W CITY O WATER M J OF ANG MASTER July 2013 GELS R PLAN
WCITY O
WATER M
J
OF ANGMASTER
July 2013
GELS R PLAN
W
12
(209
CITY OWATER M
J
Su
City584 Sou
Angels C
Pr
Nolte A(a NV5
215 West CeMante
9) 239-9080
OF ANGMASTER
July 2013
bmitted to:
y of Angelsuth Main Str
Camp, CA 95
repared by:
Associates, I, Inc. compaenter Street, eca, CA 953 ▪ (209) 239
GELS R PLAN
reet 5222
Inc. any) Suite 201
337 9-4166 (Fax)
)
Angels WMJuly 2013
Exec
A Water treatmentfuture groPlan) [1]water supsupply, tron the cuof influenannexatioPlan incl
1. Ad
2. S
pr
3. A
4. D
5. Aac
6. Aw
7. Aidsy
8. Tisim
9. A
te A phasedperformawithin thdescendin
MP
cutive S
Master Plant, distributioowth as defi. The Masterpplies; and areatment, dis
urrent City lince (SOI) beon will be thuded:
A review of pistribution, a
ite visits to tractices.
A review of t
Development
An analysis octual usage t
An evaluationwater demand
An evaluationdentificationystem reliab
The executionssues within mprovement
A prioritizatioerm and long
d CIP was deance, distribuhe treatment,ng order of i
Summ
n (Master Plaon, and storagined in the rer Plan includ
an identificatstribution, animits from theyond the Cihe subject of
previous repoand storage s
the existing
he current an
t of design cr
of existing wto develop p
n of water trds.
n of availabln of alternateility.
n of hydraulthe distribut
ts on system
on of recommg-term capita
eveloped basution system supply, andimportance:
mary
an) was prepge systems tecently adopdes an evalution of recomnd storage syhe General Pity limits. Wf future techn
orts and studsystems.
facilities and
nd future reg
riteria.
water demandrojected wat
eatment, sto
le water supp water suppl
ic model scetion system wperformanc
mended impal improvem
sed on a revim hydraulic cd storage CIP
ES-1n:\m
pared for theto ensure thepted City of Aation of exis
mmended imystems. The
Plan [1] and dWater supply
nical studies
dies complet
d a review o
gulatory requ
ds and calibrter demands
rage, and tra
plies under alies to help m
enarios to idwhile assesse.
provements iment plan (CI
iew of appliccapacity, andP were priori
mtb020401\docume
e City of Ange City has adAngels 2020sting facilitie
mprovement p study area fdoes not incand delivery. Tasks comp
ted for the w
of available d
uirements re
ration of a w.
ansmission f
a range of demeet future d
dentify existinsing the impa
in support ofIP).
cable regulad projected witized based
ents\_water master
gels (City) wdequate facil0 General Ples; an assessprojects for for the Mast
clude areas wy for areas re
mpleted as par
water supply,
drawings and
elated to wat
water demand
facilities und
elivery conddemands and
ng and buildacts of poten
f the develop
ations, treatmwater deman
on the follo
MTB0r plan\final\0713 m
water supplylities to suppan (General
sment of altethe water er Plan is ba
within the sphequiring rt of the Ma
, treatment,
d operationa
ter supply.
d factor base
der projected
itions and d improve
dout capacityntial
pment of a sh
ment plant ds. Projects wing, in
020401 mp.docx
, port
ernate
ased here
ster
al
ed on
d
y
hort-
City of Angels Water Master Plan
Executive Summary
Angels WMP ES-2 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
1. Addressing regulatory concerns (Phase 1A)
2. Improving reliability by providing operational redundancy (Phase 1B)
3. Replacing aging infrastructure (Phase 1C)
4. Providing capacity for future development (Phase 2A)
The distribution system CIP was prioritized based on the following, in descending order of importance:
1. Providing required fire flow for existing demands (Phase 1A)
2. Meeting hydraulic performance criteria for existing demands (Phase 1B)
3. Providing required fire flow for future (buildout) demands (Phase 2A)
4. Meeting hydraulic performance criteria for future (buildout) demands (Phase 2B)
The total CIP cost is approximately $24.3 million, with an average annualized cost of $1.22 million. Comparing the projected CIP costs to recent City budgets (e.g., FY 2011-12 CIP budget for water of $260,000) indicates that additional revenues will be needed to adequately fund the recommended CIP projects. Included as recommended CIP projects are water rate and connection fee studies to better assist with determining appropriate project financing.
Angels WMJuly 2013
Executiv
Chapter
1.1 1.2
Chapter 2
2.1 2.2a.b 2.3 2.4a.bc. 2.5 2.6a.bc. 2.7 2.8
Chapter 3
3.1 3.2 3.3
Chapter 4
4.1 4.2 4.3 4.4
Chapter 5
5.1 5.2a.b 5.3a.bc.
MP
ve Summary
1 Introduc
BackgrouScope of M
2 Summar
AgreemenPrevious W
Distributi. Water Tre.
MunicipaMemoran
Postpone . Storage T. Sediment.
Angels CaFlow Met
Account f. Replace M. Account f.
Water TreList of W
3 Descript
Raw WateWater TreDistributi
4 Applicab
Source CaTreatmenStorage CDistributi
5 Existing
Study AreLand Use
Existing A. Future Ar.
Analysis o Water Pro. 2012 Wat. Metered W.
...................
tion ............
und and PurpMaster Plan
ry of Previou
nt for IrrigatWater Masteion System Peatment Plan
al Service Rendum on Con
Fourth FilteTank at Powdation Basin amp Water Ater Report – for Water UsMeter at the for Age of Deatment Faci
Water Service
tion of Existi
er Delivery eatment Planion System .
ble Regulatio
apacity .......nt Plant ........Capacity ......ion System .
and Projecte
ea ...............e ..................Areas ..........reas .............of Existing Woduction .....ter ProductioWater Usage
CO
....................
....................
pose .............n ...................
us Reports....
tion Water foer Plan – 200Projects........nt Projects ...eview – 2009ntinuance of er Cell ..........der House H....................Audit – 20112012 ...........sed at the WStorage Tan
Distribution Silities Operas or Mains t
ing Water Sy
System ........nt .....................................
ons and Des
....................
....................
....................
....................
ed Water De
....................
....................
....................
....................Water Dema....................on Trends ....e ..................
TC-1n:\m
ONTENTS
....................
....................
....................
....................
....................
or Greenhorn02........................................................9 ..................f 2002 Water....................
Hill ....................................1 ......................................
Water Treatmenk .................System and Mations Plan –o be Replace
ystem ..........
....................
....................
....................
ign Criteria .
....................
....................
....................
....................
emands ........
....................
....................
....................
....................ands .........................................................................
mtb020401\docume
....................
....................
....................
....................
....................
n Creek Gol................................................................................r Master Plan....................................................................................................ent Plant .........................Meters ........
– 2012 ..........ed ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ents\_water master
....................
....................
....................
....................
....................
lf Course – 1................................................................................n – 2011 .............................................................................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
MTB0r plan\final\0713 m
....................
....................
....................
....................
....................
1998 ........................................................................................................................................................................................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
020401 mp.docx
Page
.ES-1
...1–1
.. 1–1
.. 1–2
...2–1
.. 2–1
.. 2–1
.. 2–1
.. 2–2
.. 2–3
.. 2–3
.. 2–3
.. 2–3
.. 2–3
.. 2–4
.. 2–8
.. 2–8
.. 2–8
.. 2–8
.. 2–8
.. 2–9
...3–1
.. 3–1
.. 3–1
.. 3–3
...4–1
.. 4–1
.. 4–1
.. 4–2
.. 4–3
... 5-1
... 5-1
... 5-1
... 5-2
... 5-5
... 5-7
... 5-7
... 5-8
... 5-9
Angels WMJuly 2013
de.f. 5.4a.b 5.5a.bc.d 5.6a.bc.d 5.7
Chapter 6
6.1 6.2a.bc.de.f.ghi.
6.3 6.4 6.5a.bc.d 6.6a.b 6.7a.bc. 6.8a.
MP
Non-Reve. Per Capita. Greenhorn
Peaking F Maximum. Peak Hou.
Developm Summary. Calculatio. Comparis. Review o.
Projection Base Yea. Projected . Projection. Projection.
Conclusio
6 Current a
OverviewHistory of
Union Wa. Utica Gol. Union Pu. Pacific Ga. Calaveras. Northern City of An. Utica Pow. Water Sup
Creek SysWater SupAvailableAlternate
Groundw. Abandone. Reduction. Recycled .
Overview Estimates. Comparis.
Options fo Option 1 –. Option 2 –. Option 3 –.
Planning Emergenc.
enue Water .a Water Demn Creek Gol
Factors ........m Day Demaur Demand ..ment of Watey of Equivaleon of Water son of Estimf Recommenn of Future Wr .................Growth .....
n of 10-Yearn of Water Dons ..............
and Future W
w ..................f Water Supater Companld Mining Coblic Utility Das & Electrics County WaCalifornia Pngels ..........
wer Authoritpply within stem ...........pply Agreem
e Surface WaWater Suppater ............ed Mines ....n in Surface Water for N
w of City Was of Future Dson of Availafor Meeting F– Obtain Inc– Supplemen– Enhanced for Drought cy Use of M
....................mands ..........lf Course Irr....................and ...................................er Demand Fent Water UnDemand Facated Versus nded Water Water Dema........................................r, 20-Year, a
Demands Inc....................
Water Suppli
....................ply Develop
ny ................ompany .......District ........c ..................ater District .Power Agenc....................ty .................the North Fo....................
ments ...........ater Suppliesplies .....................................................Water Diver
Non-potable ater DemandDemands ......able Supply Future Demacreased Allont with GrouUse of NonYears .........ines .............
TC-2n:\m
....................
....................igation Dem............................................................Factor ..........nit Conversictor .............Actual ResiDemand Fac
ands .....................................................
and Buildoutcluding Gree....................
ies ...............
....................pment ...............................................................................................................cy ........................................................ork of the St........................................s ..............................................................................rsions to GreDemands ....s and Water ....................vs. Projecteands ............cations fromundwater .....-potable Wa........................................
mtb020401\docume
....................
....................mands ...........................................................................................ion Factors ......................idential Watctor .........................................................................t Water Demenhorn Creek....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................tanislaus Riv........................................................................................................................eenhorn Cre....................r Supply ...........................d Demands .....................
m UPA .............................ater ......................................................
ents\_water master
....................
....................
....................
....................
....................
....................
....................
....................
....................er Demands................................................................................
mands ...........k Golf Cours....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................ver, Mill Cre........................................................................................................................eek Golf Cou........................................................................................................................................................................................................
MTB0r plan\final\0713 m
....................
....................
....................
....................
....................
....................
....................
....................
....................s .......................................................................................................................se ....................................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................eek, Angels ........................................................................................................................urse .....................................................................................................................................................................................................................
020401 mp.docx
. 5-11
. 5-12
. 5-13
. 5-14
. 5-14
. 5-15
. 5-15
. 5-15
. 5-17
. 5-19
. 5-19
. 5-20
. 5-20
. 5-20
. 5-20
. 5-21
. 5-22
... 6-1
... 6-1
... 6-1
... 6-1
... 6-2
... 6-3
... 6-3
... 6-3
... 6-4
... 6-5
... 6-5
... 6-6
... 6-6
... 6-8
... 6-8
... 6-9
. 6-12
. 6-12
. 6-13
. 6-13
. 6-14
. 6-16
. 6-18
. 6-18
. 6-19
. 6-20
. 6-20
. 6-20
Angels WMJuly 2013
b 6.9a.b
Chapter 7
7.1 7.2a.bc.de.f.g 7.3
Chapter 8
8.1 8.2 8.3 8.4a.bc. 8.5a.b 8.6 8.7a.b
Chapter 9
9.1 9.2 9.3 9.4 9.5 9.6
Chapter
10.1 10.2 10.3 10.4 10.5
MP
Water Co.Alternate
Evaluatio. Prelimina.
7 Water Tr
Current anEvaluatio
Coagulati. Sediment. Filtration . Disinfecti. Treated W. Transmiss Backwash.
Conclusio
8 Hydrauli
Study AreSummaryExisting DHydraulic
Modeling. Physical D. Demand I.
Calibratio Typical F. Applied F.
ScenariosDistributi
Average D. Fire Flow.
9 Recomm
RecommeWater TreDistributiRecommeMeter SysAdditiona
10 Probable
ConstructProject CoProject CoProject CoProject Co
onservation (Future Waten of Water S
ary Recomm
reatment Pla
nd Projectedn of Facilitieion and Flocation .............................ion ..............
Water Storagsion ............h Water and ons and Reco
ic Evaluation
ea and Existiy of Water DDistribution c Model ......g Software...Data ...........Inputs .........on of the HydFriction CoefFriction Coefs Analyzed wion System PDay, Maxim
w Analysis (E
mended Impr
ended Watereatment Planion System Rended Waterstem Upgradal Recomme
e Project Cos
tion Cost Acosts for Watosts for Watosts for Distosts for Stor
(Drought Coer Supply StSupply Stratendation .....
ant Evaluatio
d Treated Waes ................
cculation ..................................................................
ge .....................................Sludge Han
ommendatio
n of Existing
ing Land UsDemands by L
System .......................................................................................draulic Modfficients .......fficients for
with HydraulPerformance
mum Day, anExisting) ......
rovements ....
r Supply Impnt RecommeRecommendr Storage Imde and Leak nded Project
sts ...............
ccuracy ........ter Supply Imter Treatmentribution Sysrage Improve
TC-3n:\m
ntingency Ptrategies ......egies ...............................
on ................
ater Demand............................................................................................................................................
ndling ...........ons ...............
g Distributio
se .................Land Use Ty....................................................................................................
del ....................................Model Caliblic Model ....
e under Existd Peak Hour....................
....................
provements .ended Improved Improvem
mprovementsDetection Sts .................
....................
....................mprovementnt Plant Imprstem Improvements ........
mtb020401\docume
lans) .......................................................................
....................
ds ....................................................................................................................................................................................................
on System ....
....................ype ..........................................................................................................................................................bration ............................ting Conditior Demands (....................
....................
....................vements ......ments .............................
Survey ..............................
....................
....................ts .................rovements ...vements ...........................
ents\_water master
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................ons ..............(Existing) ........................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
MTB0r plan\final\0713 m
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
020401 mp.docx
. 6-21
. 6-22
. 6-23
. 6-26
... 7-1
... 7-1
... 7-3
... 7-3
... 7-4
... 7-5
... 7-6
... 7-7
... 7-8
... 7-9
. 7-10
... 8-1
... 8-1
... 8-4
... 8-4
... 8-5
... 8-5
... 8-5
... 8-5
... 8-7
... 8-7
... 8-7
. 8-10
. 8-12
. 8-13
. 8-15
... 9-1
... 9-1
... 9-3
... 9-4
... 9-8
. 9-10
. 9-11
. 10-1
. 10-1
. 10-1
. 10-2
. 10-3
. 10-5
Angels WMJuly 2013
10.6 10.7
Chapter
11.1
Chapter
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
MP
Project CoProject Co
11 Capital I
Project Co
12 Referenc
x A Devel
x B Base Y
x C Projec
x D Utica
x E Amen1999 –
x F SelectAugus
x G Initial
x H Projec
x I Fire H
x J Hydra
osts for Metosts for Mas
Improvemen
osts ............
ces ..............
lopment of U
Year (2011)
cted Water D
Power Auth
nded Attachm– 2012
t Pages fromst 1995; and
l Hydrogeolo
cted Water D
Hydrant Flow
aulic Model
ter System Uster Plan and
nt Plan ..........
....................
....................
APP
Unit Convers
Water Dem
Demand Calc
hority Major
ment A, Wat
m the Asset Sd the Assignm
ogical Invest
Demands for
w Test Repor
Output – W
TC-4n:\m
Upgrade and d Rate Study
....................
....................
....................
PENDICES
sion Factors
mand Calcula
culations
Facilities an
ter Allotmen
Sale Agreemment and As
tigation
r WTP Evalu
rts
ater Distribu
mtb020401\docume
Leak Detecty ...................
....................
....................
....................
S
from City W
ations
nd Related P
nt Tables, an
ment By and Bssumption A
uation
ution System
ents\_water master
tion Survey .....................
....................
....................
....................
Wastewater M
Projects
nd May 1st F
Between PGAgreement, M
m
MTB0r plan\final\0713 m
....................
....................
....................
....................
....................
Master Plan
Forecasts from
G&E and CCMay 1997
020401 mp.docx
. 10-6
. 10-8
. 11-1
. 11-1
. 12-1
m
CWD,
Angels WMP TC-5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
LIST OF TABLES Table 2-1 City of Angels Water Master Plan Summary of Recommended Projects in the
2011 Water Audit .................................................................................................... 2–5
Table 4-1 City of Angels Water Master Plan Fire Flow Requirements ................................... 4–3
Table 4-2 City of Angels Water Master Plan Distribution System Evaluation and Design Criteria ........................................................................................................ 4–4
Table 5-1 City of Angels Water Master Plan Land Use Descriptions ...................................... 5-2
Table 5-2 City of Angels Water Master Plan Summary of Existing Land Uses ...................... 5-3
Table 5-3 City of Angels Water Master Plan Summary of Buildout Land Uses ...................... 5-5
Table 5-4 City of Angels Water Master Plan Historical Monthly Water Production, Water Treatment Plant, 2007-2012 .......................................................................... 5-8
Table 5-5 City of Angels Water Master Plan 2012 Monthly Water Production, Water Treatment Plant, January-July .................................................................................. 5-9
Table 5-6 City of Angels Water Master Plan Metered Water Service Connections by User Type for 2011 ................................................................................................ 5-10
Table 5-7 City of Angels Water Master Plan Historical Meted Water Usage by User Type, 2007-2011 .................................................................................................... 5-11
Table 5-8 City of Angels Water Master Plan Non-Revenue Water, 2007-2011 .................... 5-12
Table 5-9 City of Angels Water Master Plan Existing Per Capita Water Demand ................ 5-12
Table 5-10 City of Angels Water Master Plan Historical Surface Water Deliveries for Irrigation of GHC Golf Course, 2009-2011 ........................................................... 5-13
Table 5-11 City of Angels Water Master Plan Maximum Day Production Peaking Factors, 2007-2010 ................................................................................................. 5-14
Table 5-12 City of Angels Water Master Plan Summary of EWU Conversion Factors .......... 5-16
Table 5-13 City of Angels Water Master Plan Calculation of Water Demand Factor ............. 5-18
Table 5-14 City of Angels Water Master Plan Comparison of Estimated Versus Actual Residential Water Demands ................................................................................... 5-19
Table 5-15 City of Angels Water Master Plan Projected Population, Development, and Water Demands ...................................................................................................... 5-21
Table 5-16 City of Angels Water Master Plan Water Demand Projections Including GHC Golf Course Surface Water Irrigation Demands........................................... 5-22
Table 6-1 City of Angels Water Master Plan Current and Projected Water Demands ........... 6-14
Table 6-2 City of Angels Water Master Plan 2007-2012 Historical Monthly Percentage of Annual Treated Water Production .................................................................... 6-15
Table 6-3 City of Angels Water Master Plan Estimate of Non-Potable Demands for City ......................................................................................................................... 6-16
Angels WMP TC-6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
Table 6-4 City of Angels Water Master Plan Potable and Non-Potable Projected Water Demands ................................................................................................................. 6-16
Table 6-5 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections GHC Golf Course Surface Water Irrigation Demands ......... 6-17
Table 6-6 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Assuming only City Potable Water Demands and GHC Golf Course Surface Water Irrigation Demands .................................................... 6-17
Table 6-7 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Excluding GHC Golf Course Surface Water Irrigation Demands ................................................................................................................. 6-18
Table 6-8 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Excluding Non-potable Water Demands .............................. 6-18
Table 6-9 City of Angels Water Master Plan Water Shortage Stages and Water Use Reduction Goals ..................................................................................................... 6-22
Table 6-10 City of Angels Water Master Plan Summary of Future Alternate Water Supply Strategies .................................................................................................... 6-23
Table 6-11 City of Angels Water Master Plan Evaluation Criteria for Alternate Water Supply Strategies .................................................................................................... 6-24
Table 6-12 City of Angels Water Master Plan Evaluation Matrix for Alternate Water Supply Strategies .................................................................................................... 6-25
Table 6-13 City of Angels Water Master Plan Summary of Possible “Blend” of Alternative Water Supply Sources to Meet Buildout Water Demand of 2,655 AFY ........................................................................................................................ 6-26
Table 7-1 City of Angels Water Master Plan Current and Projected Water Demands for WTP Evaluation ....................................................................................................... 7-3
Table 7-2 City of Angels Water Master Plan WTP Flocculation Basin Hydraulic Loading Summary .................................................................................................... 7-4
Table 7-3 City of Angels Water Master Plan WTP Sedimentation Basin Hydraulic Loading Summary .................................................................................................... 7-4
Table 7-4 City of Angels Water Master Plan WTP Filtration System Capacity ...................... 7-6
Table 7-5 City of Angels Water Master Plan System Storage Requirements for California Waterworks Standards ............................................................................ 7-7
Table 7-6 City of Angels Water Master Plan System Storage Requirements for City Improvement Standards............................................................................................ 7-8
Table 7-7 City of Angels Water Master Plan Sizing of Parallel Water Transmission Main ......................................................................................................................... 7-9
Table 8-1 City of Angels Water Master Plan Developed Land Use Summary ........................ 8-3
Table 8-2 City of Angels Water Master Plan Summary of Water Demands By Land Use ...... 8-4
Angels WMP TC-7 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
Table 8-3 City of Angels Water Master Plan Pipeline Materials and Friction Coefficients .............................................................................................................. 8-7
Table 8-4 City of Angels Water Master Plan Fire Hydrant Flow Test and Model Calibration Data ....................................................................................................... 8-8
Table 8-5 City of Angels Water Master Plan Applied Friction Coefficients ......................... 8-10
Table 8-6 City of Angels Water Master Plan Executed Hydraulic Model Scenarios ............. 8-11
Table 8-7 City of Angels Water Master Plan Fire Flow Requirements .................................. 8-12
Table 8-8 City of Angels Water Master Plan Distribution System Hydraulic Performance Criteria .............................................................................................. 8-12
Table 8-9 City of Angels Water Master Plan Hydraulically Deficient Junctions and Pipe Segments, Existing Conditions .............................................................................. 8-13
Table 8-10 City of Angels Water Master Plan Hydraulically Deficient Fire Hydrants, Existing Conditions ................................................................................................ 8-15
Table 9-1 City of Angels Water Master Plan Hydraulic Summary of Supply Route Alternatives .............................................................................................................. 9-1
Table 9-2 City of Angels Water Master Plan Assessment of Well Site/Supply Pipeline Alternatives .............................................................................................................. 9-3
Table 9-3 City of Angels Water Master Plan Recommended Water Treatment Plant ImProvements........................................................................................................... 9-4
Table 9-4 City of Angels Water Master Plan Distribution System Hydraulic Performance Criteria ................................................................................................ 9-5
Table 9-5 City of Angels Water Master Plan Recommended Distribution Main Improvements ........................................................................................................... 9-6
Table 9-6 City of Angels Water Master Plan Storage Tank Site Alternatives ......................... 9-8
Table 9-7 City of Angels Water Master Plan Assessment of Storage Tank Site Alternatives ............................................................................................................ 9-10
Table 10-1 City of Angels Water Master Plan Unit Costs for Water Supply Improvements ......................................................................................................... 10-1
Table 10-2 City of Angels Water Master Plan Project Costs for Water Supply Improvements ......................................................................................................... 10-2
Table 10-3 City of Angels Water Master Plan Project Costs for Water Treatment Plant Improvements ......................................................................................................... 10-3
Table 10-4 City of Angels Water Master Plan Unit Costs for Distribution System Improvements ......................................................................................................... 10-3
Table 10-5 City of Angels Water Master Plan Project Costs for Distribution System Improvements ......................................................................................................... 10-4
Table 10-6 City of Angels Water Master Plan Unit Costs for Storage Improvements ............. 10-6
Angels WMP TC-8 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
Table 10-7 City of Angels Water Master Plan Project Costs for Recommended Storage Tank Site Alternative ............................................................................................. 10-6
Table 10-8 City of Angels Water Master Plan Project Costs for Meter System Upgrade ........ 10-7
Table 10-9 City of Angels Water Master Plan Project Costs for Leak Detection Survey ........ 10-7
Table 10-10 City of Angels Water Master Plan Project Costs for Master Plan and Rate Study ...................................................................................................................... 10-8
Table 11-1 City of Angels Water Master Plan Capital Improvement Projects for Treatment, Storage, and Supply Systems ............................................................... 11-2
Table 11-2 City of Angels Water Master Plan Capital Improvement Projects for Distribution System ................................................................................................ 11-3
Table 11-3 City of Angels Water Master Plan 20-Year Capital Improvement Plan ................ 11-5
Table 11-4 City of Angels Water Master Plan Summary of Capital Improvement Plan Costs ....................................................................................................................... 11-7
LIST OF FIGURES
Figure 3-1 Existing Water System .............................................................................................3–2
Figure 5-1 Existing Developed Land Uses ................................................................................ 5-4
Figure 5-2 Buildout Land Uses .................................................................................................. 5-6
Figure 6-1 Potential Well Sites ................................................................................................ 6-11
Figure 7-1 WTP Flow Diagram - Existing................................................................................. 7-2
Figure 7-2 WTP Flow Diagram - Proposed ............................................................................. 7-11
Figure 8-1 Distribution System Pressure Zones ........................................................................ 8-2
Figure 8-2 Distribution System Trunk Network ........................................................................ 8-6
Figure 8-3 Hydrant Test Locations ............................................................................................ 8-9
Figure 8-4 Distribution System Model Results ....................................................................... 8-14
Figure 8-5 Fire Flow Analysis Results .................................................................................... 8-16
Figure 9-1 Well Site and Supply Pipeline Route Alternatives .................................................. 9-2
Figure 9-2 Recommended Distribution Main Improvements .................................................... 9-7
Figure 9-3 Storage Tank Site Alternatives ................................................................................. 9-9
Angels WMP TC-9 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
LIST OF ABBREVIATIONS The following abbreviations are used in this report: AACE Associated Advancement of Cost Engineering ac Acre ADD Average Day Demand AF Acre-Feet AFY Acre-Feet per Year AMR Automatic Meter Reading ARV Air Release Valve AWWA American Water Works Association BAE Business Attraction/Expansion Cal ISO California Independent System Operator CC Community Commercial CCWC Calaveras County Water Company CCWD Calaveras County Water District CDPH California Department of Public Health cfs Cubic Feet Per Second CIP Capital Improvement Plan CWUA Calaveras Water Users Association DE Dunn Environmental DWR Department of Water Resources EA Each ENR Engineering News Record EPA United States Environmental Protection Agency EWU Equivalent Water Unit FERC Federal Energy Regulatory Commission fps Feet per Second ft Feet or Foot ft2 Square Foot GHC Greenhorn Creek GIS Geographical Information Systems gpcd Gallons per Capita per Day gpd Gallons per Day gpd/ac Gallons per Day per Acre gpd/EWU Gallons per Day per Equivalent Water Unit gpd/ft2 Gallons per Day per Square Foot gpm Gallons per Minute HC Historic Commercial HDR High-Density Residential HDR-WMC Worldmark Club I Industrial in Inch IWA International Water Association LF Lineal Feet or Lineal Foot
LIST OF ABBREVIATIONS (Cont.)
Angels WMP TC-10 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
LS Lump Sum MDD Maximum Day Demand MDR Medium-Density Residential MW Megawatt MG Million Gallons mgd Million Gallons per Day MSR Municipal Service Review NCPA Northern California Power Agency NPDES National Pollutant Discharge Elimination System NTU Nephelometric Turbidity Unit OS Open Space P Public PG&E Pacific Gas and Electric Company PHD Peak Hour Demand PR-Golf Golf Course PR Parks and Recreation PRV Pressure Reducing Valve P-SCH Public School PVC Polyvinyl Chloride psi Pounds per Square Inch RE Residential Estate ROW Right-of-Way rpm Revolutions per Minute SC Shopping Commercial SF-CCI San Francisco Construction Cost Index SFR Single-Family Residential SOI Sphere of Influence SP Special Planning SR State Route SWRCB State Water Resources Control Board TDH Total Dynamic Head UGMC Utica Gold Mining Company UPA Utica Power Authority UPUD Union Public Utility District USGS United States Geological Survey UWC Union Water Company WTP Water Treatment Plant WWTP Wastewater Treatment Plant
Angels WMP TC-11 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
CONVERSION FACTORS Volume 1 AF = 43,560 ft3 = 325,851 gallons 1 ft3 = 7.48 gallons 1 million gallons = 3.07 AF Flow Rate 1 cfs = 450 gpm = 646,320 gallons/day 1,000 gpm = 2.23 cfs = 4.42 AF/day 1 mgd = 1,120 AFY = 3.07 AF/day 1 cfs for 24 hours = 1.983 AF 1 cfs for 30 days = 59.5 AF 1 cfs for 1 year = 724 AF
Angels WMJuly 2013
1 In
A Water treatmentfuture groPlan) [1]water supsupply, tron the cuof influenannexatiowater ma
B1.1 The CityPlan incl
1. A
2. P
3. Ad
4. A
m
5. Aanre
6. Cfapr
7. A
din
8. Idan
MP
troduc
Master Plant, distributioowth as defi. The Masterpplies; and areatment, dis
urrent City lince (SOI) beon will be thanagement an
Background
desires a coudes the foll
A summary a
rojected wat
An evaluationeficiencies w
An evaluationmaintenance,
An evaluationnd secondaryequirements,
Cost estimateacilities to enrojections.
A short-term eficiencies include establ
dentificationnd treatment
ction
n (Master Plaon, and storagined in the rer Plan includ
an identificatstribution, animits from theyond the Cihe subject of nd tasks com
and Purpo
omprehensivlowing items
and descripti
ter demands
n of the existwith mitigati
n of the exist and mitigat
n of supplemy long-term , costs, and c
es for requirensure adequa
and long-terncluding prilishment of c
n of any prest facilities.
an) was prepge systems tecently adopdes an evalution of recomnd storage syhe General Pity limits. Wf future technmpleted as pa
se
ve Master Plas:
on of the wa
for the 10-y
ting water dion recomme
ting treatmetion recomm
mental water alternatives
constraints.
ed improvemate capacity
rm Capital Imioritization, aconnection f
ent and futu
1–1n:\m
pared for theto ensure thepted City of Aation of exis
mmended imystems. The
Plan [1] and dWater supply
nical studiesart of the Ma
an prepared
ater system.
year and 20-y
istribution syendations tri
nt facilities,mendations to
supply sourwith consid
ments to the dfor both sum
mprovementalternatives fees based on
ure regulatory
mtb020401\docume
e City of Ange City has adAngels 2020sting facilitie
mprovement p study area fdoes not incand delivery. Backgrounaster Plan ar
for water fac
year plannin
ystem and idiggered by d
identificatioo optimize op
rces includinderation for t
distribution mmer and wi
t Plan (CIP) analysis, andn growth pro
y concerns f
ents\_water master
gels (City) wdequate facil0 General Ples; an assessprojects for for the Mast
clude areas wy for areas rend informatiore presented
cilities. The
ng horizon.
dentificationdemand proje
ons of deficiperations.
ng emergenctreatment an
system and inter demand
to address id schedules.ojections.
for the distrib
MTB0r plan\final\0713 m
water supplylities to suppan (General
sment of altethe water er Plan is ba
within the sphequiring on regardingin this chap
required Ma
n of hydrauliections.
iencies with
y alternativend distributio
treatment ds with grow
identified . The CIP wi
bution system
020401 mp.docx
, port
ernate
ased here
g ter.
aster
ic
es on
wth
ill
m
Angels WMJuly 2013
S1.2 The follo
1. Ad
2. S
pr
3. A
4. D
5. Aac
6. Aw
7. Aidsy
8. Tisim
9. A
sh Each of t
MP
cope of Ma
owing tasks w
A review of pistribution, a
ite visits to tractices.
A review of t
Development
An analysis octual usage t
An evaluationwater demand
An evaluationdentificationystem reliab
The executionssues within mprovement
A prioritizatiohort-term an
these tasks is
ster Plan
were comple
previous repoand storage s
the existing
he current an
t of design cr
of existing wto develop p
n of water trds.
n of availabln of alternateility.
n of hydraulthe distribut
ts on system
on of recommnd long-term
s summarize
eted as part o
orts and studsystems.
facilities and
nd future reg
riteria.
water demandrojected wat
eatment, sto
le water supp water suppl
ic model scetion system wperformanc
mended impCIP.
ed in the foll
1–2n:\m
of the Maste
dies complet
d a review o
gulatory requ
ds and calibrter demands
rage, and tra
plies under alies to help m
enarios to idwhile assesse.
provements i
owing chapt
mtb020401\docume
er Plan:
ted for the w
of available d
uirements re
ration of a w.
ansmission f
a range of demeet future d
dentify existinsing the impa
in support of
ters.
WaChapter
ents\_water master
water supply,
drawings and
elated to wat
water demand
facilities und
elivery conddemands and
ng and buildacts of poten
f the develop
City of AWater Master
r 1: Introdu
MTB0r plan\final\0713 m
, treatment,
d operationa
ter supply.
d factor base
der projected
itions and d improve
dout capacityntial
pment of a
ngels Plan
uction
020401 mp.docx
al
ed on
d
y
Angels WMJuly 2013
2 Su
Previous constrainthe Masteprojects w
A2.1 The secoCreek Asthe Greenuntreated
Tfo(g
The agreCity’s wa
Awofshsu
P2.2 The 2002improvemA numbeplant (W
Da. The folloreplacemprobabili
1. SO
2. S3. R
MP
ummar
reports prepnts, and mether Plan. Recwere integra
Agreement f
ond amendedssociates L.Pnhorn Creekd water from
The City shalor the Projecgpm) up to a
ement also sastewater tre
At the time ofwastewater tr
f treated washall become ufficient trea
Previous Wa
2 Water Masments and aser of projectsTP) as discu
Distribution S
owing five prment of old wity of failure
tate Route (SOffice)
R-49 PipelinRaspberry La
ry of P
pared for thehodologies uently compl
ated into the
for Irrigatio
d agreement P. ensures thk (GHC) Gol
m Angel’s Cr
ll make availct’s golf coua maximum r
states that theatment plan
f installationreatment facstewater as sa secondary
ated wastewa
ater Master
ster Plan wasssociated coss were suggeussed further
System Proje
rojects recomwelded steel m
:
SR) 49 Pipe
ne Replacemane Pipeline
reviou
e City are sumused for analyeted projectsMaster Plan
on Water for
dated July 1hat the City mlf Course [2]eek:
lable up to 4rse irrigatio
rate of 1,400
e golf coursent (WWTP) a
n and commecility, the golfset forth hery source of iater is not av
Plan – 2002
s prepared tosts needed toested to imprr below [3].
ects
mmended inmains becau
line Replace
ment (from MReplacemen
2–1n:\m
us Repo
mmarized inysis in past rs were noted
n as appropri
r Greenhor
998 betweenmaintains a r]. The agreem
450 acre-feeton at a minim0 gpm.
e irrigation sas follows:
encement of lf course irrirein. From thrrigation, avvailable.
