Top Banner
City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage Tank RFQ 2018-006 DUE BY: Consulting firms must submit FOUR (4) paper copies, and ONE (1) electronic copy: in a CLEARLY IDENTIFIED RESPONSE PACKAGE to: City of Haslet Attention: Engineering Department 101 Main Street Haslet, Texas 76052 No later than 4:00 p.m., Tuesday, January 15, 2019.
8

City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

Mar 25, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

City of Haslet

REQUEST FOR QUALIFICATIONS

Elevated Storage Tank RFQ 2018-006

DUE BY: Consulting firms must submit FOUR (4) paper copies, and ONE (1) electronic copy: in a CLEARLY

IDENTIFIED RESPONSE PACKAGE to: City of Haslet

Attention: Engineering Department 101 Main Street

Haslet, Texas 76052

No later than 4:00 p.m., Tuesday, January 15, 2019.

Page 2: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

RFQ 2018-006 Elevated Storage Tank 2

RFQ Sections Purpose of RFQ: The City of Haslet is seeking a qualified engineering consulting firm to provide site planning, surveying, engineering design, and construction services for an Elevated Storage Tank to service the City’s utility system. The services to be provided include: field surveys, design and analysis, construction plans, bid documents, and construction administration. The firm shall demonstrate previous experience in the design and construction administration of similar elevated storage tank design projects. Questions Pertaining to the Selection Process: Any questions related to the project that are not covered in the RFQ must be in writing and directed to: Travis N. Attanasio, P.E., CFM City of Haslet (817) 439-5931 ext. 112 [email protected] Changes in the RFQ The City of Haslet shall not be held responsible for any oral instructions related to the project. Any changes to this RFQ will be in the form of a written addendum, which will be published on the City website at www.haslet.org. Withdrawal of RFQ The City reserves the right to withdraw the RFQ at any point. At any time prior to the specified solicitation due time and date, a consultant (or designated representative) may withdraw their Statement of Qualifications (SOQ) by submitting a written request stating the reason for withdrawal. General Information:

1) The City of Haslet reserves the right to reject any or all SOQs, to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQ’s received.

2) Project Description: An elevated storage tank will be necessary to sustain the growth on the west side of the City of Haslet. Qualified engineering consulting firms are being sought to provide site planning, design, and construction administration services for this project.

3) The Engineer will be selected on the basis of demonstrated competence and qualification for the type of services required without regard to fee, and thereafter the City of Haslet will negotiate a contract for the site planning, design, and construction administration services at a fair and reasonable fee with the best qualified firm.

4) The Engineer will be an integral member of the Project Team, consisting of the Engineer, Contractor, and City staff personnel.

Page 3: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

RFQ 2018-006 Elevated Storage Tank 3

Scope of Services The Engineer should expect to provide the following services on the project:

1) Design and construction of a 500,000 gallon Elevated Storage Tank 2) Field surveys 3) Subsurface utility engineering (SUE) as necessary 4) Geotechnical investigations and recommendations for tank support 5) BNSF Railroad Crossing Permits 6) 16” Water line design in accordance with City of Haslet Specifications 7) Preliminary plan submittals for review (30, 60, 90 percent completion) 8) City involvement which includes meetings with city staff and presentations to City Council 9) Erosion Control Plans 10) Recommendations on equipment additions such as pumps, valves, lines, and flowmeters 11) Recommendations on upgrades to existing utility operations such as the installation of

pressure reducing valves, hydro tank removals, plant upgrades etc. 12) Existing SCADA system integration 13) Land and easement acquisition support as required 14) An Engineer’s Opinion of Probable Construction Cost for each phase of the design 15) Conduct the bidding process including the preparation of a detailed bid tabulation of all

bidders 16) Construction phase services including but not limited to: contract administration (RFIs,

Change Orders, etc.), and construction inspections 17) Site planning and analysis with public interaction 18) Maintain compliance with regulatory agencies including but not limited to, FAA, TCEQ, etc. 19) Public Outreach including attending public information meetings and construction

notification 20) Original and digital Submittal of record drawings to the City of Haslet including plans, shape

files, and CAD drawings RFQ Schedule The dates and times listed below are estimated and are subject to change without notice.

1. December 19, 2018 – Issue Request for Qualifications to provide engineering consulting services on the City of Haslet - Elevated Storage Tank Project.

