt (in millions) : Short Term $3.4 Long Term $12.0 Cash Costs per Ounce: Q3 2011 $871CDN $888 US TSX: 52 Week High $2.73 52 Week Low $1.03 Avg. Volume 460,000 NYSE Amex: 52 Week High $2.85 52 Week Low $1.04 Avg. Volume 375,000
5
Focused on Growth
Great Risk vs. Reward Investment Opportunity Cash flow and net earnings from Seabee Operation
Significant exploration upside at all three projects
Experienced management team
Strong balance sheet
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Prod
uctio
n O
unce
s
Increasing Seabee Gold Production (2007-2016)
806,000 735,000 662,000 1,300,000
1,225,000 1,225,000
1,225,000
1,018,000
1,566,000
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
4500000
2008 2009 2010 2011
Resource Base
Amisk
Madsen
Seabee
0.81 Moz
1.96 Moz
2.91 Moz
4.09 Moz
6
AMISK PROJECT
Operations
7
Seabee Gold Operation
• 100% ownership • 14,400 hectare property • Produced over 973,000 ounces of gold from 1991 to 2011 • 1.30 million ounces in NI 43-101 resource calculation • Full infrastructure including an 850 ton per day permitted mill • Two producing mines: Seabee Gold Mine and the new Santoy 8 Gold Mine • Exploration focused on Santoy Gap, L62, Santoy 8, Seabee Deep, and Neptune 130,000 metre drilling exploration program planned for 2012
8
Seabee Property
Seabee Property: 14,400 Hectares
• Established fully-permitted infrastructure • Underexplored productive belt • $7.5 M, 130,000 m regional exploration in 2012
9
Regional Exploration: Santoy Gap
• Inferred Mineral Resources of 495,000 ounces (NI 43-101 compliant)
• 3 rigs drilling approximately 40,000 metres in 2012
• Proximal to current mining infrastructure
• Extension of Santoy 8 deposit
10
L62 Discovery
• L62 200 m from infrastructure
• Open in all directions
• Expected to be in production 2H
2012
L62 Discovery
Shaft Extension Q3 2012
11
Regional Exploration: Neptune
Highlights of 2010 and 2011 drilling:
• 3.2 m @ 85.0 g/t
• 3.0 m @ 13.6 g/t
• 2.0 m @ 5.2 g/t
• 3.9 m @ 5.9 g/t
70,000 m of drilling between
Neptune, Santoy 8 and Santoy Gap
planned for 2012
12
Amisk Gold Project
• 100% ownership • 23,450 hectare property • 1.57 million ounces in NI 43-101 resource calculation • Proven mining district and “mining friendly” community • Close to infrastructure • Large bulk mineable potential • Mineralization begins at surface and has been tested to approximately 600 metres below surface NI 43-101 Resource planned in Q2 2012 and PEA to be completed in Q3 2012
13
Amisk Location
14
Amisk Pit Shell
Claude Resources - Amisk Lake Project - Grade - Tonnage Sensitivity Table
Au Eq Cut-Off Total Resource Indicated Inferred
Tonnage Au Eq (gpt) Au (gpt) Ag (gpt) Total Oz Ind Oz % Inf Oz %
0.30 82,422,879 0.69 0.62 4.35 1,828,471 998,622 55% 824,675 45%
0.40 58,803,225 0.83 0.75 5.11 1,569,171 920,881 59% 644,854 41%
0.50 42,979,475 0.97 0.88 5.85 1,340,368 824,702 62% 512,676 38%
15
Madsen Exploration Project
• 100% ownership • 10,000 hectare property • 1.23 million ounces in NI 43-101 resource calculation • Historic production was 2.45 million ounces of gold from 1938 to 1976 • Similar type of geology to that of Goldcorp’s Red Lake Assets • All existing infrastructure is fully permitted 29,000 metre drilling exploration program planned for 2012
16
Madsen Property
17
Madsen Mine Trend
2012 Exploration is focused on continued testing of the 8 Zone Trend as well as the McVeigh and Austin Tuff depth continuity.
18
Madsen Property: Red Lake Camp
Starratt Olsen 164,000 oz @ 0.18 opt
Madsen Mine Historic Production 2.4 M oz @ 0.30 opt Austin East
Underground Drill Chambers
2012 exploration target areas
8 Zone
19
Madsen Cross Section
20
Madsen Infrastructure
Modern equipment and facilities:
• 500 ton per day permitted mill
• 5 compartment shaft to 4,125 feet
• Shaft capable of skipping 1,925 tpd
• Permitted tailings facility
Minimal capital required to bring Madsen into production
21
Exploration Summary
2012 2012 2011 2011
$ (in millions) Metres $ (in millions) Metres
Seabee $7.50* 129,600 $4.90* 100,000
Madsen $6.50 29,050 $3.85 18,000
Amisk $1.50 6,000 $1.74 10,000
Total $15.50 164,650 $6.66 128,000
*Excluding underground expenditures.
22
Peer Valuation (as of March 23, 2012)
0.00
50.00
100.00
150.00
200.00
250.00
300.00
Producers
Explorers
Mar
ket
Cap/
Oz
Calculation based on National Instrument 43-101 ounces
23
Catalysts for 2012
Q1 • Closing of SEM Acquisition • Seabee Exploration Results (Santoy Gap and L62) • Global Reserve and Resource Update
Q2 • Amisk Resource Update • Amisk Exploration Results • Seabee Exploration Results (Neptune, Santoy Gap and L62)
Q3
• Shaft Extension Completed at Seabee • Mill Expansion Completed at Seabee • Madsen Exploration Results • PEA at Amisk
Q4 • Seabee Exploration Results (Santoy Gap and L62) • Madsen Exploration Results
24
Claude Resources Inc. Experience. Stability. Potential.
Creating the Capacity to
Discover. Develop. Deliver.
TSX: CRJ NYSE Amex: CGR
200, 224- 4th Avenue South Saskatoon, Saskatchewan, S7K 5M5 Canada P. 306.668.7505 F. 306.668.7500