2
o support groo meet futurerove the dist
n the 2002 Wuse they were
ement (from
Museum to Mnt
mtb020401\docume
orts
n this chapterreports wered and recommiate.
rn Creek Go
n the City ofregular suppment states t
t (AF) of cremum flow of
system must
operation ofigation systehat time forwvailable dur
owth in the Ce water demtribution sys
Water Master e undersized
Stanislaus S
Mark Twain R
ents\_water master
r. Design crie considered mended imp
olf Course –
f Angels andly of water fthe following
eek water frof 700 gallons
t use recycle
f the City’s sem shall be cward, untreaing those tim
City and idemands througstem and the
Plan involvd and/or had
Street to Alta
Road)
MTB0r plan\final\0713 m
iteria, in developin
provement
– 1998
d Greenhornfor irrigationg in regards
om Angel’s Cs per minute
ed water from
substantiallyconverted to ated creek wames when
ntify gh the year 20
water treatm
ved the a high
aville Post
020401 mp.docx
ng
n of to
Creek
m the
y new use ater
015. ment
Angels WMJuly 2013
4. M5. C
The follofire flow system:
1. F2. D3. L
All pipelPlan as oReplacemby privat In additiogallon (Mwhile thebasin. Th
Wb. The 2002basin by configurainstallatiosedimentwould all Due to thaddition include awater rec The addithe year 2 All improhave yet
MP
Minna Street Church Street
owing water requirement
innegan LanDemarest-MoLee Lane Wa
ine improveoutlined abovment (from Ste developme
on the constrMG) capacitye WTP is shuhis project re
Water Treatm
2 Water Masinstalling a mation, the sedon of a mechtation basin plow for high
he lack of sluof two sludg
access rampscovery system
tion of a fou2014.
ovements to to be initiate
Pipeline Ret Pipeline Re
main extensts, and incre
ne to Centenonte Verde Sater Pipeline
ments to theve have beenStanislaus Stent.
ruction of a y was suggesut down for bemains incom
ment Plant Pr
ster Plan sugmechanical dimentation hanical sludgpossible. Ad
her overflow
udge processge dewaterins to allow remm, and recyc
urth filter cel
the WTP reed and are ad
placement eplacement
sions were reease flows to
nnial Road LoStreet Loop
e distributionn completed treet to Altav
second storasted to meet backwashingmplete and is
rojects
ggested that isludge collebasin has to
ge collectiondding tube se
rates due to
sing capabiling basins to tmoval of dricle pumps.
ll was also re
ecommendedddressed late
C
2–2n:\m
ecommendedo accommoda
oop
n system recowith the exc
ville Post Of
age tank at Pthe maximu
g filters and s addressed l
improvemenection systemo be drained n system wouettlers to the o the shallow
ities, the 200the WTP. Thied sludge w
ecommended
d in the 2002er in this Ma
Chapter 2: Su
mtb020401\docume
d to provide ate new conn
ommended iception of thffice) which
Powder Housum day demaremoving sllater in this
nts be made tm and tube seand hosed duld make cooutlet end o
w settling dep
02 Water Mahe proposed
with mechani
d to increase
2 Water Masaster Plan.
Waummary of P
ents\_water master
looped watenections to t
in the 2002 Whe SR-49 Pip
has been pa
se Hill with and (MDD) ludge from tMaster Plan
to the existinettlers. Unde
down to remoontinuous useof the sedimepth.
aster Plan prsludge dewa
ical equipme
e the capacit
ster Plan as o
City of AWater Master
Previous Rep
MTB0r plan\final\0713 m
er mains, methe existing
Water Mastepeline artially comp
a 2.0 millionon the syste
the sedimentn.
ng sedimenter the currenove sludge. Te of the entation basi
roposed the atering basinent, a clarifie
ty of the WT
outlined abov
ngels Plan
eports
020401 mp.docx
eet
er
pleted
n em tation
tation nt The
in
ns ed
TP by
ve
Angels WMJuly 2013
M2.3 The Munfacilities The MSRpopulatio
1. Ad
2. Ctr
3. F The MSRAuthoritydisrupted In additiomains tha
M2.4 An internWater/WMaster P
Pa. It was suincluded
Sb. The meminstead bfor the wthe waterto supply
Sc. As recomsediment
MP
Municipal Se
nicipal Serviincluding th
R identified ton growth:
Addition of aay (mgd).
Construction reated water inding addit
R mentionedy (UPA) cand the City’s w
on, the MSRat have a hig
Memorandu
nal memoranWastewater TPlan projects
ostpone Fou
uggested thatin a new ma
torage Tank
morandum rebe constructewater system r supply. A sy the City wi
edimentation
mmended in tation basin b
ervice Revie
ce Review (he water supp
the followin
a fourth filter
of an additioeach day.
tional water
d that the Citnal system fowater supply
R stated that vgh probabilit
m on Conti
ndum was prreatment witwith the mo
urth Filter Ce
t the proposeaster plan.
k at Powder H
ecommendeded on the siteand allow m
second pipelith water in t
n Basin
the 2002 Wabe equipped
ew – 2009
MSR) proviply, treatmen
ng improvem
r at the WTP
onal 2.0 MG
supply sourc
ty’s water suor water deliy in the past.
various projty of failure
inuance of 2
repared in Jath the recom
odifications l
ell
ed fourth filt
House Hill
d that the proe of the aban
maintenance line from thethe event tha
ater Master Pd with a sludg
C
2–3n:\m
des an assesnt, distributi
ments based o
P to increase
G storage tan
ces to meet f
upply is solelvery. Proble
ects had beeor are under
2002 Water
anuary 2011 mmendation tlisted below
ter cell proje
oposed storandoned clearwon the existi
e WTP to theat the existin
Plan, it was ge removal s
Chapter 2: Su
mtb020401\docume
ssment of theion, and stor
on previous
the capacity
nk to provide
future water
ly dependentems with the
en identified rsized.
Master Pla
by the Senioto complete [5].
ect at the WT
age tank at Porwell at the Wing storage te distributionng pipeline fa
suggested thsystem to rem
Waummary of P
ents\_water master
e City’s pubrage systems
studies to su
y to 3.0 milli
e the City wi
r demands.
nt on the Utice canal have
to replace o
an – 2011
or Supervisothe existing
TP be postpo
owder HousWTP to provtank withoutn system wa
fails.
hat the existimove solids
City of AWater Master
Previous Rep
MTB0r plan\final\0713 m
lic services as [4].
upport projec
ion gallons p
ith 4.0 MG o
ca Power severely
old welded st
or of g 2002 Water
oned and
se Hill shoulvide extra stot shutting doas also sugge
ing without
ngels Plan
eports
020401 mp.docx
and
cted
per
of
teel
r
d orage wn
ested
Angels WMJuly 2013
decanting2002 Wacapacity it was suexisting sstorm eve
A2.5 The 2011compliancurrent afour cate4) Adminare provi
MP
g. A sludge hater Master Pto handle sluggested to bsedimentatioents, and to
Angels Camp
1 Angels Camnce with regund future resgories as folnistration anided in Table
handling facPlan but withudge from begin plans fo
on basin withprepare for f
p Water Au
mp Water Aulations and sidents of thllows: 1) WT
nd Planning. e 2-1 [6].
cility was alsh the clarificoth the sedim
for a second hout shuttingfuture growt
udit – 2011
Audit (2011 Wto develop pe City. The pTP; 2) DistriA summary
C
2–4n:\m
so recommenation that thmentation basedimentatiog down the Wth.
Water Audit)projects to eproposed proibution Systeof the recom
Chapter 2: Su
mtb020401\docume
nded in the mhe facility neasin and the on basin to aWTP, to help
) was preparquip the watojects in theem; 3) Watemmended pr
Waummary of P
ents\_water master
memorandumeds to be defilter backw
allow maintep reduce turb
red for the Cter system fo
e 2011 Waterer Quality Sarojects with t
City of AWater Master
Previous Rep
MTB0r plan\final\0713 m
m as in the signed with
wash. In addienance to thebidity during
City to ensureor the needs r Audit fall iampling; andthe current s
ngels Plan
eports
020401 mp.docx
the ition, e g
e of
into d status
City of Angels Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 2-1 CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT
Project Number Project Description Rationale Status
WTP Projects
1 Construct Settling Ponds and Discharge Backwash Water Properly
Construct settling ponds. Recycle backwash water through headworks, obtain discharge permit, or discharge to wastewater system.
Required for regulatory compliance. Backwash water is currently being discharged without a permit.
Incomplete. Addressed in this Master Plan.
2 Implement Redundancy During Filter Backwash
Modify system so that at least one filter is on-line during backwashing.
Improves reliability. Allows water treatment to continue through backwash procedures, eliminating 2.75 hour shutdowns.
Incomplete. Addressed in this Master Plan.
3 Pursue Emergency Alternative Water Supply
Pursue alternative options for providing emergency water supply in event that flume system is damaged.
Necessary to provide redundancy if flume system is compromised.
Incomplete. Addressed in this Master Plan.
4 Construct Second Storage Tank
Construct a new 2.0 MG tank at one of three proposed locations.
Needed to meet future maximum day scenarios. Improve system reliability and security.
Incomplete. Addressed in this Master Plan.
5 Address Post-Storm Turbidity Shutdowns
Option A: Investigate whether second sedimentation basin would prevent shutdowns. Option B: Investigate feasibility of pre-filtration or other process to make high turbidity water usable.
Necessary to improve reliability after storms. If Option A is feasible, it would also improve redundancy.
Incomplete. Addressed in this Master Plan.
6 Add Fourth Filter Add fourth mixed-media filter to provide additional capacity at WTP.
Provide additional redundancy. Needed to accommodate future growth.
Incomplete. Addressed in this Master Plan.
City of Angels Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 2-1 (Cont.) CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT
Project Number Project Description Rationale Status
Distribution System Projects
7 Complete an Inventory of the Distribution System
Complete an inventory of all pipes, valves, and hydrants within the system and incorporate into geographical information systems (GIS).
Necessary to allow the City to make accurate decisions in planning and construction. Needed to create hydraulic model.
Completed as part of this Master Plan. See Chapter 8.
8 Develop a Hydraulic Pipe Network Model
Develop a model of the system including the WTP, storage tank, and distribution system.
Can be used to analyze the system for compliance, make decisions, prioritize projects, and plan for future development.
Completed as part of this Master Plan. See Chapter 8.
9 Identify and Prioritize Infrastructure Upgrades using Hydraulic Model
Use the results of the model to identify and prioritize infrastructure upgrades.
Hydraulic model provides a tool for assessing system needs.
Completed as part of this Master Plan. See Chapter 8.
10 Assess Distribution System Compliance using Hydraulic Model
Use the results of the model to assess whether regulations are being met.
Provides a way for the City to demonstrate compliance with certain regulations.
Completed as part of this Master Plan. See Chapter 8.
11 Add Second Water Main from WTP to City
Add 18-inch pipeline parallel to the existing pipeline.
Necessary for redundancy and reliability. The existing pipeline is old and a major system weakness.
Incomplete. Addressed in this Master Plan.
12 Loop Dead Ends and Install Blowoff Assemblies
Where possible, loop dead ends. Otherwise install a blowoff assembly.
Will improve system reliability and water quality. Required for regulatory compliance.
Incomplete. Addressed in this Master Plan.
City of Angels Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–7 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 2-1 (Cont.) CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT
Project Number Project Description Rationale Status
Water Quality Sampling Projects
13 Update Bacterial Sampling Plan
Revise City’s Bacterial Sampling Plan by 2012 (last updated in 2002).
State regulations require a minimum number of samples per month based on number of connections. Because the number of connections in the distribution system has increased, a minimum of six samples per month is now required rather than the five samples per month required in the 2002 plan. Regulations also require the plan be updated every 10 years.
Completed.
Administration and Planning Projects
14 Develop City Planning Criteria in Next Water Master Plan
Incorporate all related water codes into a list of criteria for future planning.
Useful planning tool for assessing criteria for future infrastructure and existing deficiencies.
Completed as part of this Master Plan. See Chapter 4.
15 Submit Permit Amendment Following Major Upgrades at WTP
Submit application for a permit amendment following major improvements at the WTP.
Necessary for compliance with regulations. Will be submitted concurrent with completion of design activities.
16 Update Operations and Maintenance Plan
Update the plan to reflect upgrades to the WTP.
Required by Water Supply Permit. Completed by City Engineer in May 2012.
17 Pursue Shortage Plan with UPA
City should work with UPA to develop a plan to allocate water to all users during a drought.
Essential to securing a reliable water supply and the ability to meet maximum day scenarios at all times.
Ongoing.
18 Develop an Alternative Supply for GHC Development
Explore options for alternative supplies for GHC.
Necessary to ensure that the entire water supply allocation from UPA is available for the City.
Ongoing.
19 Staffing Level Recommendation
Hire one full-time and one part-time staff member.
Current staffing levels are below other comparable water purveyors by approximately 20 percent.
Under consideration.
Angels WMJuly 2013
F2.6 A flow mthe distribetween
Aa. There aredifferenc(custome
1. P2. P
Accountiwater meanalyses
Rb. There arestorage tayear old mfor water
Ac. The flowaging pip
1. B2. R
mel
The leak system ar
W2.7 The Wateon the opfollowing
MP
Flow Meter R
meter report wbution systewater produ
Account for W
e two uses oce between wer meters):
rocess waterrocess water
ing for the petered from 2of unit capa
Replace Mete
e a number oank (aka, themeter to incrr in the syste
Account for A
w meter reporpes and custo
Budget for leReplace all olmeters are wolectronic me
detection wre incorpora
Water Treat
er Treatmenperation of thg:
Report – 20
was preparedem [7]. Recouced and wat
Water Used
f process wawater produc
r for filter bar for sodium
rocess water20 percent toacities at the
er at the Stor
of concerns we “town meterease the acc
em. Replacem
Age of Distr
rt presented omer meters
ak checks byld meters anorn, accuracyeter reading s
work, replaceated into the
tment Facili
nt Facilities Ohe City WTP
012
d in April 20mmendationter metered a
at the Water
ater at the Wced (from the
ackwash. m hypochlorit
r brings the ao 12 percentWTP is add
rage Tank
with the age er”). The flocuracy of mement of the m
ibution Syst
two recomm:
y a leak detend upgrade toy is problemsystem will i
ment of old recommende
ities Operat
Operations PP [8]. The Op
C
2–8n:\m
012 to addrens that were are discussed
r Treatment P
WTP that shoue combined f
te generation
average diffe. The critica
dressed in Ch
and calibratow meter repeasurementsmeter is anti
tem and Met
mendations f
ection contrao an electron
matic contribuimprove acc
meters, and ed projects i
tions Plan –
Plan (Operatiperations Pl
Chapter 2: Su
mtb020401\docume
ess concerns brought forwd below.
Plant
uld be accoufilter effluen
n.
ference betwality of includhapter 7.
tion of the mport recomms which may icipated in 20
ters
for accountin
actor. nic meter reauting to pote
curacy and re
upgrade to ein Chapter 9
– 2012
ions Plan) pran includes
Waummary of P
ents\_water master
that water isward to redu
unted for in cnt meter) and
ween water prding process
meter at the tmends replaci
contribute t013.
ng for the wa
ading systemential loss reeduce City la
electronic m.
rovides detainformation
City of AWater Master
Previous Rep
MTB0r plan\final\0713 m
s being lost iuce the differ
calculating td water mete
roduced ands water in th
treated watering the 15-20to unaccount
ater lost due
m. Because oevenues. Thabor costs.
meter reading
ailed informaon the
ngels Plan
eports
020401 mp.docx
in rence
the ered
d e
r 0 ted-
to
old e
g
ation
Angels WMJuly 2013
1. D2. O3. D4. A5. C6. P7. M8. P
L2.8 The City
1. R8
2. R3. R4. R5. R6. R7. R
Recently
1. Phy
MP
Detailed descOverview of Detailed standAbnormal conCalibration an
rocedures foMaintenance
rocedures in
List of Wate
provided th
Replace wate70 South Ma
Replace CLAReplace fire hReplace blowReplace old sReplace blowReplace wate
y completed w
ipeline on Hydrant on th
cription of unstart-up procdard operatinnditions andnd monitorinor record keeof each of th
n emergency
r Services o
he following
er main and wain Street.
A-valve box ohydrant (dre
woff valve onsteel pipeline
woff valve oner services at
water main r
Hillside Courhe end of the
nit processescedures. ng procedur
d troubleshoong the plant.eping and rephe WTP com
y situations.
or Mains to
list of water
water service
on Mark Twsser) in fronn Bruntz Roaes on corner n 859 Gold Ct dead end of
replacement
rt (replaced apipeline).
C
2–9n:\m
s at the WTP
res. oting. porting.
mponents.
be Replaced
r services or
es from 876
wain Road annt of Middletad. of Mark Tw
Cliff Road. f Holley to M
s include:
and upgrade
Chapter 2: Su
mtb020401\docume
P.
d
mains to be
South Main
nd Echo Streton’s on Nor
wain Road.
Main.
d to 6-inch p
Waummary of P
ents\_water master
e replaced:
n Street to ap
eet. rth Main Stre
pipeline with
City of AWater Master
Previous Rep
MTB0r plan\final\0713 m
pproximately
eet.
h a dry barre
ngels Plan
eports
020401 mp.docx
y
el
Angels WMJuly 2013
3 De
The Citydistributiexisting w
R3.1 The raw and multCity has agreemendelivery Water onUnion, UdownstreUpper Utthen to Hinto the LLower Utown of Mand is divcapacity 2011 Wadiverts wpowerhou An agreeCourse tothat surfaCity’s Wof the Cit
W3.2 The Cityfiltration is provid
MP
escript
’s existing wion facilitieswater system
Raw Water D
water sourceiple tributaricontractual rnts with Pacsystem is pr
n the North FUtica, and Speam along thtica Canal. F
Hunter’s ReseLower Utica
Utica Canal isMurphys, anverted into Aof up to 100
ater Audit [6water to the W
use.
ement betweo divert up toace water fro
WWTP, whenty’s annual a
Water Treat
acquired thetreatment an
ded below an
tion of
water system. Each of the
m facilities ar
Delivery Sy
e for the Cityies. Raw warights for upific Gas andovided below
Fork of the Spicer Meadowhe North ForkFrom the Upervoir throug Canal, also s used for hy
nd to other prAngels Ditch0 AF and rep]. Below Ro
WTP. Unuse
en Greenhoro 450 AFY oom Angels Cn available. Dallocation of
tment Plant
e WTP fromnd disinfecti
nd described
Existi
m consists of e existing syre shown in
stem
y is surface wter is deliver
p to 1,600 acd Electric Cow and descri
Stanislaus Riw). Water rek of the Stanper Utica Cagh the Tunnknown as th
ydroelectric grivate users. h. Water in Apresents a 30oss Reservoird water disc
rn Creek Assof surface w
Creek shouldDiversions frf 1,600 AFY
m PG&E in 1ion with sodin more deta
3–1n:\m
ng Wa
raw water suystem compo
Figure 3-1.
water from tred to the Cire-feet per y
ompany (PG&ibed in great
iver is storedeleased fromnislaus Riveranal, water iel Tap. From
he flume, whgeneration aFollowing M
Angels Ditch0-day emerger, water travcharges to An
sociates L.Pwater from And be a secondrom Angels
Y.
984. The Wdium hypochail in Chapte
mtb020401\docume
ater Sy
upply, treatmonents is des
the North Foity via a flumyear (AFY) o&E). An oveter detail in C
d in four uppm these upper
r to a diversiis diverted tom Hunter’s Rhich is owneand for waterMurphys, theh travels to Rency supply
vels to the Anngels Creek
. and the Citngels Creek dary source tCreek to GH
WTP is equipphlorite solutioer 7.
ents\_water master
ystem
ment, storagescribed in thi
ork of the Stme and canalof water throerview of theChapter 6.
per reservoirr reservoirs cion ditch kno the ColliervReservoir, wed and operatr deliveries te water ente
Ross Reservofor the City
ngels Forebaafter the An
ty allows thek [2]. The agrto recycled wHC Golf Cou
ped for convon. An overv
MTB0r plan\final\0713 m
e, and is chapter. T
anislaus Rivl system. Though a seriese raw water
rs (Alpine, continues own as the ville Tunnel
water is releasted by UPA.to the City, t
ers Angels Coir which ha
y according tay where thengels
e GHC Golf reement statwater from thurse count as
ventional view of the W
020401 mp.docx
The
ver he s of
l and sed . The the reek
as a o the
e City
tes he s part
WTP
LEGEND
CITY LIMITS
WATER DISTRIBUTION SYSTEM NETWORK
FIRE HYDRANT
AIR RELEASE VALVE
BLOWOFF VALVE
PRESSURE REDUCING VALVE
SURGE VALVE
Angels WMJuly 2013
Raw watflocculata sodiumstorage tathe City’basin cleWTP incForebay and pressinjected p The totalfilter is u3.1 mgd
D3.3 The existare descr2.5 MG t(approximDistributrelease vmaterialsin newer galvanize
MP
er is receiveion basin, a
m hypochloritank, and a 3s distributionaning is disc
cludes: 1) aluand the floccsure filters; 3prior to treat
l plant capacunder considewith one filt
Distribution
ting water diribed further treated watermately 85 petion system falves (ARV
s include Amareas (less t
ed steel in ol
ed at the WTsedimentatiote disinfectio,508 foot (ftn system by charged into uminum-baseculation bas3) caustic soted water sto
city is 2.0 mgeration by thter out of ser
System
istribution isin Chapter 8
r storage tanercent residefeatures inclus), blowoff v
merican Watethan 20 yearlder areas.
P from the Aon basin, fouon system w) transmissiogravity. Filta stock pon
ed coagulantin; 2) sodium
oda injected porage tank.
gd with one phe City, and rvice.
s separated in8. The entire
nk at the WTential). Pipelude fire hydvalves, presser Works Ass old) and as
Chapter 3
3–3n:\m
Angels Forebur filter-feed
with an on-siton main thatter backwash
nd on a neight injected intm hypochlorprior to pres
pressure filtif constructe
nto five prese distribution
TP. The systeines range fr
drants (includsure relief vassociation (Asbestos ceme
3: Descriptio
mtb020401\docume
bay. WTP fad pumps in pte generator,t delivers wah water and hboring rancto raw waterrite injected ssure filters;
ter out of sered would bri
ssure zones: n system is fem serves 1,7from 2-inch tding wharf halves (PRVsAWWA) C90ent, spiral w
Waon of Existin
ents\_water master
acilities incluparallel, three, a 2.5 MG trater from thewater from
ch. Chemicalr between thprior to flocand 4) zinc
rvice. Installaing the total
Zones A – Efed by gravit769 meteredto 14-inch dihead style hys), and a surg00 polyviny
weld steel, du
City of AWater Master
ng Water Sy
MTB0r plan\final\0713 m
ude a four-ste pressure fireated watere storage tansedimentatiol addition at
he Angels cculation basorthophosph
ation of a foplant capaci
E. Pressure zty from the d connectioniameter. ydrants), air ge valve. Pipyl chloride (Puctile iron, or
ngels Plan
ystem
020401 mp.docx
tage lters,
r nk to on the
sin hate
ourth ity to
zones
ns
pe PVC) r
Angels WMJuly 2013
4 Ap
A reviewwater sys
S4.1 An agreePower ANorth FoHunter’s Resourcewater allonecessary In additiosurface wof the woprovide a The CityWaterwo
1. A
2. Tso
3. Bin
4. T
b
5. Tshsufo
T4.2 In generaprocess rregulatio
MP
pplicab
w of applicabstem are pro
ource Capa
ement betwegency (NCP
ork of the StaReservoir fo
es (DWR) Mocations. Thy to firm-up
on to securinwater supply ooden flume a supplemen
’s water suporks Standard
At all times, t
The water sysource capaci
Both the MDDn each indivi
The source caased on adeq
The source cahould be incufficient stororeseeable sh
Treatment P
al, although residuals [6],ns. In additi
ble Reg
ble regulationvided in this
acity
en CalaveraPA) providesanislaus Rivefor use by UP
May 1 forecashere are unce
water alloca
ng a firm allowith grounddelivery sys
ntal water sup
pply capacityds [10]. Spec
the water sys
stem should ity, storage c
D and PHD idual pressur
apacity of a quately supp
apacity of a pluded in the rage or standhutdowns by
Plant
improvemen, the City Won, recent C
gulatio
ns and the des chapter.
s County Was a schedule er (through tPA [9]. This st of ‘total ruertainties of dations and ag
ocation of sodwater. Becastem, more ipply.
y will be evacifically, the
stem’s sourc
be able to mcapacity, and
requirementre zone.
surface wateported and do
purchased wtotal source
dby source cy the supplie
nts may be nWTP compliesCalifornia De
4–1n:\m
ons and
evelopment
ater Districtof ‘Maximuthe Tunnel Tagreement i
unoff’ and isdelivery volugreements be
ource water, ause of the 2importance h
aluated basede following r
ce(s) should
meet four houd/or emergen
ts should be
er supply shoocumented d
water connece capacity of capacity to mer.
needed to incs with applicepartment of
mtb020401\docume
d Desig
of appropria
(CCWD) anum Delivery’Tap) and Milis based on ts comprised lumes duringetween CCW
a goal of Ci2001 Darby Fhas been pla
d upon criterrequirements
have the cap
urs of peak hncy source c
met in the w
ould be the ldata.
ction betweenf the purchasmeet user req
crease reliabcable Califorf Public Heal
ents\_water master
gn Cri
ate design cr
nd Northern ’ volumes ofll Creek delithe Departmof six steps
g very dry yeWD, NCPA,
ity officials iFire that des
aced on locat
ria within thes apply:
pacity to me
hour demandconnections.
water system
lowest antici
n two publicser if the purquirements d
ility and prornia drinkinglth (CDPH)
MTB0r plan\final\0713 m
iteria
riteria for the
California f water fromiveries into
ment of Waterof decreasedears, and it iand UPA.
is to augmenstroyed a secting a well to
e California
eet the MDD
d (PHD) wit
m as a whole
ipated daily
c water systerchaser has during reason
operly disposg water corresponde
020401 mp.docx
e
m the
r d s
nt the ction o
D.
th
and
yield
ems
nably
se of
ence
Angels WMJuly 2013
indicatesTreatmenwith the The WTPprovisionsubseque
1. Sco
2. Tfi
3. Spr
4. Rre
In additioStates EnCryptosp
1. R
2. Rsh
3. Ttu
S4.3 A 2.5 MGIn a 2011and, specavoid serand a trandistributiparallel tand a 14-
MP
that the Citynt Rule (no ffederal Stag
P will be evans within theent design w
tandby replaontrol of uni
The plant shoilters are out
olids removrocess water
Recycle flowecycle proce
on, new recynvironmentaporidium Act
Recycle flow
Raw water anhould be pro
The recycled urbidities of
torage Cap
G tank locate1 memorandcifically, the rvice interrupnsmission mion system. To the existin-inch transm
y is in compfurther actione 2 Disinfec
aluated basede California sill focus upo
acement equit processes
ould be equipt of service f
al treatment r at the WTP
s should be ress water at t
ycling facilitl Protection tion Plan [14
should be le
nd recycle floovided for re
water treatmless than 2.0
acity
ed at the WTum [15], CDstorage tank
ptions, the mmain to store The second sng domestic w
mission main.
Cha
pliance with n required) a
ctants and Di
d upon desigsurface wateon the follow
uipment shoufor coagulat
pped with filfor backwash
should be pP).
returned to tthe WTP).
ties within thAgency (EP
4]. The follo
ess than or e
ows should becycle flows.
ment process0 Nephelome
TP is the onlDPH staff cok and the tra
memorandumand carry trestorage tank water supply.”
apter 4: App
4–2n:\m
the federal Land has madisinfection B
gn criteria, reer treatment wing specific
uld be availation, filtratio
lter units whh or mainten
provided for
the headwork
he WTP willPA) technicaowing criteri
equal to 10 p
be controlled.
s should be setric Turbidi
ly existing stommented onansmission pm stated that eated water and the new
y system tha
plicable Regu
mtb020401\docume
Long Term 2de significantByproducts R
eliability reqregulations
c requiremen
able to assureon, and disinf
hich provide nance.
recycle flow
rks of the WT
l be designedal guidance [a will be use
percent of the
d to avoid hy
selected and ity Units (NT
torage tank wn the reliabilipeline from“the City nefrom the wa
w transmissioat comprises
Waulations and
ents\_water master
2 Enhanced t progress to
Rule [11].
quirements, [12]. The ev
nts:
e continuousfection.
redundant c
ws (if City ch
TP (if City c
d in accordan[13] and the ed:
e plant influe
ydraulic surg
designed to TU).
within the Clity of the Ci
m the WTP ineeds one moater treatmenon main willof a 2.5 MG
City of AWater Master
d Design Cri
MTB0r plan\final\0713 m
Surface Watoward compl
and recyclinvaluation and
s operation a
capacity whe
hooses to rec
chooses to
nce with UnCalifornia
ent flow.
ges. Equaliz
achieve
City water syity water sysnto the City.ore storage tant plant to thl operate in
G storage tan
ngels Plan iteria
020401 mp.docx
ter lying
ng d
and
en
cycle
nited
zation
stem. stem To
ank e
nk
Angels WMJuly 2013
Storage cWaterwoand main
1. Tca
2. SshF
3. SoparRst
4. Cm
D4.4 The Citywater by more tha
MP
capacity withorks Standardntenance con
The system shapacity, and/
torage capachutdowns ofork of the St
torage capacperational (sre calculated
Resolution 21torage is equ
City staff shomaintenance,
Rural resid
Single fam
Single fam
Multiple rebusinesses
Multiple restory; light
Multiple reand heavy a Fire flows
Distribution
distributiongravity fromn 50 years, a
hin the City ds [10], the C
nsiderations.
hould be abl/or emergen
city should bf the woodentanislaus Riv
city should bsystem peakid based on th1-78. Operatual to four ho
ould have the cleaning, an
CITY
Land Us
dential (<2 lots
mily residential
mily residential
esidential up toof one story
esidential unitst commercial a
esidential, threeindustrial
and durations es
System
n system inclm the WTP. and pipe size
Cha
water systemCity of AngeThe followi
le to meet focy source co
be sufficient n flume systever.
be greater thaing) storage,he flows andtional storagours of MDD
e ability to rend re-coating
TY OF ANGELS
FIRE FLOW
se Category
/acre)
(<2 lots/acre)
(≥3 lots/acre)
o a fourplex; ne
s of >4 units, onand light indust
e stories; heavy
stablished in Cit
ludes five prCertain preses range from
apter 4: App
4–3n:\m
m will be evels 2010 Imping criteria w
our hours of Ponnections.
to satisfy deem that conv
an or equal t, and emerge
d durations pe is equal to
D.
emove a tankg without ca
TABLE 4-1 S WATER MA
W REQUIREM
eighborhood
ne and two trial
y commercial,
ty Resolution 21
ressure zonesssure zones cm 2-inch to
plicable Regu
mtb020401\docume
aluated baseprovement Swill be applie
PHD with so
emands durinveys water to
to the sum oency storage
presented in To 20 percent
k from serviausing servic
ASTER PLANMENTS
Fire Flow(gpm)
500
500
750
750
1,500
2,000
-78.
s, and all of contain pipin14-inch. Som
Waulations and
ents\_water master
ed upon the CStandards [16ed:
ource capaci
ng reasonabo the City fro
of the requiree. Fire storagTable 4-1 froof the MDD
ice for repairce interruptio
N
wa Dura(hr
2
2
2
2
2
2
the pressureng that has bme pipe size
City of AWater Master
d Design Cri
MTB0r plan\final\0713 m
California 6], and oper
ity, storage
bly foreseeabom the North
ed fire storagge requiremeom City
D. Emergency
rs, inspectionons.
ationa rs)
2
2
2
2
2
2
e zones receibeen in use fos are unknow
ngels Plan iteria
020401 mp.docx
ation
ble h
ge, ents
y
n,
ive for wn.
City of Angels Water Master Plan
Chapter 4: Applicable Regulations and Design Criteria
Angels WMP 4–4 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
As part of the master planning process, a computer model of the distribution system was developed. Computer simulations were used to evaluate the distribution system and identify necessary improvement projects. Evaluation and design criteria are summarized in Table 4-2.
TABLE 4-2 CITY OF ANGELS WATER MASTER PLAN
DISTRIBUTION SYSTEM EVALUATION AND DESIGN CRITERIA
Criteria Value Source
Minimum pressure – ADDa 40 psib 2010 Improvement Standards [16]
Minimum pressure – MDD 35 psi Typical design standard
Minimum pressure – PHD 20 psi California Waterworks Standards [10]
Minimum pressure – fire flow plus MDD
20 psi 2010 Improvement Standards [16], California Waterworks Standards [10]
Maximum pressure at service connection
150 psi (PRV required at 80 psi)
2010 Improvement Standards [16]
Maximum velocity 8 fpsc (typical) 12 fps (short durations)
Typical design standards
Maximum head loss gradient 10 ft per 1,000 ft Typical design standard
Minimum main size 4-inches California Waterworks Standards [10] a ADD = average day demand b psi = pounds per square inch c fps = feet per second
Angels WMJuly 2013
5 Ex
The purpfuture lanas well a
S5.1 The studyand doesrequiringprovidedencompaFigure 3-
L5.2 City GISthe studycurrent Gdescriptio
MP
xisting
pose of this cnd uses to prs for buildou
tudy Area
y area for th not include
g annexationd in GIS formassed a total -1).
Land Use
S data were ay area. In addGIS status ofons are prese
and P
chapter is to redict future ut conditions
he Master Plaareas within will be the
mat were utilarea of appr
analyzed to ddition to landf each parcelented in Tab
Project
develop an awater dema
s.
an is based on the SOI besubject of fulized for the roximately 2
determine thed uses based: developed,
ble 5-1.
5-1n:\m
ed Wa
appropriate wands for the 1
on the curreneyond the Cituture technicdevelopmen,280 acres (a
e distributiod on the Gene, partially de
mtb020401\docume
ater De
water deman10-year and
nt City limitsty limits. Wa
cal studies. Lnt of this chaac) within th
n of existingeral Plan [1]
eveloped, or
ents\_water master
emand
nd factor for20-year plan
s from the Gater supplies
Land use datapter. The fuhe City limit
g and future ], data reviewvacant. Lan
MTB0r plan\final\0713 m
ds
r existing andnning horizo
General Plan s for areas a for the Cit
urnished datas (see
land uses wwed included
nd use
020401 mp.docx
d ons
[1]
ty a
ithin d the
Angels WMJuly 2013
Ea. Overall lreflectingpartially and OS wdemands
MP
R
C
I
P
O
Existing Area
and use charg historical wdeveloped a
were assume.
CITY
Land U
Residential
HDR
MDR
RE
SFR
HDR-WMC
Commercial
BAE
CC
HC
SC
Industrial
I
Public
P
P (WWTP)
P-SCH
PR
PR-Golf
Other
SP
OS
ROW
as
racteristics wwater demanareas) is presed to have no
TY OF ANGELS
LAND USE
Use
C
were used to nds. A summsented in Tabo water dema
Chapter 5:
5-2n:\m
TABLE 5-1 S WATER MAE DESCRIPT
D
High-De
Medium-D
Resid
Single-F
Wor
Business A
Commun
Histor
Shoppi
I
Public (Wastew
Pu
Parks
G
Spec
O
Rig
develop an mary of existible 5-2 and Fands and we
Existing an
mtb020401\docume
ASTER PLANTIONS
Description
ensity Resident
Density Reside
dential Estate
amily Residen
rldmark Club
Attraction/Expa
unity Commerc
ric Commercia
ing Commercia
Industrial
Public
water Treatme
ublic School
and Recreation
Golf Course
cial Planning
Open Space
ght-of-Way
appropriate ing developeFigure 5-1. Pere excluded
Wand Projected
ents\_water master
N
tial
ential
ntial
ansion
cial
al
al
ent Plant)
n
water demaed land uses Parcels desigfrom the an
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
and factor (including
gnated as ROnalysis of exi
ngels Plan
mands
020401 mp.docx
OW isting
City of Angels Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-3 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 5-2 CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF EXISTING LAND USES
Land Use Number of
Parcelsa
Total Developed Areaa (ac)
Residential
HDR 128 80
MDR 68 51
RE 10 14
SFR 1,190 372
HDR-WMC 19 21
Commercial
BAE 21 26
CC 101 65
HC 79 16
SC 39 32
Industrial
I 5 16
Public
P 22 28
P (WWTP) 2 18
P-SCH 8 50
PR 9 18
PR-Golf 5 144
Other
SP 1 4
OS 5 12
ROW 154 216
Total 1,866 1,183 a Includes partially-developed land uses.
