Department of Public Utilities Water Rate Presentation Water and Sewer Committee Toledo Regional Chamber of Commerce April 19, 2013
May 22, 2015
Department of Public Utilities
Water Rate PresentationWater and Sewer Committee
Toledo Regional Chamber of CommerceApril 19, 2013
Presentation OverviewDeputy Mayor Steve Herwat
Collins Park Water Treatment PlantCommissioner of Water Treatment
David Leffler
Treatment Plant Additions(Total $96,600,000)Basin 7 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $53,400,000Basin 8 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $43,200,000
Raw Water Intake Impr.$1,775,000Structural, Interiorand Exterior Improvements
Low Service PS Improvements$20,633,000Electrical Upgrades, Pump Rehab, Piping Gallery ImprovementsEquipment Replacements, Security
Chemical Feed System Impr.$10,384,000Carbon, Alum, Lime and Soda Ash
Flocculation/Sedimentation Basin Impr.$14,321,000Equipment Replacements and StructuralImprovements
Filter System Improvements$37,695,000Piping and Valve Replacements and Rehabilitation, Pumping System Impr.,Filter Wash Water Facility Impr., etc.
High Service PS Improvements$12,172,000Electrical Upgrades, Pump Rehab, Piping GalleryImprovements, Equipment Replacements
Heatherdowns PS Impr.$5,530,000Electrical Upgrades, Pump And Equipment Rehab, Structural Improvements
Residuals Handling$20,542,000Press and Thickener Rehabilitation, Additional Thickener Tank, Additional Press and Bldg Expansion
Additional Facility Improvements1. SCADA System Replacement $5,000,0002. Power Supply Improvements $ 7,000,0003. HVAC Improvements $1,869,0004. Filter Plant Roof Replacements $15,000,0005. Structural Repairs to Plant $2,638, 0006. Administration Bldg Offices and Property Acquisition $4,804,000
Toledo Division of Water Treatment - Improvement CostsTotal Cost - $263,963,000
Expenditures from 2013 through 2018 total $235,072,958
New Disinfection Facilities$8,000,000Chlorine and Chlorine Dioxide Generation and Feed Equip., Masonry Building
Water Distribution SystemCommissioner of Engineering Services
Robin Whitney
•Introductions
•Overview
Toledo Water Distribution Study
Toledo Water Service Area
2012 Water Distribution Study
• Completed by Outside Engineering Firm
• Computer Model of All Pipes
• Serves Demands Through 2035
• Provides Redundancy
City of Toledo Water Distribution System
1,190 miles of pipe• 4” to 96” Pipes• Dating to 1870
• 58% of System is 6” Cast Iron
---Small diameter pipe is Ductile Iron since 1960s
---Large diameter pipe is Steel and Concrete Cylinder
Water Distribution System ChallengesAging – over 50% pre-1930
Water Distribution System ChallengesMain Breaks - More than 300 on average per year
Water Distribution System Challenges4” Mains, 6 miles, 1874-1954
Water Distribution System ChallengesDead End Mains – water quality, pressure, redundancy issues
Water Distribution System ChallengesSteel Mains – corrosion, lower useful life
:1
869
1870
:187
9
1880
:188
9
1890
:189
9
1900
:190
9
1910
:191
9
1920
:192
9
1930
:193
9
1940
:194
9
1950
:195
9
1960
:196
9
1970
:197
9
1980
:198
9
1990
:199
9
2000
:200
9
2010
:201
3
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
Age and Break Distribution
Main Breaks % of System
Decade
Perc
ent
Main Replacement Criteria
• Break History• Flow/Pressure Problems• 4” Serving Hydrant• Scheduled Road Construction • Cost of Replacement/Cost of Repair• Year of Construction – Baby Boomer Era• Criticality• Other (diameter, corrosion, material,
geographic zone, age)
Current Main Replacement Program
• $2.5 million per year • Prioritized replacement criteria• Approx. 3.1 miles per year (1100 total miles)• 0.27% of the system• 366 year average replacement cycle• Also replacing large steel mains - $1.5 million
every other year
Current Loop Closure Program
• Separate program to loop dead end mains• $200,000 per year • Improves
– Water quality– Fire flow capacity– Redundancy
Goals of Proposed Program
• Replace at least 1% of system per year. (Based on 100 years expected life)
• Replace all 4” mains serving hydrants within 10 years.
• Close all significant dead end mains within 10 years.
Current
Main Replacement Program• $2.5 million per year• 0.27% of system per year• 366 year average cycle• Approx. 3.1 miles per year
Proposed
Main Replacement Program• $10 million per year• 1.1% of system per year• 91 year average cycle • Approx. 12.4 miles per year
Current
Loop Closure Program$200,000 per year
Steel Main Replacement$1.5 million every other year
Proposed
Loop Closure Program$500,000 per year
Steel Main Replacement$1.5 million every other year
Current
Dead End MainsMinimal Program
4” MainsMinimal Program
Proposed
Dead End Mains Close all significant dead end mains within 10 years
4” MainsReplace all 4” mains serving hydrants within 10 years
Review of Water Rate Ordinance
Department of Public Utilities Director David Welch
Five-Year Water Rate Program2014-2018
In 2018…
34.2 cents more daily for typical customers
8.6 cents more daily for Homestead customers
2012 Water Rate Comparison
2012 Rates
City 1,000 cu. ft.
per month
Akron, OH $25.15
Ann Arbor, MI $20.56
Canton, OH $17.94
Cincinnati, OH $25.63
Cleveland, OH $32.60
Columbus, OH $33.35
Detroit, MI $25.12
Fort Wayne, IN $22.20
Average of Above Cities $25.32
TOLEDO, OH $13.33
TOLEDO, OH (2018 rate as proposed) $24.93
US Median $29.85
Midwest Median $25.68
Water Rate Increase Supports
Comprehensive plan to address needed improvements in water treatment plant and distribution system
$314 million total cost of all projects
Rate increase leverages bond funding
Impact of ProgramDeputy Mayor Steve Herwat
Price ComparisonDeputy Mayor Steve Herwat
Five-Year Water Rate Program2014-2018
In 2018…
34.2 cents more daily for typical customers
8.6 cents more daily for Homestead customers