    : , ,SECTION A (50 Marks) ,Answer all the uestions 1 to 30 carries ONE mark and uestions 31 to 35 carriesFOUR marks each.Tick the correct answer in each of the followin 1 mark each1. The maximum deflection of a simply supported beam of span 1 carrying a uniformlydistributed load of intensity w per unit length is:

    SWl4 Ia)-Iii324El ~r:'4 :b) ~384ElWl4c) -324ElWl4d) -384El

    2. The Standard Penetration Test is the most commonly used in-situ test for cohesionless 8soils, especially for determining:a) Specific Density and Angle of Reposeb) Specific Density and Angle of Shearing Resistancec) Relative Density and Angle of Reposed) Relative Density and Angle of Shearing Resistance3. If the load passes through the shear centre then there shall be:a) Only bending in the cross section

    b) No bending in the cross sectionc) Only twisting in the cross sectiond) No twisting in the cross section4. Bituminous materials are used in highway construction primarily because of:a) Cementing and water-proofing propertiesb) Load bearing capacities

    c) High specific gravities 8 td) Black color which facilitates road markings .5. Area of the Shear Force Diagram is equal to the:

    a) Load at the pointb) Bending Moment at the pointc) Shear Force at the pointd) Maximum Bending Moment at the point6. The particle size distribution curves are extremely useful for classification of:a) Fine grained soilsb) Coarse grained soilsc) Both coarse and fine grained soilsd) Silts and claysCSCE-TG2007CE 2

    It.'.,

  • 8/12/2019 Civil Engg MCQ Paper

    3/17

    .., , .7. By simple bending of a beamwe mean hat:a) The bendingof the beamshallbe accompanied y twistingb) The bendingof the beamshall not be accompanied y twistingc) The plane of loadscoincideswith the centroidalplaned) The plane of loadsdoesnot coincide with the centroidalplane8. The ability of the material to deform plastically before fracture is called:

    a) neckingb) yieldingc) malleabilityd) ductility9. Which is the correct Bending Formula?M y Ea) -= -= -I q R

    M Y Rb) -= -=-I q EM q Ec) -= -= -I Y R

    18 d) ~ = ~ = ~lyE

    10. A soil having particles of nearly the samesize s known as:a) Well gradedb) Uniformly gradedc) Poorly gradedd) Gapgraded

    11. Which of the following load combination s not used n the design:a) DeadLoad + Live Loadb) DeadLoad + Live Load + Wind Loadc) DeadLoad + Earthquake oad + Live Loadd) DeadLoad + Earthquake oad + Wind Load8 12. The effective length of compressionmembers, effectively held in position and restrainedagainst rotation at both ends:a) O.55Lb) O.65L

    c) O.75Ld) O.85L13. Water hammer in pipe is due to:a) excessiveeakageof flowing fluidb) bursting of pipe underhigh luid pressurec) sudden toppage f flow by closureof a valved) hitting of pipe with a hammer

  • 8/12/2019 Civil Engg MCQ Paper

    4/17

  • 8/12/2019 Civil Engg MCQ Paper

    5/17

    ...,22. Soap helps n cleaning clothesbecause:a) dirt is absorbedb) there occursa change n the chemicalconstituents f soapc) surface ensionof the solution s decreasedd) solutionbecomesmore viscous23. For the shear force to be uniform throughout the span of a simply supported beam, itshould carry:a) a concentratedoad at mid-spanb) u.d.l over ts spanc) a couple at mid-spand) a coupleanywhereon ts span24. The analysis of rate is done to derive:a) Unit costof the buildingb) Unit costof item of workc) Unit costof worke d) Unit costof whole work25. The workability of concrete s measured n terms of slump, match List I with List II usingcodes givenbelow:

    Code List I works Code List II slumA Concrete oad works 1 25 to 50mmB Ordin RCC works for beams 2 75 to 150mmC Columns & thin vertical sections 3 12 o 25mmD MassConcrete 4 20 to 30mmE VibratedConcrete 5 50 to 100mm

    Code ABC D E Ticki 1 2 3 4 5ii 3 4 1 5 2iii 4 5 2 1 3.a iv 2 1 5 3 4..v 5 3 4 2 1

