Top Banner
PART- B
41

Civil Spec - NTPC, Ramagundam

Aug 17, 2015

Download

Documents

bisworupm

Civil spec NTPC Ramagundam
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

PART- B

M

N

M

O

N

N

P

L

Q

R

S

S

R

S

S

T

1.01.00

This specification covers design, preparation of general arrangement drawings,construction and fabrication drawings, supply of materials and construction of allcivil, structural and architectural works.Description of various items of work under this specification and nature of work indetail are given hereinafter. Complete work under this scope is referred to as civilworks. List of various civil works covered under the scope is given in (PART- A, SubSection- II D1-01) and herein.The work to be performed under this specification consists of design, engineeringand providing all labour, materials, consumable, equipment, temporary works,temporary storage sheds, temporary labour and staff colony, temporary site offices,constructional plant, fuel supply, transportation and all incidental items not shown orspecified but reasonably implied or necessary for completion and proper functioningof the plant, all in strict accordance with the specifications and including revisionsand amendments thereto as may be required during execution of the work.All materials including cement, reinforcement steel and structural steel etc. shall beprovided by the Bidder.The scope shall also include setting up by the Bidder a complete testing laboratoryin the field to carry out all relevant tests required for the civil works for the project.Minimum facilities as specified in the enclosed Annexure - I to this Chapter shall beprovided by the Bidder in this laboratory.The work shall be carried out according to the design / drawings to be developed bythe Bidder and approved by the Employer. For all building & structures, foundations,etc., necessary layout and details are to be developed by the Bidder keeping in viewstatutory & functional requirements of the plant & facilities and providing enoughspace & access for operation, use and maintenance. Certain minimum requirementsare indicated in this specification for guidance purpose only. However, the Biddersoffer shall cover the complete functional requirements as per the best prevailingpractices and to the complete satisfaction of the Employer.Layout and levels of all structures shall be made by the Bidder at his own cost fromgeneral grid of the plot and nearest GIS bench mark or other acceptable bench markof govt. deptt. as per directions of the Engineer. The bidder shall give all help inproviding all instruments, materials and personnel to the engineer for checking thelayout and correctness of layout & levels. The Bidder shall be solely responsible forthe correctness of the layout and levels.All the quality standards, tolerances, welding standards and other technicalrequirements as covered in this specification shall be strictly adhered to by theBidder.The Bidder should fully appraise himself of the prevailing conditions at the proposedsite, locations of adjoining facilities / structures, climatic conditions includingmonsoon pattern, local conditions and site specific parameters and shall include for

!

:

C

6"

#

$

%

&

&

'

(

)

#

$

*

&

&

'

(

-

0

3

2

3

7

=

/

2

1

-

3

>

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

G

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

s

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

v

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

x

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

G

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

U

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

U

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

U

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;

0

&

,

-

.

/

0

/

1

/

2

1

-

3

!

.

3

1

/

2

1

-

3

&

&

&

&

8

*

8

9-

4

5

1

/

E

F

J

,

D

8

+

;