Manual last updated in 2004.Changes in Surface Water
Regulation require manual to be reviewed and updated as needed.
Opportunity to update other sections of manual.
Need For Update
NPDES LID Code Revision
Public Meeting April 10, 2014
Merita Trohimovich, P.E. City of Tacoma
Surface Water Engineer
The intent of the code revisions shall be to make LID the preferred and commonly-used approach to site development.
Revisions shall be designed to: minimize impervious surfaces, minimize native vegetation loss, and minimize stormwater runoff in all types of development situations.
S5.C.5 b LID Code-related Requirements
Direct Approach:All projects shall complete LID feasibility analysis and implement to maximum extent feasible.
Tacoma’s Proposed Approach: Remove barriers; Make equivalent guidance; Add incentives; Provide equivalent manual; and Lead by example.
LID Code Updates Approach
Code Update Process Guidance
Reviewing all development codes, regulatory and guidance documents
Partnering with planning department using existing process for code adoption
Using Standards Committee existing process to update Public Works Design Manual
Creating internal work groups Public outreach
Tacoma’s Process
Process and schedule developed Staff, manager, supervisor education Team on board Team educated Beginning public education Beginning actual work of
code review and revision
Work to Date
What is needed to implement LID? Additional training and technical support Additional details and pre-engineered sizing Site assessment and design guidance Guidance for minimizing impervious surfaces Tree retention and protection specifications Methods for retaining native vegetation Soil testing assistance Training workshops Online information
LID Design Needs
What would help you choose LID over traditional stormwater options? Faster permit review Reduction of permit fees Allowance to modify design elements (additional
height, ability to decrease setbacks, lower parking requirements, less landscaping)
Reduction in surface water fees Training and Education Other?
Choosing LID
Merita TrohimovichCity of Tacoma Surface Water [email protected]
Contact me for suggestions, questions and to get involved.
Contact Information