    26. The following are the common defects in painting, match List I with List II using codesgiven below:Code List I de ects Code List II (causeA Wrinklin 1 Due to excess f moistureB Discoloration 2 Lar e thicknessof aintC Exudation 3 Deficienc of oilD ChaIkin 4 Characteristics f certainknotsE Blisterin 5 Due to resence f knots

    CSCE-TG2007CE 5

  • 8/12/2019 Civil Engg MCQ Paper

    6/17

    I I I'" : '

    ..Code ABC D E Ticki 5 4 3 2 1

    ii 3 4 1 2 5iii 4 5 2 1 3iv 5 1 2 3 4v 2 4 3 5 1

    27. Match List I with List II and select the correct answer by using codes given below:Code List I (d~finition) Code List II (word)

    A Ratio of applied load and area of 1 S "" traIncross sectionB Ratio of change in length and 2 VI " S...," II ' n1 h f h I d d "timate tressonf;ma enf;t 0 t e oa e sectIonC Ratio of maximum load and original 3 Young's Modulus of i

    area of cross section Elasticity 1D Ratio of stress and strain 4 Unit Stress IeCode ABC D Ticki 4 1 2 3

    ii 3 2 1 4iii 2 4 3 1iv 1 3 4 2

    28. Match List I with List II and select the correct answer by using codes given below:Code List I (definition) Code List II (word)A Stations which are used to carry forward 1 M " St t"th k f " ,...,I " aIn a Ione networ trianE,uationB Stations which are selectedclose to the 2 S b "di St ti""" "d b " u Sl ary a onmain statIons to avol 0 structions

    C Stations which are used only to provide 3 S t II "t St "dill " I """ d n, " a e I e atIon 8 "tiona ray~ to mtersecte ,:omtsD StatIons at whIch no observa~lons re 4 Pivot Stationmade but angles at those stations are used

    Code ABC D Ticki 3 2 4 1ii 2 4 1 3iii 1 3 2 4iv 4 1 3 2

    , ~~-~ ~ ~ ~- ---~---~SCE-TG2007CE 6

  • 8/12/2019 Civil Engg MCQ Paper

    7/17

    _. ,

    ...i .29. Match List I with List II and select the correct answer by using codes given below:

    Code List I (de nition Code List II ormula)A Max. deflection of a simply supported beam of 1 Wl3span 1 carrying conc. load Wat the centre s -

    Slope of a simply supported beam of length 1 at l3B the supports carrying u..d.l of intensity w per unit 2 ~len th is 12EIC Deflection at the free end of a cantilever of span 3 SWl31 carrying a conc.load Wat the free end isD Max. slope of a cantilever of span1 carrying a 4 wlu.d.l of intensity w per unit length is -

    Code ABC D Ticki 3 4 1 2ii 1 3 2 4iii 1 2 4 3iv 3 2 1 4830. Match List I with List II and select the correct answer by using codes given below:

    Code List I ~ e 0 stress n member) Code List IIA Tension members 1B Me~bers c~i~g compressive oad due 2 250to WInd or SelSInlCorce onlC Comp~essionmembers carrying dead and 3 350

    su er 1m osed loadsD Members carryin~ mainly tension in a 4 400roof truss or a bracm s stemCode ABC D Tick

    i 2 1 3 4ii 3 4 2 18 iii 4 2 1 3iv 1 3 4 2

    CSCE-TG2007CE 7

  • 8/12/2019 Civil Engg MCQ Paper

    8/17

    ,.. , .31. A beam AB of span 5m is simply supported at A and B. A cantilever beamDC of length 3m .which is fixed at D meets he beamAB at midpoint C, thereby forming a rigid joint at C.A vertical load of 200KN is applied vertically at common oint C. Find out reactions at ends ofsimply supported beam.

    CA Br answer

    I

    8

    I1;

    8it

    IIIIiIiI:;;,

    ~ ~~SCE-TG200 8

  • 8/12/2019 Civil Engg MCQ Paper

    9/17

    .