LAND USE LEGEND
RESIDENTIAL
HDR HIGH-DENSITY RESIDENTIAL
MDR MEDIUM-DENSITY RESIDENTIAL
RE RESIDENTIAL ESTATES
SFR SINGLE-FAMILY RESIDENTIAL
HDR-WMC
WORLDMARK CLUB (HIGH-DENSITY)
COMMERCIAL
BAE BUSINESS ATTRACTION & EXPANSION
CC COMMUNITY COMMERCIAL
HC HISTORIC COMMERCIAL
SC SHOPPING COMMERCIAL
INDUSTRIAL
I INDUSTRIAL
PUBLIC
P PUBLIC
P (WWTP) PUBLIC (WASTEWATER TREATMENT PLANT)
P-SCH PUBLIC SCHOOL
PR PARKS & RECREATION
PR-GOLF GOLF COURSE
OTHER
SP SPECIAL PLANNING
OS OPEN SPACE
ROW RIGHT-OF-WAY
N/A UNDEVELOPED PARCEL
Angels WMJuly 2013
Fb. Land usesummary
MP
Future Areas
es for parcelsy of buildout
s
s shown in tht land use is
CITYSUM
Residentia
HDR
MDR
RE
SFR
HDR-W
Commerci
BAE
CC
HC
SC
Industrial
I
Public
P
P (WWT
P-SCH
PR
PR-Golf
Other
SP
OS
ROW
Total a Includes d
he GIS files presented in
TY OF ANGELSMMARY OF
Land Use
al
WMC
ial
TP)
f
developed, partia
Chapter 5:
5-5n:\m
were used ton Table 5-3 a
TABLE 5-3 S WATER MABUILDOUT L
Numof Pa
1
2
ally developed, a
Existing an
mtb020401\docume
o estimate fuand displaye
ASTER PLANLAND USES
mber arcelsa
ToBuil
Area
163
75
26
1,472
19
31
133
85
50
11
28
19
8
10
5
36
5
154
2,330 2
and vacant land u
Wand Projected
ents\_water master
uture water ded in Figure 5
N
otal ldout aa (ac)
223
54
126
507
21
59
102
21
97
32
31
266
50
22
144
297
12
216
2,280
uses.
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
demands. A 5-2.
ngels Plan
mands
020401 mp.docx
LAND USE LEGEND
RESIDENTIAL
HDR HIGH-DENSITY RESIDENTIAL
MDR MEDIUM-DENSITY RESIDENTIAL
RE RESIDENTIAL ESTATES
SFR SINGLE-FAMILY RESIDENTIAL
HDR-WMC
WORLDMARK CLUB (HIGH-DENSITY)
COMMERCIAL
BAE BUSINESS ATTRACTION & EXPANSION
CC COMMUNITY COMMERCIAL
HC HISTORIC COMMERCIAL
SC SHOPPING COMMERCIAL
INDUSTRIAL
I INDUSTRIAL
PUBLIC
P PUBLIC
P (WWTP) PUBLIC (WASTEWATER TREATMENT PLANT)
P-SCH PUBLIC SCHOOL
PR PARKS & RECREATION
PR-GOLF GOLF COURSE
OTHER
SP SPECIAL PLANNING
OS OPEN SPACE
ROW RIGHT-OF-WAY
N/A UNDEVELOPED PARCEL
Angels WMJuly 2013
A5.3 Historicawater (i.eparameteproductioConsump The GHCsurface wAlthoughdiversionwater frowater profor inclus
Wa. Water prwater delHistoricain Table 339 MG,The 2007productiochapter a
MP
Analysis of E
al water prode., system loers to estimaton data are bption data w
C Golf Courwaters from Ah the GHC Gns from Angom UPA. GHoduction fromsion in futur
Water Produc
roduction datlivered to theal monthly w5-4, the ann, correspond7-2012 averaon of 0.86 mas an overall
Existing Wa
duction and csses), peakinte and alloca
based on inflere compiled
se meets its Angels Cree
Golf Course dels Creek ar
HC Golf Coum the WTP
re water requ
ction
ta are based e WTP. The
water productual producti
ding to an aveage annual p
mgd. The 200target value
ater Demand
consumptionng factors, aate existing aluent flow md from custo
irrigation deek and seasondoes not rece included a
urse irrigatioand metered
uirements for
on influent f influent flowtion data forion at the WTerage day pr
production is07-2012 avere for water d
Chapter 5:
5-7n:\m
ds
n data were aan appropriatand projecte
meter recordsomer billing
emands withnal use of reeive finished
as part of theon demands ad City water r the City.
flow meter (w meter is lo
r the City WTTP from 200roduction of s 314 MG anrage day proemand facto
Existing an
mtb020401\docume
analyzed to dte water dem
ed future wats of raw waterecords base
h a combinatecycled wated waters pro
e City’s annuare not a comusage data b
(aka, upper pocated upstrTP are prese07 to 2011 raf 0.75 mgd annd corresponoduction of 0or developme
Wand Projected
ents\_water master
determine nomand factor, ter demandser delivered ed on water
tion of directer from the Woduced by thual deliveriesmponent of tbut were eva
plant meter) ream of the pented in Tabanged from 2nd 0.93 mgd
nds to an ave0.86 mgd is uent and calib
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
on-revenue and other . Water to the WTPmeter readin
t diversions WWTP. he WTP, the s of surface the historicaaluated separ
records of rplant headwole 5-4. As sh275 MG to
d, respectivelerage day used in this bration.
ngels Plan
mands
020401 mp.docx
. ngs.
of
al rately
raw orks. hown
ly.
Angels WMJuly 2013
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Tota
Tota
Avera The
Water prfor evalushould beprocesseshypochloin the pro
2b. Trends in2011 andTable 5-5productio1) increarate strucincrease rates for projectio
MP
Month
y
al
al (AF)
rage Day (mgd
e monthly produc
roduction datuations of avae noted that s at the plantorite solutionojected dema
012 Water P
n water prodd more close5, monthly won in 2011. Tsed irrigatio
cture (the addin plant prod2007-2012 (ns.
CITYHISTORI
WA
2007
16.2
14.4
18.4
20.8
30.5
38.3
46.1
47.3
36.4
26.6
20.6
16.3
332
1,018
d) 0.91
ction data is from
ta based on tailable waterthe WTP inft. Process wn and represeands for eva
Production T
duction for thly represent
water producThe apparenn resulting fdition of 1,0duction in 20(as shown in
TY OF ANGELSICAL MONTTER TREAT
Month
2008
16.5
14.8
18.3
26.5
32.8
38.3
44.3
47.5
37.4
28.5
18.3
15.6
339
1,039
0.93
m the WTP influ
the WTP infr supply andfluent flow mater is drawnents a signifi
aluation of th
Trends
he beginningtrends in the
ction in 2012nt increasing from a relativ000 cubic fee012 may repn Table 5-4)
Chapter 5:
5-8n:\m
TABLE 5-4 S WATER MA
THLY WATERMENT PLAN
hly Production
2009 20
13.4 13
11.4 11
14.1 14
21.3 13
30.3 20
32.4 31
42.0 40
40.7 40
35.1 34
25.0 25
18.4 15
15.0 13
299 2
918 8
0.82 0.
uent flow meter (
fluent flow md distributionmeter does nn from the st
ficant demanhe WTP unit
g of 2012 shoe dry-years o2 is up to 40water produvely dry winet to the monpresent a longwill serve as
Existing an
mtb020401\docume
ASTER PLANR PRODUCT
NT, 2007-2012
na (MG)
010 2011
3.8 13.0
1.7 11.9
4.3 13.9
3.9 16.1
0.2 26.7
1.2 32.2
0.8 46.0
0.1 47.3
4.2 41.8
5.8 27.2
5.4 18.4
3.2 17.8
75 313
43 959
75 0.86
(upper plant met
meter as presn system pernot account ftorage tank o
nd at the WT processes in
ow significaof 2008 and percent high
uction trendsnter; and 2) cnthly base rag-term trends the “startin
Wand Projected
ents\_water master
N TION, 2
A2012
18.2
16.7
15.8
18.3
34.2
38.7
42.8
-
-
-
-
-
-
-
-
ter).
sented in Tabrformance. Hfor water useoutlet to genP. Process wn Chapter 7.
ant increases 2009. As sh
her than the s in 2012 machanges in thate). Becaused, average wng point” for
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
2007-2012 Average (MG)
15.2
13.5
15.8
19.5
29.1
35.2
43.7
44.6
37.0
26.6
18.2
15.6
314
963
0.86
ble 5-4 are uHowever, it ed in variousnerate sodiumwater is inclu
as comparehown in monthly
ay be relatedhe City watee the apparenater productr demand
ngels Plan
mands
020401 mp.docx
useful
s unit m uded
d to
d to: er nt tion
Angels WMJuly 2013
Mc. The City1,769 serto DWR City reporelated co
MP
Metered Wate
’s water systrvice connecfor 2011 is p
orts an additionnections [
CITY2012
WATER
Mon
Jan
Feb
Mar
Apr
May
Jun
Jul a Per Tab
er Usage
tem serves actions. The npresented in ional 350 un6].
TY OF ANGELS2 MONTHLYR TREATMEN
nth
2012 Pro
(
ble 5-4.
a population number of m
Table 5-6. Inmetered con
Chapter 5:
5-9n:\m
TABLE 5-5 S WATER MA
Y WATER PRNT PLANT, J
Monthly oduction (MG)
P
18.2
16.7
15.8
18.3
34.2
38.7
42.8
of approximetered servicIn addition tonnections for
Existing an
mtb020401\docume
ASTER PLANRODUCTION,JANUARY-JU
Percent Increa from 2011a
40%
40%
14%
13%
28%
20%
-7%
mately 3,836 ce connectioo the meterer fire hydran
Wand Projected
ents\_water master
N , ULY
ase
people [17, ons by user tyed service conts and other
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
18] throughype as repor
onnections, tr fire service
ngels Plan
mands
020401 mp.docx
h rted the e
City of Angels Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-10 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 5-6 CITY OF ANGELS WATER MASTER PLAN
METERED WATER SERVICE CONNECTIONS BY USER TYPE FOR 2011
User Type Number of Metered
Connections
Single Family Residential 1,469
Multi-Family Residentiala 33
Commercial/Institutionalb 211
Industrial 3
Landscape Irrigationc 47
Otherd 3
Agricultural Irrigatione 3
Total 1,769 a “Multi-Family Residential” includes condominiums, apartment complexes, and
mobile home parks. b “Commercial” includes general businesses, restaurants, hotels/motels, markets,
laundromats, and car washes. The GHC Timeshare has 7 commercial accounts for their restaurant, pools, restrooms, spa lockers, and a lift station. “Institutional” includes schools, City buildings (such as City Hall, the Firehouse, and the Police Department), City parks, and process water for the WTP and WWTP [19].
c “Landscape Irrigation” represents areas where the meter is used strictly for landscaping and includes subdivision and business landscaping, but excludes City parks. The GHC Timeshare has 3 landscape irrigation accounts [19].
d “Other” includes construction meters. e “Agricultural Irrigation” represents areas for crops and raising cattle/animals
[19].
Historical metered water usage by user type is presented in Table 5-7. As shown in Table 5-7, the metered water usage from 2007 to 2011 ranged from 260 MG to 325 MG. The 2007-2011 average annual water usage is 293 MG which corresponds to an ADD of 0.80 mgd.
Angels WMJuly 2013
U
Single Fa
Multi-Fam
Commerc
Industrial
Landscap
Other
Agricultu
Total
Total (AF
Average
Nd.
Non-revereflected authorizemeter inalosses (syincludes equipmen
Non-revethe 2007-high percnew influ10 percenagainst gassessmethe InternIWA/AWsystem chrather thafor the puwill be uCapita W
MP
HIS
User Type
amily Resident
mily Residenti
cial/Institution
l
pe Irrigation
ural Irrigation
F)
Day (mgd)
Non-Revenue
enue water (in customer
ed consumptaccuracies, uystem leakagsystem lossent wash-dow
enue water fr-2011 averagcentage of nouent flow ment are typica
gauging wateent of the sysnational Wat
WWA Waterharacteristican relying onurpose of thised as an adj
Water Deman
CITYTORICAL M
2007
tial 203.
ial 17.
al 81.
2.
16.
2.
3.
32
99
0.8
e Water
aka, unaccour billings. Notion (water founauthorizedge and storages at the WT
wns (i.e., unr
from 2007 thge for non-reon-revenue weter at the Wally an indicaer losses as astem’s waterter AssociatiAudit Meth
cs as input ton a single, siis Master Pla
djustment to ands.
TY OF ANGELS
METED WATE
Metere
7 2008
0 202.0
0 19.0
0 81.0
0 2.0
0 16.0
0 1.0
0 3.0
5 323
7 991
9 0.88
unted-for waon-revenue wfor firefightind consumptioge tank over
TP from procrecovered or
hrough 2011 evenue watewater in 201
WTP in Februator of good a percentage r losses and tion (IWA)/A
hod relies upo several perfimplistic peran, the 2007account for n
Chapter 5:
5-11n:\m
TABLE 5-7 S WATER MAER USAGE B
d Water Usag
2009
187.8
15.7
71.7
1.7
13.8
0.8
3.1
294
904
0.81
ater) is the dwater as defing, flushing,on, and systerflows) [20].cess water innon-recycle
is presenteder is 6.1 perc1 of 16.9 pe
uary 2011 [2water systemtotal producthe effect on
AWWA Waton the quantformance inrcentage of u-2011 averanon-revenue
Existing an
mtb020401\docume
ASTER PLANBY USER TYP
ge (MG)
2010 2
165.9
14.5
67.3
0.9
13.3
0.4
2.2
264
811
0.72
distributed vofined by AW, etc.) plus apematic data h Non-revenu
ncluding filteed water).
d in Table 5-cent of the toercent may b21]. Althoughm performanction [20]. Fn City revenuter Audit Metification of dicators to r
unaccountedage for non-re water dema
Wand Projected
ents\_water master
N PE, 2007-2011
200Av
(M2011
169.8
12.0
62.8
0.6
13.3
0.1
1.9
260
799
0.71
olume of waWWA is the su
pparent losshandling erroue water for er backwash
-8. As shownotal water probe due to the h losses of lence, AWWAor a more mues, AWWAethod [20]. Twater volum
reveal water -for water [2
revenue wateands in Sect
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
7-2011 verage MG)
Pero
To
185.7 6
15.6
72.8 2
1.4 0.
14.5
0.8 0.
2.6 0.
293 100
901
0.80
ater that is noum of unbilles (customeors) plus reathe City also
hing and
n in Table 5-oduced. Theinstallation
ess than A recommenmeaningful A recommenThe mes, costs, anloss standin
20]. Howeveer of 6.1 percion 5.3-e, Pe
ngels Plan
mands
020401 mp.docx
rcent of otal
63%
5%
25%
.5%
5%
.3%
.9%
0%
-
-
ot led r
al o
-8, e of a
ds
nds
nd ng er, cent er
Angels WMJuly 2013
T
T
N
Na b
Pe. City popucustomerresidentiaadjusted an averagCity 2010150 gpcdwater demfactor de
MP
Pa
Total Annual P
Total Annual M
Non-Revenue W
Non-Revenue W
See Table 5-4.
See Table 5-7.
er Capita W
ulation data r billing recoal water demtotal residenge per capita0 Improvem
d, within 2 pemand of 586termined in
Curren
Total R
Adjust
Averaa April b 2007-
calcuc gpd =d Total
avera
CITYN
arameter
roductiona (MG
Metered Usageb
Water (MG)
Water (%)
Water Demand
and per-capords are summand adjustential water dea water dema
ment Standardercent of the
6,000 gpd wiSection 5.5,
CITYEXIS
nt Population (
Residential Wa
ted Total Resid
ge Per Capita W
2010 population
-2011 average mlated from value
gallons per day
residential demage non-revenue
TY OF ANGELSNON-REVENU
200
G) 3b (MG) 3
2.
ds
ita water demmmarized in Ted to accountemand dividand of 153 gds Section 1e calculated dill be used as Developme
TY OF ANGELSSTING PER C
Parameter
(Capita)a
ater Demand (g
dential Water D
Water Demand
n estimate from
metered water usaes in Table 5-7 (e
and including aldemand of 6.1%
Chapter 5:
5-12n:\m
TABLE 5-8 S WATER MAUE WATER,
07 2008
332 339
325 323
7 16
1% 4.7%
mands basedTable 5-9. At for non-rev
ded by the cugallons per ca6.06.01 [16]demand of 1s a target valent of Water
TABLE 5-9 S WATER MA
CAPITA WAT
r
gpd)b,c
Demand (gpd)d
d (gpcd)
Dept. of Finance
age for single-faexcludes non-res
llowance for non% per Table 5-8)
Existing an
mtb020401\docume
ASTER PLAN2007-2011
2009 201
299 27
294 26
5 1
1.7% 4.0%
d on existingAs shown in Tvenue water urrent City papita per day] identifies a153 gpcd. Thlue for validDemand Fa
ASTER PLANTER DEMAND
d
e, Table E-4 [17
amily and multi-fsidential water u
n-revenue water.
Wand Projected
ents\_water master
N
0 2011 2
75 313
64 260
11 53
% 16.9%
g water prodTable 5-9, thdemand is 5
population ofy (gpcd). Fo
a design per che adjusted tdation of the actor.
N D
Value
3,836
552,000
586,000
153
7, 18].
family residentiausage).
r demand (assum
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
2007-2011 Average
312
293
19
6.1%
duction and he total 586,000 gpd.f 3,836 resulr comparisocapita demantotal residentwater dema
al
me
ngels Plan
mands
020401 mp.docx
. The lts in n, nd of tial
and
Angels WMJuly 2013
Gf. As discusurface wwater begCourse adelivery
In additiothe yearsIn 2012, delivered An agree(450 AFYcase scenGolf Coulargest irsurface w104 MG Golf Cou
MP
Greenhorn Cr
ssed previouwaters from Agan in April re summarizfor GHC Go
HIST
Mon
Apr
May
Jun
Jul
Aug
Sep
Oct
Total
Total (AF)
Average Da
on to the 55.s 2009-2011 53.6 MG (1
d to GHC Go
ement betweY) of Angelsnario, if the Wurse would brrigation demwater diversi(319 AFY).
urse is assum
reek Golf Co
usly, GHC GAngels Cree2009 [21]. H
zed in Table olf Course is
CITYTORICAL SU
O
M
nth
ay (mgd)
0 MG (169 Awas 31.0 M65 AF) of crolf Course fo
en the City as Creek surfaWWTP failebe entitled tomand recordeion and recycFor future w
med at this m
ourse Irrigat
Golf Course mek and recyclHistorical su5-10. As sh
s 55.0 MG (1
TAY OF ANGELSURFACE WAOF GHC GOL
Monthly Irriga
2009
0.0
0.0
9.4
17.2
14.6
9.4
3.9
54.4
167
0.15
AF) of creekMG (95 AF) f
reek water anor a total irri
and Greenhoface water foed to produceo take their eed for GHC cled water dwater deman
maximum his
Chapter 5:
5-13n:\m
ion Demand
meets its irriled water fro
urface water own in Tabl
169 AF).
ABLE 5-10 S WATER MATER DELIVE
LF COURSE,
ation with Surf
2010
0.0
1.7
10.1
13.1
17.1
12.7
0.0
54.7
168
0.15
k water, the for a total irrnd 50.1 MGigation dema
orn Creek Asor irrigation oe recycled wntire supply Golf Course
delivery for gnd projectionstorical value
Existing an
mtb020401\docume
ds
igation demaom the WWTdeliveries fo
le 5-10, the a
ASTER PLANERIES FOR I2009-2011
face Water (M
2011
4.5
10.5
13.
14.
5.3
7.6
0.0
55.8
17
0.15
average delirigation dem
G (154 AF) oand of 104 M
ssociates L.Pof the GHC
water meeting from Angel
e occurred ingolf course irns, the annuae.
Wand Projected
ents\_water master
ands with a cTP. Irrigatioor irrigation average annu
N IRRIGATION
MG) 2009-Aver
(M
5
5
1
8
3
6
0
8
1
5
ivery of recymand of 86.0
f recycled wMG (319 AF
P. allows up Golf Courseg Title 22 Stls Creek. . Hn 2012. The rrigation in 2
al irrigation d
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
combinationon with recyc
of GHC Goual surface w
N
-2011 rage
MG)
1.5
4.1
10.9
15.0
12.3
9.9
1.3
55.0
169
0.15
ycled water fMG (264 AF
water was ).
to 147 MG/e [2]. In a wotandards, GH
Historically, tcombined 2012 was demand for
ngels Plan
mands
020401 mp.docx
n of cled
olf water
for F).
/year orst HC the
GHC
Angels WMJuly 2013
P5.4 Peaking fconditionhydraulicevaluatioto MDD.previous
Ma. The maxaverage dtypically shown inconfirmeof the dat
D
M
A
Ma b
The recointended recommespecify arecommeamendme[22]. The1,440 gpmfactor wi
MP
Peaking Fact
factors are uns greater thac analysis ofon and sizing. Peaking facstudies.
Maximum Da
imum day pday productisized for M
n Table 5-11ed that maximta presented
MA
Date of Maximu
Maximum Day
Average Day Pr
Maximum Day
Per 2011 Water
See Table 5-4.
mmended mfor master p
ended factor a maximum dended factor ent for 1993e City’s watem [23]. Cityill influence
tors
used to calcuan average af the distribug of improvectors are obt
ay Demand
eaking factoion for the ye
MDD. The av. Daily produmum day pro
d in Table 5-1
CITYAXIMUM DAY
Item
um Day Produ
Production (M
roduction (MG
Peaking Facto
Audit [6].
maximum dayplanning purof 2.2 is con
day peaking is also cons and 1994 wer supply pery growth ratethe timing o
ulate the wateannual demaution system.ements includained from a
or is the ratioear. Water trerage annuauction recoroduction in 211, the recom
TAY OF ANGELSY PRODUCT
20
uctiona Jul
MG) 1
G)b 0
or 2
y peaking farposes (e.g. tnsistent withfactor of 2.0istent with h
with maximumrmit limits thes in conjuncof improvem
Chapter 5:
5-14n:\m
er demands eands. The res. Typical peade the ratio oa review of h
o of the maxiransmission,
al and maximrds for 2011 2011 did notmmended m
ABLE 5-11 S WATER MA
TION PEAKIN
007 2
y 6/7 Au
.80
0.91
2.0
actor of 2.2 itiming of imph the City 200 or 3.0 depehistorical datm day peakihe maximumction with th
ments needed
Existing an
mtb020401\docume
expected unsulting demaaking factorsof MDD to Ahistorical wa
imum day pr, treatment, a
mum day prowere not evt exceed 2.0
maximum day
ASTER PLANNG FACTOR
Year
2008
ug 17/18 Ju
2.00
0.93
2.2
s based on amprovements 010 Improveending on thta presented ing factors o
m flow rate the recommend at the WTP
Wand Projected
ents\_water master
nder varying and conditions necessary fADD and thater producti
roduction foand pumping
oduction for aluated but tMG [21]. B
y peaking fac
N RS, 2007-2010
2009
uly 27/28
1.61
0.82
2.0
actual producin the CIP).ment Standa
he project sizin the City’
of 2.2 and 2.3through the Wnded maximu
P.
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
demand ns are used ifor the hydra
he ratio of PHion data and
or the WTP tg facilities a2007 to 201the City
Based on anactor is 2.2.
2010
Oct 5
1.66
0.75
2.2
ction data an. Even so, thards which ze [16]. The s CDPH per3, respectiveWTP to um day peak
ngels Plan
mands
020401 mp.docx
in the aulic HD
to the are 0 are
alysis
nd is he
rmit ely
king
Angels WMJuly 2013
Pb. The PHDdiurnal drecords wis 2,400 gmaximumthe recomthat specspecify a
D5.5 A water dconsistensummarizgpd/EWU
Sa. Existing planning existing cAppendixGeneral Pdevelop ain conjundemand p
MP
eak Hour De
D factor is thdemand. PHDwere not avagpm (3.46 mm day prodummended PHify a minimu
a PHD factor
Development
demand factncy with the zes conversiU water dem
ummary of E
and future Eland uses ar
conversion fx A. Future Plan [1]. Exia water demnction with tprojections.
emand
he ratio of theD is typicallyilable, but th
mgd) [6]. Theuction of 2.00HD factor is um PHD facr.
t of Water D
tor was devemethodolog
ion factors omand factor.
Equivalent W
EWU converre summarizfactors is incconversion fisting EWU and factor o
the existing a
e highest houy met by utilhe estimatede ratio of the0 mgd in 2001.7 which is
ctor of 1.5 [1
Demand Fa
eloped on thegy used in thof EWU/ac fo
Water Unit C
rsion factors zed in Table cluded as an factors are bconversion n the basis oand future E
Chapter 5:
5-15n:\m
urly demandlizing water
d PHD duringe estimated P08 (per Tabls consistent w0]. The City
actor
e basis of an e City Wasteor the differe
Conversion F
for resident5-12. The deexcerpt fromased on projfactors prese
of an EWU. WU convers
Existing an
mtb020401\docume
d to the MDDin water sto
g the summePHD of 2,40le 5-11) is 1.with Califory 2010 Impro
n equivalent wewater Mastent land uses
Factors
tial, commeretailed analym the City Wjected land uented in TabThe water dsion factors
Wand Projected
ents\_water master
D and represorage facilitieer based on p00 gpm (3.46.7. Based onrnia Waterwoovement Sta
water unit (Eter Plan [18]s and an app
rcial, public,ysis for deve
Wastewater Muse densitiesble 5-12 weredemand facto
to estimate f
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
sents the grees. Hourly mprevious stud6 mgd) to then this calculaorks Standarandards do n
EWU) for ]. This sectiopropriate
and special elopment of tMaster Plan is presented ine used to
or was then ufuture water
ngels Plan
mands
020401 mp.docx
eatest meter dies e ation, rds
not
on
the in n the
used r
City of Angels Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-16 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 5-12 CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF EWU CONVERSION FACTORS
Conversion Factora (EWU/ac)
Land Use Existing Futureb
Residential
HDR 5.0 15.0
MDR 3.0 10.0
RE 2.0 0.5
SFR 4.0 6.0
HDR-WMC 9.5 9.5
Commercial
BAE 2.0 1.0
CC 2.0 15.0
HC 2.0 15.0
SC 2.0 15.0
Industrial
I 2.0 2.0
Public
P 5.0 5.0
P (WWTP)c 5.0 0.0
P-SCH 10.0 10.0
PR 4.0 4.0
Other
SP 1.5 1.5 a Existing and future conversion factors from the City Wastewater Master Plan [18].
OS and ROW land uses are excluded from the table and the development of a water demand factor because no water demands are assumed for these land uses. The PR-Golf land use is also excluded from the table because irrigation demands associated with GHC Golf Course were evaluated separately.
b Future conversion factors based on projected General Plan [1] densities. c Water demands are not anticipated for future WWTP areas. Potential increases in
water demands at the existing 18 ac WWTP site associated with future expansions are assumed to be met with Title 22 recycled water.
As shown in Table 5-12, future EWU conversion factors for RE and BAE are lower than existing EWU conversion factors. The existing EWU conversion factor for RE was based on an analysis of existing parcel sizes for areas with the RE land use designation [18]. The existing EWU conversion factor for BAE was based on an analysis of existing developed commercial parcel areas [18]. The future EWU conversion factors, including the factors for RE and BAE, are from the General Plan [1, 18].
Angels WMJuly 2013
There arethe futuredemandswater use18 ac of Wassociate
Cb. Using the0.86 mgdthe value
MP
e approximae conversion will be assoed at the WWWWTP site.
ed with futur
Calculation o
e existing EWd, a water dees used to est
ately 18 ac den factor for Pociated with WTP is accou. Potential inre expansion
of Water Dem
WU/ac convemand factortimate the ap
eveloped andP (WWTP) ithe future 24unted for in
ncreases in ws are assume
mand Factor
version factor in terms of ppropriate w
Chapter 5:
5-17n:\m
d 248 ac vacs 0.0 EWU/a48 ac at the the water de
water demanded to be met
rs and the 20f gpd/EWU wwater demand
Existing an
mtb020401\docume
cant at the Wac based on WWTP siteemands assods at the exit with Title 2
007-2012 avwas determind factor.
Wand Projected
ents\_water master
WWTP site. Ithe assumpt. It is assum
ociated with isting 18 acre22 recycled w
verage day pned. Table 5
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
In Table 5-1tion that no w
med that procthe existing e WWTP sitwater.
production of5-13 summar
ngels Plan
mands
020401 mp.docx
2, water ess
te
f rizes
City of Angels Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-18 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 5-13 CITY OF ANGELS WATER MASTER PLAN
CALCULATION OF WATER DEMAND FACTOR
Land Use
Total Developed Areaa (ac)
Existing Densityb
(EWU/ac)
Total Existing
EWU Residential
HDR 80 5.0 400
MDR 51 3.0 153
RE 14 2.0 28
SFR 372 4.0 1,488
HDR-WMC 21 9.5 200
Commercial
BAE 26 2.0 52
CC 65 2.0 130
HC 16 2.0 32
SC 32 2.0 64
Industrial
I 16 2.0 32
Public
P 28 5.0 140
P (WWTP) 18 5.0 90
P-SCH 50 10.0 500
PR 18 4.0 72
Other
SP 4 1.5 6
Total 811 3,387
Total Existing Productionc (gpd) 860,000
Water Demand Factor (gpd/EWU) (rounded) 255 a See Table 5-2. Excludes ROW, OS, and PR-Golf. b Existing EWU conversion factor (see Table 5-12). c 2007-2012 average day production (see Table 5-4).
A water demand factor of 255 gpd/EWU results from using the method described in this chapter. It should be noted that the water demand factor is based on an EWU, not per capita or per dwelling unit, and is to be used only with the EWU conversion factors presented in Table 5-12. For context, there are a total of 1,769 existing water meter connections in the City and a total of 3,387 existing EWUs as calculated in Table 5-13. The number of water meters is not comparable to the number of EWUs.
Angels WMJuly 2013
Cc. A compapresentedwith the residentiaof 586,00
CO
Rd. A water dprojectiofactor is bEWU condesignedSection 5 Selectionand distrioverestimincrease Converse
MP
Comparison o
arison of estid in Table 5-existing EWal demand o00 gpd.
OMPARISON
ResidentialUse
HDR
MDR
RE
SFR
HDR-WMC
Total Estimat
Total Actual R
Percent Differa See Table 5-2.b Existing EWUc 2007-2011 ave
revenue water
Review of Re
demand factns of future based on an nversion fac
d to mimic w5.3-d, Non-R
n of a water dibution syste
mation of procapacity of sely the use o
of Estimated
imated reside-14. As show
WU conversiof 579,000 gp
CITYN OF ESTIMA
l Total
DevelopeAreaa (a
80
51
14
372
21
ted Residentia
Residential Wat
rence
U conversion fact
erage metered w(see Table 5-9).
ecommended
tor of 255 gpwater demanEWU, not p
ctors presentewater productRevenue Wat
demand factem. Use of aojected watesupply, treat
of a lower tha
d Versus Act
ential water wn in Table 5on factors prpd, within 1.
TAY OF ANGELSATED VERSU
ed c)
ConversiFactorb
(EWU/a
5
3
2
4
10
al Water Dem
ter Demand, A
tor (see Table 5-
ater usage for sin
d Water Dem
pd/EWU is rnds. As men
per capita or ed in Table 5tion at the Wter.
tor is a critica greater thaner demands; itment, and dan appropria
Chapter 5:
5-19n:\m
tual Residen
demands to 5-14, a waterovided in Ta.2 percent of
ABLE 5-14 S WATER MAUS ACTUAL
ion b
ac)
Total Existin
EWU
400
153
28
1,488
200
and (gpd)
Adjustedc (gpd)
-12).
ngle family and
mand Factor
ecommendentioned previ
per dwelling5-12. The w
WTP includin
cal step in then appropriateinfrastructuristribution sy
ate water dem
Existing an
mtb020401\docume
ntial Water D
actual meteer demand faable 5-12, prf the “target”
ASTER PLANRESIDENTIA
ng
WateDemaFacto
(gpd/EW
255
255
255
255
255
)
multi-family res
ed for masteriously, the reg unit, and i
water demandng non-reven
e hydraulic ee water demre oversizingystems earlimand factor
Wand Projected
ents\_water master
Demands
red residentiactor of 255 roduces a tot” residential
N AL WATER D
er nd or
WU)
EstW
De(
sidential adjuste
r planning puecommendes to be used
d factor of 25nue water as
evaluation omand factor wg; or schedulier than nececould result
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
ial water usagpd/EWU, atal estimatedwater dema
DEMANDS
imated Water emand gpd)
102,000
39,000
7,100
379,400
50,900
579,000
586,000
-1.2%
ed for non-
urposes and ed water dem
only with th55 gpd/EWUdescribed in
of the treatmewill result in ling projectsessary. t in lower wa
ngels Plan
mands
020401 mp.docx
age is along d and
mand he U is n
ent
s to
ater
Angels WMJuly 2013
demand psupply, tr
P5.6 Future wassumed conjuncti(EWU/acdensities Base yeabelow.
Ba. The base3,387 EWfactor of demands
Pb. Average from 1.80ranging fon the gr2.16 percis consist A base ypopulatio
Pc. The totalprovidedTable 5-1for projecpopulatiobuildout are includ(1,600 Ain the yea
MP
projections; reatment, an
Projection of
water demandgrowth rate ion with a bac) for future in the Gene
ar water dem
Base Year
e year for waWUs represe
255 gpd/EW by land use
rojected Gro
annual grow0 to 2.52 perfrom 0.13 to rowth rates pcent is recomtent with the
ear 2011 popon of 3,836 [
rojection of
l EWUs for bd in Table 5-312. The 2.16ctions of 10-on; developmconditions aded in Appe
AFY less 319ar 2024.
infrastructurnd distributio
f Future Wa
ds were projeand water d
ase-year watdevelopmen
eral Plan [1].
mands, projec
ater demand nting existin
WU, the basee type is prov
owth
wth rates prercent. Observ1.23 percen
presented in tmmended fore City Waste
pulation of 3[17, 18] and
10-Year, 20
buildout con3 combined
6 percent ave-year and 20ment (EWUsare provided endix C. As s AFY histor
re undersizinon system pr
ater Deman
ected for 10-demand factoter demand fnt, presented
cted growth,
calculationsng developme year ADDvided in App
sented in theved growth r
nt, as reportethe General r future growewater Maste
3,919 was dea mid-range
0-Year, and B
nditions werewith existin
erage annual0-year EWUss); and waterin Table 5-1
shown in Tarical maximu
Chapter 5:
5-20n:\m
ng; and discorojects to add
nds
-year, 20-yeaor of 255 gpdfor existing dd previously
and future e
s is 2011. Foment as show
is 864,000 gpendix B.
e Land Use Erates from 2
ed by the CalPlan [1], a m
wth projectioer Plan [18].
etermined use annual grow
Buildout Wa
e calculated g and futurel growth rates and water r demand pro15. Detailed
able 5-15, theum demand f
Existing an
mtb020401\docume
onnects in scdress capacit
ar, and buildd/EWU for fdevelopmenin Table 5-1
estimated wa
r the 2011 bwn in Table 5gpd. A break
Element of t2008-2010 halifornia Depmid-range anons. The 2.16
sing the publwth rate of 2
ater Demand
based on bue EWU/ac coe was applieddemands. Esojections forwater dema
e available wfor GHC Go
Wand Projected
ents\_water master
cheduling apty shortfalls
dout conditiofuture develo
nt. Conversio12, were base
ater demands
base year, the5-13. With a kdown of the
the General Pave been sigartment of Fnnual growth6 percent ann
lished 2010 2.16 percent
ds
uildout land uonversion facd uniformly stimated Citr 10-year, 20and projectiowater supplyolf Course) w
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
ppropriate .
ons using anopment in
on factors ed on land u
s are discuss
ere are a totawater dema
e base year w
Plan [1] varygnificantly loFinance. Bash rate of nual growth
census .
use areas ctors providto each land
ty-wide 0-year, and on calculatioy of 1,281 AFwill be excee
ngels Plan
mands
020401 mp.docx
n
use
sed
al of nd
water
y ower, ed
rate
ed in d use
ns FY eded
Angels WMJuly 2013
Proj
Base Ye
10-year P
20-year P
Buildouta Populatib Percent c Availabl
exceede
Pd. Water deTable 5-1fails to prtake theirGHC Gorecycled GHC Goirrigationdiversion(319 AF)
MP
PROJE
jection (Year)
ar (2011)
Projection (202
Projection (203
t (2052)
ion and EWU pr
of buildout base
le supply of 1,28d in the year 202
rojection of
emand projec16. A worst roduce reclar entire supp
olf Course is water delive
olf Course is n demand recn and recycle).
