Top Banner
2/11/2016 1 BOMA Presentation City of Saint Paul City of Saint Paul City of Saint Paul City of Saint Paul Jackson Street Jackson Street Jackson Street Jackson Street Reconstruction Reconstruction Reconstruction Reconstruction LOCATION
8

City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

Aug 29, 2018

Download

Documents

vokhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

1

BOMA Presentation

City of Saint PaulCity of Saint PaulCity of Saint PaulCity of Saint Paul

Jackson Street Jackson Street Jackson Street Jackson Street ReconstructionReconstructionReconstructionReconstruction

LOCATION

Page 2: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

2

PROJECT BACKGROUND

• Roadway is in need of total reconstruction

• Desire for Economic Development

• 8 80 Vitality Funds

• Vibrant Places and Spaces

PROJECT HISTORY

• Saint Paul Bicycle Plan recommends protected bikeway facility along

Jackson Street

• Provides the missing gap for safe connections

Page 3: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

3

TYPICAL PLAN VIEW

Page 4: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

4

PROPOSED TYPICAL SECTION

PROPOSED TYPICAL SECTION

Page 5: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

5

PROPOSED TYPICAL SECTION

Page 6: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

6

DESIGN FEATURES

• Utility Upgrades –

� Water Main and Services, Xcel Electric and Gas, Storm Sewers, Sanitary Service Repairs, Comcast, Others

• New Concrete Sidewalks, New Asphalt Bikeway

� East curbline from 2nd Street to 6th remains in current location

• New Concrete Pavement

• Trees, Vegetation, Furnishings

� Existing trees will be retained or replaced

� New plantings and landscape furnishings proposed

• Streetlights and Signals

� Historic Globe lights will be refurbished and reinstalled

� New Single Globe Lighting supplemented with Bent Straw

� Modern Signal System at all intersections

TRAFFIC / SAFETY / ENVIRONMENTAL

• Maximize pedestrian and bicycle space

• Provides buffer areas between all modes of

transportation

• Respect and enhance existing context

• Consistent with downtown standards and development

goals

• Provides a “Complete Street Design”

Page 7: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

7

UTILITY WORK

UTILITY WORK

Page 8: City of Saint Paul Jackson Street Reconstruction · • Saint Paul Bicycle Plan recommends protected bikeway facility along Jackson Street • Provides the missing gap for safe connections.

2/11/2016

8

TIMELINE

• NOW – Utility relocation

• May 2016-

Construction Contract Begins on south end of corridor

• December 2016 –

Construction substantially complete south of 7th Place

• April 2017 –

Construction begins north of 7th Place to 11 th Street.

• December 2017 –

Construction complete

QUESTIONS / COMMENTS