Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer
11

City of Tacoma

Feb 22, 2016

Download

Documents

xiang

City of Tacoma. Public Meeting April 10, 2014. Jim Parvey, P.E ., LEED AP City of Tacoma Senior Principal Engineer. Design Manual Update. Need For Update. Manual last updated in 2004. Changes in Surface Water Regulation require manual to be reviewed and updated as needed. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: City of Tacoma

Design Manual Update

City of Tacoma

Public Meeting April 10, 2014

Jim Parvey, P.E., LEED APCity of Tacoma

Senior Principal Engineer

Page 2: City of Tacoma

Manual last updated in 2004.Changes in Surface Water

Regulation require manual to be reviewed and updated as needed.

Opportunity to update other sections of manual.

Need For Update

Page 3: City of Tacoma

NPDES LID Code Revision

Public Meeting April 10, 2014

Merita Trohimovich, P.E. City of Tacoma

Surface Water Engineer

Page 4: City of Tacoma

The intent of the code revisions shall be to make LID the preferred and commonly-used approach to site development.

Revisions shall be designed to: minimize impervious surfaces, minimize native vegetation loss, and minimize stormwater runoff in all types of development situations.

S5.C.5 b LID Code-related Requirements

Page 5: City of Tacoma

Direct Approach:All projects shall complete LID feasibility analysis and implement to maximum extent feasible.

Tacoma’s Proposed Approach: Remove barriers; Make equivalent guidance; Add incentives; Provide equivalent manual; and Lead by example.

LID Code Updates Approach

Page 6: City of Tacoma

Code Update Process Guidance

Page 7: City of Tacoma

Reviewing all development codes, regulatory and guidance documents

Partnering with planning department using existing process for code adoption

Using Standards Committee existing process to update Public Works Design Manual

Creating internal work groups Public outreach

Tacoma’s Process

Page 8: City of Tacoma

Process and schedule developed Staff, manager, supervisor education Team on board Team educated Beginning public education Beginning actual work of

code review and revision

Work to Date

Page 9: City of Tacoma

What is needed to implement LID? Additional training and technical support Additional details and pre-engineered sizing Site assessment and design guidance Guidance for minimizing impervious surfaces Tree retention and protection specifications Methods for retaining native vegetation Soil testing assistance Training workshops Online information

LID Design Needs

Page 10: City of Tacoma

What would help you choose LID over traditional stormwater options? Faster permit review Reduction of permit fees Allowance to modify design elements (additional

height, ability to decrease setbacks, lower parking requirements, less landscaping)

Reduction in surface water fees Training and Education Other?

Choosing LID

Page 11: City of Tacoma

Merita TrohimovichCity of Tacoma Surface Water [email protected]