CITYECTED POPU
Popula
3,91
21) 4,85
31) 6,00
9,45
rojections using a
ed on existing an
81 AFY (1,600 A24.
Water Dem
ctions includcase scenari
aimed water ply from Ang
86.0 MG (2eries. For futassumed at
corded for Ged water deli
TAY OF ANGELSULATION, DE
tiona Total EWUa
9 3,387
53 4,194
09 5,193
53 8,170
a 2.16% growth
nd/or projected E
AFY less 319 AF
ands Includi
ding GHC Gio is assumedmeeting Titl
gels Creek. F264 AF) baseture water dethis maximu
GHC Golf Coivery for irri
Chapter 5:
5-21n:\m
ABLE 5-15 S WATER MA
EVELOPMEN
a Percent ofBuildoutb
41%
51%
64%
100%
rate.
EWU relative to
FY historical ma
ing Greenho
Golf Course id for water dle 22 StandaFor the base ed on the 200emand projeum historicalourse occurrigation of GH
Existing an
mtb020401\docume
ASTER PLANNT, AND WAT
fb
Projecte(gpd
864,0
1,069,
1,324,
2,084,
total buildout EW
aximum demand
orn Creek Go
irrigation demdemand projards and GHyear, the an09-2011 aveections, the al value. Hist
red in 2012. HC Golf Co
Wand Projected
ents\_water master
N TER DEMAN
d ADD d)
P
(
000
,000
,000
,000
WU.
d for GHC Golf C
olf Course
mands are suections in wC Golf Cour
nnual irrigatierages for suannual irrigatorically, theThe combin
ourse in 2012
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
NDS
Projected AnnuDemandc
(MG) (A
315 96
390 1,1
483 1,4
761 2,3
Course) will be
ummarized iwhich the WWrse is entitleon demand f
urface water ation demande largest ned surface w2 was 104 M
ngels Plan
mands
020401 mp.docx
ual
AF)
67
97
482
336
in WTP d to for and d for
water MG
Angels WMJuly 2013
Proje
Base Year
10-year Pr
20-year Pr
Buildout (a See Table b 2009-2011
31.0 MG (c 2012 GHC
recycled wd Available
C5.7 Using hischapter dwater demsupply, tr Critical aprojectio
1. E
2. E
MP
GHC
ection (Year)
r (2011)
rojection (2021
rojection (2031
(2052)
5-15.
1 average GHC G(95 AF) of recyc
C Golf Course irwater (Section 5.
supply of 1,600
Conclusions
storical watedocuments a mand factor reatment, an
assumptions ns include:
EWU densitie
EWU relation
CITYWATER
C GOLF COU
Project
Citya
315
1) 390
1) 483
761
Golf Course irrigcled water (Secti
rrigation demand.3).
0 AFY will be ex
er productionrecommendand peaking
nd distributio
which affec
es used for p
nships used f
TAY OF ANGELSR DEMAND P
URSE SURFA
ted Annual De
a GHC G
Cour
86b
104c
104c
104c
gation demand iion 5.3).
d is 53.6 MG (16
xceeded in the ye
n, consumptided water demg factors areon system ca
ct the calcula
particular lan
for non-resid
Chapter 5:
5-22n:\m
ABLE 5-16 S WATER MAPROJECTION
ACE WATER
emand (MG/y
Golf rse Tota
401c 494c 587c 865
is 55.0 MG (169
65 AF) of surfac
ear 2024.
ion data, andmand factor used to proj
apacity requi
ated water de
nd uses (e.g.
dential land
Existing an
mtb020401\docume
ASTER PLANNS INCLUDIIRRIGATION
year) Pr
al C
1 9
4 1
7 1
5 2
9 AF) of surface
ce water from An
d EWU estimr of 255 gpd/ject MDD anirements.
emand factor
, the number
uses.
Wand Projected
ents\_water master
N ING N DEMANDS
rojected Annu
Citya GHC
Co
967 2
,197 3
,482 3
,336 3
e water from Ang
ngels Creek and
mates for the/EWU. The rnd PHD for
r and future
r of EWUs p
City of AWater Master d Water Dem
MTB0r plan\final\0713 m
S
ual Demand (A
C Golf ourse To
264b 1,
319c 1,
319c 1,
319c 2,
gels Creek and
50.1 MG (154 A
e City, this recommendeevaluation o
water dema
per ac).
ngels Plan
mands
020401 mp.docx
AFY)
otald
,231
,516
,801
,655
AF) of
ed of the
and
Angels WMJuly 2013
6 Cu
This chap(County)
O6.1 The histoinflux of productiothe Staniby the Cithe area (
H6.2 In 1848, Gold minwash golindustry.reliable a Gold minmules to were alsoconstructsupply anstraddledlumber pconstructintricate The follopresent. Aand distridescribedprepared
Ua. In 1852, working UWC loo
MP
urrent
pter presents) and provide
Overview
ory of water f people comon of power,slaus River aity. To under(watershed)
History of W
the town of ning was easld from the g In addition,
and adequate
ners were embring water
o constructedtion of the flnd built a wad the creek; aproduced at ttion sites dowwater delive
owing paragrA series of wibute water ad. A schemaby the UPA
Union Water
the Union Wto tap the looked beyond
and F
s the history es a discussi
supply in thming to seek t
, and the potand multiplerstand the cuwill be revie
Water Supply
Murphys (Tsier in the raigravels. Wat, to support te water supp
mployed to bto where it w
d. In the beglumes. The mater-poweredand because he mill coulwnstream. Tery system w
raphs providwater and poand power thtic of the ma
A and is prov
Company
Water Compacal watershe
d the local w
Future
and agreemion of alterna
he County is their fortunetable water ue tributaries urrent water ewed.
y Developm
Town) and thiny season ber was also nthe growing ly.
build a serieswas needed
ginning, a sawminers took ad sawmill juit was at thed easily floa
Thus, out of nwas created u
de a brief hisower companhroughout thajor facilitiesvided in App
any (UWC) ed of Angels
watershed to t
6-1n:\m
Water
ments governiate water sup
entwined wie. Water wasuses of the grare the key ssupply avail
ment
he surroundinbecause runoneeded to popopulation,
s of flumes amost. Eventwmill was nadvantage ost downstrea
e high end ofat down the cneed for the upstream of t
story of the wnies and utilihe watersheds along the wendix D.
was formed s Creek and tthe North Fo
mtb020401\docume
r Supp
ing water supply strategi
ith the gold s needed for rowing popusources of wlable, the his
ng area was off in the watower the toothere becam
and ditches wtually, severa
needed to prof the naturalam from the f the water cconstructed fsupport of t
the Town.
water supplyity districts hd and each owatershed up
by two comthe Mill Creork of the St
ents\_water master
plies
upplies in Caies for the C
mining induthe mining o
ulation. The water deliverestory of wate
inundated wtershed was ls used in th
me a critical n
with picks, shal small damoduce lumbel energy thathead of the
conveyance sflumes and cthe gold min
y dating fromhave been fof the key entpstream of th
mpanies that eek. Shortly anislaus Riv
MTB0r plan\final\0713 m
alaveras Couity.
ustry and theof gold, the North Fork ed to and utier resources
with gold seeavailable to
he mining need for a
hovels, and ms and reserver for t the water wflume. The
system, the canals to
ning industry
m 1852 to theormed to contities is he City was
were alreadyafter, in 185
ver.
020401 mp.docx
unty
e
of ilized in
ekers.
voirs
would mill
y, an
e nvey
y 54,
Angels WMJuly 2013
The longin 1858. which haStanislauthe one ugravity flthe mines
Ub. The Uticmining cexpanded UGMC ppenstockwhere thestamp mi Expansiowatershe In 1895, first electThis planreplacingCounty. Ibuilt wesThe stone When theconvertedconstruct The next1903-190was comp Half of thPG&E. Althoughhad becosold to a
MP
g dry summeAlso at this
ad built a rouus River. Theused by the Ulow from Mcs. The Lowe
Utica Gold M
a Gold Miniompany acqd and improv
put its water ks from whate pressure ofills that proc
on of the watd by creatin
UGMC contricity to thent provided eg power fromIt is said thast of the Roce powerhous
e Utica Mined into a ‘‘temted in 1940-
significant c06. The finalpleted in 192
he UGMC w
h built to facome an impo
power entity
rs limited thtime, the UW
ughly parallee ditch, knowUWC. Gold mcKays Dam
er Utica Can
Mining Comp
ing Companyquired UWC ved the wate
to work runt is now the Af falling wat
cessed the or
ter system ing Lake Alpin
structed a sme Utica mineelectricity tom the Angelst this powerhky Mountainse had a gen
e closed in 1mporary’’ el1941.
constructionl reservoir co29.
was owned by
cilitate the mrtant source y, residents o
he water flowWC acquiredel ditch fromwn as the Upminers builtthrough the al delivers w
pany
y (UGMC) oin the late 1
er system to
nning the heaAngels Foreter was harnere [24].
ncluded provne in 1889-1
mall experim. The same y
o mines, mills Camp powhouse was thns. In 1899, erator power
1918, an air clectric genera
n on the Nortonstructed b
y Emma Ro
mining industof water for
of the Murph
Chapter
6-2N:\MTB0
ws in creeks,d the Calave
m a diversionpper Utica Ct the entire UUpper Utica
water from H
owned some880s. Over tprovide pow
avy machinebay were runessed to ope
viding additi1892.
mental poweryear, anothers, and resideerhouse. It ihe fourth to bthe Utica Pored by water
compressor ator. It serve
th Fork of thby the UGMC
se. When sh
try, the netwr domestic uhys area bec
r 6: Current
020401\Documen
so UWC coras County W
n point on theCanal, was coUtica flume aa Canal to H
Hunter’s Res
e of the richethe next sev
wer for the m
ery of industrun to the minerate air com
ional storage
r plant in Anr powerhousences of Angs touted to bbe built in Cowerhouse wr delivered th
assembly in ed until a new
he StanislausC was at Spi
he died in 19
work of ditchese and irriga
came concern
Wat and Future
nts\_Water Master
onstructed UWater Compe North Forkonsidered to and canal sy
Hunter’s Reservoir to Mu
est mines in veral decadesmining indust
rial mining. nes at Angels
mpressors, ho
e on the uppe
ngels Camp tse was built gels Camp abe the first poCalifornia, anwas built eashough a pen
n Angels Camw Angels Po
s was the Utiicer Meadow
946, the comp
es fed by theation. With Uned about re
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
Union Reservpany (CCWCk of the be superior stem to utilizervoir and ourphys.
the County. s, UGMC try.
The first s Camp in 18oists, and the
er end of the
to supply theabove Murp
and the Counower in the nd the eighthst of Murphynstock.
mp was owerhouse w
ica Reservoiw. The reserv
pany was so
e Utica systeUGMC beingetaining their
ngels Plan
pplies
020401 MP.docx
voir C),
to ze
on to
The
890 e
e
e phys. nty,
h ys.
was
ir in voir
old to
em g r
Angels WMJuly 2013
water supagreemento the pre
Uc. The UPUCWUA. To this dand a rawwater to twater is d
Pd. PG&E puThis inclditches a The PG&Commiss
1. U(ANRw
2. TDdFm Inan
Ce. CCWD wStanislaunew divepipeline (
MP
pply. They ont for the rigesent-day Un
Union Public
UD was form
day, UPUD iw water systethe commundelivered thr
acific Gas &
urchased theuded replacend flumes.
&E system wsion (FERC)
Utica Project Alpine, Unio
North Fork ofReservoir on with diversion
The Angels PDiversion Da
iversion, waorebay and t
made to the D
n 1997, PG&nd Angels pr
Calaveras Co
was formed ius River Hydersion from t(Collierville
organized theght to purchanion Public U
Utility Dist
med in 1946.
s an active pem, are mainnities of Murrough ditche
& Electric
e UGMC in ement of the
was covered b). These faci
– FERC Noon, Utica, anf the StanislaMill Creek. ns into UPU
Project – FERam about threater flows dothen to the A
Dogtown Dit
&E transferrerojects to the
ounty Water
in 1946. By droelectric Dthe North Foe Tunnel) div
e Calaveras Wase water froUtility Distr
trict
In 1961, UP
purveyor of wntained by Urphys, Dougles to the sam
1946 and proe Utica Powe
by two licenilities are inc
o. 2019: The nd Spicer Meaus River, anThe Lower
UD’s ditches,
RC No. 2699ee miles dow
own the AngAngels Powetch and other
ed by deed ae UPA [24].
District
the mid-198Developmentork of the Staverts water to
Chapter
6-3N:\MTB0
Water Usersom the Utica ict (UPUD).
PUD acquire
water. Two sUPUD. The d
las Flat, Valme areas for ir
oceeded to merhouse in 19
nses issued bcluded under
Utica Projeceadow), the dnd the UppeUtica Canal, as well as t
9: The Angewnstream froels Canal thr
erhouse. Addr small users
and bill of sa
80s, CCWD t Project, FEanislaus Rivo generate el
r 6: Current
020401\Documen
s Associationsystem. The
.
ed all assets
separate systdomestic sysllecito and Crrigation.
modernize an953-1954 an
by the Federar each of the
ct includes tdiversion da
er Utica Canal carries wateto private use
els Project beom the Murprough Ross ditional dives and to the C
ale all the ass
began work ERC No. 240
er was constlectricity at
Wat and Future
nts\_Water Master
n (CWUA) ae CWUA is
and liabilitie
tems, a treatstem treats an
Carson Hill. U
nd upgrade tnd upgrades
al Energy Ree licenses list
the four uppeam at McKayal from McKer to the Utiers along the
egins at the Aphys AfterbaReservoir to
ersions from City WTP.
sets and righ
k on the Nort09. As part otructed. ThisCollierville
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
and secured the predeces
es from the
ted water sysnd supplies Untreated or
the Utica systo the miles
egulatory ted below.
er reservoirsys Point on tKays to Huntca Powerhoue canal.
Angels ay. From theo the Angels the canal ar
hts of the Uti
th Fork of this projecs large diamePowerhouse
ngels Plan
pplies
020401 MP.docx
an ssor
stem
r raw
stem. of
s the ter’s use,
e
re
ica
ct, a eter e and
Angels WMJuly 2013
bypasseswater forthe CCW Accordinapproximdistricts t
Nf. NCPA wpower, anMembersand othermanagem NCPA is
1. N
isSsmcamdCp MA TseCRd
2. UNprUS
MP
much of ther CCWD. W
WD.
ng to the currmately 12,50throughout t
Northern Cali
was establishend to coordinship consistsr publicly-ow
ment of elect
s responsible
North Fork Sts a 259 megatanislaus, anmaller poweapacity gene
major compoiameter and
Collierville Plant.
Major projectAlto, Rosevil
The Collierviervice to the
Collierville TReservoir. UP
elivered thro
Upper Utica PNorth Fork of
rojects wereUnion, and U
tanislaus Riv
e Upper UticWater is transf
rent CCWD 0 municipal the County.”
ifornia Powe
ed in 1968 tonate and mas primarily owned entitietrical energy
e for operatin
tanislaus Rivawatt (MW) nd Tuolumneerhouses. Thierated duringnent of the p8 miles long
Powerhouse o
t participantslle, and Lodi
ille Tunnel e Utica system
Tunnel to a rePA’s pre-19ough the Tun
Project – FEf the Stanisla
e purchased, Utica, along w
ver water rig
ca Canal. Byferred to the
website, theand residen
”
er Agency
o build and oanage wholesof municipalis interested i [25].
ng the two F
ver Hydroeleproject occu
e counties. Tis stated powg a wet year project is theg. The tunneon the Stanis
s in the Colli.
eliminated anm, a pressuremaining po14 water righnnel Tap to H
ERC No. 115aus River, inand NCPA t
with the old ghts.
Chapter
6-4N:\MTB0
y agreement,Ebbetts Pas
e “District cuntial/commer
operate jointsale power foities, a rural in the purch
ERC project
ectric Develupying 4,500The project inwer capacity with the pla
e Colliervilleel diverts watslaus River.
ierville Proj
n upper portirized pipe knortion of the hts allotmenHunter’s Re
563: This pron Tuolumne took ownersSpicer Mead
r 6: Current
020401\Documen
, a tap on thess WTP whic
urrently provrcial custome
tly-owned pofor member c
electric cooase, aggrega
ts that are de
lopment Proj0 ac in Alpinncludes a se
y is a maximuants being ope Power Tunter from McCollierville
ect are the c
ion of the Utnown as the TUpper Utica
nt of 60 cubicservoir acco
oject is locatand Alpine
ship of the updow storage
Wat and Future
nts\_Water Master
e pipeline is ch is owned
vides water ers in four im
ower plants,cities and dis
operative, irration, schedu
escribed brie
ject – FERCne, Calaveraeries of damsum project pperated at ‘funnel. The tuncKays Point t
Powerhouse
cities of Sant
tica Canal. TTunnel Tap a Canal at Huc feet per se
ording to a m
ted on Silvercounties. Fopper reservorights and N
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
the source oand operate
service to mprovement
, to purchasestricts. igation distruling, and
efly below.
C No. 2409: Tas, San Joaqus, tunnels, anproduction ull throttle.’nnel is 18 ft ito the e is a 253 M
ta Clara, Pal
To maintain connected thunter’s cond (cfs) is
monthly sche
r Creek and tormer PG&Eoirs, Lake AlNorth Fork o
ngels Plan
pplies
020401 MP.docx
of ed by
t
e
ricts,
This uin, nd
A in
MW
o
he
s edule.
the E lpine, of the
Angels WMJuly 2013
TP
Cg. The Cityintimatelinteractio Househo1984 whe
Uh. The UPACCWD, Ugoverned In 1995, the PG&ownershiand additallotmentand NCP In May oremainedNo. 2699buy out C As its namsystem dPowerho(Cal ISOrenewablthrough tcertified utilities aresourcesand impr
MP
The remaindeowerhouse,
City of Angel
is located atly entwined wons upstream
lds and busien the munic
Utica Power A
A was formedUPUD, and
d by a board
CCWD negE projects oip of Lake Ational North ts for North
PA. UPA reta
of 1997, CCWd a member o9 (Angels) wCCWD, and
me suggestseveloped byuse generate
O) and is tranle by the Calthe Western “green powe
across Califos. UPA’s greroving the U
er of the PG&was transfer
ls
t the furthestwith all of th
m.
inesses in thecipal water s
Authority
d as a joint pthe City, thucomprised o
otiated and sn the Utica s
Alpine, UnionFork of the Fork of the
ained all PG
WD granted of the entity
were issued toCCWD with
s, UPA is alsy the UGMCe electricity t
nsmitted out tlifornia EnerRenewable er,” UPA is ornia increaseen power rePA water an
&E projects,rred to the ne
t downstreamhe gold mini
e City purchsystem was f
power authorus establishinof representa
signed a settsystem and Nn, and Utica Stanislaus RStanislaus a
G&E rights on
all water rig. New licenso UPA in 20hdrew from
so in the busi and PG&E.that is meterto the grid. Trgy CommisEnergy Geneligible for g
se their use oevenues helpnd power sys
Chapter
6-5N:\MTB0
, from the Tuewly formed
m point of thing activities
hased their wformed.
rity in Decemng local ownatives from t
tlement agreNCPA woulreservoirs, t
River water rand Mill Creen Angels Cr
ghts, propertses for FERC003. On July UPA.
iness of hyd. The Murphred by the CaThe energy pssion and quaneration Inforgreen energy
of environmep pay for mustem.
r 6: Current
020401\Documen
unnel Tap thd UPA.
he Utica systs, and the wa
water directly
mber 1995. nership of ththe member
ement with Nd share in ththe old Spicerights. A schek deliveries
reek and Fren
ties, facilitieC projects Ny 1, 2004, the
droelectric gehys Powerhoalifornia Indproduced is alifies for “grmation Sysy tickets for entally-frien
uch of the co
Wat and Future
nts\_Water Master
hrough the A
tem. The Citater and pow
y from the U
Member agehe water suppagencies.
NCPA. CCWhe cost. NCPer Meadow
hedule of mos was negotinch Gulch.
s, and contraNo. 2019 (Utie City and U
eneration, opouse and the dependent Sycertified 100
green energystem. As a prits electrica
ndly, renewabst of operati
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
Angels
ty’s history iwer supply
Utica system
encies includply. UPA is
WD purchasPA took storage right
onthly wateriated by CCW
acts to UPA,ica) and
UPUD agreed
perating the Angels
ystem Opera0 percent y” purchase roducer of l output as ble energy ng, maintain
ngels Plan
pplies
020401 MP.docx
is
until
ded
ed
ts, r WD
, but
d to
ator
ning,
Angels WMJuly 2013
Wi.S
The goldelevationReservoicontinues The Nortthe UPA in Appenmap alsoPowerho
W6.3 The UPA1996, CCStanislauUtica andbut rema The Tran
1. O
2. C1
3. W
hy Other key
1. Cnsecu
2. URCw
MP
Water Supplyystem
d miners whon gravity flowir and then ths to take adv
th Fork of thmap titled U
ndix D. The mo shows UPAuse.
Water Suppl
A was formedCWD obtaineus River, Angd Angels wained an entit
nsfer Deed d
Ownership rig
CCWD’s inte995 Restated
Water conveyydroelectric
y points of th
CCWD agreeo longer neeervice areas ustomers wi
Under the 199Reservoir. CCCCWD is limwater operatio
y within the N
o built the Utw from McKhrough the Lvantage of th
he StanislausUtica Powermap shows f
A’s key wate
ly Agreeme
d in 1995 aned from PG&gels Creek, a
ater systems ty member u
dated May 1,
ghts in the fo
erest in the wd Agreemen
yance ditchepowerhouse
he settlemen
ed to only diveded by UPAand/or at or thin their ser
97 Transfer CWD owns a
mited in acceons.
North Fork o
tica flume anKays Dam thLower Utica hat system to
s River, Mill r Authority Mfacilities ow
er and power
nts
nd included m&E the rightand French G[26]. In 199
until 2004.
1997 transf
former PG&E
water delivernt (Attachme
es and facilities.
nt agreement
vert water frA, City of An
above Angervice areas.”
Deed from Ca pump statiss to and use
Chapter
6-6N:\MTB0
of the Stanis
nd canal syshrough the U
Canal, thereo deliver wat
Creek, and Major Facilitwned and oper system, Mu
member agents to divert aGulch that h7, CCWD d
ferred the fol
E pre-1914 w
ry allotment nt A can be
ies, and the A
t between CC
rom lower Angels, and Uels Powerhou”
CCWD, UPAion near the be of the pum
r 6: Current
020401\Documen
slaus River,
stem took adUpper Utica Ceby avoidingter and to ge
Angels Creeties and Relaerated by UPurphys Powe
ncies CCWDand use waterhad historicaleeded facilit
llowing from
water rights.
defined by Afound in Ap
Angels and U
CWD and U
Angels CreekUPUD to gen
use or to pro
A has exclusbase of Hun
mp station so
Wat and Future
nts\_Water Master
Mill Creek,
dvantage of tCanal througg the need foenerate green
ek watershedated Project
PA, NCPA, aerhouse, and
D, UPUD, anr from Northlly been useties and wate
m CCWD to
.
Attachment ppendix E).
Utica (Murp
UPA are as li
k and only afnerate powerovide water s
sive control nter’s Reserv
as to not int
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
Angels Cree
the higher gh Hunter’s or pumping. Un energy.
ds are shownts and providand CCWD. d Angels
nd the City. h Fork of thed within theer rights to U
UPA:
A to the
phys)
isted below.
fter the ‘‘watr within theirservice to
of Hunter’svoir Dam. terfere with U
ngels Plan
pplies
020401 MP.docx
ek
UPA
n on ded The
In e
UPA,
ter is r
UPA
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-7 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
3. The settlement agreement clarifies issues relating to the ownership and operation of CCWD-owned/NCPA-operated facilities, UPA owned and operated facilities, and physical access to those respective facilities.
4. Neither party can, without prior written consent, use or occupy any property nor facilities owned by the other party, nor apply for a grant or loan that would require use of the other party’s water rights or facilities [26].
Because of CCWD’s contracts with NCPA, the water available for use within the Ebbetts Pass-Murphys-Angels area is limited to the following:
1. The water UPA is contractually entitled to under Attachment A. The water is supplied by NCPA but the entitlement is based upon UPA’s pre-1914 water rights in the North Fork of the Stanislaus River-Mill Creek-Angels Creek system.
2. The maximum volume of 8,000 AF that CCWD is allowed to divert for consumptive
purposes from the North Fork of the Stanislaus River system is subject to the following restrictions: a. The water must be diverted “from points upstream of the existing Mill Creek Tap
butterfly valve” and CCWD cannot “cause this water to directly or indirectly enter any of the PG&E Project facilities without prior written agreement from NCPA.”
b. Under State Water Resources Control Board (SWRCB) Order No. 97-05 issued in September 1997, CCWD has until December 1, 2015, to put the entire 8,000 AFY to full beneficial use. Failure to do so could result in a partial revocation of CCWD’s SWRCB water rights permits; i.e., that portion of the 8,000 AF not put to full beneficial use by December 1, 2015 … “Use It or Lose It” [27].
Because of the above 2015 permit deadline, CCWD and UPA agreed in the November 2009 settlement agreement to use their best efforts to negotiate an agreement by December 31, 2014, for CCWD to transfer water to UPA for consumptive use in the UPA, City, and/or UPUD service areas. The settlement agreement does not identify the amount of water to be transferred but it could be approximately 4,000 to 5,000 AFY. Such water would be in addition to the water delivered to UPA under Attachment A, which is further defined in the following sections [27]. In 1985, CCWD entered into a Revised Power Purchase Contract and the 1995 Restated Agreement with the NCPA wherein CCWD gave control of most of the water in the North Fork of the Stanislaus River system to NCPA for power generation at the Collierville Powerhouse. Excerpts from the Asset Sale Agreement By and Between PG&E and Calaveras County Water District, August 18, 1995 and the Assignment and Assumption Agreement between CCWD and UPA are included as Appendix F.
Angels WMJuly 2013
A6.4 HistoricaFork of threservoirCanal. A28 cfs of were dee60 cfs, U UPA is cAttachmecombinedMay 1 fofrom wetallocationyear; therAppendix As mentiyears andfirm agreallotment It shoulddeliverie1995 AmaccuratelUPUD. UPA hasthe originfor domediversionminers-in1,000 AF
A6.5 As discuadequate The UPAand deliv
MP
Available Su
al water righthe Stanislau
rs; and seniorAs a result of f PG&E’s hiseded to UPAUPA only rec
contractuallyent A is a scd flow of the
orecast of tott to driest yen each year orefore, the ax E.
ioned previod decreasingeement to rect under Atta
d be noted, hos to UPA an
mended and Rly reflect the
s assumed thnal assumed estic and irrigns to UPUD nch. PursuanFY at $15.00
Alternate W
ssed previou quantities o
A is restrictedvery restricti
urface Wate
ts for the Utus River, Bear rights to ththe 1995 Am
storical 88 cand is deliv
ceives 46 cfs
y entitled to rhedule of me Mill Creektal unimpairears are definon May 1. Fllocation is 2
ously, the entg in steps to aceive 1,600 Achment A.
owever, thatnd the membRestated Agre reality of th
e previous Pagreement w
gation waterfor domestic
nt to that pre0 per AF [28
ater Suppli
usly, the Cityof water to th
d in volumesons due to A
er Supplies
tica System iaver Creek, ahe flow of Anmended and fs water righ
vered throughs in the wette
receive the vmaximum delk Tap and Med runoff in ned in the tabFor example,26,830 AF. T
titled voluma volume of AFY, and th
t during a veer agencies. reement betwhe decreasing
PG&E contrawith a subser supply at noc and irrigativious contra].
es
y is completehe Angels Fo
s of water thAttachment A
Chapter
6-8N:\MTB0
included 88 and Mill Crengels Creek Restated Ag
hts were conh the Tunnelest year.
volume of waivery of watill Creek. Ththe Stanislauble. DWR m May 1, 201The Amende
e is a maxim16,107 AF i
his amount h
ery dry year tThe existing
ween NCPAg water deliv
acts that werequent amendo charge untion water suact with PG&
ely dependenorebay for tr
hat can be deA. During ve
r 6: Current
020401\Documen
cfs of the coeek; the righsufficient to
greement betnveyed to NCl Tap. Altho
ater as outlinter to the Utihe deliveriesus River. Th
makes the det2, was defined Attachme
mum of 33,5in the driest
has not been
there is the pg contracts w
A, CCWD, anveries in dry
re with UPUdment, the Ctil further mo
upply cannot&E, UPUD c
nt on the abireatment and
elivered baseery dry years
Wat and Future
nts\_Water Master
ombined flowht to store wao fully suppltween NCPA
CPA. The remough the wate
ned under Aica/Angels ps are based ohe six steps otermination ned to be a Lent A table is
14 AF in norwater years.reduced reg
possibility owere writtennd UPA andy years to the
UD and the CCity can receodified. Thet exceed 6.75can obtain an
ility of UPAd distribution
ed on multips, delivery o
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
w of the Norater in the uply the AngelsA and CCWmaining 60 er rights are
Attachment Aproject from on the DWR of reduced flof the level
Level III wats provided in
rmal to wett. The City ha
gardless of th
f reduced wan prior to thed therefore doe City and
City. Pursuaneive 1,600 Ae combined 5 cfs at $0.05n additional
A to deliver n.
le agreemenf supplies ca
ngels Plan
pplies
020401 MP.docx
rth pper s D, cfs
A. the
low of ter n
test as a
he
ater o not
nt to AFY
5 per
nts an be
Angels WMJuly 2013
reduced tdisrupt th3,000 ft o Because emergenc A discusreductionnon-pota
Ga. An alternor more w Groundwflows havFormatioBear Mogold minmovemenTo furtheconducteAppendix(see Figu
1. PprlipmovDin
2. PthwanSrey
MP
to 52 percenhe City wateof the woode
of these poscy use only o
sion of alternn in surface wable demands
Groundwater
nate water suwells to pum
water flow inve been foun
ons and throuuntain and M
nes are presennt. Review oer assess coned by Dunn Ex G. Based oure 6-1). Eac
otential Welrevious test ikely high-yiotential. Wa
meet the watever three we
DWR well lonvestigations
otential Welhe tertiary gr
water quality nticipated toite A (Area eference, oneield.
nt of normal. er supply. Asen flume.
ssibilities, theor for supple
nate water suwater divisios.
upply to the mp groundwa
n the area of nd in some ough natural sMelones Faunt in the areaof the area innceptually thEnvironmenton this “deskch is describe
ll Site A (Arwell investigielding area.ater quality cer supply shoell completiog search, thes, if possible
ll Site B (Arravels and limconcerns m
o be significa1). To meet e well was id
In addition,s an example
e City is invementing dem
upplies folloons to GHC
current surfaater into the
the City is pof the alluviastreams. Regult zones anda that may sindicates a limhis alternativtal (DE). Thktop” evaluaed below.
rea 1) – Thisgations, incl Fractured b
concerns are ortfall and bons may be ne well site she.
rea 3) – Thismestone pac
may be identifantly higher the water sudentified dur
Chapter
6-9N:\MTB0
, problems we, in 2001 th
vestigating almands.
ows below inGolf Course
ace water suCity’s water
primarily relaal units of thgional faults d the Calaverignificantly mited numbeve, an initial hhe results of tation, three p
s potential wuding test w
bedrock condnot anticipaased upon th
necessary. Bhould be loca
potential wckage. Yieldfied. Producand may req
upply short fring the DW
r 6: Current
020401\Documen
with the transhe Darby Fire
lternate wate
ncluding groe, and use of
upply would r system.
ated to flow e Valley Sprare located
ras Shoo-Flyinfluence gr
er of monitorhydrogeologthe investiga
potential wel
well site area wells and pasditions, howeated other thahe reported rased on highated to the e
ell site combds are anticipction capacityquire fewer wfall, only one
WR well log r
Wat and Future
nts\_Water Master
smission syse demolished
er supplies, w
oundwater, af recycled wa
be the devel
through fracrings and Min the area a
y Thrust Fauroundwater oring and progical investigation are prell sites were
has been cost surface geoever, may loan septic tanresults of Teh-yield wellseast of the or
bines the stopated to be hiy within limwells than Pe well may breview with
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
stem can sevd approxima
whether for
abandoned mater for
lopment of o
ctures. Limitehrten
and include tult. Many hisoccurrence aoduction welgation was
esented in identified by
nfirmed by ophysics, to
ower the nk locations.est Hole No. s identified iriginal testho
orage potentiigh; howeve
mestone is otential Wel
be necessaryover 100 gp
ngels Plan
pplies
020401 MP.docx
verely ately
mines,
one
ted
the storic and lls.
y DE
be a
To 2,
in the ole
ial of er,
ll y. For pm
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-10 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
3. Potential Well Site C (Area 3) – DE suggests exploring this location for high potential due to the proximity of Mehrten Gravels in conjunction with limestone deposits. Yields are anticipated to be high; however, water quality concerns may be identified. To meet the water supply short fall, only one well may be necessary. Two wells highlighted during the DWR well log search were identified with yields over 100 gpm close to this location.
4. Potential Well Site D (Area 2) – This location was selected as a potential location if the City pursues water well drilling and permitting efforts with the City of Murphys. The site is located in proximity to high-yield wells identified during DWR well log review and in the preferred geology package of tertiary gravels and Mehrten Formation close to limestone.
Angels WMJuly 2013
Ab. In 2001, water to tprepared undergrosuccessfuexamplesparagraph
1. TMdugrww
2. T
coinwansi
Rc. Of the 1,supply muse of thiwithin thincrease GHC GoAngels Cdelivery average dcreek wairrigationL.P. allowCourse. ICourse w The secoAssociate
MP
Abandoned M
the Darby Fthe City. At and then su
ound water soully in the pas of utilizinghs with their
The SchmaudMining activi
uring the miroundwater
water from thwere perform
The project tiost $80,000 nstalling a pu
water qualitynticipated toituation, the
Reduction in
600 AFY ofmay be divert
is surface wahe City. This surface wate
olf Course mCreek and recfor GHC Godelivery of rater and 154 n demand of ws up to 450If the WWTP
would be allo
ond amendedes L.P. ensur
Mines
Fire destroyethat time, a mmarized byource to meeast, and it is g the abandonr approximat
der-Tyron Mity occurred ining procesflooding due
he mine coulmed at the tim
itled Angels in equipmenump and pip, water produ
o be approximextraction o
Surface Wa
f surface watted to the GHater supply, would not r
er deliveries
eets its irrigacycled waterolf Course frrecycled watAF of recyc
f 319 AF. An0 AFY (147 P could not dowed to take
d agreement res that the C
d 3,000 ft ofcollaborativy DWR. Duet water demreasonable tned mines fote yield.
Mine is locatefor approximses with no ce to an ancield provide apme to confirm
Central Calnt and $30,00pe into the muction, and amately 500,0
of water from
ater Diversion
ter that the CHC Golf Couthen this wo
represent an to the City’
ation demanr from the Crom 2009 threr for the yeled water wa
n agreement MG/year) odeliver recyc
e their entire
dated July 1City maintai
Chapter
6-12N:\MTB0
f the Utica Dve review of uring this emmands. Sourcto consider tor a water so
ed northwestmately 5-6 ychemicals inent river systpproximatelym suitability
laveras Mine00 a month t
mine to remova mine colla000 gpd [29]
m this mine w
ns to Greenh
City receivesurse per agreould ‘free-upalternate was WTP to m
nds with a coity WWTP. rough 2011 wears 2009-20as delivered between thef surface wacled water msupply from
998 betweenins a regular
r 6: Current
020401\Documen
Ditch, a woodemergency w
mergency situce water fromthese sourcesource are des
t of the City years, endingnvolved. Thetem. The repy 500,000 gpfor use.
e at Rolleri Pto operate. Tve the water
apse during p]. In the endwas determin
horn Creek G
s, a full 28 peeement. If thp’ water to bater supply, b
meet potable d
ombination oThe averagewas 169 AF
011 was 95 Ato GHC Go
e City and Grater for irrigameeting Titlem Angels Cre
n the City ansupply of w
Wat and Future
nts\_Water Master
den flume uwater supply
uation, the Cm the mines s for the futuscribed in th
at an elevatig in 1992. We mine experport states thpd [29]. Wat
Property waThe project ir. Project conpumping. W, for the emened not to be
Golf Course
ercent (450 Ahe golf course used for pobut an alterndemands.
of surface wae annual surfY or 55 MG
AFY. In 2012olf Course foreenhorn Cration of the Ge 22 Standareek.
nd Greenhorwater for irrig
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
sed to distriby options wa
City utilized ahas been uti
ure. Two he following
ion of 1,765Water was use
riences frequhat pumping ter quality te
as estimated tincludes ncerns includater deliveryergency e feasible.