2. January 4, 2019 – Deadline for written questions 5:00 PM (CST). 3. January 8, 2019 – Questions and Responses will be posted to the City of Haslet website

(http://www.haslet.org/) by the close of business day. 4. January 15, 2019 – Four (4) paper copies and One (1) electronic copy of the Statement of

Qualifications (SOQ) due no later than 4 PM. 5. January 16-18, 2019 – The selection committee reviews each SOQ. 6. January 21, 2019 - Consultant will be notified of contract award selection and will have ten

(10) business days to prepare a Professional Services Agreement for review by the City Attorney.

7. February 19, 2019 – Regular City Council Meeting to Approve Consultant Selection and Professional Services agreement which will include the Scope of Services.

8. February 20, 2019 – Consultant will be notified of contract award selection and will have ten (10) business days to execute the Professional Services Agreement.

Page 4: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

RFQ 2018-006 Elevated Storage Tank 4

Qualifications The project will require the firm to have the following qualifications:

• Five (5) or more years of related elevated storage tank design experience • Experience working with municipal and regulatory agencies, including military installations • Familiarity with the City of Haslet dynamics (i.e. staff, council, community involvement) • Experience with public outreach and consensus building including effective communication

with private property owners, special interest groups, and other stakeholders Instructions to Proposers Response Format: The response shall be organized and formatted as follows:

• All pages shall be 8 ½ x 11 (Fold-out pages shall be allowed for the schedule only) • All pages shall be white 20 lb. “copier-style” paper. Cover stock, plastic pages or laminations

shall not be allowed • All pages shall be bound together only at the upper left-hand corner by a single staple.

Plastic bindings, wire bindings, screw-type bindings or notebooks shall not be allowed • All pages shall be single-sided • Page 1 shall be a Cover Letter • Page 2 shall be an organizational chart identifying primary consultant and each proposed

sub consultant with the following information included: name of firm, office address, name of project manager, telephone number, and email address.

• Pages 3-9 shall be one-page resumes for each of the following: Principal, Project Manager, Project Engineer, Surveyor, Geotechnical Engineer, Structural Engineer, Quality Manager

• Pages 10-12 shall be a summary of at least 3 projects within the last five years that are similar in nature identifying the project owner, location, include contact name, title, current phone number, and e-mail address for each of the project

• Page 13 shall be a Gantt chart showing the proposed schedule for the project phases and disciplines

• Pages 14-15 shall be a written document that describes the project approach and any recommendations

• Page 16 shall be a written document that describes quality assurance and quality control procedures

• Responses that are longer than 16 pages will not be considered Evaluation Criteria All proposals received will be reviewed, evaluated, and ranked according to a numerical scoring system based on the responses to the criteria listed below. The Selection Committee may select firms to be interviewed, based wholly on qualifications.

A. Project team and key personnel (25 points) [Pages 2-9] B. Team relevant experience (20 points) [Pages 10-12] C. Project schedule reasonability (20 points) [Page 13] D. Project approach and recommendations (25 points) [Pages 14-15] E. Quality assurance and control process (10 points) [Page 16]

Page 5: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

RFQ 2018-006 Elevated Storage Tank 5

Special Conditions

1. The Consultant/Engineer must demonstrate adequate Insurance coverage, including but not limited to Errors and Omissions. The City of Haslet shall be added to the policy.

2. A City of Haslet selection committee will review the submittals and recommend the most highly qualified submitting firms.

3. The Consultant/Engineer’s project manager shall be a Professional Engineer licensed in the State of Texas.

4. The Consultant/Engineer shall have an office within reasonable proximity to Haslet City Hall (NCTCOG Area). The Consultant’s project manager shall be based in that office.

Contract Negotiation Process The City reserves the right to reject any or all Statement of Qualifications. The highest ranked Respondent(s) may be invited to enter into Contract negotiations with the City of Haslet. If an agreement cannot be reached with the highest ranked Respondent(s), the City shall notify the Respondent and terminate negotiations. The second highest Respondent may be contacted for negotiations. The process may continue until successful negotiations are achieved. The City reserves the right to terminate negotiations with any and all Respondents should it be in the City’s best interest.

Page 6: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

AV

ON

DA

LE-H

AS

LET

RO

AD

JOHNDAYROAD

AV

ON

DA

LE-H

AS

LET

RO

AD

ATCHISON,TOPEKAANDSANTAFERAILROAD

11-27

-18

C I

T Y

O F

Texa

s

25A

BEN

CH

MA

RK

S:

BM

NO

.1C

ITY

OF

FOR

T W

OR

TH M

ON

UM

EN

T N

O. 9

129

AT T

HE

S.W

. CO

R. O

F EA

GLE

PA

RK

WA

Y 0

.1 M

ILE

EAS

T O

FS

TATE

HIG

HW

AY N

O. 1

56, 3

64' E

AST

OF

THE

A.T

. & S

.F.