    ..'.32. A rectangular singly reinforced beam, 300mm wide by 500mm effective depth is used as asimply supported beam over an effective span of 6m. The reinforcement consistsof 4 bars of20mm diameter. If the beam carries a load of 12KN/m, inclusive of the self weight, determinethe stressesdeveloped n concreteand steel.Take m = 19

    S r answer

    8

    8

    CSCE-TG2007CE

  • 8/12/2019 Civil Engg MCQ Paper

    10/17

    .. , .33. A 300mm pipe carries water at a velocity of 24.4 m/s. At points A and B measurementsof .pressure and elevation were 361KN/m2,30.Smand 288 KN/m2, 33.Sm espectively. For steadyflow, find the lossof head betweenA and B. (Hint w = 9810N/m3 ndg=9.81m1s2)r answer

    8

    ~,SCE-TG2007CE 10

  • 8/12/2019 Civil Engg MCQ Paper

    11/17

  • 8/12/2019 Civil Engg MCQ Paper

    12/17

    .. ..35. Calculate the final bending moment using the Moment Distribution Method for the'following structure.Length of beamAB = BC = 5mSize of beam AB = BC = 300 x 500mm

    s KN 8 KN

    ~~ 'm 'm ~: ': ~"m ,,~ "m ~~E I is constantSpaceor answer

    8'

    Ii

    '8

    Ii

    CSCE-TG2007CE 12

  • 8/12/2019 Civil Engg MCQ Paper

    13/17

    ...,.Section B (50 Marks)

    Answeranyone Questiononly. The 9yestioncarries50 marksQuestion 1: A reinforced cement concrete building was proposed to be constructed on a marshyarea. The site being inaccessible machineries cannot be deployed. The designer initially proposed tohave isolated footings as the foundation assuming the soil bearing capacity of 150KN/m2, howeveron physical observation and test at the site, the soil bearing capacity was found to be much less thanthe assumedvalue.Therefore, the contractor proposed to relocate the building to a more stable place; however thisproposal was turned down and the contractor was asked to make all the necessary changes requiredand to construct the building on the proposed area only.

    a) You as the soil engineer, how you would carry out the investigation and recommend theremedial measures,describe briefly.(15 marks)

    8 b) You as the designer, what changes would you make. Describe briefly and if necessary givesome sketches o substantiate your justifications.

    (15 marks)

    c) You as the site engineer, how would you carry out the foundation excavation works in suchharsh conditions, describe briefly. And also prepare the work plan upto the plinth level withthe duration of 30 days.

    (20 marks)

    8

    ~- ~- ~-~ e ' ~- --~SCE-TG2007CE 13

  • 8/12/2019 Civil Engg MCQ Paper

    14/17

    ... ..Question2: a) At one particular site, due to the recentheavymonsoon,most of the random ubble'masonrywalls of height 4 -6m with weepholesconstructed t site had either ailed or bulged. Thedesignerwas nformed about his andhe nsists hat he designs re safe.You as he nvestigator,describewhat might havebeen he causes f these ailures?

    (10 marks)Suggest ome emedialmeasures onsidering he ime aswell as he cost(10 marks)

    Question2: b) 100mRRM boundarywall was awarded o a contractor or contractduration of just10 days.The detailsof the walls areas ollows:PCC 1:3:6 oundationpad of size900Wmmx 150DmmRRM in foundation n CM 1:5 s 600Wmmx 450DmmRRM in superstructuren CM 1:5 s 300Wmmx 1200DmmFoundationDepth = 600mm rom the ground evel.

    List d?wn the activities that are involved in carrying out such work in chronological order of ..executIon. -(10 marks)Prepare cross sectionof the RRM wall with the above nformationand alsopreparea realistic workplan within the contractduration

    (10 marks)What would have been he materialconsumption. ist only the basicmaterials ike cement,sandandstones.

    (10 marks)

    8

    ~.'CSCE-TG2007CE

    I;

  • 8/12/2019 Civil Engg MCQ Paper

    15/17

    .';'

    Spaceor answer o SectionB

    8

    8

    CSCE-TG2007CE 15

  • 8/12/2019 Civil Engg MCQ Paper

    16/17

    '..Spaceor answer o SectionB ' .

    8IIf

    .8

    CSCE-TG2007CE 16I'IIII,i;',J

  • 8/12/2019 Civil Engg MCQ Paper

    17/17

    .,"'...7..Space for answer to Section B

    8

    8