AFY) of thisse reduces thotable dema
native metho
aters from face water
G/year. The 2, 165 AF o
or a total reek AssociaGHC Golf ds, GHC Go
rn Creek gation of the
ngels Plan
pplies
020401 MP.docx
bute as an ilized
ft. ed uent
ests
to
de: y was
s he ands od to
f
ates
olf
e
Angels WMJuly 2013
GHC GoAngels C
TP1,
The agreCity WW
Awofshsu
Rd. There arecourse irrfire supp Effluent recycled to HolmaGolf Couaverage rdelivery (winter) d Holman Rimmediatrecycled total annuin 2021 tGHC Go2021 (10
O6.6 Future wcomparis
MP
olf Course. TCreek:
The City shalProject’s golf
,400 gpm.
ement also sWTP as follow
At the time ofwastewater tr
f treated washall become ufficient trea
Recycled Wa
e opportunitirigation. Somression, whi
from the WWwater is use
an Reservoirurse from therecycled watto GHC Godischarge to
Reservoir prtely disposedwater from ual productito 923 AFY olf Course, re0-year projec
Overview of
water demandson of deman
The agreemen
ll make availf course irrig
states that thws:
f installationreatment facste water as a secondary
ated waste w
ater for Non-
ies within thme typical apich currently
WTP is Titleed for irrigatir and 110 ac e City WWTter delivery d
olf Course w Angels Cre
rovides 202 Ad to the pastthe WWTP on of recyclat buildout. ecycled watection) to 604
City Water
ds are summnd and suppl
nt states the
lable up to 4gation at a m
e golf course
n and commecility, the golf
set forth hery source of i
water is not a
-potable Dem
he City to usepplications i
y utilize treat
e 22 tertiary ion of a 136at the GHC
TP have varieduring this tas 154 AF. T
eek.
AF, or 66 Mtureland or Gwill increaseed water froAssuming a
er available fAFY in 205
r Demands a
arized belowly is then pre
Chapter
6-13N:\MTB0
following w
450 AF of creminimum flow
e irrigation s
encement of lf course irrirein. From trrigation, av
available [2]
mands
e recycled winclude publted water.
disinfected rac sprayfielGolf Courseed from 77-ime was 95 The WWTP
MG, of storagGHC Golf Coe as a functio
om the WWTa recycled wafor reuse in o51 (buildout)
and Water
w including pesented for v
r 6: Current
020401\Documen
with regard to
eek water frw of 700 gpm
system must
operation ofigation systethat time forvailable dur.
water for nonlic landscape
recycled wald (61 ac avae. Recycled 109 AFY foAFY. In 201discharge p
ge capacity fourse. In theon of increas
TP is estimatater deliveryother areas w).
Supply
potable and various optio
Wat and Future
nts\_Water Master
o untreated w
rom Angel’s m up to a ma
t use recycle
f the City’s sem shall be crward, untreaing those tim
n-potable usee irrigation, d
ater as defineailable for diwater deliver the years 212 the recyc
permit also al
for recycled e future, the sed wastewated to range y of up to 31will range fr
non-potableons.
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
water from
Creek for thaximum rate
ed water from
substantiallyconverted to ated creek wmes when
es other thandust control,
ed by CDPHisposal) adjaeries to the G2009-2011. Tled water llows season
water not availability
ater flows. Tfrom 510 A9 AFY to th
rom 191 AFY
e demands. A
ngels Plan
pplies
020401 MP.docx
he e of
m the
y new use
water
n golf , and
H. The acent GHC The
nal
of The
FY he Y in
A
Angels WMJuly 2013
Ea. Existing Chapter 5GHC Goand are r169 AFYtotal of 2their primfuture waon actual
CurrentlyreductionordinancReducingmeeting pGHC Goirrigation Non-pota(typicallypotable wnon-potameter at tThe 2007Table 6-2productio
MP
Estimates of F
and projecte5 are summa
olf Course areflected in T
Y of creek wa264 AFY. Pemary irrigatioater demand l demand fro
Pr
Base Yea
10-Year P
20-Year P
Buildout a Per Tableb Annual ir
diversionc 2012 GH
154 AF o
y, all of the Cn in overall pes related tog the use of ppotable dem
olf Course asn of agricultu
able water dey during the water demanable uses sucthe WTP we7-2012 avera2, monthly tron.
Future Dema
ed water demarized belowre included aTable 6-1. Foater plus 95
er agreementon water souprojections,
om 2012 (sur
CITYCURREN
rojection (Yea
ar (2011)
Projection (202
Projection (203
(2051)
e 5-16.
rrigation demandns (169 AF) plus
HC Golf Course iof recycled water
City’s demanprojected sur conservatiopotable wate
mands. Non-ps well as resiural lands.
emands can rainy season
nd. Any demah as landsca
ere used to cage annual preated water
ands
mands for 10w in Table 6-as part of theor the base yAFY of recy
t, the golf cource, and cre, the irrigatiorface water d
TY OF ANGELSNT AND PRO
ar)
21)
31)
d for GHC Golf s recycled water
irrigation demanr [21].
nds are met rface water d
on efforts durer for non-popotable wateidential, com
be estimatedn). The demaand above th
ape irrigationalculate the
production wr production
Chapter
6-14N:\MTB0
0-year, 20-ye1. Diversion
e City’s annuyear, the watycled water burse shall us
eek water useon demand fdiversion plu
TABLE 6-1 S WATER MA
OJECTED WA
Proje
Citya G
967
1,197
1,482
2,336
Course based on(95 AF).
nd is 165 AF of s
by the use odemands by ring droughtotable uses wr demands in
mmercial, ins
d by identifyand in the rahis base rate n. Historical monthly pro
was estimatedat the plant
r 6: Current
020401\Documen
ear, and buildns from Angual allocationer demand fbased on these recycled we becomes afor GHC Golus recycled w
ASTER PLANATER DEMA
ected Demand
GHC Golf Cou
264b
319c
319c
319c
n 2009-2011 ave
surface water fro
of surface wareducing pots and/or emwill also provnclude irrigastitutional, an
ying months ainy season i
is assumed flow data co
oduction of td to be 314 Mis displayed
Wat and Future
nts\_Water Master
dout conditigels Creek fon of surface for GHC Gole 2009-2011water from ta secondary slf Course is water delive
N ANDS
ds (AFY)
urse Tot
1,23
1,51
1,80
2,65
erage of surface
om Angels Creek
ater. There isotable deman
mergency convide additionation of landnd industrial
with low irris assumed toto be demanollected fromtreated waterMG (per Tabd as a percen
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
ons developor irrigation owater from Ulf Course is averages fo
the WWTP asupply. For 319 AFY ba
ery).
al
31
16
01
55
water
k and
s potential fonds through nditions. nal capacity
dscaping for l accounts an
rigation demo the base nd for m the influenr for the Cityble 5-4). In
ntage of total
ngels Plan
pplies
020401 MP.docx
ped in of UPA
or a as
ased
or City
y for
nd
mands
nt y.
l year
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-15 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
TABLE 6-2
CITY OF ANGELS WATER MASTER PLAN 2007-2012 HISTORICAL MONTHLY PERCENTAGE OF
ANNUAL TREATED WATER PRODUCTION
2007-2012 Monthly Percentage of Annual Production, %a
Month Monthly
Productionb Baseline Demandc
Non-potable Demandd
January 4.8 4.8
February 4.3 4.8
March 5.0 4.8
April 6.2 1.4
May 9.3 4.5
June 11.2 6.4
July 13.9 9.1
August 14.2 9.4
September 11.8 7.0
October 8.5 3.7
November 5.8 1.0
December 5.0 4.8
Total 100.0 42.5 a Per Table 5-4. b Monthly production as a percentage of annual production. c 2007-2012 average December-March demand (rounded). d 2007-2012 April-November non-potable demand = monthly production – baseline demand.
Months with the lowest production can be correlated to the rainy season when irrigation demands are low. As shown in Table 6-2, the lowest monthly demands for 2007-2012 occurred from December through March, with an average winter monthly demand of 4.8 percent of yearly production. The 2007-2012 estimated non-potable demand for April through November is the additional percentage above the monthly 4.8 percent identified as the base potable water demand. The additional non-potable or irrigation demand in the summer months adds to approximately 43 percent (42.5 percent) of the annual demand. Using this factor, the estimate of non-potable demands for the City is summarized in Table 6-3.
Angels WMJuly 2013
Existing into pota
Proje
Base Yea
10-Year P
20-Year P
Buildout (a Non-potab See Table
Cb. Comparinsupplemewater sup
MP
2007-2012
2007-2012
Estimated
Estimateda Assumed
Table 6-2b Estimated
the baseli
and projecteble and non-
POT
ection (Year)
r (2011)
Projection (202
Projection (203
(2051)
able demand for
e 6-1.
Comparison o
ng the currenental water spplies at buil
CITYESTIMATE
2 Average Win
2 Total Additio
d Non-Potable D
d Potable Dema
baseline potable2.
d percent of demine Winter Dema
ed water dem-potable dem
CITYTABLE AND N
Potabl
556
21) 688
31) 852
1,343
City assumed to
of Available
nt supply frosupplies willldout will be
TY OF ANGELSE OF NON-PO
Item
nter Month De
onal Demand (
Demand as Per
and as Percenta
e demand based
mand that is Non-and percentage o
mands for 10mands are pr
TY OF ANGELSNON-POTAB
le Citya
411
509
630
3 993
o be 42.5 percent
e Supply vs.
om UPA witl occur withie 1,055 AFY
Chapter
6-16N:\MTB0
TABLE 6-3 S WATER MAOTABLE DEM
emand (Dec-M
(Apr-Nov)
rcentage of An
age of Annual
on percentage o
-Potable = Additof total demand.
0-year, 20-yeesented in T
TABLE 6-4 S WATER MA
BLE PROJEC
Projected A
Non-
GHC Go
2
3
3
3
t of total demand
Projected D
th the projecin the next te
Y as shown in
r 6: Current
020401\Documen
ASTER PLANMANDS FOR
Mar)a
nnual Demandb
Demand
of annual produc
tional production
ear, and buildTable 6-4.
ASTER PLANCTED WATER
Annual Deman
-Potable
olf Courseb
264
319
319
319
d per Table 6-3.
emands
cted demandsen years. Then Table 6-5.
Wat and Future
nts\_Water Master
N R CITY
Value,
4.8
42.5b 42.5
57.5
ction data presen
n percentage abo
dout conditi
N R DEMANDS
nd (AFY)
Total
675
828
949
1,312
s illustrates te estimated
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
, %
5
5
5
nted in
ove
ons separate
S
Total PotableNon-Potab
1,231
1,516
1,801
2,655
that the needdeficit in fut
ngels Plan
pplies
020401 MP.docx
ed
e and ble
d for ture
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-17 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
TABLE 6-5 CITY OF ANGELS WATER MASTER PLAN
COMPARISON OF WATER SUPPLY VERSUS DEMAND PROJECTIONS GHC GOLF COURSE SURFACE WATER IRRIGATION DEMANDS
Projection (Year)
Annual Supplya (AFY)
Projected Annual Demandb (AFY) Supply – Demand (AFY) City
GHC Golf Course Total
Base Year (2011) 1,600 967 264 1,231 369
10-year Projection (2021) 1,600 1,197 319 1,516 84
20-year Projection (2031) 1,600 1,482 319 1,801 -201
Buildout (2051) 1,600 2,336 319 2,655 -1,055 a Assuming no recycled water deliveries to GHC Golf Course. b Per Table 6-1.
If approximately 43 percent of the City’s water demands is non-potable, then the opportunity exists to provide recycled water for the majority of these uses. For comparison purposes, Table 6-6 displays the balance of supply vs. demand using only City potable water demands, but keeping the GHC Golf Course surface water diversions in place. In this scenario, an additional supply of 62 AFY is required at buildout.
TABLE 6-6 CITY OF ANGELS WATER MASTER PLAN
COMPARISON OF WATER SUPPLY VERSUS DEMAND PROJECTIONS ASSUMING ONLY CITY POTABLE WATER DEMANDS AND
GHC GOLF COURSE SURFACE WATER IRRIGATION DEMANDS
Projection (Year)
Annual Supplya (AFY)
Projected Annual Demand (AFY) Supply – Demand (AFY)
City Potableb
GHC Golf Coursec Total
Base Year (2011) 1,600 556 264 820 780
10-year Projection (2021) 1,600 688 319 1,007 593
20-year Projection (2031) 1,600 852 319 1,171 429
Buildout (2051) 1,600 1,343 319 1,662 -62 a Assuming no recycled water deliveries to GHC Golf Course. b Assumes potable demand is 57.5 percent of City demand (see Table 6-4). c Per Table 6-1.
Separating the GHC Golf Course demand for surface water supply from the City’s water demand (potable and non-potable) provides the City with adequate supply through the 20-year projected growth, but not to buildout. This scenario is presented in Table 6-7. At buildout, an additional supply of 736 AFY is required.
Angels WMJuly 2013
C
Bas
10-y
20-y
BuiaPot
Under thcombinatCourse frbuildout.
P
Base Yea
10-year P
20-year P
Buildout a Assumes
O6.7 In the foloptions, cthe estim
Oa. Option 1considera
MP
COMPARISONGHC
Projection (Y
se Year (2011)
year Projection
year Projection
ildout (2051)
table and non-po
e current agrtion of reducrom the dem This scenar
COMPA
Projection
ar (2011)
Projection (202
Projection (203
(2051)
potable demand
Options for M
llowing sectican be imple
mated future d
Option 1 – Ob
would be toations are as
CITYN OF WATER
C GOLF COU
Year)
n (2021)
n (2031)
otable demands (
reement withcing the City
mand would brio is illustra
CITYARISON OF
EXCLUD
AnnuSuppl(AFY
1,600
1) 1,600
1) 1,600
1,600
d is 57.5 percent
Meeting Fu
ions, three oemented as ademands.
btain Increas
o acquire all follows:
TY OF ANGELSR SUPPLY V
URSE SURFA
Annual Supply (AFY)
1,600
1,600
1,600
1,600
(per Table 6-1).
h UPA for ay’s demand tbe required tated in Table
TY OF ANGELS
WATER SUPDING NON-P
al ly
Y) City
Potabl
0 556
0 688
0 852
0 1,343
of City demand
ture Deman
options are oua future strat
sed Allocatio
needed futu
Chapter
6-18N:\MTB0
TABLE 6-7 S WATER MAERSUS DEM
ACE WATER
Projected A
Citya
967
1,197
1,482
2,336
a firm 1,600 Ato only potabto stay withie 6-8.
TABLE 6-8 S WATER MA
PPLY VERSUOTABLE WA
Projected A
lea
City Npotab
0
0
0
3 0
(see Table 6-4).
nds
utlined. Anytegy to make
ons from UP
ure suppleme
r 6: Current
020401\Documen
ASTER PLANMAND PROJE
IRRIGATION
Annual Dema
GHC Golf Course
0
0
0
0
AFY of surfble uses and in the existin
ASTER PLANUS DEMAND ATER DEMA
Annual Deman
Non-ble
GHC GCour
0
0
0
0
.
y one of these up for the w
PA
ental water fr
Wat and Future
nts\_Water Master
N ECTIONS EXCN DEMANDS
and (AFY)
Total
967
1,197
1,482
2,336
face water sud separating tng allocation
N PROJECTIO
ANDS
nd (AFY)
Golf rse Tot
55
68
85
1,34
se options, owater supply
from UPA. K
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
CLUDING S
Supply – Demand (AFY)
633
403
118
-736
upply, a the GHC Gon through
ONS
SuppDem(AFtal
6 1,0
8 91
2 74
43 25
r combinatioy deficit and
Key
ngels Plan
pplies
020401 MP.docx
olf
ply – mand FY)
44
12
48
57
on of meet
Angels WMJuly 2013
1. T1th
2. U
red
3. CC
4. CthsuUalar
Talca
Ob. For Optioextractionfurther co Due to thexploratibeen devdevelopesequenceareas havgroundwdemand sareas can
MP
The current a,600 AFY. Through Attac
UPUD receiveality, UPUDiversions.
CCWD is alloCCWD curre
Considering “he City mustupplies in al
UPA receivesllocation frore as follows
Scenario IScenario IScenario IScenario IScenario VScenario V
The Amendedllocation, anan be found
Option 2 – Su
on 2, it is assn and pumpionsideration
he extremelyion findings,veloped to med to depict tes of the Mehve the most s
water. The weshortfall. Ban be used to r
agreement wiThis quantitychment A.
ves 4,800 AFD cannot rec
owed to divently uses app
“2” and “3”,t plan for verignment wits a reduced p
om Scenario s:
I (a normal wII = 90 perceIII = 80 percIV = 68 percV = 58 perceVI = 48 perc
d Attachmennd a table of
in Appendix
upplement w
sumed that sing. As desc
n.
y variable ge a phased iteaximize the the preferredhrten Formasustainable gell yields in tased on the preduce the n
ith UPA proy is and has b
FY with an oceive this tot
ert, for consuproximately
opportunitiry dry years th reduced alpercentage oI thought Sc
wet year) = ent of normacent of normcent of norment of normacent of norm
nt A, a table Amended Ax E.
with Groundw
supplementacribed earlier
ology and poerative approplacement o
d hydrogeoloation near pergroundwaterthese areas a
proposed invnumber of we
Chapter
6-19N:\MTB0
ovides a maxbeen provide
option for anal amount du
umptive purpy 1,800 AFY
es exist for aand the poss
llocations thof water in eacenario VI. T
100 percent al
mal mal al
mal
prepared byAttachment A
water
al water wour, three poten
otential signoach is propoof future proogic setting wrmeable lim
r resources aare anticipate
vestigation efells needed t
r 6: Current
020401\Documen
ximum allocaed regardles
n additional 1ue to contrac
poses, up to Y for the Ebb
acquiring adsibility that U
hrough Attacach successiThe scenario
of the alloca
y UPA to furA allocations
uld be providntial areas ha
nificant diffeosed using aduction wellwhich consis
mestones locas they are need to be highffort of the wto address th
Wat and Future
nts\_Water Master
ation from Uss of the allot
1,000 AF froctual restrict
8,000 AFYetts Pass WT
dditional supUPA may ne
chment A. Foive dry year os and respec
ation
rther describs from 1999
ded through gave been ide
erences in pra conceptual ls. The modests of the sanated east of tear recharge h to satisfy twell sites, highe water supp
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
UPA of tment provid
om UPA. In tions in
. Of this voluTP.
plies. Howeeed to restricor reference,in a stepped
ctive allocati
e the water through 201
groundwaterentified for
oduction wemodel that hel has been nd and gravethe City. Theareas for
the water supgher well yiply shortfall
ngels Plan
pplies
020401 MP.docx
ded
ume,
ever, ct ,
d ions
12
r
ell has
el ese
pply eld l.
Angels WMJuly 2013
Oc. Non-potarecycled water forprojectedwater demnon-pota A signifiamount b450 AFYfree-up thpotable wsource (ffor other
P6.8 Because provisionbelow.
Ea. Based onfor tempoadequatethis grouperiods o As provebe tappedactivate ipower ousystem. Wconduct relements
1. L
2. M
3. L
MP
Option 3 – En
able water iswater that is
r non-potabled non-potablmand is used
able water, th
cant amountbetween 200Y in the futurhe raw waterwater uses. Iffor example a
non-potable
Planning for
of potential ns for drough
Emergency U
n the emergeorary supple source. Rep
undwater is cof time. Relia
en in 2001, thd when necein the event utage, or eveWhen activaresponses to:
List of water
Measures to b
List of City e
nhanced Use
s either the ras produced ae uses withine water demd for non-pohe City’s sup
t of recycled9 and 2011 ire. By separar that is beinf the golf coan irrigatione uses.
r Drought Y
planned or uht conditions
Use of Mines
ency situationemental wateports state thconstant. Howability of thi
his supplemeessary. It is reof a disaster
en a bioterrorted, the City damaged pr
system com
be taken prio
mergency op
e of Non-pot
aw supply wat the WWTPn the City. A
mands. It has otable uses aspply can prov
d and raw wais 264 AFY.ating this demng diverted tourse convert
n well), this w
Years
unplanned cus are critical
s
n in 2001, aber. In particuhat the mine wever, tappiis source ove
ental water secommende
r such as a firrism attack o
y would coorrocesses and
mponents (we
or to and foll
peration per
Chapter
6-20N:\MTB0
table Water
water that comP facility. Th
Available recbeen estimas summarizevide potable
ater is directe. By agreememand from to the golf cots to use of awould free-u
utbacks in su. A discussio
bandoned mular the Schmfills constaning this sourer the long te
supply is an d that the Cire on the fluon the City’srdinate damad systems. Th
ells, distribut
lowing an em
sonnel.
r 6: Current
020401\Documen
mes throughhe City’s WWcycled waterated that 43 ped in Table 6e water for fu
ed to the GHent, GHC Gthe City’s alourse and dirall recycled wup recycled w
urface wateron of manag
mines seem tomauder-Tyrontly, and thisrce has not berm cannot b
excellent reity have a re
ume system, s water treatmage surveys,he plan wou
tion system,
mergency ev
Wat and Future
nts\_Water Master
h the canal syWTP facilityr supplies alipercent of th6-4. Throughuture growth
HC Golf CouGolf Course illotment fromrect that flowwater, but thwater for use
r supplies in gement strate
o be an approon Mine, hass suggests thaeen implemebe predicted
source for emesponse planan earthquak
tment and di gather infor
uld include th
storage tank
vent.
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
ystem or the y can providign well withhe City treateh the use of h.
urse. The aves allowed
m UPA, this w to the WTPhen finds anoe within the
the future, egies is prov
opriate sourcs proven to bat recharge oented for lon
d.
mergencies,n in place to ke, a City-wstribution rmation, andhe following
ks, etc.).
ngels Plan
pplies
020401 MP.docx
de h ed
erage
will P for other City
vided
ce be an of ng
to
wide
d g
Angels WMJuly 2013
4. In
5. L
in
6. Uw
An impoto obtain
Wb. Water coestimatedconserva Adoptionpeak usagsuggestioa sensible The Cityto take insupply) oexperienc As part oand pipelagreemenbe in placshortage To plan fOrdinancdrought,
MP
nformation r
List of water nstallation co
Utility serviceworks supplie
rtant part of supplement
Water Conser
onservation cd 43 percent ation and sup
n of a summege on maximons of incorpe way to pla
is encouragn case of a loor temporaryced with the
of an emergelines that counts with othece to regulatsituations.
for droughts ce with goalsand emergen
regarding co
testing laborontractors.
e numbers foers.
f the emergental water from
rvation (Dro
can significaof non-pota
pplemental u
er water restmum days coporating xeroan for additio
ged to develoong-term decy interruption Darby Fire)
ency action puld be used ter member ate outdoor irr
and emerges that includncy stages. A
ordination w
ratories, wat
or traffic sig
ncy responsem the mines
ought Contin
antly reduce able uses wituse of recycle
triction ordinould be impleophytic landonal water sa
op and adoptcreased suppn in the raw ).
plan, the Cityto convey w
agencies for erigation and
encies, the Ce voluntary An example
Chapter
6-21N:\MTB0
with police an
ter system co
gnal repairs,
e plan would.
ngency Plans
the demand thin the City ed water.
nance to reduemented. En
dscaping for ravings into th
t an emergenply (drought water supply
y should idenwater from ot
emergency dd all non-pota
ity can adopand mandatoof water sho
r 6: Current
020401\Documen
nd fire depa
ontractors, a
gas and elec
d be informa
s)
on the City’y can be redu
uce overall wncouraging cresidential ahe future.
ncy action plconditions ly coming thr
ntify locatiother sources.diversions. Iable water u
pt a three stagory stages toortage stages
Wat and Future
nts\_Water Master
artment perso
and pipe repa
ctrical repair
ation and the
’s treated wauced by a com
water demanconservationand commerc
lan. This woleading to Urough the flu
ons and avail. The City shIn addition, ause during em
ge Water Coo be implemes are present
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
onnel.
air and
rs, and water
e required ste
ater. The mbination of
nd by reducin with cial properti
ould include PA reducingumes (as
lability of puhould pursuea system shomergency wa
onservation ented in normted in Table
ngels Plan
pplies
020401 MP.docx
r
eps
f
ng
es is
steps g
umps e ould ater
mal, 6-9.
Angels WMJuly 2013
To achievbased onwould bedrought areductionstages ofdisaster ojeopardiz
A6.9 Currentlypotable wuse of recoptions (explored as presenincluded
MP
WATE
Shortage
0 up to 10%
10% to 30%
30% to 50%
ve these goa reduced sup
e based on thand emergenn up to 50 pef the water usor when the hzed.
Alternate Fu
y, the City rewater. Other cycled watersurface wateand evaluat
nted in Tablefor buildout
CITYER SHORTAG
St
No
Dro
Eme
als, City Coupply. The sphe amount thncy stages, thercent, if reqse reductionhealth and s
uture Water
elies exclusivfuture optio
r for non-poter, groundwated. From thie 6-10. For ct facilities fo
TY OF ANGELSGE STAGES A
tage
ormal
ought
ergency
uncil would decific criteri
hat projectedhe City’s rat
quired. In somn plan. For exafety of cust
r Supply Str
vely on surfaons include thtable demanater, and recis process, se
comparison por each strate
Chapter
6-22N:\MTB0
TABLE 6-9 S WATER MAAND WATER
Water Use Re
0 to 10% R
10% to 30%
30% to 50%
declare the aia for triggerd supply doeste structure cme cases, it mxample, stagtomers in the
rategies
face water dehe developm
nds. By combycled water)even alternapurposes, ordegy.
r 6: Current
020401\Documen
ASTER PLANR USE REDUC
eduction Goal
Reduction
% Reduction
% Reduction
appropriate wring the Citys not meet pcan be set as may be nece
ges may be ske City’s wat
elivered throment of grounbining eleme), a broad arr
ate water supder of magni
Wat and Future
nts\_Water Master
N CTION GOA
l Program
Volun
Manda
Manda
water consery’s water conprojected dem flexible to aessary for thekipped durin
ter service ar
ough UPA asndwater andents of the thrray of stratepply strategieitude capital
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
LS
m Type
ntary
atory
atory
rvation stagenservation stmand. Underattain water e City to sking a natural rea are
s a source ofd the increasehree primarygies can be es are identifl costs are al
ngels Plan
pplies
020401 MP.docx
e tages r use ip
f ed
y
fied lso
Angels WMJuly 2013
1 – Increa
2 – AdditNew D
3 – DevelLocal
4 – DevelRegio
5 – SomeUPA, CreekRepla
6 – SomeUPA, CreekRepla
7 – SomeUPA, DistribDiverGHC Local
Ea. To determevaluatedfactors asthrough timportanimportan
MP
SUMM
Strate
ase Deliveries t
tional Supply thDownstream D
lop GroundwatWells (Area 1
lop Groundwatonal Wells (Are
Increase in DeMinimize Div
k to Supply GHacing with Recy
Increase in DeMinimize Div
k to Supply GHacing with Loca
Increase in DeConstruct Citybution Systemsions from AnGolf Course bGroundwater
Evaluation of
mine a potend considerings presented ithe use of im
nt were assignce factors of
CITYMARY OF FU
egy
through UPA
hrough UPA thDiversion
ter Supply from)
ter Supply fromea 3)
eliveries througversions from AHC Golf Courseycled Water
eliveries througversions from AHC Golf Courseal Groundwate
eliveries througy-wide Dual , Minimize gels Creek to Sy Replacing w
f Water Supp
ntially superig multiple crin Table 6-1
mportance facgned a value f 0.5 and 0.7
TAY OF ANGELSTURE ALTE
OMag
hrough
m
m
gh Angels e by
gh Angels e by er
gh
Supply with
ply Strategie
ior alternateriteria. Thes1. Based on ctors. Specifof 1.0. Conv
7.
Chapter
6-23N:\MTB0
ABLE 6-10 S WATER MARNATE WAT
Order of nitude Cost,
$M
10.1
12.5
2.7
4.7
7.7
7.9
10.0
es
, the seven se criteria incinput from C
fically, the eversely, less
r 6: Current
020401\Documen
ASTER PLANTER SUPPLY
Depends on tUPUD/CCW
Diversion wohydroelectricrequire const
May require
May require demands.
Depends on tUPUD/CCWcommunicatiCourse and Cdiversions.
Depends on tUPUD/CCWsubstitute forcourse irrigat
Depends on tUPUD/CCWdistribution ssubstitute forcourse irrigat
strategies descluded econoCity staff, thevaluation cr
important c
Wat and Future
nts\_Water Master
N Y STRATEGIE
Key Charact
transfer of alloWD.
ould be downstc plants. Implemtruction of seco
six wells to me
three wells to m
transfer of alloWD. Requires ef
ion/coordinatioCity to minimiz
transfer of alloWD. Groundwat
r surface watertion.
transfer of alloWD and constru
system. Groundr surface watertion.
scribed in Taomic and nohe criteria weriteria considriteria were
City of AWater Master
e Water Sup
MTB0Plan\Final\0713 M
ES
teristics
ocations from
tream of mentation wouond WTP.
eet buildout de
meet buildout
ocations from ffective on between GHze surface wate
ocations from ter well(s) wour diversions for
ocations from uction of dual dwater wells wr diversion for g
able 6-10 weon-economicere prioritizedered most designated w
ngels Plan
pplies
020401 MP.docx
uld
emands.
HC Golf er
uld r golf
would golf
ere ed
with
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-24 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
TABLE 6-11 CITY OF ANGELS WATER MASTER PLAN
EVALUATION CRITERIA FOR ALTERNATE WATER SUPPLY STRATEGIES
Evaluation Criteria Description Importance
Factor
Meet 10-year Projection Capacity to deliver 10-year projected demands. 1.0
Meet Buildout Projection Capacity to deliver buildout projected demands. 0.5
WTP Expansion Need to expand existing WTP. 0.5
Second WTP Need to construct second WTP. 1.0
Minimize Impact of a Single Point of Failure (Single Pipeline)
Level of redundancy in key transmission pipelines. 1.0
Provisions for Emergency Conditions (Failure of Upstream Conveyance)
Ability to tolerate interruptions in raw water supply. 0.7
Impact from Drought Potential reduction in supply due to drought. 0.7
Capital Cost Relative magnitude of capital investment. 1.0
Operational Cost Relative magnitude of annual operation and maintenance costs.
1.0
Ease of Implementation Number/complexity of agreements, permits, approvals required for implementation.
1.0
Coordinated with Other City Plans Consistency with other City master plans or programs. 0.5
In evaluating a strategy, a score of 1-5 was selected for each criterion. Lower scores reflected an inferior alternate while a score of 5 signified a superior strategy when considering a specific evaluation criteria. As an example, for the criterion, WTP Expansion, if the strategy required an expansion of the existing WTP, the strategy would be assigned a low score. In contrast, strategies that do not incorporate improvements to the existing WTP would receive a higher score. By then applying the importance factor to each criterion score, a weighted score could be calculated and aggregated to identify a preferred alternate. This process is summarized in Table 6-12.
City of Angels Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-25 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx
TABLE 6-12 CITY OF ANGELS WATER MASTER PLAN
EVALUATION MATRIX FOR ALTERNATE WATER SUPPLY STRATEGIES
Criteriab Imp
orta
nce
F
acto
r Water Supply Strategya
1 2 3 4 5 6 7
Valuec Weightedd Value Weighted Value Weighted Value Weighted Value Weighted Value Weighted Value Weighted
Meet 10-year Projection 1 5 5 5 5 3 3 5 5 5 5 3 3 3 3
Meet Buildout Projection 0.5 3 1.5 3 1.5 3 1.5 5 2.5 1 0.5 1 0.5 5 2.5
WTP Expansion 0.5 1 0.5 5 2.5 5 2.5 5 2.5 3 1.5 3 1.5 3 1.5
Second WTP 1 5 5 1 1 5 5 5 5 5 5 5 5 5 5
Minimize Impact of a Single Point of Failure (Single Pipeline)
1 1 1 3 3 3 3 3 3 1 1 1 1 1 1
Provisions for Emergency Conditions (Failure of Upstream Conveyance)
0.7 1 0.7 3 2.1 3 2.1 3 2.1 1 0.7 1 0.7 1 0.7
Impact from Drought 0.7 5 3.5 5 3.5 1 0.7 3 2.1 5 3.5 3 2.1 3 2.1
Capital Coste 1 3 3 1 1 5 5 3 3 3 3 3 3 1 1
Operational Cost 1 5 5 1 1 3 3 3 3 5 5 5 5 1 1
Ease of Implementation 1 5 5 1 1 3 3 3 3 5 5 3 3 3 3
Coordinated with Other City Plans
0.5 3 1.5 3 1.5 3 1.5 3 1.5 5 2.5 1 0.5 1 0.5
Totals 32 23 30 33 33 25 21 a See Table 6-10 for description. b See Table 6-11 for description. c Value of 1 represents least favorable, value of 5 represents best or superior alternate. d Weighted = Value x Importance Factor. e Strategies with capital costs greater than $10M were considered least favorable. The strategy with the lowest capital cost was considered superior.
Angels WMJuly 2013
Pb. From a re(IncreaseWells), aAngels Cof the thrTable 6-1
S
Al
Surface
Ground
RecyclIrrigati
Total a Recyclb Recyc
Based onrecomme
1. P
2. R
3. In
4. M These ac
MP
reliminary R
eview of theed Deliveriesand Strategy Creek to Supree strategies1) is illustrat
SUMMARY O
lternate Water
e Water Delive
dwater Develop
ed Water Use fon
led water deliver
led water delive
n this initial eended:
ursue multip
Request addit
nitiate next s
Maximize use
tions are inc
Recommenda
e weighted scs through UP5 (Some Incply GHC Gos in meetingted in Table
CITYOF POSSIBLE
TO MEET B
r Supply Sour
eries through U
pment
for GHC Golf
ries, 2009-2011
ries, 2012.
evaluation, f
ple parallel o
tional delive
steps in grou
e of recycled
corporated in
ation
cores in TabPA), Strategycrease in Deolf Course b buildout wa6-13.
TAY OF ANGELSE “BLEND” OBUILDOUT W
rce
Av
Cu
UPA
Course
average.
for future wa
opportunities
eries through
undwater exp
d water at GH
nto a series o
Chapter
6-26n:\m
ble 6-12, threy 4 (Developlivery througy Replacingater supply r
ABLE 6-13 S WATER MA
OF ALTERNAWATER DEM
vailable Suppl
urrent
1,600
0
95a
1,695
ater supplies
s.
h UPA.
ploration.
HC Golf Co
of recommen
r 6: Current
mtb020401\docume
ee strategies p Groundwagh UPA, Mi
g with Recycrequirements
ASTER PLANATIVE WATEMAND OF 2,6
ly (AFY)
Future
2,000 A4
505 D
150b M
2,655
s, the followi
ourse in lieu
nded project
Wat and Future
ents\_water master
appear supeater Supply finimize Divecled Water). s of 2,655 A
N ER SUPPLY S55 AFY
Com
Additional annu00 AFY
Develop 2-3 gro
Maximum histo
ing actions b
of surface w
s described i
City of AWater Master
e Water Sup
MTB0r plan\final\0713 m
erior – Stratefrom Regionersions fromA possible mFY (see
SOURCES
mment
ual delivery of
oundwater wel
orical delivery
by the City a
water.
in Chapter 9
ngels Plan
pplies
020401 mp.docx
egy 1 nal
m mix
f
lls
are
9.