RAI

L R

OAD

TR

AC

K, 4

5' W

EST

OF

WE

ST C

UR

B L

INE

OF

FUTU

RE

PUBL

IC R

OAD

. ON

TH

E S.

CL

OF

THE

EAST

BO

UN

D L

ANE

OF

EAG

LE P

ARKW

AY C

ENTE

R O

F A

10'

INLE

T.

ELE

VA

TIO

N: 6

80.3

7

BM

NO

.2B

OX

CU

T O

N E

ND

OF

CO

NC

. RET

. WAL

L 20

' NO

RTH

AN

D2.

5' W

EST

OF

THE

NO

RTH

WES

T PR

OP

ERTY

CO

RN

ER

OF

THE

SU

RVE

YED

TR

ACT.

ELE

VA

TIO

N: 7

27.3

8

PR

OPO

SED

SA

NIT

AR

Y S

EWER

SER

VIC

E

PR

OPO

SED

WA

TER

SE

RV

ICE

EX

ISTI

NG

CO

NTO

UR

PR

OPO

SED

STO

RM

SE

WE

R A

ND

INLE

T

EXI

STIN

G S

TOR

M S

EW

ER

AN

D IN

LET

PR

OPO

SED

WA

TER

LIN

E A

ND

VAL

VE

EXI

STIN

G W

ATE

R L

INE

AN

D V

ALVE

EXI

STIN

G F

IRE

HYD

RAN

T

EXI

STIN

G S

EW

ER

LIN

E W

ITH

MA

NH

OLE

PR

OPO

SED

FIR

E H

YDR

ANT

PR

OPO

SED

SE

WE

R L

INE

WIT

H M

AN

HO

LE

LEG

END

\\Ws02\JOBS(E)\JOB\200605\DS\SH\200605D-JDR\WTPL01.dwg,11/28/20182:45:25PM,rkh

Page 7: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

AVONDALE - HASLET RD

.200 0 200100 FeetWater Tower Exhibit October 23, 2018

LegendWater ImprovementsType

Water Line EasementWater Tower Property

500k water tower

Existing Gas Pad Easement

Gas Lines0.84 acres

0.13 acres

Property Lines

Page 8: City of Haslet REQUEST FOR QUALIFICATIONS Elevated Storage ...

!?

!?

!?!?

!?

!?

!?

!?

!?

!?

!?

"C̀

"C̀

"C̀

PL2

PL4

PL5

PL9

PL3

PL6

PL7

20

1624

12

16

12

16

12

16

12

12

16

16

16

1212

16

12

1012

1212

12

8

16

16

12

12

12

12

12

12

12

12

10

10

12

12

12

12

12

12

12

8

12

12

16

6

86

6

8

12

12

12

16

8

16

12

16

8

12

12

6

12

6

12

16

12

16 10

8

6

8

8

12

6

6

6

8

10

8

8

8

6

8

8

12

8 8

6

12

6

12

8

8

12

6

12

12

1012

108

10

4

8

6

6

6

12

8

6

6

8

6

6

12

16

610

§̈¦35W

§̈¦81

FM 15

6

FM 156

WESTPORT PKWY

NORT

H FW

Y

ALLIANCEGATEWAY

FWY

AVONDALE HASLET RD

NORT

H FW

Y

F M R

D 15

6

NORT

H FWY

FW Meter #4

FW Meter #3

FW Meter #2

LegendCCN Boundary

"C̀ Points of Connection

Primary Highway

Existing10-Year CIP(2018-2028)

1.6 MG GST9.1 MGD PS

Harmon EST1.0 MG T

M2

PL1

LaTera0.5 EST

North PS:0.5 MG GST5.2 MGD PS

PL8EST1

TGST2

Harmon PS:1 MG GST

2.4 MGD PSPS1/GST1

South PS:1 MG GST

5.5 MGD PST 1.5 MGD PS AND

PRESSURE TANK

Buildout

T

T

PL10

!? Pressure Reducing Valves

DeveloperContribution

0 0.5 10.25Miles

WATER DISTRIBUTIONMASTER PLANAND CAPITAL

IMPROVEMENTS PLAN ´

EXHIBIT 8

16

Lower Pressure Plane

Highest ThirdPressure Plane

Upper PressurePlane

M1

ODESSA DRIVE

BLUE MOUND ROAD E

BAYNE RD

BENT

TREE

LN

HWY 81

W HICKS RD

BLUE MOUND ROAD

North EST:0.5 MG EST

T

M3

tattanasio
Polygon