City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy 3 1 2 3 4
Mar 27, 2015
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
31
2 3
4
City of Eugene: Neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth St to existing pathway
extending from Concord St)
City of Eugene: neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth Street to existing pathway
extending from Concord Street
City of Eugene: Neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth St to existing pathway
extending from Concord St)
City of Eugene – Malabon Elementary School: sidewalk connection to school front entrance
City of Eugene – Malabon Elementary School: replacement of old bike racks with hoops
City of Eugene: Arts & Technology Academy(1) Intersection 24th Ave/Fillmore St: marked crosswalk/curb extensions/stutter flash units(2) Chambers St (23rd-24th Ave): infill sidewalk(3) 22nd Ave (Polk St-Jefferson St): crosswalks/curb extensions/lighting/signage(4) Intersection 22nd Ave/Jefferson St: high-visibility crosswalks/stutter flash units/lighting/signs(5) Installation of bicycle parking shelter – hoops @ school
3
2
4
1
5
City of Eugene – Arts & Technology Academy West 22nd Ave Corridor (Polk St-Jefferson St): Installation of marked
crosswalks/curb extensions/lighting/stutter flash units
City of Eugene – Arts & Technology Academy: Intersection 24th Ave/Fillmore St (construction of marked crosswalk, curb
extensions, and stutter flash unit)
City of Eugene - Intersection Avalon St/Frigon St: Installation of stutter flash unit