Angels WMJuly 2013
7 W
The purptreatment
C7.1 Water debased onfactors wpersonnerespectiv Althoughevaluatioflow metfrom the prior to fsignificanprocesses70 gpm (Table 7-1Appendix The projefacilities treated wdemand) demand)
MP
Water T
pose of this ct, storage, an
Current and
emands and p historical in
were establishel, and previovely (as discu
h current andons of availabter does not astorage tank
flocculation ant demand as. Based on (100,800 gpd1. Detailed wx H.
ected MDD for coagulat
water storagewere used. were used t
Treatm
chapter is to nd transmiss
d Projected T
peaking factnfluent flow hed based onous studies. ussed in Sect
d projected wble water suaccount for wk outlet and uand filtration
at the WTP ainput from thd). A summawater deman
(influent demtion, floccul, the projectThe projecte
to evaluate th
ment Pla
evaluate thesion facilities
Treated Wa
tors were devmeter record
n historical iThe recommtion 5.4).
water demanupply and diswater used inused to genen (see Figure
and is includhe WTP Supary of currennd projection
mand plus ination, sedim
ted MDD anded MDD andhe transmiss
7-1n:\m
ant Ev
e hydraulic as under exist
ater Deman
veloped in Cds for raw winfluent flow
mended MDD
nds presentedstribution syn various un
erate sodiume 7-1). Wateed in hydraupervisor, “prnt and projecns in one-yea
n plant procementation, filt
d PHD (influd PHD (influion main fro
mtb020401\docume
valuati
and treatmenting and futu
nds
Chapter 5. Thwater deliverw meter recorD and PHD f
d in Chapter stem perform
nit processesm hypochloriter for internaulic evaluatiorocess watercted water dear increment
ess demand)tration, and uent demanduent demandom the WTP
ents\_water master
on
nt capacity ofure flow scen
he ADD projred to the WTrds, input frofactors are 2
r 5 were usefmance, the Ws at the plantte solution th
al processes rons of the var” demands aemands is prts are include
) was used todisinfectiond plus in-plad, excluding P to the distri
MTB0r plan\final\0713 m
f the water narios.
ojections werTP. Peakingom WTP
2.2 and 1.7,
ful for WTP influent. Water is drhat is injecterepresents a arious treatmare estimatedrovided in ed in
o evaluate . For evaluat
ant process in-plant proibution syste
020401 mp.docx
re
nt rawn ed
ment d at
ting
cess em.
Angels WMJuly 2013
Y
Base Yea
10-year P(2021)
20-year P(2031)
Buildout a Projectiob Projectedc See Tabld MDD = 2e PHD = 1
E7.2 The Cityconventiothan a dewater regevaluatio
Ca. An alumiAngels Fmonitorinfeed pum Flocculatmotor anminute (rof approxprocess cmixing fodemand c
MP
CURREN
ear P
ar (2011)
Projection
Projection
(2052)
ons based on WT
d WTP Influent D
e 5-15.
2.2 x ADD.
.7 x MDD.
Evaluation o
acquired theonal filtratio
ecade, the Wgulations, alton of each un
Coagulation a
inum-based Forebay and ng and autom
mps.
tion occurs ind drive gearrpm). The baximately 9 ftcriteria or loaor a period oconditions ar
CITYNT AND PROJ
Population
3,919
4,853 1
6,009 1
9,453 2
TP influent flow
Demand + In-pla
of Facilities
e WTP fromon treatment
WTP has consthough concnit process is
and Floccula
coagulant (Nthe flocculatmatic coagul
in a single, fring are usedasin is 48 ft lt. California ading limits.of 10-30 minre summariz
TY OF ANGELS
JECTED WA
Projected WDem
ADDc (gpd)
M(g
864,000 1
1,069,000 1
1,324,000 2
2,084,000 3
meter (upper pla
ant Process Dem
m PG&E in 1and disinfec
sistently comerns have bes presented b
ation
NTU Technotion basin. Alant dose adj
four-stage bad to achieve along and 12 surface wat
. Optimal flonutes [30]. Ezed in Table
Chapte
7-3n:\m
TABLE 7-1 S WATER MA
ATER DEMAN
WTP Influentmanda
MDDd gpm)
PHD(gpm
,320 2,24
,633 2,77
2,023 3,43
,184 5,41
ant meter).
mand at 70 gpm (
984. In genection with so
mplied with aeen raised rebelow.
ologies 935)A streaming cjustments. T
asin with a roa paddle speft wide, with
ter treatmentoc formationstimated det7-2 and sug
er 7: Water
mtb020401\docume
ASTER PLANNDS FOR WT
t W
De m)
A(g
44 964
76
1,16
39
1,42
13 2,18
(100,800 gpd).
eral, the WTodium hypocapplicable stegarding cap
) is injected icurrent cont
The WTP is e
otating paddeed of approxh three intert regulationsn, however, ttention times
ggest that the
WaTreatment P
ents\_water master
N TP EVALUAT
WTP Unit Pro(Including In
Dem
ADD gpd)
MD(gp
4,800 1,3
69,800 1,7
24,800 2,0
84,800 3,2
TP is equippechlorite soluttate and fedeacity and rel
into raw wattroller is usedequipped wit
dle assemblyximately 9 rrior baffles a do not inclutypically reqs under curree capacity of
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
TION
ocess Demand-plant Process
mand )
DDd pm)
PHD(gpm
390 2,31
703 2,84
093 3,50
254 5,48
ed for tion. For mo
eral drinkingliability. An
ter between td for procesth two coagu
y. An electricrevolutions pand a water dude flocculatquires gentle ent and projef the existing
ngels Plan
uation
020401 mp.docx
db
s
De m)
14
46
09
83
ore g
the s ulant
c per depth tion
ected g
Angels WMJuly 2013
flocculatneeded tofrom servreliabilitywhen the
Sb. Water flosedimentapproximbasin undthat the csurface wlimits, bu800-1,20
The sedimmodern d
1. Lrest
MP
ion basin wio allow the Wvice for mainy should the e water level
WTP
edimentation
ows from thetation basin i
mately 310,0der current acapacity of thwater treatmeut typical des00 gallons pe
WTP
mentation badesign featur
Lack of automemoved fromtock pond on
ill be adequaWTP to contntenance or need for un in the treate
CITYP FLOCCULA
Dem
Base Year
10-year M
20-year M
n
e flocculatiois 100 ft long00 gallons. E
and projectedhe existing sent regulatiosign surface
er day per sq
CITYSEDIMENTA
Dem
Base Year
10-year M
20-year M
asin was conres. Major is
matic sludgem service, drn a neighbor
ate through 2tinue operatirepairs. Thescheduled reed water stor
TY OF ANGELSATION BASIN
mand Conditio
MDD (2011)
DD (2021)
DD (2031)
n basin into g and 38 ft wEstimated sud demand cosedimentatioons do not in
loading ratequare foot (gp
TY OF ANGELSATION BASIN
mand Conditio
r MDD (2011)
MDD (2021)
MDD (2031)
nstructed whssues and con
e removal syrained, and mring ranch. T
Chapte
7-4n:\m
2031. A secoing when the standby flocepairs arise drage tank is l
TABLE 7-2 S WATER MAN HYDRAUL
on Es
a single, guwide (at top)urface loadinonditions areon basin will nclude sedimes for sedimepd/ft2) [30].
TABLE 7-3 S WATER MAN HYDRAUL
on Es
Loa
hen the WTPncerns are li
stem. Periodmanually cleThe cleaning
er 7: Water
mtb020401\docume
ond flocculate existing flocculation baduring high-low.
ASTER PLANLIC LOADING
stimated DetenTime, minute
28
23
19
unite-lined se), with slopeng rates for te summarize
be adequatementation pro
entation basi
ASTER PLANLIC LOADIN
stimated Surfading Rate, gp
530
650
800
P was under Pisted below.
dically, the saned. Sludgprocedure i
WaTreatment P
ents\_water master
tion basin, hocculation baasin would p-demand per
N G SUMMARY
ntion es
edimentationd walls and the existing sd in Table 7e through 20ocess criteriains are in the
N G SUMMARY
face pd/ft2
PG&E owne
sedimentatioe and wash ws time-consu
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
however, is asin is removrovide addit
riods or at tim
Y
n basin. The a capacity osedimentatio
7-3 and sugge031. Californa or loading e range of
Y
ership and la
n basin muswater flow iuming and la
ngels Plan
uation
020401 mp.docx
ved tional mes
of on est
nia
acks
t be nto a abor-
Angels WMJuly 2013
inpr
2. Sthre
3. S
enprUww
4. S
hydbu
Fc. Filtrationcells. TheConditionshall not (with one As mentirepresentof future 1,440 gpmconsiderawith one planning Table 7-4
MP
ntensive, androgress.
tructural dethe basin. In 2epair two cra
ingle point ontire facilityrogress. Cer
Unscheduled which the wawater service
hort-circuitiydraulic shoownstream tut the short-
iltration
n is achievede maximum n No. 10 of exceed 1,44
e filter out o
ioned previots a significaincreases inm could be eation by the filter out of horizon). A
4.
d the WTP c
terioration. W2011, in respacks.
of failure. Bey must be shurtain maintenrepairs, whi
ater level wit interruption
ing. Performort-circuitingtreatment uncircuiting pr
d at the WTPfiltration cathe City’s w
40 gpm [23] f service).
ously, sodiumant amount on water demaexceeded at City. The fo
f service, whA summary o
annot produ
With age, larponse to CD
ecause the Wut down whenance eventsich could be thin the treatns.
mance of the sg. As a resultnits increasesroblem persi
P with three papacity of eacwater supply
which is the
m hypochloriof flow proceands, under cMDD in 1-2
ourth filter which would nof the MDD p
Chapte
7-5n:\m
uce water wh
rge cracks haPH inspectio
WTP lacks men sedimentas can be sche
needed durited water sto
sedimentatiot, settling tims. The basin ists.
pressure filtech filter is lipermit, the m
e capacity of
ite added to essed by the current oper2 years. Insta
would bring tot be exceedprojections a
er 7: Water
mtb020401\docume
hile sediment
ave developeon findings
multiple paraation mainteeduled durining high-dem
orage tank is
on basin is ame is reducedhas been ret
ers, each witmited to 720maximum flf two pressur
the headworpressure filtations the filallation of a the total filtrded until 203and filtration
WaTreatment P
ents\_water master
tation basin
ed in the wa[15], a seala
llel sedimenenance and reng lower-demmand period low, could r
adversely affd, and the sotrofitted with
th four 60 sq0 gpm. Accolow rate throre filters ope
rks and priorters. Dependltration capafourth filter
ration capaci33 (beyond tn capacities i
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
cleaning is i
alls and floorant was used
ntation units,epairs are in
mand periodss or at timesresult in City
fected by olids loadingh baffle curt
quare foot (fording to ough the WTerating in par
r to filtrationding on the pacity of r is under ity to 2,160 gthe 20-year is provided i
ngels Plan
uation
020401 mp.docx
in
r of to
, the n s. s in y
g on ains,
ft2)
TP rallel
n pace
gpm
in
Angels WMJuly 2013
Followinthe 10-ye
Dd. Sodium hinjected uand the sstorage ta The on-s0.8 perce1,000 galAccordinmonths, otwo days The disinGiardia iconcentraregulatioby the thwere grealimits forbyproduc
MP
Base
10-y
20-y
Curr
Curr
Futu
Futua Seeb Cap
ng installatioear and 20-y
Disinfection
hypochloriteupstream of torage tank. ank, respecti
ite sodium hent sodium hllon tank [8]ng to City staoften genera
s.
nfection equinactivation; ation througns. Operatioird objectiveater than 10 r disinfectionct precursors
CITYWT
e Year MDD (2
year MDD (202
year MDD (203
rent Operation
rent Operation
ure Operation (
ure Operation:
e Table 7-1. Incl
pacity with one f
n of the fourear MDD pr
e solution is the filters foShort-circui
ively, when
hypochlorite hypochlorite ]. The WTP aff, the geneating sodium
ipment is op2) ≥2-log10 hout the dist
onal records e. Throughoutimes the re
n byproductss.
TY OF ANGELS
P FILTRATI
Item
2011), gpma
21), gpma
31), gpma
(3 filters): Ma
: Year that Cap
(4 filters): Max
Year that Capa
udes 70 gpm of
filter out of serv
rth filter, therojections.
generated ator disinfectioiting (T10/T)calculating p
solution gensolution peris equipped
erator functiom hypochlorit
perated to simvirus inactivtribution syssuggest thatut 2011, calc
equired ratess (trihalomet
Chapte
7-6n:\m
TABLE 7-4 S WATER MAON SYSTEM
aximum Capaci
pacity will be E
ximum Capacit
acity will be Ex
in-plant process
vice.
e filtration sy
t the WTP anon. Disinfect) factors of 0pathogen ina
nerator is capr hour, and thwith two sod
ons at capacite solution w
multaneouslyvation; 3) mastem; and 4) t disinfectionculated inact. Over the sathanes and h
er 7: Water
mtb020401\docume
ASTER PLANM CAPACITY
ity, gpmb
Exceeded
ty, gpmb
xceeded
s water.
ystem will ha
nd, under notant contact
0.7 and 0.3 aactivation ra
pable of prohe 0.8 percedium hypochity during hi
without stopp
y achieve fouaintain a detcomply with
n process contivation ratesame period, haloacetic ac
WaTreatment P
ents\_water master
N
Value
1,390
1,703
2,093
1,440
2013
2,160
2033
ave sufficien
ormal operatiis provided
are applied toates.
oducing 62.5nt solution ihlorite solutigher-demanping for peri
ur objectivetectable residh disinfectiontrol is, in gs for Giardiathe WTP co
cids) and dis
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
nt capacity f
ing conditiowithin the fio the filters a
gallons of is stored in ation feed pumnd summer iods in exces
s: 1) ≥0.5-lodual chlorineon byproductgeneral, govea and virusesomplied withinfection
ngels Plan
uation
020401 mp.docx
for
ns, ilters and
a mps.
ss of
og10 e ts erned s
h
Angels WMJuly 2013
Te. FollowinCity’s diwater sysinterruptioperationwould all The capaCaliforniCalifornisource caminimumaccordingof storagdemand crequired
SY
B
1
2a
b
The Citysum of thstorage redemand c
MP
Treated Wate
ng the pressustribution system, the Citions, CDPH n in parallel low City sta
acity of the fuia Waterworia Waterworapacity, storam volume of g to Conditioe requiremenconditions isby Californi
STEM STOR
Demand C
Base Year (201
10-year (2021)
20-year (2031)a California Watb Condition No.
must be mainta
2010 Improhe required fequirementsconditions is
er Storage
ure filters, waystem by graty water syststaff suggeswith the exi
aff to remove
future storagerks Standardsks Standardsage capacity
f 937,500 galon No. 9 of tnts meeting s provided inia Waterwor
CITYRAGE REQUI
ondition
11)
)
)
terworks Standar
9 of the City’s 2ained for disinfec
ovement Stanfire storage, s meeting thes provided in
ater is routedavity. With otem lacks redsted that the sting storagee a tank from
e tank shouls [10] and ths require tha
y, and/or emellons is requithe City’s 20the Californ
n Table 7-5. rks Standard
TY OF ANGELS
REMENTS F
Storage R
for CaliWaterworks
(ga
555,3
683,
842,0
rds = 4 hours of
2003 permit amectant contact tim
ndards requioperational e City 2010 In Table 7-6.
Chapte
7-7n:\m
d into a singonly one treadundancy anCity constru
e tank [11]. Tm service for
d satisfy thehe City 2010at the systemergency sourired in the ta003 water sunia WaterwoAs shown ins at the 20-y
TABLE 7-5 S WATER MA
FOR CALIFO
Required
ifornia Standardsa
al)
360
143
093
PHD (including
endment states thme [6].
ire storage castorage, andImprovemen
er 7: Water
mtb020401\docume
gle 2.5 MG stated water stond reliabilityuct an additiThe additionr maintenanc
e greater of th0 Improveme
m be able to mrce connectiank for chlorupply permitrks Standardn Table 7-5, year demand
ASTER PLANRNIA WATE
MinimumChlorine Co
Volume(gal)
937,500
937,500
937,500
g in-plant proces
hat a minimum v
apacity be gd emergency nt Standards
WaTreatment P
ents\_water master
torage tank torage tank fo
y. To avoid sonal storagen of a secondce or repairs.
he requirement Standardmeet four hoons [10]. In rine contact t amendmentds for currenthe minimu
d condition is
N ERWORKS ST
m ontact eb
TReSt(
0
0
0
s demands) [10]
volume of 937,5
greater than ostorage [16] for current
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
that feeds thfor the entireservice e tank for d storage tan.
ments of the ds [16]. The ours of PHD
addition, a volume t [6]. A sum
nt and projecum storage s 1.8 MG.
TANDARDS
Total equired torage (MG)
1.5
1.7
1.8
].
00 gallons
or equal to th]. A summarand projecte
ngels Plan
uation
020401 mp.docx
he
nk
with
mmary cted
he ry of ed
Angels WMJuly 2013
Dem
Base Year
10-year (2
20-year (2a Fire stora
industrialb Operationc Emergencd Condition
for disinf
As shownat the 20-of 2.3 MGand repai If an alteminimumBased onrequiremfurther di
Tf. Finished single wethe existitransmissfail, the Cthe City n[11]. The paragreater ofire flow of requireprovided
MP
SYSTEM ST
mand Conditio
r (2011)
2021)
2031)
age = maximum l) for a 2 hour du
nal storage = 20%
cy storage = 4 ho
n No. 9 of the Cifectant contact ti
n in Table 7-year demanG is recommirs if the sec
rnative locatm chlorine con the 20-year
ment or in plaiscussed in C
Transmission
water from elded steel tring transmission main is City would bneeds an add
llel transmisf PHD or firof 2,000 gpements for s
d in Table 7-7
CITYTORAGE RE
on
FSto
(
24
24
24
fire flow conditiuration.
% of MDD (incl
ours of MDD (in
ity’s 2003 permiime [6].
-6, the minimnd condition mended for reond tank is c
tion (i.e., noontact volumr demand coant process dChapter 9.
n
the treated wransmission sion main is50-60 years
be unable to ditional trans
ssion main shre flow plus m, the 20-ye
sizing of the 7.
TY OF ANGELSQUIREMENT
Fire oragea gal)
OpS
0,000 4
0,000 4
0,000 6
ion of 2,000 gpm
luding in-plant p
ncluding in-plant
it amendment sta
mum storageis 2.3 MG. Aedundancy tconstructed a
ot at the WTPme requiremendition, the
demands is a
water storagemain that is
s unknown bus old and in psupply watesmission ma
hould be sizMDD. The 2ear projectioparallel tran
Chapte
7-8n:\m
TABLE 7-6 S WATER MATS FOR CITY
erational torageb (gal)
E
400,320
490,520
602,720
m (multiple resid
process demands
t process deman
ates that a minim
e required byA second treto avoid servat or near th
P site) is seleent and in-plminimum st
approximatel
e tank is fed approximat
ut is believepoor conditioer to its custoain in paralle
ed to meet v20-year proj
on for fire flonsmission ma
er 7: Water
mtb020401\docume
ASTER PLANY IMPROVEM
Emergency Storagec
(gal)
C
333,600
408,767
502,267
dential, three stor
s).
nds).
mum volume of 9
y the City 20eated water svice interrupe WTP.
ected for thelant process torage volumly 1.4 MG. T
to the City’tely 3,508 ft ed to be 10-inon [5]. If theomers. CDPHel with the ex
velocity and ection for PH
ow plus MDDain based on
WaTreatment P
ents\_water master
N MENT STAN
MinimumChlorine Con
Volumed (gal)
937,500
937,500
937,500
ries, heavy comm
937,500 gallons
010 Improvestorage tank tions during
e second stordemands do
me without aTank site alte
s distributioin length. Tnches or 14-e transmissioH staff has cxisting trans
head loss crHD is 3,439D is 4,023 g
n fire flow pl
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
NDARDS
m ntact
TotRequiStora(MG
2.0
2.1
2.3
mercial, or heav
must be mainta
ement Standawith a volum
g maintenanc
rage tank, tho not apply. a chlorine coernatives are
on system viahe diameter -inches. The on main wercommented tmission mai
riteria for the9 gpm. Usinggpm. A summlus MDD is
ngels Plan
uation
020401 mp.docx
tal ired age G)
0
1
3
vy
ined
ards me ce
he
ontact e
a a of
re to that in
e g a mary
Angels WMJuly 2013
As showncriteria. Bfor the pa2011 Waneed for
Bg. Currentlya stock pThe follodocumensupernatafrom the capacity wastewatwould al Under AlWTP facbackwashSedimentshort-circrecycle pflow from10 percenminor an
MP
20-ye
Maxi
Minim
Maxi
Minima Fire b Veloc Maxlength
n in Table 7Because a 16arallel waterater Audit [6reliability, s
Backwash W
y, filter backond on a nei
owing two alnts [3, 6]: 1) ant to the heWTP to a poin the City wter treatmentso significan
lternative 1, cilities. The ch water and tation wouldcuiting. Supe
pump stationm the sludgent of the tota
nd will not be
CITYSIZING OF
ear Projection o
mum Velocity
mum Pipe Diam
mum Head Lo
mum Pipe Diam
flow of 2,000 gp
ocity criteria per
ximum head loss h of 3,508 ft.
-7, the minim6-inch diamer transmissio]. The additiecurity, and
ater and Slu
kwash water ighboring ralternative strconstructionad of the WToint within twastewater ct facility, Alntly increase
two lined slcapacity of ewater from s
d occur in thernatant wou
n. The pump e lagoons to tal plant influe a factor in
TY OF ANGELS
PARALLEL
Item
of Fire Flow +
y for Short Dura
meter to Meet
ssc, ft
meter to Meet
pm + MDD of 2
Table 4-2.
criteria of 10 ft
mum pipe dieter pipelineon main is 18ion of a parasystem redu
udge Handlin
and water franch. The storategies haven of sludge laTP; and 2) cthe City wascollection sylternative 1 ie the efficien
ludge lagooneach lagoon wsedimentatioe sludge laguld flow fromstation woulthe head of t
uent flow. (Tdetermining
Chapte
7-9n:\m
TABLE 7-7 S WATER MAWATER TRA
MDD (2031),
ationsb, fps
Velocity Criter
Head Loss Cri
,023 gpm (per T
per 1,000 ft (per
iameter is coe is a less com8-inches, conallel water trundancy.
ng
rom sedimenock pond in te been identiagoons and a
construction tewater colle
ystem and pois recommenncy of the W
ns would be would be apon basin cleaoons, and bam the sludgeld be equippthe WTP. Th
The flow of pg the recycle
er 7: Water
mtb020401\docume
ASTER PLANANSMISSION
gpma
ria, in
iteria, in
Table 7-1) for 20
r Table 4-2) and
ontrolled by mmon size, tnsistent withansmission m
ntation basinturn can discified and disa pump statiof a sludge pection system
otential advended. Implem
WTP.
constructed pproximatelyaning wouldaffles woulde lagoons to ped with a flohe recycled wprocess wated water flow
WaTreatment P
ents\_water master
N N MAIN
Value
4,023
12
12
35
16
0-year projection
d a total pipe
the head losthe recomme
h the suggestmain addres
n cleaning is charge to Chscussed in prion to recyclpipeline andm. Due to a rse effects o
mentation of
adjacent to y 500,000 gad flow to the d be provided
the wet wellow meter to water flow s
er to the headw.) Proper de
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
n.
ss evaluationended diametion in the sses a critical
discharged herokee Creerevious le sludge lagd appurtenanlack of avai
on the City f Alternative
the existing allons. Filtersludge lagoo
d to prevent l of a duplexmonitor the
should not exd of the WTPesign, operat
ngels Plan
uation
020401 mp.docx
n eter
l
into ek.
goon nces lable
1
r ons.
x e xceed P is tion,
Angels WMJuly 2013
and maineliminate Periodicaallowed tdestinatio
C7.3 In generaparallel b
1. F2. S3. S4. T
Treated wThe CityAddition The follodifficulti
1. Rsl
2. CdCC
A WTP pthe necesissues:
1. F2. S
MP
ntenance of te the need fo
ally, on a rotto dry. Driedon.
Conclusions
al, the WTP backup units
locculation bedimentationtorage tank
Transmission
water deman should com
nal on-site so
owing needs es:
Replacement ludge remov
Construction ischarges of
Control BoardCherokee Cre
process flowssary improv
ourth filter ludge lagoon
the lagoons aor National P
tating basis, d sludge wou
and Recom
lacks redund to use while
basin n basin
n main from
nd projectionmplete designodium hypoc
have been id
of the existival system.
of sludge laffsite and potd triggered beek could be
w diagram shvement proje
ns, recycle p
and recycle pPollutant Dis
sludge lagoould be remov
mmendations
dancy. The fe maintenan
WTP to dist
ns indicate thn of the fourtchlorite gene
dentified con
ing sediment
agoons, a rectential regulaby releases toe subject to a
owing necesects, the follo
pump station
Chapte
7-10n:\m
pump stationscharge Elim
ons would bved and haul
s
following Wce and repai
tribution sys
hat a fourth fth filter proje
eration capac
nsidering cu
tation with a
cycle pump satory issues o Cherokee
administrativ
ssary improvowing addre
n, and appurt
er 7: Water
mtb020401\docume
n should premination Syst
e removed fled to a land
WTP elementsir operations
stem
filter could bect and proccity will also
urrent operat
a modern un
station, and awith the ReCreek. Non
ve civil liabil
vements is pess possible r
tenances
WaTreatment P
ents\_water master
event dischartem (NPDES
from servicedfill or other
s were consts are in progr
be required iceed with cono be required
tional practic
it that is equ
appurtenancgional Wate
n-permitted rlities.
resented in Fregulatory co
City of AWater Master
Plant Evalu
MTB0r plan\final\0713 m
rges and S) permitting
, drained, anapproved
tructed withoress:
in the near funstruction.
d.
ces and
uipped with a
es to eliminaer Quality releases to
Figure 7-2. Oompliance
ngels Plan
uation
020401 mp.docx
g.
nd
out
uture.
a
ate
Of
Angels WMJuly 2013
8 HySy
The purpvarious dscenariosdistributiwater dem
S8.1 Land usehydraulicthe City l[6], are p A summapresenteddesignatethe analy
MP
ydraulystem
pose of this cdemand scens will be useion system. Tmands and a
tudy Area a
e data for thec model. Thelimits. Wate
presented in F
ary of existind in Table 5-ed as ROW aysis of existin
lic Eva
chapter is to narios under d to developThe developassumed pipe
and Existing
e City provide furnished dr distributionFigure 8-1.
ng develope-2 and Figurand OS wereng demands.
aluation
execute a wexisting dev
p recommendment and caeline friction
g Land Use
ded in GIS fodata encompn system pre
d land uses (re 5-1, is alsoe assumed to.
8-1n:\m
n of Ex
water distribuvelopment coded capacityalibration of n factors are
ormat were upassed a totalessure zones
(including po presented io have no wa
mtb020401\docume
xisting
ution system onditions. Thy improvemethe hydraulialso discuss
utilized for tl area of app
s, identified i
artially devein Table 8-1ater demand
ents\_water master
g Distri
hydraulic mhe results ofent projects fic model usinsed.
the calibratioproximately in the 2011 W
eloped areas for referenc
ds and were n
MTB0r plan\final\0713 m
ibution
model for f the model for the ng calculate
on of the 2,280 ac witWater Audit
), previouslyce. Parcels not included
020401 mp.docx
n
d
thin t
y
d in
ZONE E
ZONE D
ZONE B
ZONE C
ZONE A
ZONE D
ZONE B
ZONE C
ZONE A
ZONE E
LEGEND
PRESSURE ZONE BOUNDARY
PRESSURE REDUCING VALVE
City of Angels Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System
Angels WMP 8-3 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 8-1 CITY OF ANGELS WATER MASTER PLAN
DEVELOPED LAND USE SUMMARY
Land Use Description Number of
Parcelsa
Total Developed Areaa (ac)
Residential
HDR High-Density Residential 128 80
MDR Medium-Density Residential 68 51
RE Residential Estates 10 14
SFR Single-Family Residential 1,190 372
HDR-WMC Worldmark Club 19 21
Commercial
BAE Business Attraction/Expansion 21 26
CC Community Commercial 101 65
HC Historic Commercial 79 16
SC Shopping Commercial 39 32
Industrial
I Industrial 5 16
Public
P Public 22 28
P (WWTP) Public (Wastewater Treatment Plant) 2 18
P-SCH Public School 8 50
PR Parks and Recreation 9 18
PR-Golf Golf Course 5 144
Other
SP Special Planning 1 4
OS Open Space 5 12
ROW Right-of-Way 154 216
Total 1,866 1,183 a Includes partially-developed land uses.
Angels WMJuly 2013
S8.2 As discu2007-201for indivi
La
Resid
HD
MD
RE
SF
HD
Comm
BA
CC
HC
SC
Indus
I
Publi
P
P (
P-S
PR
Other
SPa Convb Dem
E8.3 The existpipelinesapproxim
MP
ummary of
ssed in Chap11 average widual parcels
and Use
dential
DR
DR
E
FR
DR-WMC
mercial
AE
C
C
C
strial
ic
(WWTP)
SCH
R
r
P
version factors p
mand factor per T
Existing Dist
ting water dis with diamemately 300 hy
Cha
f Water Dem
pter 5, existinwater use. Ws were applie
CITY SUMMAR
Conversi(EW
Existing
5.0
3.0
2.0
4.0
9.5
2.0
2.0
2.0
2.0
2.0
5.0
5.0
10.0
4.0
1.5
per Table 5-12.
Table 5-13.
tribution Sy
istribution syters rangingydrants, 30 A
apter 8: Hyd
mands by La
ng and futurWater demand
ed to the nea
TAOF ANGELS
RY OF WATE
ion Factora,b
WU/ac)
Future
15.0
10.0
0.5
6.0
9.5
1.0
15.0
15.0
15.0
2.0
5.0
0.0
10.0
4.0
1.5
ystem
ystem consis from 2-inchARVs, 14 bl
draulic Eval
8-4n:\m
and Use Typ
re demands fds by land usarest point (n
ABLE 8-2 S WATER MAER DEMAND
DemFacto
(gpd/E
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
sts of approxhes to 14-inclowoff valve
luation of E
mtb020401\docume
pe
for the systemse are presennode) on the
ASTER PLANDS BY LAND
mand ora,b
EWU) E
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
ximately 167ches. The syses, ten PRVs
WaExisting Dist
ents\_water master
m were devented in Tablee distribution
N USE
Deman(gpd/a
Existing
1,275
765
510
1,020
2,423
510
510
510
510
510
1,275
1,275
2,550
1,020
383
7,000 lineal stem includes, and one su
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
eloped frome 8-2. Deman system.
nd ac)
Future
3,825
2,550
128
1,530
2,423
255
3,825
3,825
3,825
510
1,275
0
2,550
1,020
383
feet (LF) of es urge valve.
ngels Plan stem
020401 mp.docx
m ands
Angels WMJuly 2013
For mode4-inch topresented
H8.4 This sect
Ma. A model (version distributicalibratioPHD con
Pb. GIS dataARVs, an(USGS) mobtain pithan 90 p
Dc. GIS parcnetwork.the hydra
MP
eling purposo 14-inch pipd in Figure 8
Hydraulic M
tion will desc
Modeling Sof
of the existi8i). The softion network on of the hydnditions was
hysical Data
provided bynd hydrants.maps and aepe invert ele
percent, by le
Demand Inpu
cel maps wer Parcels withaulic model,
Cha
ses, only the pelines, 262 h8-2.
Model
cribe the sof
ftware
ing distributitware can anunder steady
draulic modeconducted.
a
y the City in. Ground eleerial imageryevations. Theength, of the
uts
re reviewed thin each locabased on de
apter 8: Hyd
water distribhydrants, an
ftware used t
ion network nalyze hydray-state and eel, analysis o
cluded the loevations werey. Pipe covere extents of te entire City
to establish lal service ar
emands prese
draulic Eval
8-5n:\m
bution trunknd ten PRVs
to develop th
was createdaulic performextended perof a steady st
ocation and e determinedr was assumthe modeledwater system
local water srea were usedented in Tab
luation of E
mtb020401\docume
k network, cowas analyze
he distributio
d using Bentmance and wriod (non-stetate model u
size (diametd from Uniteed to be an a
d distributionm.
service areasd to establish
ble 8-2.
WaExisting Dist
ents\_water master
onsisting of ed. This trun
on network m
ley Haestad ater quality eady) conditiunder ADD,
ter) of pipelied States Geaverage deptn network in
s along the dh water dem
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
154,900 LF nk network is
model.
WaterCAD behavior of ions. For MDD, and
ines, PRVs, eological Surth of 3 ft to
nclude greate
distribution mand loading
ngels Plan stem
020401 mp.docx
of s
a
rvey
er
g for
ZONE D
ZONE B
ZONE C
ZONE A
ZONE E
LEGEND
4-INCH DIAMETER PIPELINE
6-INCH DIAMETER PIPELINE
8-INCH DIAMETER PIPELINE
10-INCH DIAMETER PIPELINE
12-INCH DIAMETER PIPELINE
14-INCH DIAMETER PIPELINE
PRESSURE ZONE BOUNDARY
FIRE HYDRANT
AIR RELEASE VALVE
BLOWOFF VALVE
PRESSURE REDUCING VALVE
SURGE VALVE
Angels WMJuly 2013
C8.5 This sect
Ta. As pipeliperformathe Hazevalues co The 2011distributiTable 8-3available
Ab. The CityJanuary 2August apressuresan averagdegradatipresent wreviewedHydrant model re
MP
Calibration o
tion will desc
Typical Fricti
ines age, detance. The hyn-Williams
orrespond to
1 Water Audion system p3. A conserve.
Pressure Zone
A
B
C
D
E
Applied Frict
provided da2012. Updatand Septembs (before hydge C value, bion. Because
when the hydd to confirm test locationsults are pre
Cha
of the Hydr
cribe the me
ion Coefficie
terioration thydraulic condequation whlower pipe f
dit [6] providpressure zonevative C valu
CITY PIPELINE M
Not Specifi
50 year old steel, ductil
50 year old steel, ductil
10-20 year
10-20 year
tion Coeffici
ata from threed static preer 2012, werdrant flow) oby zone, obte it is not kndrant tests wcalibration w
ns are presenesented in Ta
apter 8: Hyd
raulic Mode
ethodology f
ents
hrough normdition of a pihich is primafriction, low
ded general pes. Existing pue of 110 is a
TAOF ANGELS
MATERIALS A
Pipe Mater
ied
asbestos cemele iron, or galv
asbestos cemele iron, or galv
old C900 PVC
old C900 PVC
ients for Mo
ee fire hydraessure test rere provided observed at eained from Town which f
were performewithin an acc
nted in Figureable 8-4. Flo
draulic Eval
8-7n:\m
el
for water mo
mal use may ripeline is besarily a functiwer head loss
pipeline age pipe materiaassumed wh
ABLE 8-3 S WATER MAAND FRICTI
rial
ent, spiral weldanized steel
ent, spiral weldanized steel
C
C
del Calibrati
ant flow testssults for twoby City staffeach locationTable 8-3 whflow conditied, model receptable mare 8-3. Static
ow test repor
luation of E
mtb020401\docume
odel calibrati
result in chast expressedon of pipe m
s, and improv
and materiaals and typichere pipeline
ASTER PLANION COEFFIC
TypicalRange
1
d
d
ion
s performed o of the fire hff. To calibran were comphich would ions (ADD, M
esults for all rgin of errorpressure da
rts are provid
WaExisting Dist
ents\_water master
ion.
anges to hydrd by the coefmaterial and ved hydrauli
al characteriscal C values information
N CIENTS
l Friction Coefe (Hazen-Will
C value)
110 (Assumed)
110-120
110-120
120-130
120-130
between Ochydrants, pe
ate the modepared to modindicate normMDD, of PHflow scenar
r (±10 percenata, flow dataded in Appen
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
raulic fficient C witage. Higher ic performan
stics for the are presente
n is not
fficient liams
)
ctober 2010 aerformed in l, static del results usmal
HD) were rios were nt). a, and calibrandix I.
ngels Plan stem
020401 mp.docx
thin C
nce.
ed in
and
sing
ated
City of Angels Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System
Angels WMP 8-8 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 8-4 CITY OF ANGELS WATER MASTER PLAN
FIRE HYDRANT FLOW TEST AND MODEL CALIBRATION DATA
Hydrant ID Test
Month Pressure
Zone Test
Value
Model % Diff.
