City of Somersworth City of Somersworth Presentation to City Council on Presentation to City Council on Pavement Management Pavement Management Presented by: Presented by: Joe Ducharme, Jr., P.E. Joe Ducharme, Jr., P.E. Contract City Engineer Contract City Engineer & & Britt E. Audett, P.E. Britt E. Audett, P.E. CMA Engineers, Inc. CMA Engineers, Inc.
18
Embed
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
City of SomersworthCity of SomersworthPresentation to City Council onPresentation to City Council on
Pavement ManagementPavement Management
Presented by:Presented by:
Joe Ducharme, Jr., P.E.Joe Ducharme, Jr., P.E.
Contract City EngineerContract City Engineer
& &
Britt E. Audett, P.E.Britt E. Audett, P.E.
CMA Engineers, Inc.CMA Engineers, Inc.
Pavement is an AssetPavement is an Asset
► City’s Public Infrastructure Assets City’s Public Infrastructure Assets include:include: Drainage SystemsDrainage Systems ParksParksPaved RoadsPaved Roads Public BuildingsPublic Buildings SchoolsSchools Sewage Treatment Sewage Treatment
Plant Plant Sewage CollectionSewage Collection
SystemSystem SidewalksSidewalks Water DistributionWater Distribution
SystemSystem Water Treatment PlantWater Treatment Plant
► ~50 miles of paved roads maintained by the City of ~50 miles of paved roads maintained by the City of Somersworth.Somersworth.
► At avg pavement thickness of 4-inches, equates to At avg pavement thickness of 4-inches, equates to more than 180,000 tons of pavement.more than 180,000 tons of pavement.
► Replacement value to reconstruct all paved roads Replacement value to reconstruct all paved roads (including gravel base) ~ $25,000,000 million (including gravel base) ~ $25,000,000 million dollars.dollars.
Preservation vs. Preservation vs. ReconstructionReconstruction
► Uniform pavement surface limits water penetration Uniform pavement surface limits water penetration to road base below (good)to road base below (good)
► Cracked road surface allows water penetration, Cracked road surface allows water penetration, frost heaves, pot holes (bad)frost heaves, pot holes (bad)
► Cost of reconstructing a bad road can be 10 to 20 Cost of reconstructing a bad road can be 10 to 20 times more times more $$$$$$ than surface treatment on a good than surface treatment on a good roadroad
► Good road surface = preserved road base = longer Good road surface = preserved road base = longer service life = lower cost to maintainservice life = lower cost to maintain
Pavement Management PlanPavement Management Plan
► Elements of a PMPElements of a PMP1. road inventory1. road inventory2. road condition2. road condition3. road classification3. road classification4. local repair methods and costs4. local repair methods and costs5. project prioritization5. project prioritization6. funding 6. funding 7. implementation7. implementation8. annual updates to the plan8. annual updates to the plan
Road InventoryRoad Inventory
► ~50 miles of City-maintained paved roads~50 miles of City-maintained paved roads► 3D Laser Imaging – all lanes3D Laser Imaging – all lanes► Imaging linked to GISImaging linked to GIS
coordinatescoordinates
Pavement ConditionPavement Condition
► Pavement Condition Pavement Condition Index (Index (PCIPCI))
► Ranges from 0 to 100 Ranges from 0 to 100 ((higher = betterhigher = better))
► Strive for 75 or higher – Strive for 75 or higher – good/satisfactorygood/satisfactory
► City-wide average City-wide average PCI PCI = 53= 53
PCI Rating Scale
90-10090-100 Good
70-9070-90 Satisfactory
50-7050-70 Fair
40-5040-50 Poor
30-4030-40 Very Poor
10-3010-30 Serious
0-100-10 Failed
PCI DistributionPCI Distribution
PCI RangePCI Range Total Miles Total MilesFailed (0-10)Failed (0-10) 00Serious (10-30)Serious (10-30) 9.39.3Very Poor (30-40)Very Poor (30-40) 7.27.2Poor (40-50)Poor (40-50) 6.96.9Fair (50-70)Fair (50-70) 11.411.4Satisfactory (70-90)Satisfactory (70-90) 9.19.1Good (90-100)Good (90-100) 4.34.3
Injection or Portland Cement Injection or Portland Cement $$30.00/SY30.00/SY► Full Box Out and ReconstructionFull Box Out and Reconstruction $$70.00/SY70.00/SY
Pavement Management PlanPavement Management Plan► Local input for repairs, costs, other needsLocal input for repairs, costs, other needs► Goal is to bring all roads up to satisfactory/good Goal is to bring all roads up to satisfactory/good
conditioncondition► Run scenarios: # yrs / annual budget / avg PCIRun scenarios: # yrs / annual budget / avg PCI► Adjust and update annually for CIP Adjust and update annually for CIP
Level of Investment MattersLevel of Investment Matters
► Goal is to achieve City-wide PCI>=75Goal is to achieve City-wide PCI>=75
PMP UpdatesPMP Updates
►Annual updates to database by staffAnnual updates to database by staff►Annual monitoring by staff for road Annual monitoring by staff for road
deterioration (compare to video library)deterioration (compare to video library)►Re-run repair & funding scenarios annuallyRe-run repair & funding scenarios annually►Coordinate repaving with other CIP projectsCoordinate repaving with other CIP projects►Update road condition imaging periodically Update road condition imaging periodically