Department of Public Utilities Water Rate Presentation Water and Sewer Committee Toledo Regional Chamber of Commerce April 19, 2013
30

City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

May 22, 2015

Download

Documents

City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce - April 2013
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Department of Public Utilities

Water Rate PresentationWater and Sewer Committee

Toledo Regional Chamber of CommerceApril 19, 2013

Page 2: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Presentation OverviewDeputy Mayor Steve Herwat

Page 3: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Collins Park Water Treatment PlantCommissioner of Water Treatment

David Leffler

Page 4: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Treatment Plant Additions(Total $96,600,000)Basin 7 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $53,400,000Basin 8 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $43,200,000

Raw Water Intake Impr.$1,775,000Structural, Interiorand Exterior Improvements

Low Service PS Improvements$20,633,000Electrical Upgrades, Pump Rehab, Piping Gallery ImprovementsEquipment Replacements, Security

Chemical Feed System Impr.$10,384,000Carbon, Alum, Lime and Soda Ash

Flocculation/Sedimentation Basin Impr.$14,321,000Equipment Replacements and StructuralImprovements

Filter System Improvements$37,695,000Piping and Valve Replacements and Rehabilitation, Pumping System Impr.,Filter Wash Water Facility Impr., etc.

High Service PS Improvements$12,172,000Electrical Upgrades, Pump Rehab, Piping GalleryImprovements, Equipment Replacements

Heatherdowns PS Impr.$5,530,000Electrical Upgrades, Pump And Equipment Rehab, Structural Improvements

Residuals Handling$20,542,000Press and Thickener Rehabilitation, Additional Thickener Tank, Additional Press and Bldg Expansion

Additional Facility Improvements1. SCADA System Replacement $5,000,0002. Power Supply Improvements $ 7,000,0003. HVAC Improvements $1,869,0004. Filter Plant Roof Replacements $15,000,0005. Structural Repairs to Plant $2,638, 0006. Administration Bldg Offices and Property Acquisition $4,804,000

Toledo Division of Water Treatment - Improvement CostsTotal Cost - $263,963,000

Expenditures from 2013 through 2018 total $235,072,958

New Disinfection Facilities$8,000,000Chlorine and Chlorine Dioxide Generation and Feed Equip., Masonry Building

Page 5: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution SystemCommissioner of Engineering Services

Robin Whitney

Page 6: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

•Introductions

•Overview

Toledo Water Distribution Study

Toledo Water Service Area

Page 7: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

2012 Water Distribution Study

• Completed by Outside Engineering Firm

• Computer Model of All Pipes

• Serves Demands Through 2035

• Provides Redundancy

Page 8: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

City of Toledo Water Distribution System

1,190 miles of pipe• 4” to 96” Pipes• Dating to 1870

• 58% of System is 6” Cast Iron

---Small diameter pipe is Ductile Iron since 1960s

---Large diameter pipe is Steel and Concrete Cylinder

Page 9: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution System ChallengesAging – over 50% pre-1930

Page 10: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution System ChallengesMain Breaks - More than 300 on average per year

Page 11: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution System Challenges4” Mains, 6 miles, 1874-1954

Page 12: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution System ChallengesDead End Mains – water quality, pressure, redundancy issues

Page 13: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Distribution System ChallengesSteel Mains – corrosion, lower useful life

Page 14: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

:1

869

1870

:187

9

1880

:188

9

1890

:189

9

1900

:190

9

1910

:191

9

1920

:192

9

1930

:193

9

1940

:194

9

1950

:195

9

1960

:196

9

1970

:197

9

1980

:198

9

1990

:199

9

2000

:200

9

2010

:201

3

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Age and Break Distribution

Main Breaks % of System

Decade

Perc

ent

Page 15: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Main Replacement Criteria

• Break History• Flow/Pressure Problems• 4” Serving Hydrant• Scheduled Road Construction • Cost of Replacement/Cost of Repair• Year of Construction – Baby Boomer Era• Criticality• Other (diameter, corrosion, material,

geographic zone, age)

Page 16: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Current Main Replacement Program

• $2.5 million per year • Prioritized replacement criteria• Approx. 3.1 miles per year (1100 total miles)• 0.27% of the system• 366 year average replacement cycle• Also replacing large steel mains - $1.5 million

every other year

Page 17: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Current Loop Closure Program

• Separate program to loop dead end mains• $200,000 per year • Improves

– Water quality– Fire flow capacity– Redundancy

Page 18: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Goals of Proposed Program

• Replace at least 1% of system per year. (Based on 100 years expected life)

• Replace all 4” mains serving hydrants within 10 years.

• Close all significant dead end mains within 10 years.

Page 19: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Current

Main Replacement Program• $2.5 million per year• 0.27% of system per year• 366 year average cycle• Approx. 3.1 miles per year

Proposed

Main Replacement Program• $10 million per year• 1.1% of system per year• 91 year average cycle • Approx. 12.4 miles per year

Page 20: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Current

Loop Closure Program$200,000 per year

Steel Main Replacement$1.5 million every other year

Proposed

Loop Closure Program$500,000 per year

Steel Main Replacement$1.5 million every other year

Page 21: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Current

Dead End MainsMinimal Program

4” MainsMinimal Program

Proposed

Dead End Mains Close all significant dead end mains within 10 years

4” MainsReplace all 4” mains serving hydrants within 10 years

Page 22: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Review of Water Rate Ordinance

Department of Public Utilities Director David Welch

Page 23: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Five-Year Water Rate Program2014-2018

In 2018…

34.2 cents more daily for typical customers

8.6 cents more daily for Homestead customers

Page 24: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

2012 Water Rate Comparison

2012 Rates

City 1,000 cu. ft.

per month

Akron, OH $25.15

Ann Arbor, MI $20.56

Canton, OH $17.94

Cincinnati, OH $25.63

Cleveland, OH $32.60

Columbus, OH $33.35

Detroit, MI $25.12

Fort Wayne, IN $22.20

Average of Above Cities $25.32

TOLEDO, OH $13.33

TOLEDO, OH (2018 rate as proposed) $24.93

US Median $29.85

Midwest Median $25.68

Page 25: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Water Rate Increase Supports

Comprehensive plan to address needed improvements in water treatment plant and distribution system

$314 million total cost of all projects

Rate increase leverages bond funding

Page 26: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Impact of ProgramDeputy Mayor Steve Herwat

Page 27: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Price ComparisonDeputy Mayor Steve Herwat

Page 28: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce
Page 29: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce
Page 30: City of Toledo Department of Public Utilities Water Rate Presentation to the Toledo Regional Chamber of Commerce

Five-Year Water Rate Program2014-2018

In 2018…

34.2 cents more daily for typical customers

8.6 cents more daily for Homestead customers