ADDa MDDb ADDa MDDb
Static Pressure (psi)
A1-FH-113 Oct. 2010 B 120 psi 108 psi 102 psi -9.9% -14.8%
C2-FH-100 Aug. 2012 B 108 psi 98 psi 92 psi -9.4% -14.8%
C2-FH-117 Sep. 2012 B 87 psi 90 psi 79 psi 3.9% -9.8%
Hydrant Flow (gpm) c
A1-FH-113 Oct. 2010 B 2,165 gpm 2,132 gpm 1,796 gpm -1.5% -17.0% a ADD conditions. b MDD conditions. c Hydrant flow only available for Oct. 2010 test of Hydrant A1-FH-113.
Based on the results presented in Table 8-4, it is likely that ADD flow conditions were present for the October 2010 and August 2012 hydrant flow tests. ADD or MDD flow conditions were likely present for the September 2012 hydrant flow test.
A1-FH-1113
120 psi, static
2,165 gpm
October 2010
C2-FH-100
108 psi, static
August 2012
C2-FH-117
87 psi, static
September 2012
ZONE E
ZONE D
ZONE B
ZONE C
ZONE A
LEGEND
PRESSURE ZONE BOUNDARY
WATER DISTRIBUTION SYSTEM NETWORK
FIRE HYDRANT
TESTED FIRE HYDRANT
AIR RELEASE VALVE
BLOWOFF VALVE
PRESSURE REDUCING VALVE
SURGE VALVE
Angels WMJuly 2013
The caliband indicother predistributimaterial.
Approximrecent coconstruct
S8.6 Using frimodel waand futurhydraulic
MP
brated C valucates typical essure zones ion system p Applied fric
mately 6,180onstruction bted C900 PV
cenarios An
iction coefficas analyzed re (buildout)c model scen
Cha
ue of 115 forpipe degradis not availa
perform simiction coeffic
CITY AP
0 LF of 8-incby the City, iVC.
nalyzed with
cients and deto evaluate t demand sce
narios are pr
apter 8: Hyd
r Zone B is wdation from nable for analylarly within
cients for all
TAOF ANGELS
PPLIED FRIC
PressureZone
A
B
C
D
E
ch to 12-inchis assumed to
h Hydraulic
emand factothe conditionenarios. Detaesented in T
draulic Eval
8-10n:\m
within the ranormal use. Bysis, it is assthe respectivpressure zon
ABLE 8-5
S WATER MACTION COEF
e ApplC-va
110
115
115
125
125
h pipeline wo have a C v
c Model
rs discussedn and capaciailed results
Table 8-6.
luation of E
mtb020401\docume
ange of expeBecause firesumed that ave typical ranes are prese
ASTER PLANFFICIENTS
lied alue
0
5
5
5
5
within Pressurvalue of 130,
d in Section 8ity of the disare included
WaExisting Dist
ents\_water master
ected frictione hydrant floall pipes withanges for pipented in Tab
N
re Zone B, i, typical of n
8.4 and 8.5, stribution syd in Append
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
n coefficientow data fromhin the peline age anble 8-5.
dentified as newly
the hydraulistem for exiix J. Execut
ngels Plan stem
020401 mp.docx
s m
nd
ic sting ted
City of Angels Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System
Angels WMP 8-11 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 8-6 CITY OF ANGELS WATER MASTER PLAN
EXECUTED HYDRAULIC MODEL SCENARIOS
Demand Scenario Scenario Description
Existing Conditions
Existing ADD ADD for existing parcels; based on demand factors presented in Table 8-2
Existing MDD Existing ADD scenario with an applied MDD peaking factor of 2.2 (per Section 5.4)
Existing PHD Existing MDD scenario with an applied PHD peaking factor of 1.7 (per Section 5.4)
Existing MDD Plus Fire Flowa
Existing MDD scenario with fire flow demands applied and analyzed independently at each hydrant location
Buildout Conditionsb
Buildout ADD ADD for buildout parcels; based on demand factors presented in Table 8-2
Buildout MDD Buildout ADD scenario with an applied MDD peaking factor of 2.2 (per Section 5.4)
Buildout PHD Buildout MDD scenario with an applied PHD peaking factor of 1.7 (per Section 5.4)
Buildout MDD Plus Fire Flowa
Buildout MDD scenario with fire flow demands applied and analyzed independently at each hydrant
a Fire flow requirements presented in Table 8-7. b Buildout Conditions based on ultimate General Plan [1] land uses.
The results of scenarios presented in Table 8-6 were analyzed to evaluate the distribution system for areas with excessively low or high pressures and the effectiveness of future infrastructure improvements. Fire flow requirements, previously presented in Table 4-1, are also presented in Table 8-7 for reference.
Angels WMJuly 2013
D8.7 The distrAdditionidentified Desired hTable 4-2
Min
Min
Min
Minplu
Macon
Ma
Ma
MP
Rural resid
Single fam
Single fam
Multiple rebusinesses
Multiple restory; light
Multiple reor heavy ina Fire flows
Distribution
ribution systenally, a fire fld in Table 8-
hydraulic pe2, are presen
DISTR
Criter
nimum pressur
nimum pressur
nimum pressur
nimum pressurus MDD
aximum pressunnection
aximum velocit
aximum head lo
Cha
CITY
Land Us
dential (<2 lots
mily residential
mily residential
esidential up tos of one story
esidential unitst commercial a
esidential, threndustrial
and durations e
System Per
em was analflow analysis-7.
rformance cnted in Table
CITY RIBUTION SY
ria
re – ADD
re – MDD
re – PHD
re – fire flow
ure at service
ty
oss gradient
apter 8: Hyd
TAOF ANGELSFIRE FLOW
se Category
s/acre)
(<2 lots/acre)
(≥3 lots/acre)
o a fourplex; ne
s of >4 units, oand light indust
ee stories, heav
stablished in Cit
rformance u
lyzed under s was perform
criteria for the 8-8 for refe
TAOF ANGELS
YSTEM HYD
Val
40 psi
35 psi
20 psi
20 psi
150 psi (PRVat 80 psi)
8 fps (typica12 fps (short
10 ft per 1,0
draulic Eval
8-12n:\m
ABLE 8-7 S WATER MA
W REQUIREM
eighborhood
one and two trial
y commercial,
ty Resolution 21
under Existi
existing conmed using M
he distributioerence.
ABLE 8-8 S WATER MADRAULIC PER
lue
V required
al) t durations)
00 ft
luation of E
mtb020401\docume
ASTER PLANMENTS
Fire Flow(gpm)
500
500
750
750
1,500
2,000
1-78.
ing Conditi
nditions for AMDD and Cit
on system, pr
ASTER PLANRFORMANC
2010 Improve
Typical design
California Wa
2010 ImproveCalifornia Wa
2010 Improve
Typical design
Typical design
WaExisting Dist
ents\_water master
N
wa Durati(hour
2
2
2
2
2
2
ions
ADD, MDDty fire flow r
reviously pr
N CE CRITERIA
Source
ement Standard
n standard
aterworks Stan
ement Standardaterworks Stan
ement Standard
n standards
n standard
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
ion rs)
, and PHD. requirement
resented in
A
ds [16]
dards [10]
ds [16], dards [10]
ds [16]
ngels Plan stem
020401 mp.docx
ts,
Angels WMJuly 2013
Aa. Several pcriteria foHydrauliin Figurewere ach
HYDR
Scenario
ADD
MDD
PHD
a Length-weig
MP
Average Day
pipe segmentor maximumically deficiee 8-4. Hydrauhieved in all
RAULICALLY
Lo
Greenhorn C
Moose Trail
Golden Chai
Mark Twain
Moose Trail
Golden Chai
Hillcrest Stre
Mark Twain
Moose Trail
Murphy's Gr
Oneida Stree
Stanislaus A
ghted average.
Cha
, Maximum
ts and one jum pressure anent junctionsulic performdemand scen
CITY Y DEFICIENT
cation
Creek Road
in Highway
Road
in Highway
eet
Road
rade Road
et
venue
apter 8: Hyd
Day, and Pe
unction werend maximums and pipe se
mance criterianarios for ex
TAOF ANGELS
T JUNCTION
Maximu
No. ofJunctions
1
-
-
-
-
-
-
-
-
-
-
-
draulic Eval
8-13n:\m
eak Hour De
e identified am head loss gegments are sa for minimuxisting condi
ABLE 8-9 S WATER MANS AND PIPE
um Pressures
s
PressureRange(psi)
151
-
-
-
-
-
-
-
-
-
-
-
luation of E
mtb020401\docume
emands (Exi
as failing to gradient undsummarizedum pressure itions.
ASTER PLANSEGMENTS
Ma
PipeLengt
(ft)
-
958
47
825
958
802
175
1,740
958
3,329
548
542
WaExisting Dist
ents\_water master
sting)
meet hydrauder existing cd in Table 8-9
and maximu
N S, EXISTING
aximum Head
e th
Pipe Diameter
(in)
-
4
6
6
4
6 - 8
6
0 6
4
9 6 - 8
4
4
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
ulic performaconditions. 9 and presenum velocity
CONDITION
d Loss Gradie
r Head LGradie
(ft per 1,0
-
13
35
13
31
25
22
25
32
12
13
13
ngels Plan stem
020401 mp.docx
ance
nted
NS
nt
Loss ent 00 ft)a
MOOSE TRAIL
All Scenarios
GOLDEN CHAIN HIGHWAY
MDD and PHD Scenarios
MURPHY'S GRADE ROAD
PHD Scenario
GOLDEN CHAIN HIGHWAY
PHD Scenario
GREENHORN CREEK RD
ADD and MDD Scenarios
STANISLAUS AVENUE
PHD Scenario
ONEIDA STREET
PHD Scenario
ZONE E
ZONE D
ZONE B
ZONE C
MARK TWAIN ROAD
MDD and PHD Scenarios
HILLCREST STREET
PHD Scenario
MARK TWAIN ROAD
PHD Scenario
ZONE A
DEMAND SCENARIOS (EXISTING CONDITIONS):
1. ADD: AVERAGE DAY DEMAND SCENARIO
2. MDD: MAXIMUM DAY DEMAND SCENARIO
3. PHD: PEAK HOURLY DEMAND SCENARIO
LEGEND
PRESSURE ZONE BOUNDARY
WATER DISTRIBUTION SYSTEM NETWORK
PIPELINE DEFICIENCIES
MAXIMUM HEADLOSS EXCEEDED (ADD, MDD, AND PHD SCENARIOS)
MAXIMUM HEADLOSS EXCEEDED (PHD SCENARIO ONLY)
PIPELINE DEFICIENCIES
MAXIMUM PRESSURE EXCEEDED (ADD, MDD, AND PHD SCENARIOS)
Angels WMJuly 2013
Fb. The distrmains 4-iidentifiedhydrauliccontains reviewed Several fMDD copresented
Model
HydrantID
D3-FH-10
D3-FH-10
D3-FH-10
A1-FH-10
A1-FH-10
A1-FH-10
A1-FH-10
A1-FH-11
B2-FH-11
B2-FH-12
B2-FH-13
B2-FH-13
D2-FH-11
D2-FH-11
D2-FH-11
a Available fib Residual prc N/A indicatd Wharf-type
MP
ire Flow An
ribution systeinches in diad approximac model is ge262 fire hyd
d to determin
fire hydrantsnditions. Hyd in Figure 8
HYDRAUL
t City
HydranID
05 53
06 54d
07 52
01 A59
02 A69
03 A68
04 A67
14 A962
9 A332
21 A311
30 A20
31 A36
16 391
12 806
13 807
fire flow with 20
ressure with achi
tes that required
e hydrant.
Cha
nalysis (Exist
em contains ameter or smately 30 wharenerally comdrants, 28 of ne fire flow r
were identiydraulically d8-5.
CITY LICALLY DE
nt Loc
Mark Tw
Fairview
Mark Tw
Copello R
Golden C
Golden C
Golden C
Brunner H
Monte Ve
Monte Ve
Lee Lane
Golden C
Gold Clif
Jumping F
Miner's C
psi residual pre
ievement of requ
fire flow was no
apter 8: Hyd
ting)
approximatmaller are “wrf hydrants o
mprised of pif which are wrequirements
fied as failindeficient fire
TAOF ANGELS
EFICIENT FI
cation
wain Road
Street
wain Road
Road
Chain Hwy
Chain Hwy
Chain Hwy
Hill Road
erde Street
erde Street
Chain Hwy
ff Road
Frog Way
Circle
ssure.
uired fire flow.
ot achieved with
draulic Eval
8-15n:\m
ely 300 fire wharf” style hon mains 6-iipe segments
wharf-type hys for each hy
ng to produce hydrants ar
ABLE 8-10 S WATER MAIRE HYDRAN
Assumed LanUse Categor
Single familyresidential
(<2 lots/acre
Multipleresidential uniof >4 units, onand two story
light commercand lightindustrial
Multipleresidential, thr
stories, heavycommercial, oheavy industri
h any residual pre
luation of E
mtb020401\docume
hydrants. Ahydrants. Adinches in dias 6-inches inydrants. GISydrant based
e the requirere summariz
ASTER PLANNTS, EXISTIN
nd ry
Fire
Requir
y
e)
500
500
500
its ne y; cial
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
reevy or ial
2,000
2,000
essure.
WaExisting Dist
ents\_water master
All hydrants cdditionally, Cameter or larn diameter orS data for thed on adjacent
ed fire flow uzed in Table
N NG CONDITI
e Flow (gpm)
red Availab
436
422
454
0 1,452
0 1,416
0 1,459
0 1,495
0 1,010
0 1,488
0 1,194
0 1,364
0 855
0 934
0 1,989
0 1,966
City of Anater Master Ptribution Sys
MTB0r plan\final\0713 m
connected toCity staff hager. The r larger and e City were t land uses.
under existin8-10 and
IONS
ResidPress
(psi)blea
8
1
13
2 14
6 11
9 15
5 19
0 (N/A
8 18
4 (N/A
4 3
(N/A
(N/A
9 16
6 1
ngels Plan stem
020401 mp.docx
o ave
ng
dual ure )b,c
3
4
5
9
A)
8
A)
A)
A)
6
ZONE E
ZONE D
ZONE B
ZONE C
MARK TWAIN ROAD
D3-FH-105
D3-FH-107
FAIRVIEW STREET
D3-FH-106
GOLD CLIFF ROAD
D2-FH-116
MONTE VERDE STREET
B2-FH-119
MONTE VERDE STREET
B2-FH-121
GOLDEN CHAIN HIGHWAY
B2-FH-131
BRUNNER HILL ROAD
A1-FH-114
COPELLO ROAD
A1-FH-101
GOLDEN CHAIN HIGHWAY
A1-FH-102
A1-FH-103
A1-FH-104
LEE LANE
B2-FH-130
ZONE A
JUMPING FROG WAY
D2-FH-112
MINER'S CIRCLE
D2-FH-113
LEGEND
PRESSURE ZONE BOUNDARY
WATER DISTRIBUTION SYSTEM NETWORK
FIRE HYDRANT DEFICIENCIES
FAILURE TO MEET REQUIRED FLOW (500 GPM)
FAILURE TO MEET REQUIRED FLOW (1,500 GPM)
FAILURE TO MEET REQUIRED FLOW (2,000 GPM)
NOTE:
1. FIRE FLOW ANALYSIS PERFORMED UNDER MAXIMUM DAY
DEMAND (MDD) SCENARIO.
Angels WMJuly 2013
9 Re
ImprovemChaptersAdditionpresented
R9.1 Currentlypotable wChapter 6hydrogeofurther inFigure 9- A prelimpumpingprovided
As shownAlternatiinstallatioThe exist Well Sitefacilitate
WellAlter
A
B
C
Da Elevatib Total Dc Well S
MP
ecomm
ments for Ci 6, 7, and 8 a
nal projects pd in Chapter
Recommend
y, the City rewater. The de6 as a recomologic techninvestigation.-1.
minary hydraug requiremend in Table 9-
HY
n by Table 9ive D, requiron of a pressting PRV do
es B, C, and s connection
l Site native E
A
B
C
D
ion where the su
Dynamic Head (T
Site Alternative D
mended
ity water supare assemble
previously pl10.
ded Water S
elies exclusivevelopment
mmended straical memora. The potenti
ulic analysisnts. A hydrau1.
CITYYDRAULIC SU
9-1, all grounre a booster psure-reducinownstream o
D have the an to a propos
Well Elevation
1,598
1,893
1,740
2,127
upply pipeline co
TDH) required a
D does not requir
d Impr
pply, treatmeed into a serilanned by th
upply Impr
vely on surfaof groundwa
ategy to augmandum (Appeial well sites
s was performulic summary
TY OF ANGELSUMMARY O
ndwater supppump station
ng station prif the WTP m
advantage osed storage t
Maximum PipElevation al
Route
1,642
1,895
1,895
2,127
onnects to the dis
at booster pump
re a booster pum
9-1n:\m
roveme
ent, distributies of recom
he City are al
rovements
face water deater suppliesment the Citendix G) ides and associa
med for eachy for each w
TABLE 9-1 S WATER MAF SUPPLY R
ply alternativn to facilitateior to connecmay be suitab
f being locatank site in P
peline long Con
Ele
1
1
1
1
stribution system
station to supply
mp station.
mtb020401\docume
ents
tion, and stormmended prolso described
elivered thros from regionty’s water suentified four ated pipeline
h pipeline rowell site and p
ASTER PLANROUTE ALTE
ves, with thee delivery. Ection to the eble for use w
ted to the eaPressure Zon
nnection evationa
1,570
1,415
1,415
1,415
m.
y water to distrib
ents\_water master
rage systemojects in this d. Probable c
ough UPA asnal wells wa
upply. A subpotential we
e routes are p
oute to determpipeline sup
N ERNATIVES
e exception oEach alternatexisting distrwith Well Sit
ast of the Cityne C (see Sec
Pipeline Length
(ft)
8,300
30,600
33,100
27,100
bution system.
MTB0r plan\final\0713 m
s described ichapter.
costs are
s a source ofas identified bsequent ell sites for provided in
mine boosterpply route is
of Well Sitetive also requribution systte Alternativ
y which ction 9.4).
TDHRequired
(ft)b
170
135
290
N/Ac
020401 mp.docx
in
f in
r
e uires tem. ve A.
d
ANGELS CAMP
POTENTIAL WELL SITE C
Near Well 32B
POTENTIAL TANK SITE
(Zone B)
MURPHY'S GRADE ROAD
SR4
VALLECITO
MURPHYS
DOUGLAS
FLAT
POTENTIAL WELL SITE D
Near Well 17J
VALLECITO BYPASS
POTENTIAL
TANK SITE
(Zone A)
POTENTIAL TANK SITE
(Zone C)
POTENTIAL WELL SITE A
Near Well 23M
CONNECT TO
8" PIPELINE
AREA 2
AREA 3
CONNECT TO
14" PIPELINE
AREA 1
POTENTIAL WELL SITE B
Near Well 29P
PARROT'S FERRY ROAD
LEGEND
POTENTIAL SUPPLY PIPELINE ROUTE
APPROXIMATE TERTIARY GRAVEL CHANNEL
COUNTY PARCEL
TOWNSHIP BOUNDARY
COUNTY ROAD
LIMESTONE FORMATION
AREA OF INTEREST FOR DWR WELL LOG REVIEW
POTENTIAL WELL SITE
POTENTIAL TANK SITE
Angels WMJuly 2013
An assesadvantag
Final welhydrogeo For plannB) is targdrilling).of surfac SelectionInvestigahigh-quahole drillwater sup
W9.2 As discutreatmentimprovem
MP
sment of Weges/disadvant
ASSE
Well Site Alternative
A
B
C
D
ll site selectiologic assess
ning purposegeted for the Two wells ae water deliv
n of Area 3 iation (Appenality groundwling confirmpply system
Water Treat
ssed in Chapt capacity, rement project
ell Site/Supptages, is pro
CITYESSMENT OF
- Shortest p- Reduced i
- Allows co- Operation- Relatively
- Allows co- Operation
- Does not r- Reduced o- Allows co- Operation
ion will be dsment.
es and becaunext phase o
are desired tvered throug
s based on rendix G) whicwater requiri
m the initial fiimprovemen
tment Plant
pter 7, severaedundancy, ots are summa
ply Pipelinevided in Tab
TY OF ANGELSF WELL SITE
Advantages
ipeline lengthnstallation cos
onnection to Zoal redundancy
y low TDH requ
onnection to Zoal redundancy
require boosteroperational cosonnection to Zoal redundancy
dependent up
use of superiof groundwato meet futurgh UPA.
ecommendach indicate Aing the fewesindings, Welnts.
Recommen
al improvemoperational darized in Tab
C
9-3n:\m
Alternativesble 9-2.
TABLE 9-2 S WATER MAE/SUPPLY PI
sts
one C Tank
uirement
one C Tank
r pumping sts one C Tank
pon the resul
or hydrogeoater developmre water dem
ations presenArea 3 is the st number ofll Site and W
nded Impro
ments are recdifficulties, ble 9-3.
Chapter 9: R
mtb020401\docume
s, considerin
ASTER PLANIPELINE ALT
Dis
- Requires boo- No connectio- Lacks operat
- Requires boo- Increased op- Relatively lo- Increased ins
- Requires boo- Increased op- Relatively lo- Increased ins
- Relatively lo- Increased ins
lts of test we
ological charment (geoph
mands in con
nted in the Inlikeliest to yf wells. If ge
Waterline Ro
vements
commended and regulato
WaRecommende
ents\_water master
ng hydraulic
N TERNATIVE
sadvantages
oster pumping on to Zone C Ttional redundan
oster pumping perational costsong pipeline lenstallation costs
oster pumping perational costsong pipeline lenstallation costs
ong pipeline lenstallation costs
ell drilling an
racteristics, Ahysical profinjunction wit
nitial Hydrogyield a sufficeophysical poute B will b
at the WTP ory concerns
City of AWater Master
ed Improvem
MTB0r plan\final\0713 m
and operatio
S
Tank ncy
s ngth s
s ngth s
ngth s
nd
Area 3 (Welliling, test holth continued
geologic cient quantit
profiling and be the preferr
to address s. These
ngels Plan
ments
020401 mp.docx
onal
l Site le
d use
ty of test
red
Angels WMJuly 2013
Pro
Second FloBasin
Second Sedimentat
Replace ExSedimentat
Sludge LagRecycle PuStation
Fourth Filt
Parallel TraMain
The recothrough 2improvembuildout success o
D9.3 The distridentify scriteria fofor refere
MP
RECO
oject
occulation C(da
tion Basin Cs
xisting tion Basin
Cs
goons and ump
Cls
er Cag
ansmission Im(wt
mmended W2031 (20-yeaments at the improvemen
of the ground
Distribution
ribution systespecific pipeor the distribence.
CITYOMMENDED
Construction o(approximatelydepth to matchand associated
Construction osludge removal
Construction osludge removal
Construction olagoons, associstation
Construction oassociated pipigeneration
Installation of amain (3,508 ft)(parallel to exiswater demandstransmission pi
WTP improvear projectionWTP would
nts could be dwater explo
System Rec
em was evaleline segmenbution system
TY OF ANGELSD WATER TR
Descri
f a four-stage fy 48 ft long, 12h existing) with
piping
f a sedimentatil system and as
f a sedimentatil system and as
f two lined 500iated piping, an
f a 720 gpm fong, and additio
an upsized 18-) from WTP to sting transmisss in conjunctionipelines and sto
ements in Tan). Beyond 2d be requireddeferred, do
oration and d
commended
luated for exnts which reqm, previousl
C
9-4n:\m
TABLE 9-3 S WATER MA
REATMENT P
ption
flocculation ba2 ft long, and 9 h a rotating pad
ion basin with ssociated pipin
ion basin with ssociated pipin
0,000 gallon slnd duplex recy
our-cell pressuronal sodium hy
-inch diameter distribution sy
sion main) to mn with supplemorage facilities
able 9-3 wou2031, to meed, most notabownsized, ordevelopment
d Improvem
xisting and fuquire upsiziny presented
Chapter 9: R
mtb020401\docume
ASTER PLANPLANT IMPR
asin ft water
ddle assembly
an automatic ng
an automatic ng
ludge ycled pump
re filter, ypochlorite
transmission ystem meet future mental s
uld accommet buildout debly a fifth prr eliminated t program.
ments
uture (buildong. Desired hin Table 4-2
WaRecommende
ents\_water master
N ROVEMENT
Cap
acit
y
Red
unda
ncy
Oti
l
X
X
X
X
odate futureemands, addressure filteraltogether d
out) demandhydraulic pe2, are presen
City of AWater Master
ed Improvem
MTB0r plan\final\0713 m
S
Benefits
Op
erat
ion
al
Dif
ficu
ltie
s
Agi
ng
Infr
astr
uct
ure
X X
X
X
e demands ditional r. However,depending on
d conditions terformance nted in Table
ngels Plan
ments
020401 mp.docx
Reg
ula
tory
C
once
rns
X
X
X
these n the
to
e 9-4
City of Angels Water Master Plan
Chapter 9: Recommended Improvements
Angels WMP 9-5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 9-4 CITY OF ANGELS WATER MASTER PLAN
DISTRIBUTION SYSTEM HYDRAULIC PERFORMANCE CRITERIA
Criteria Value Source
Minimum pressure – ADD 40 psi 2010 Improvement Standards [16]
Minimum pressure – MDD 35 psi Typical design standard
Minimum pressure – PHD 20 psi California Waterworks Standards [10]
Minimum pressure – fire flow plus MDD
20 psi 2010 Improvement Standards [16], California Waterworks Standards [10]
Maximum pressure at service connection
150 psi (PRV required at 80 psi)
2010 Improvement Standards [16]
Maximum velocity 8 fps (typical) 12 fps (short durations)
Typical design standards
Maximum head loss gradient 10 ft per 1,000 ft Typical design standard
Generally, the existing distribution network has sufficient capacity for buildout ADD and MDD demand conditions. However, under buildout PHD demand conditions, there are a number of areas that fail to meet the minimum pressure specified in Table 9-4 and the fire flow requirements identified previously in Table 8-7. Based on the hydraulic analyses, approximately 27,400 LF of existing distribution mains were identified for upsizing to facilitate buildout demands. Recommended distribution main improvements are summarized in Table 9-5 and presented in Figure 9-2. The remaining segments of the SR-49 Pipeline Replacement (from Stanislaus Street to Altaville Post Office), identified in Section 2.2, are included in the Golden Chain Highway 8-inch to 10-inch improvement (upsize) project. Phasing of distribution system improvements are suggested considering the following priorities:
a. Provide required fire flow for existing demands (Phase 1A) b. Meet hydraulic performance criteria for existing demands (Phase 1B) c. Provide required fire flow for future demands (Phase 2A) d. Meet hydraulic performance criteria for future demands (Phase 2B)
City of Angels Water Master Plan
Chapter 9: Recommended Improvements
Angels WMP 9-6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 9-5 CITY OF ANGELS WATER MASTER PLAN
RECOMMENDED DISTRIBUTION MAIN IMPROVEMENTS
Location Project Description Length (ft)
Phase 1A - Meet Fire Flow Requirements (Existing Demand)
Gold Cliff Road Upsize 8-inch to 10-inch 1,144
Golden Chain Highway New 6-inch main 49
Upsize 6-inch to 10-inch 47
Upsize 8-inch to 10-inch 3,316
Hillcrest Street Upsize 6-inch to 10-inch 175
Upsize 8-inch to 10-inch 108
Mark Twain Road Upsize 6-inch to 10-inch 1,740
McCauley Ranch Road Upsize 8-inch to 10-inch 294
Monte Verde Street Upsize 4-inch to 6-inch 281
Phase 1B - Meet Hydraulic Performance Criteria (Existing Demand)
Depot Road Upsize 6-inch to 10-inch 225
Moose Trail Upsize 4-inch to 10-inch 958
Murphy's Grade Road Upsize 10-inch to 16-inch 995
Upsize 6-inch to 16-inch 1,289
Upsize 8-inch to 16-inch 2,673
Valecito Road Upsize 4-inch to 6-inch 476
Phase 2A - Meet Fire Flow Requirements (Buildout Demand)
Replace Principal Transmission Main
Upsize 14-inch to 18-inch 3,508
Golden Chain Highway Upsize 4-inch to 6-inch 857
Mark Twain Road Upsize 4-inch to 6-inch 681
Phase 2B - Meet Hydraulic Performance Criteria (Buildout Demand)
12-inch Transmission Main Upsize 12-inch to 16-inch 2,718
Bret Harte Drive Upsize 4-inch to 6-inch 186
Depot Road Upsize 6-inch to 8-inch 797
Dogtown Road Upsize 4-inch to 6-inch 1,278
Fairview Drive Upsize 4-inch to 6-inch 237
Gardner Lane Upsize 6-inch to 8-inch 529
Kurt Drive Upsize 8-inch to 10-inch 355
Mark Twain Road Upsize 4-inch to 6-inch 583
McCauley Ranch Upsize 8-inch to 10-inch 914
S. Baker Road Upsize 4-inch to 6-inch 353
Suzanne Drive Upsize 6-inch to 8-inch 648
Total 27,414
ZONE E
ZONE D
ZONE B
ZONE C
GOLDEN CHAIN HIGHWAY
1A: New Construction
(See Detail)
DOGTOWN ROAD
2B: Main Upsize
MONTE VERDE STREET
1A: Main Upsize
GARDNER LANE
2B: Main Upsize
MURPHY'S GRADE ROAD
1B: Main Upsize
(E) 12-INCH TRANSMISSION MAIN
2B: Main Upsize
PRINCIPAL TRANSMISSION MAIN
UPSIZE (E) 14-INCH MAIN TO 18-INCH
2A: Main Upsize
GOLDEN CHAIN HIGHWAY
1A: Main Upsize
GOLDEN CHAIN HIGHWAY
1A: Main Upsize
MARK TWAIN ROAD
1A: Main Upsize
GOLD CLIFF ROAD
1A: Main Upsize
McCAULEY RANCH ROAD
1A: Main Upsize
MARK TWAIN ROAD
2A: Main Upsize
FAIRVIEW DRIVE
2B: Main Upsize
GOLDEN CHAIN HIGHWAY
2A: Main Upsize
S. BAKER ROAD
2B: Main Upsize
SUZANNE DRIVE
2B: Main Upsize
BRET HARTE DRIVE
2B: Main Upsize
KURT DRIVE
2B: Main Upsize
MOOSE TRAIL
1B: Main Upsize
DEPOT ROAD
2B: Main Upsize
VALECITO ROAD
1B: Main Upsize
HILLCREST STREET
1A: Main Upsize
ZONE A
A1-FH-114
Required Flow: 1,500 gpm
Available Flow: 1,170 gpm
MARK TWAIN ROAD
2B: Main Upsize
McCAULEY RANCH ROAD
2B: Main Upsize
DEPOT ROAD
1B: Main Upsize
C2-111: 151 psi
Buildout, ADD Scenario
E3-100: 152 psi
Buildout, ADD Scenario
E3-112: 152 psi
Buildout, ADD Scenario
LEGEND
6-INCH DIAMETER IMPROVEMENT
8-INCH DIAMETER IMPROVEMENT
10-INCH DIAMETER IMPROVEMENT
16-INCH DIAMETER IMPROVEMENT
18-INCH DIAMETER IMPROVEMENT
NEW CONSTRUCTION
PRESSURE ZONE BOUNDARY
PHASING
1A
MEET FIRE FLOW REQUIREMENTS (EXISTING DEMAND)
1B
MEET HYDRAULIC PERFORMANCE CRITERIA (EXISTING DEMAND)
2A
MEET FIRE FLOW REQUIREMENTS (BUILDOUT DEMAND)
2B
MEET HYDRAULIC PERFORMANCE CRITERIA (BUILDOUT DEMAND)
GOLDEN CHAIN HIGHWAY - New Construction
Detail - Not to Scale
Angels WMJuly 2013
Implemeand fire flocated nMDD cosurrounddistributi Additionmaximummaximumwithin thin these j One newStreet whflow at h
R9.4 Currentlythe WTPthe City wdiscussed(Zone A)Zone B o City staffsite altern
P
MP
ntation of thflow deficiennear Brunnernditions is a
ding land useion line is in
nally, under bm pressures rm pressure. The allowable
unctions we
w main is recohich will clo
hydrant B2-F
Recommend
y, storage foP. As discusswater systemd in Section ) is 2.3 MG (or Zone C is
f have identinatives are s
Pressure Zone
A
B
C
he improvemncies for buir Hill Road. approximateles. Due to thesufficient to
buildout ADranging fromThese junctierror for the
ere not consi
ommended fse an existin
FH-131 to th
ded Water S
r the distribued in Chapte
m. To avoid 7.2, the min(see Section1.4 MG.
ified three posummarized
CITYSTO
Tank Loca
WTP;North of C
Brunner HillNorthwest o
Southeast ofEast of C
ments identifiildout demanThe fire flowly 1,100 gpme relatively h
o correct the
D conditionm 151-152 pons are iden
e hydraulic mdered.
for installationg 6-inch diae desired 1,5
torage Imp
ution systemer 4 and Chaservice inter
nimum volumn 7.2). The m
otential sitesin Table 9-6
TY OF ANGELSORAGE TANK
ation E
; City
l Road; of City
f SR-4; City
C
9-8n:\m
ied in Table nds with the w available am, or 75 perchigh elevatiofire flow def
ns, three juncsi, approxim
ntified in Figmodel and fu
on on Goldeameter pipeli500 gpm.
rovements
m is providedapter 7, CDPrruptions, a nme of a stora
minimum vol
s for constru6 and present
TABLE 9-6 S WATER MAK SITE ALTE
Ground Elevation
1,810
1,840
1,800
Chapter 9: R
mtb020401\docume
9-5 will alleexception o
at Hydrant Acent of the 1on of this hyficiency.
ctions (C2-1mately 1% grgure 9-2. Theurther improv
en Chain Higine loop and
d by a single PH has commnew storage age tank conlume of a sto
uction of a neted in Figure
ASTER PLANERNATIVES
RequiredVolume (M
2.3
1.4
1.4
WaRecommende
ents\_water master
eviate distribof Hydrant AA1-FH-114 u,500 gpm di
ydrant, upsiz
1, E3-100, areater than the 1% pressurvements to r
ghway near 2d increase the
2.5 MG tanmented on thtank is recostructed at o
orage tank co
ew storage tae 9-3.
N
d MG)
AdjaceDiam
City of AWater Master
ed Improvem
MTB0r plan\final\0713 m
bution systemA1-FH-114, under buildoctated by
zing the adjac
and E3-112) he design crire differentiareduce press
23 North Mae available f
nk located nehe reliabilitymmended. A
or near the Wonstructed in
ank. Storage
ent Pipelinemeter (in)
14
6
8
ngels Plan
ments
020401 mp.docx
m
out
cent
have iteria al is sure
ain fire
ear y of As
WTP n
e tank
ZONE E
ZONE D
ZONE B
ZONE A
ZONE C
POTENTIAL TANK SITE
(Zone B)
POTENTIAL TANK SITE
(Zone A)
POTENTIAL TANK SITE
(Zone C)
SUPPLY LINE
BOOSTER PUMP STATION
DISCHARGE LINE
SUPPLY LINE
DISCHARGE LINE
POTENTIAL SUPPLY PIPELINE
Routes B, C, and D
POTENTIAL SUPPLY PIPELINE
Route A
LEGEND
POTENTIAL SUPPLY PIPELINE ROUTE
STORAGE TANK SUPPLY AND DISCHARGE PIPELINE
EXISTING DISTRIBUTION SYSTEM
PRESSURE ZONE BOUNDARY
POTENTIAL TANK SITE
BOOSTER PUMP STATION
Angels WMJuly 2013
An assesadvantag
T
A
The ZoneHoweverwith a sutransmissthe new t Based onHoweverincreasinalleviate The Zonesupply rosimplify
M9.5 As discudetection(AMR) sgap on loreduces hconserva
MP
sment of Stoges and disad
A
Tank Site Alternative
(Zone)
A - -
B - -
C - -
e A tank wour, this site is ubsequent cosion main wtank would f
n site elevatior, there is nong long-term
the fire flow
e C tank siteoute for Weloperational
Meter System
ssed in Sectin survey, repsystem. The ost water duehours spent ration efforts.
orage Tank Sdvantages, is
CITYASSESSMEN
A
Located near WHydraulically
Highest elevatLesser require
Located near pLesser require
uld provide not recomm
onnection to ould then repfail to impro
on, the Zone nearby suppoperational
w deficiency
e is recommel Site Alternrequirement
m Upgrade
ion 2.6, pastplacing old wleak detectioe to aging pireading mete
Site Alternats provided in
TY OF ANGELSNT OF STORA
Advantages
WTP and existideal location
tion of all sitesed volume (1.4
proposed supped volume (1.4
the same hymended as it p
a common 1present a sinve the system
e B tank site ply source ancosts. Consat Hydrant A
ended as it isnatives B, C,ts while prov
and Leak D
t recommendwater meters,on survey anpes and meters and incre
C
9-10n:\m
tives, considn Table 9-7.
