Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit Hydrographs
37

Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Sep 14, 2018

Download

Documents

NgôAnh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Engineering Hydrology

Class 16: Direct Runoff (DRO)

and Unit Hydrographs

Page 2: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Ocean

Topics and Goals: 1. Calculate volume of DRO from a hydrograph;2. Complete all steps to develop a Unit Hydrograph.

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 3: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 4: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

- Duration of rainfall excess (D): time from start to finish of rainfall excess - Lag time (L or tp) : time from the center of mass of rainfall excess to the peak of the hydrograph- Time of rise (TR) : time from the start of rainfall excess to the peak of the hydrograph- Time of concentration (tc) : time for a wave (of water) propagate from the most distant pt in the watershed to the outlet. One estimate is time from the end of net rainfall to the inflection pt. - Time base (Tb) : total duration of the DRO hydrograph

Timing parameters

tc

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 5: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Unit Hydrograph

Assumelinear response

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 6: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Constructing the Unit Hydrograph

From your text (BHV, p. 117):

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 7: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Separating BaseflowClass 14:

Unit Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 8: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

From BHV, p. 117:

Volume (depth) of DRO?Class 14:

Unit Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 9: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

In-Class Exercise: Volume (depth) of DRO?Use DRO hydrograph to calculate volume of DRO; one approach is the “trapezoidal rule” -- see E2-1(d) in handout (posted)

For a 2600-acre basin, what is the amount (depth) of DRO?Hints: (a) sum up the total volume in cfs-hour; (b) 1 cfs = 1 ac-in / hour

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 10: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DRO

From BHV, p. 117:

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 11: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DRO

The phi-index is an assumed uniform and constant infiltration rate. It’s calculated by finding the loss difference between gross precipitation and observed surface runoff.

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 12: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DROIf the phi-index of the storm is 0.5 inches per hour for 5 hours, then what is the net rainfall?

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 13: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DROIf the phi-index of the storm is 0.5 inches per hour for 5 hours, then what is the net rainfall?

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 14: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DROIf the phi-index of the storm is 0.5 inches per hour for 5 hours, then what is the net rainfall?

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 15: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Net Rainfall (Excess Rainfall) = DRO

• DRO = Excess rainfall is the cumulative rainfall minus rainfall abstractions; estimates runoff volume (important for storage design)

• Influencing factors: rain amount, drainage area, soil type, ground cover

• Curve Number approach developed by Soil Conservation Service (now Natural Resources Conservation Service, or NRCS) to estimate daily excess rain amount from daily rain amount (we’ll tackle this in week 8)

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 16: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Constructing the Unit Hydrograph

From your text (BHV, p. 117):

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 17: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Constructing the Unit Hydrograph

From your text (BHV, p. 117):

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 18: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

Constructing the Unit Hydrograph

From your text (BHV, p. 117):

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 19: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

The Unit Hydrograph is a depiction of the hydrograph (discharge) that would result from 1.0 inch of rainfall.

The upshot: you normalize an observed hydrograph to produce the UH.

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 20: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

1) Use DRO hydrograph to calculate total DRO (“trapezoidal rule”)

2) Convert DRO hydrograph to Unit hydrograph: in this example, because total volume of DRO is 2 inches (2 inches x watershed area = volume), divide the ordinate (y-axis) values of discharge by 2, to normalize the values to a set of values that would produce only 1 inch of DRO -- this becomes the unit hydrograph.

Constructing the Unit HydrographClass 14:

Unit Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 21: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

In-Class Exercise:Unit Hydrograph Development

Class 14: Unit

Hydrographs

Learning Objectives

Hydrograph Anatomy

(components)

What is the Unit

Hydrograph?

How do you construct the

Unit HG?

Calculating Direct Runoff

(DRO)

Example: Develop Unit Hydrograph

Page 22: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

Page 23: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

In-Class Exercise:Unit Hydrograph Development

This example problem is example #2-1 on page 108 (Ch. 2) of Bedient....

Page 24: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

A ~100 cfs baseflow is evident.

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

Page 25: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

A ~100 cfs baseflow is evident - use constant discharge method.

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

Page 26: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

Page 27: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

See spreadsheet for calculations....

Page 28: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

Page 29: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

For a phi-index of 0.5 in/hour, subtract that from the hyetograph.

Page 30: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

For a phi-index of 0.5 in/hour, subtract that from the hyetograph. This yields a net excess rainfall of 1 in/hour for 2 hours = 2 inches.

Page 31: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

For an 1850-acre watershed with a phi-index of 0.5 inches/hour, convert the following hydrograph into a 2-hour unit hydrograph:

DRO = 2”

Net Rainfall = 2.0”

Page 32: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

DRO = 2”

Net Rainfall = 2.0”

Page 33: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

DRO = 2”

Net Rainfall = 2.0”

Page 34: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

DRO = 2”

Net Rainfall = 2.0”

Based on the UH, what are (a) Tb, (b) tp, and (c) tc?

Page 35: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

DRO = 2”

Net Rainfall = 2.0”

Based on the UH, what are (a) Tb, (b) tp, and (c) tc?

Page 36: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

- Duration of rainfall excess (D): time from start to finish of rainfall excess - Lag time (L or tp) : time from the center of mass of rainfall excess to the peak of the hydrograph- Time of rise (TR) : time from the start of rainfall excess to the peak of the hydrograph- Time of concentration (tc) : time for a wave (of water) propagate from the most distant pt in the watershed to the outlet. One estimate is time from the end of net rainfall to the inflection pt. - Time base (Tb) : total duration of the DRO hydrograph

Timing parameters

tc

Page 37: Class 16: Direct Runoff (DRO) and Unit Hydrographsco2.coe.utah.edu/CVEEN4410b/class/class_16/Class16_DRO_and_Unit... · Engineering Hydrology Class 16: Direct Runoff (DRO) and Unit

DRO = 2”

Net Rainfall = 2.0”

tc

Based on the UH, what are (a) Tb, (b) tp, and (c) tc?