TABLE 9-7 S WATER MA
AGE TANK S
ting tank --
-
s MG)
--
ly routes MG)
-
ydraulic serviplaces the ne14-inch transngle point ofm reliability
is a potentiand a pump struction of thA1-FH-114.
s located in p and D. This
viding a suita
Detection Su
dations for th, and upgrad
nd replacemeters. An upgreases custom
Chapter 9: R
mtb020401\docume
dering hydrauA discussion
ASTER PLANSITE ALTERN
Di
Greatest requi 14-inch transm represents sin Lacks redunda
Requires boos Increased ope
Lowest elevat
ice as the exew tank in psmission maf failure for by of the City.
ally ideal locstation wouldhe Zone B ta.
proximity tos would facilable parallel
urvey
he City including to an auent of water rade to an A
mer awarenes
WaRecommende
ents\_water master
ulic and open follows be
N NATIVES
isadvantages
ired volume (2mission main ngle point of faancy of other o
ster pumping toerational costs
tion of all sites
xisting storagproximity to ain. The existboth storage.
cation for a nd be requiredank would, h
o the proposelitate filling l storage sou
ude conductiutomatic met
meters woulAMR system ss in water u
City of AWater Master
ed Improvem
MTB0r plan\final\0713 m
erational elow.
2.3 MG)
ailure options
o fill
s
ge tank. the existing ting 14-inch tanks. As su
new storage d to fill the thowever,
ed pipeline the tank and
urce.
ing a leak ter reading ld help closesignificantly
usage and
ngels Plan
ments
020401 mp.docx
tank h uch,
tank. tank,
d
e the y
Angels WMJuly 2013
A9.6 In additiodistributiassessing
1. W
2. W Water mawater sysobjectiveplans havor in conjmanagemthe plansequipmentypically
MP
Additional R
on to the impion, and storg water facili
Water Master
Water Rate an
aster plans astem facilitiees, regulatoryve provided
njunction witment plans ofs include creant. Ideally, thoccurs ever
Recommend
provement prage systemsities. These i
r Plan (or As
nd Connecti
and rate and es and to ensy requiremensimilar guidth a master pffer the advaation of an ahese docume
ry 5-10 years
ded Projects
projects reco, there are seinclude:
sset Manage
on Fee Stud
connection fsure that adents, and main
dance as a maplan documeantage of betasset inventoents are preps.
C
9-11n:\m
s
mmended toeveral useful
ment Plan)
dy
fee studies aequate fundinntenance neaster plan dont. Althoughtter estimatinory and projepared follow
Chapter 9: R
mtb020401\docume
o address wal activities re
are updated png is availabeds. In recenocument andh a significanng costs for ections for re
wing each Ge
WaRecommende
ents\_water master
ater supply, telated to per
periodically ble to meet Gnt years, assed may be prent undertakimaintainingemaining useeneral Plan u
City of AWater Master
ed Improvem
MTB0r plan\final\0713 m
treatment, riodically
to re-assess General Planet managem
epared in lieung, asset
g systems beceful life of
update which
ngels Plan
ments
020401 mp.docx
the n
ment u of
cause
h
Angels WMJuly 2013
10 P
ProbableChapter 9managem
C10.1 The opinfrom prevplanning by the AsEngineer(February
P10.2 Project ccontingenare based20 percenconstruct Project ctransmissthese pro
MP
Probab
project cost9. The basis
ment, and adm
Construction
nions of consvious projecpurposes an
ssociated forring News Ry 2013).
Project Cost
osts for watencies for engd on a reviewnt contingention manage
osts for watesion piping, oject element
Munici
12-inch
Air Rel
Booste
Booste
Booste
Pressura EA = eb Includ
ble Pro
ts were devefor the costsministration
n Cost Accu
struction coscts and similand have an exr the Advanc
Record (ENR
s for Water
er supply imgineering, cow of recent bncy. To obtaiment, and ad
er supply imARVs, boosts are provid
CITYUNIT COST
ipal Well, Drill
h Transmission
lease Valves
r Pump Station
r Pump Station
r Pump Station
re Reducing St
each, LS = lump
des cost for pavem
oject C
eloped for ths, including
n, is describe
uracy
sts presentedar project bixpected accucement of Co
R) San Franci
r Supply Im
mprovementsonstruction mbid results, inin total projedministration
mprovementsster pump staded in Table
TAY OF ANGELSTS FOR WAT
Item
ling/Equipping
n Main Piping (
n, 135 ft TDH
n, 170 ft TDH
n, 290 ft TDH
tation
p sum.
ment removal an
10-1n:\m
Costs
e recommenallowances d below.
d in this Mastd results. Thuracy withinost Engineerisco Constru
mprovements
are composmanagementndexed to theect costs, a 2n was added
include cosations, and p10-1.
ABLE 10-1 S WATER MATER SUPPLY
g
(Rural Routes)
nd replacement.
mtb020401\docume
nded improvfor engineer
ter Plan are he opinions wn +50 to -30 ring (AACEuction Cost I
s
sed of constrt, and admine current EN
25 percent cod.
st componentpressure-redu
ASTER PLANY IMPROVEM
Unita
EA
)b LF
EA
LS
LS
LS
LS
ents\_water master
ements descring, constru
based on dowere preparepercent, bas
E). The costs Index (SF-C
ruction costsnistration. CoNR SF-CCI, ontingency f
ts for municucing station
N MENTS
Unit Cost (
400,000
100
2,000
525,000
660,000
1,125,000
40,000
MTB0r plan\final\0713 m
cribed in uction
ocumentationed for generased on defini
are based onCI) of 10369
s plus onstruction cand include
for engineeri
cipal wells, ns. Unit cost
($)
0
0
0
0
0
0
020401 mp.docx
n al itions n an 9
costs a
ing,
ts for
Angels WMJuly 2013
A prelimpumpingcosts for facilities,
Component
Area 3, Well
Municipal W
12-inch Tran(Rural Route)
Air Release V
Booster Pump
Pressure Red
Total Cost a Includes 20 pb Includes 25 p
P10.3 WTP proconstructbid resultENR SF-contingenproject coTable 10 For budgpart of thconstructpipeline e14-inch tas the pri
MP
minary hydraug and pressur
the drilling , are provide
P
l Site B
Well, Drilling/Eq
smission Main)
Valves
p Station, 135
ducing Station
percent contingen
percent contingen
Project Cost
oject costs artion managets, and EPA -CCI, and inncy for enginosts for each-3.
geting purposhe distributiotion of the 1eliminates thtransmissionincipal trans
ulic analysisre reducing rand equippin
ed in Table 1
CITYPROJECT CO
Q
quipping
n 3
ft TDH
ncy for construc
ncy for engineer
s for Water
re composedment, and adguidelines (
nclude a 20 pneering, con
h WTP impro
ses, the Paraon system im.4 MG Zonehe need for a
n main will nmission mai
s was performrequirementsng of two w
10-2.
TAY OF ANGELSOSTS FOR W
Quantity Uni
2 EA
30,600 LF
17 EA
1 LS
1 LS
tion.
ring, construction
r Treatment
d of construcdministration(Modeling thpercent continstruction maovement pro
allel Transmimprovementse C Storage Ta redundant tnot be removin from the W
10-2n:\m
med for eachs and the proells in Area
ABLE 10-2 S WATER MA
WATER SUPPL
it Unit Cos
($)
A 400,000
F 100
A 2,000
S 525,000
S 40,000
n management,
t Plant Impr
ction costs pln. Construct
he Cost of Infingency. To anagement, aoject, identif
ission Main s (see Table Tank and Wtransmission
ved from servWTP.
Chapte
mtb020401\docume
h supply alteojected quan3, Site B, an
ASTER PLANLY IMPROV
st Base Co($)
0 800,00
3,060,0
34,000
0 525,00
40,000
and administrati
rovements
lus contingention costs arenfrastructureobtain total and adminis
fied in Table
identified in9-5, Phase 2ell Site and n main fromvice, the new
Waer 10: Proba
ents\_water master
ernative to dentity of ARVnd associated
N VEMENTS
ost ConstrCost
00 960,
000 3,672
0 41,0
00 630,
0 48,0
ion.
ncies for enge based on ae, [31]) indexproject cost
stration was e 9-3, are pro
n Table 9-3 i2A). RecommWater Suppthe WTP. W
w 18-inch pi
City of AWater Master able Project C
MTB0r plan\final\0713 m
etermine booVs. Total proj
d conveyanc
ruction ta ($)
PCo
,000 1,2
2,000 4,5
000 5
,000 79
000 6
6,6
gineering, a review of rexed to the cus, a 25 perceadded. Tota
ovided in
is included amended ly Route B
While the exiipeline will s
ngels Plan
Costs
020401 mp.docx
oster ject ce
Project ostb ($)
200,000
590,000
52,000
90,000
60,000
692,000
ecent urrent ent l
as
isting serve
Angels WMJuly 2013
Se
Se
Re
Slu
Fo
Ta Inb Inc C
P10.4 Distributcontingenare based20 percenconstruct Project c(upsizingpavemenprovided
MP
PROJEC
econd Floccula
econd Sedimen
eplace Existing
udge Lagoons
ourth Filterc
Total Cost
ncludes 20 perce
ncludes 25 perce
Cost for fourth fi
Project Cost
tion system incies for engd on a reviewnt contingention manage
osts for distrg) of existingnt removal and in Table 10
UN
CITYCT COSTS F
Project
ation Basin
ntation Basin
g Sedimentatio
and Recycle P
ent contingency
ent contingency
ilter is based on e
s for Distrib
improvemengineering, cow of recent bncy. To obtaiment, and ad
ribution systg mains, instnd replaceme
0-4.
CITYNIT COSTS F
TAY OF ANGELS
OR WATER
n Basin
Pump Station
for construction
for engineering,
estimate from 20
bution Syste
nt project cosonstruction mbid results, inin total projedministration
tem improvetallation of nent. Unit cos
TAY OF ANGELSFOR DISTRIB
Diameter(in)
6
8
10
12
16
18 a Includes cos
and replacem
10-3n:\m
ABLE 10-3 S WATER MATREATMEN
Base Co
500,0
990,0
990,0
520,0
885,0
n.
, construction m
011 Water Audit
em Improve
sts are compmanagementndexed to theect costs, a 2n was added
ements inclunew mains tosts for distrib
ABLE 10-4 S WATER MA
BUTION SYST
r Unit ($/un
6
10
13
15
23
25
t for pavement rment.
Chapte
mtb020401\docume
ASTER PLANNT PLANT IM
ost ($) Co
C
000
000
000
000
000
management, and
t [6].
ements
posed of const, and admine current EN
25 percent cod.
ude cost como create loopbution system
ASTER PLANTEM IMPRO
Cost nit)a
7
00
34
50
36
58
removal
Waer 10: Proba
ents\_water master
N MPROVEMEN
nstruction Costa ($)
600,000
1,190,000
1,190,000
625,000
1,065,000
d administration.
struction cosnistration. CoNR SF-CCI, ontingency f
mponents for ps in the exism improvem
N OVEMENTS
City of AWater Master able Project C
MTB0r plan\final\0713 m
NTS
Project Costb ($)
750,000
1,490,000
1,490,000
785,000
1,335,000
5,850,000
sts plus onstruction cand include
for engineeri
replacementsting system,ments are
ngels Plan
Costs
020401 mp.docx
costs a
ing,
t , and
City of Angels Water Master Plan
Chapter 10: Probable Project Costs
Angels WMP 10-4 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
Total project costs for each distribution system improvement project, identified in Table 9-5, are provided in Table 10-5.
TABLE 10-5 CITY OF ANGELS WATER MASTER PLAN
PROJECT COSTS FOR DISTRIBUTION SYSTEM IMPROVEMENTS
Location Project Description Length
(ft)
Unit Cost
($/LF)
Base Cost ($)
ConstructionCosta
($)
Project Costb
($)
Phase 1A - Meet Fire Flow Requirements (Existing Demand)
Gold Cliff Road Upsize 8-inch to 10-inch 1,144 134 154,000 185,000 232,000
Golden Chain Highway New 6-inch main 49 67 4,000 5,000 7,000
Upsize 6-inch to 10-inch 47 134 7,000 9,000 12,000
Upsize 8-inch to 10-inch 3,316 134 445,000 534,000 668,000
Hillcrest Street Upsize 6-inch to 10-inch 175 134 24,000 29,000 37,000
Upsize 8-inch to 10-inch 108 134 15,000 18,000 23,000
Mark Twain Road Upsize 6-inch to 10-inch 1,740 134 234,000 281,000 352,000
McCauley Ranch Road Upsize 8-inch to 10-inch 294 134 40,000 48,000 60,000
Monte Verde Street Upsize 4-inch to 6-inch 281 67 19,000 23,000 29,000
Phase 1A, Subtotal 1,420,000
Phase 1B - Meet Hydraulic Performance Criteria (Existing Demand)
Depot Road Upsize 6-inch to 10-inch 225 134 31,000 38,000 48,000
Moose Trail Upsize 4-inch to 10-inch 958 134 129,000 155,000 194,000
Murphy's Grade Road Upsize 10-inch to 16-inch 995 236 235,000 282,000 353,000
Upsize 6-inch to 16-inch 1,289 236 305,000 366,000 458,000
Upsize 8-inch to 16-inch 2,673 236 631,000 758,000 948,000
Valecito Road Upsize 4-inch to 6-inch 476 67 32,000 39,000 49,000
Phase 1B, Subtotal 2,050,000
Phase 2A - Meet Fire Flow Requirements (Buildout Demand)
Replace Principal Transmission Main
Upsize 14-inch to 18-inch 3,508 258 906,000 1,088,000 1,360,000
Golden Chain Highway Upsize 4-inch to 6-inch 857 67 58,000 70,000 88,000
Mark Twain Road Upsize 4-inch to 6-inch 681 67 46,000 56,000 70,000
Phase 2A, Subtotal 1,518,000
Angels WMJuly 2013
Loca
Phase 2B - M
12-inch Trans
Bret Harte Dri
Depot Road
Dogtown Roa
Fairview Driv
Gardner Lane
Kurt Drive
Mark Twain R
McCauley Ran
S. Baker Road
Suzanne Drive
Phase 2B, Sub
Total, Distriba Includes 20 peb Includes 25 pe
P10.5 Storage iengineerireview ofcontingenmanagem Project csupply animprovem
MP
PROJ
ation
Meet Hydraulic
mission Main
ive
ad
ve
Road
nch
d
e
btotal
bution System
ercent contingen
ercent contingen
Project Cost
improvemening, construcf recent bid rncy. To obta
ment, and adm
osts for storand dischargements are pr
CITYJECT COSTS
Project
c Performance
Upsize 12-i
Upsize 4-in
Upsize 6-in
Upsize 4-in
Upsize 4-in
Upsize 6-in
Upsize 8-in
Upsize 4-in
Upsize 8-in
Upsize 4-in
Upsize 6-in
Improvemen
ncy for constructi
ncy for engineeri
s for Storag
nt project cosction managresults, inde
ain total projministration
age improvee piping, andovided in Ta
TABLY OF ANGELSS FOR DISTR
Description
e Criteria (Bu
inch to 16-inch
nch to 6-inch
nch to 8-inch
nch to 6-inch
nch to 6-inch
nch to 8-inch
nch to 10-inch
nch to 6-inch
nch to 10-inch
nch to 6-inch
nch to 8-inch
nts
ion.
ng, construction
ge Improvem
sts are compement, and a
exed to the cuect costs, a 2
n was added.
ements includ booster pumable 10-6.
10-5n:\m
LE 10-5 (ContS WATER MA
RIBUTION SY
Length(ft)
uildout Deman
h 2,718
186
797
1,278
237
529
355
583
914
353
648
n management, a
ments
osed of consadministratiourrent ENR 25 percent c
ude cost commping where
Chapte
mtb020401\docume
t.) ASTER PLAN
YSTEM IMPR
Unit Cost
($/LF)
nd)
236 64
67 1
100 8
67 8
67 1
100 5
134 4
67 4
134 12
67 2
100 6
and administratio
struction coson. ConstrucSF-CCI, and
contingency
mponents for e required. U
Waer 10: Proba
ents\_water master
N ROVEMENTS
Base Cost ($)
Con
42,000 7
13,000 1
80,000 9
86,000 1
16,000 2
53,000 6
48,000 5
40,000 4
23,000 1
24,000 2
65,000 7
on.
sts plus contction costs ad include a 2for engineer
welded steeUnit costs for
City of AWater Master able Project C
MTB0r plan\final\0713 m
S
nstructionCosta
($)
771,000
16,000
96,000
04,000
20,000
64,000
58,000
48,000
48,000
29,000
78,000
1
6
tingencies foare based on 20 percent ring, constru
l storage tanr storage
ngels Plan
Costs
020401 mp.docx
Project Costb
($)
964,000
20,000
120,000
130,000
25,000
80,000
73,000
60,000
185,000
37,000
98,000
1,792,000
6,780,000
or a
uction
nks,
Angels WMJuly 2013
Total pro
Ta
Zone C
1.4 MG
12-inch
12-inch
a Includeb Include
P10.6 Meter syengineerireview ofcontingenmanagem Project cfor metercosts are
MP
12-inch
1.4 MG
2.3 MG
Boostera Include
oject costs fo
PROJECT C
ank Location
C
G Storage Tank
h Supply Line
h Discharge Lin
es 20 percent co
es 25 percent co
Project Cost
stem upgrading, construcf recent bid rncy. To obta
ment, and adm
osts for the mrs, boxes, radprovided in
CITYUNIT C
h Supply and D
G Storage Tank
G Storage Tank
r Pump Station
es cost for pavem
or the recomm
CITYCOSTS FOR R
Quanti
k
1,80
ne 3,64
ntingency for co
ontingency for en
s for Meter
de project coction managresults, inde
ain total projministration
meter upgraddio transmitt Table 10-8.
TAY OF ANGELSCOSTS FOR S
Item
Discharge Pipel
k
k
n, 300 ft TDH
ment removal an
mended stor
TAY OF ANGELSRECOMMEN
ty Unit
1 LS
00 LF
40 LF
onstruction.
ngineering, const
System Up
osts are compement, and a
exed to the cuect costs, a 2
n was added.
des and convters, and AM.
10-6n:\m
ABLE 10-6 S WATER MA
STORAGE IM
linea
nd replacement.
rage tank site
ABLE 10-7 S WATER MA
NDED STORA
Unit Cost ($)
1,400,000
150
150
truction manage
pgrade and L
posed of conadministratiourrent ENR 25 percent c
version to anMR system e
Chapte
mtb020401\docume
ASTER PLANMPROVEMEN
Unit
LF
LS
LS
LS
e alternative
ASTER PLANAGE TANK S
Base Cost ($)
1,400,000
270,000
546,000
Total Cost
ement, and admin
Leak Detect
nstruction coon. ConstrucSF-CCI, and
contingency
n AMR systeequipment an
Waer 10: Proba
ents\_water master
N NTS
Unit Cost
150
1,400,000
2,300,000
1,160,000
e are provide
N SITE ALTERN
ConstructionCosta ($)
1,680,000
324,000
656,000
nistration.
tion Survey
osts plus contction costs ad include a 2for engineer
em include cnd software.
City of AWater Master able Project C
MTB0r plan\final\0713 m
($)
0
0
0
0
ed in Table 1
NATIVE
Project Co($)
2,100,0
405,0
820,0
3,325,0
y
tingencies foare based on 20 percent ring, constru
cost componTotal projec
ngels Plan
Costs
020401 mp.docx
10-7.
ostb
000
000
000
000
or a
uction
nents ct
City of Angels Water Master Plan
Chapter 10: Probable Project Costs
Angels WMP 10-7 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 10-8 CITY OF ANGELS WATER MASTER PLAN
PROJECT COSTS FOR METER SYSTEM UPGRADE
Item Quantity Unit Unit Cost ($) Total Cost ($)
Meter Boxesa 1,790 EA 90 161,100
Meters with Encoder Registers and Radio Transmittersb
5/8-inch 1,644 EA 320 525,300
3/4-inch 34 EA 379 12,900
1-inch 50 EA 440 22,000
1-1/2-inch 27 EA 752 20,300
2-inch 35 EA 944 33,000
3-inch 8 EA 2,832 22,700
4-inch 2 EA 3,795 7,600
6-inch 1 EA 7,082 7,100
AMR System Hardwarec 1 LS 20,750 20,800
AMR System Software 1 LS 6,820 6,800
AMR Fixed Network Transceiver 1 LS 6,880 6,900
Cellular Backhauld 1 LS 910 900
On-Site Training 1 LS 2,200 2,200
Total Base Cost 850,000
Total Construction Coste 1,020,000
Total Project Costf 1,275,000 a Assume new boxes for 2-inch and smaller meters and existing vaults to remain for 3-inch and larger meters. b Meter quantities by size provided by City Account Clerk on 01/31/13. c Includes one handheld data collector and one laptop for AMR system in mobile (drive-by) mode. d Annual cellular charge for fixed network to backhaul hourly meter reads to main computer. e Includes 20 percent contingency for construction.
f Includes 25 percent contingency for engineering, construction management, and administration.
Project costs for a leak detection survey of the distribution system were based on input from a local leak detection contractor and include labor costs plus a 20 percent contingency. Project costs for the leak detection survey are provided in Table 10-9.
TABLE 10-9 CITY OF ANGELS WATER MASTER PLAN
PROJECT COSTS FOR LEAK DETECTION SURVEY
Project Project Cost ($)
Leak Detection Survey 12,000
Angels WMJuly 2013
P10.7 Project cestimatedsimilar st
MP
Project Cost
osts for prepd based on thtudies for oth
P
W
W
s for Maste
paring a watehe cost assocher agencies
CITYPROJECT CO
Water Master P
Water Rate and
r Plan and
er master placiated with ps of compara
TAY OF ANGELSOSTS FOR M
Document
Plan
d Connection F
10-8n:\m
Rate Study
an and waterpreparation oable size. Pro
ABLE 10-10S WATER MA
MASTER PLA
Fee Study
Chapte
mtb020401\docume
r rate and coof this Masteoject costs ar
ASTER PLANAN AND RATE
Projec
1
Waer 10: Proba
ents\_water master
onnection feeer Plan and rre summariz
N E STUDY
ct Cost ($)
00,000
40,000
City of AWater Master able Project C
MTB0r plan\final\0713 m
e study wererecent costs zed in Table
ngels Plan
Costs
020401 mp.docx
e for 10-10.
Angels WMJuly 2013
11 C
This chapregulatiowater demin descen
1. A
2. Im
3. R
4. P
The distrimportan
1. P
2. M
3. P
4. M
P11.1 Chapter 9and districonsiderimiscellanprioritiesdescribed25 percenRecomm
1. P
2. P
3. P
4. P
5. P
MP
Capita
pter summarns, treatmenmands. The nding order o
Addressing re
mproving rel
Replacing agi
roviding cap
ribution systence:
roviding req
Meeting hydr
roviding req
Meeting hydr
Project Cost
9 summarizeibution systeing prioritiesneous projecs, is presented in Chapter nt contingen
mended timin
hase 1A: Ye
hase 1B: Ye
hase 1C: Ye
hase 2A: Ye
hase 2B: Ye
l Impr
rizes recommnt plant perfotreatment, suof importanc
egulatory co
liability by p
ing infrastru
pacity for fut
em CIP was
quired fire flo
raulic perform
quired fire flo
raulic perform
s
ed recommenems. The CIPs is presentedcts. The CIP ed in Table 1
10, project ncy for enginng of projects
ear 1 – Year
ear 3 – Year
ear 5 – Year
ear 5 – Year
ear 11 – Yea
roveme
mended CIP ormance, disupply, and sce:
ncerns (Pha
providing op
ucture (Phase
ture develop
prioritized b
ow for existi
mance criter
ow for futur
mance criter
nded improvP for treatmed in Table 1for distribut1-2. The comcosts includ
neering, conss is as follow
2
5
10
10
ar 20
11-1n:\m
ent Pla
projects devstribution systorage CIP w
se 1A)
perational red
e 1C)
pment (Phase
based on the
ing demands
ria for existin
re (buildout)
ria for future
vements to thent, supply, 1-1 and incltion system imbined CIP e a 20 percestruction maws:
mtb020401\docume
an
veloped basestem hydrauwas prioritiz
dundancy (P
e 2A)
e following,
s (Phase 1A)
ng demands
demands (P
e (buildout) d
he City wateand storage
ludes additioimprovemenis included nt constructi
anagement, a
ents\_water master
ed on a revieulic capacity,zed based on
Phase 1B)
in descendin
)
s (Phase 1B)
Phase 2A)
demands (Ph
er treatment,system imp
onal reports, nts, also consas Table 11-ion continge
and administ
MTB0r plan\final\0713 m
ew of applica, and project
n the followin
ng order of
hase 2B)
, supply, storrovements studies, andsidering -3. As was ency and tration.
020401 mp.docx
able ted ng,
rage,
d
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-2 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 11-1 CITY OF ANGELS WATER MASTER PLAN
CAPITAL IMPROVEMENT PROJECTS FOR TREATMENT, STORAGE, AND SUPPLY SYSTEMS
Description Phase Quantity Unit of
Measure Unit Cost($/unit)
Base Cost ($)
Construction Cost ($)
Project Cost ($)
Water Treatment Plant Improvements
Install Fourth Pressure Filter 1A 1 LS 885,000
885,000
1,065,000
1,335,000
Construct Sludge Lagoons and Recycle Pump Station
1A 1 LS 520,000
520,000
625,000
785,000
Replace Existing Sedimentation Basin 1C 1 LS 990,000
990,000
1,190,000
1,490,000
Construct Second Flocculation Basin 1C 1 LS 500,000 500,000 600,000 750,000
Construct Second Sedimentation Basin 1C 1 LS 990,000 990,000 1,190,000 1,490,000
3,885,000 4,670,000 5,850,000
Water Supply Improvements - Well Site and Water Supply Route B
Construct and Equip Municipal Well(s)
1B
2 EA 400,000 800,000 960,000 1,200,000
Construct 12-inch Transmission Main 30,600 LF 100 3,060,000 3,672,000 4,590,000
Install Air Release Valves 17 EA 2,000 34,000 41,000 52,000
Construct 135-ft TDH Booster Pump Station 1 LS 525,000 525,000 630,000 790,000
Construct Pressure Reducing Station 1 LS 40,000 40,000 48,000 60,000
4,459,000 5,351,000 6,692,000
Water Storage Improvements - Zone C Storage Tank
Construct 1.4 MG Storage Tank
1B
1 LS 1,400,000 1,400,000 1,680,000 2,100,000
Construct Storage Tank Supply Line 1,800 LF 150 270,000 324,000 405,000
Construct Storage Tank Discharge Line 3,640 LF 150 546,000 656,000 820,000
2,216,000 2,660,000 3,325,000
Reports, Studies, and Miscellaneous Projects
Leak Detection Survey 1 LS 12,000 - - 12,000
Meter System Upgrade 1 LS 850,000 850,000 1,020,000 1,275,000
Water Rate and Connection Fee Study, FY2013-2014 1 LS 40,000 - - 40,000
Water Master Plan, FY2020-2021 1 LS 100,000 - - 100,000
Water Rate and Connection Fee Study, FY2021-2022 1 LS 40,000 - - 40,000
Water Master Plan, FY2028-2029 1 LS 100,000 - - 100,000
Water Rate and Connection Fee Study, FY2029-2030 1 LS 40,000 - - 40,000
850,000 1,020,000 1,607,000
Total, Treatment, Supply, and Storage CIP 11,410,000 13,701,000 17,474,000
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-3 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 11-2 CITY OF ANGELS WATER MASTER PLAN
CAPITAL IMPROVEMENT PROJECTS FOR DISTRIBUTION SYSTEM
Location Project
Description
Unit Cost
($/LF)
Length(LF)
Base
Cost ($)
Construction Cost ($)
Project Cost ($)
Phase 1A - Existing Fire Flow Deficiencies
Gold Cliff Road
Upsize 8-inch to 10-inch 134 1,144 154,000 185,000 232,000
Golden Chain Highway
Upsize 6-inch to 10-inch 134 47 7,000 9,000 12,000
Upsize 8-inch to 10-inch 134 3,316 445,000 534,000 668,000
New 6-inch main 67 49 4,000 5,000 7,000
Hillcrest Street
Upsize 6-inch to 10-inch 134 175 24,000 29,000 37,000
Upsize 8-inch to 10-inch 134 108 15,000 18,000 23,000
Mark Twain Road
Upsize 6-inch to 10-inch 134 1,740 234,000 281,000 352,000
McCauley Ranch Road
Upsize 8-inch to 10-inch 134 294 40,000 48,000 60,000
Monte Verde Street
Upsize 4-inch to 6-inch 67 281 19,000 23,000 29,000
Subtotal, Phase 1A 7,154 942,000 1,132,000 1,420,000
Phase 1B - Existing Hydraulic Deficiencies
Depot Road
Upsize 6-inch to 10-inch 134 225 31,000 38,000 48,000
Moose Trail
Upsize 4-inch to 10-inch 134 958 129,000 155,000 194,000
Murphy's Grade Road
Upsize 10-inch to 16-inch 236 995 235,000 282,000 353,000
Upsize 6-inch to 16-inch 236 1,289 305,000 366,000 458,000
Upsize 8-inch to 16-inch 236 2,673 631,000 758,000 948,000
Valecito Road
Upsize 4-inch to 6-inch 67 476 32,000 39,000 49,000
Subtotal, Phase 1B 6,616 1,363,000 1,638,000 2,050,000
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-4 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 11-2 (CONT.) CITY OF ANGELS WATER MASTER PLAN
CAPITAL IMPROVEMENT PROJECTS FOR DISTRIBUTION SYSTEM
Location Project
Description
Unit Cost
($/LF)
Length(LF)
Base
Cost ($)
Construction Cost ($)
Project Cost ($)
Phase 2A - Buildout Fire Flow Deficiencies
Replace Principal Transmission Main
Upsize 14-inch to 18-inch 258 3,508 906,000 1,088,000 1,360,000
Golden Chain Highway
Upsize 4-inch to 6-inch 67 857 58,000 70,000 88,000
Mark Twain Road
Upsize 4-inch to 6-inch 67 681 46,000 56,000 70,000
Subtotal, Phase 2A 5,046 1,010,000 1,214,000 1,518,000
Phase 2B - Buildout Fire Flow Deficiencies
12-inch Transmission Main
Upsize 12-inch to 16-inch 236 2,718 642,000 771,000 964,000
Bret Harte Drive
Upsize 4-inch to 6-inch 67 186 13,000 16,000 20,000
Depot Road
Upsize 6-inch to 8-inch 100 797 80,000 96,000 120,000
Dogtown Road
Upsize 4-inch to 6-inch 67 1,278 86,000 104,000 130,000
Fairview Drive
Upsize 4-inch to 6-inch 67 237 16,000 20,000 25,000
Gardner Lane
Upsize 6-inch to 8-inch 100 529 53,000 64,000 80,000
Kurt Drive
Upsize 8-inch to 10-inch 134 355 48,000 58,000 73,000
Mark Twain Road
Upsize 4-inch to 6-inch 67 583 40,000 48,000 60,000
McCauley Ranch
Upsize 8-inch to 10-inch 134 914 123,000 148,000 185,000
S. Baker Road
Upsize 4-inch to 6-inch 67 353 24,000 29,000 37,000
Suzanne Drive
Upsize 6-inch to 8-inch 100 648 65,000 78,000 98,000
Subtotal, Phase 2B 8,598 1,190,000 1,432,000 1,792,000
Total, Distribution System CIP 27,414 4,505,000 5,416,000 6,780,000
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 11-3 CITY OF ANGELS WATER MASTER PLAN 20-YEAR CAPITAL IMPROVEMENT PLAN
Description
Project Cost Allocation ($) Project Total
($) FY2013-2015 (Phase 1A)
FY2015-2018 (Phase 1B)
FY2018-2023 (Phases 1C, 2A)
FY2023-2033 (Phase 2B)
Water Treatment Plant Improvements
Install Fourth Pressure Filter 1,335,000 - - - 1,335,000
Construct Sludge Lagoons and Recycle Pump Station 785,000 - - - 785,000
Replace Existing Sedimentation Basin - - 1,490,000 - 1,490,000
Construct Second Flocculation Basin - - 750,000 - 750,000
Construct Second Sedimentation Basin - - 1,490,000 - 1,490,000
Water Supply Improvements - Well Site and Water Supply Route B
Construct and Equip Municipal Well(s) - 1,200,000 - - 1,200,000
Construct 12-inch Transmission Main - 4,590,000 - - 4,590,000
Install Air Release Valves - 52,000 - - 52,000
Construct 135-ft TDH Booster Pump Station - 790,000 - - 790,000
Construct Pressure Reducing Station - 60,000 - - 60,000
Water Storage Improvements - Zone C Storage Tank
Construct 1.4 MG Storage Tank - 2,100,000 - - 2,100,000
Construct Storage Tank Supply Line - 405,000 - - 405,000
Construct Storage Tank Discharge Line - 820,000 - - 820,000
Reports, Studies, and Miscellaneous Projects
Leak Detection Survey 12,000 - - - 12,000
Meter System Upgrade 1,275,000 - - - 1,275,000
Water Rate and Connection Fee Study, FY2013-2014 40,000 - - - 40,000
Water Master Plan, FY2020-2021 - - 100,000 - 100,000
Water Rate and Connection Fee Study, FY2021-2022 - - 40,000 - 40,000
Water Master Plan, FY2028-2029 - - - 100,000 100,000
Water Rate and Connection Fee Study, FY2029-2030 - - - 40,000 40,000
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
TABLE 11-3 (CONT.) CITY OF ANGELS WATER MASTER PLAN 20-YEAR CAPITAL IMPROVEMENT PLAN
Description
Project Cost Allocation ($) Project Total
($) FY2013-2015 (Phase 1A)
FY2015-2018 (Phase 1B)
FY2018-2023 (Phases 1C, 2A)
FY2023-2033 (Phase 2B)
Distribution System Projects
Replace Principal Transmission Main - - 1,360,000 - 1,360,000
12-inch Transmission Main - - - 964,000 964,000
Bret Harte Drive - - - 20,000 20,000
Depot Road - 48,000 - 120,000 168,000
Dogtown Road - - - 130,000 130,000
Fairview Drive - - - 25,000 25,000
Gardner Lane - - - 80,000 80,000
Gold Cliff Road 232,000 - - - 232,000
Golden Chain Highway 687,000 - 88,000 - 775,000
Hillcrest Street 60,000 - - - 60,000
Kurt Drive - - - 73,000 73,000
Mark Twain Road 352,000 - 70,000 60,000 482,000
McCauley Ranch Road 60,000 - - 185,000 245,000
Monte Verde Street 29,000 - - - 29,000
Moose Trail - 194,000 - - 194,000
Murphy's Grade Road - 1,759,000 - - 1,759,000
S. Baker Road - - - 37,000 37,000
Suzanne Drive - - - 98,000 98,000
Valecito Road - 49,000 - - 49,000
Fiscal Year Total 4,867,000 12,067,000 5,388,000 1,932,000 24,254,000
City of Angels Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-7 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
Total CIP costs for treatment, supply, storage, and distribution systems are summarized in Table 11-4.
TABLE 11-4 CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF CAPITAL IMPROVEMENT PLAN COSTS
Component Total Cost ($)
Treatment System Improvements 5,850,000
Supply System Improvements 6,692,000
Storage System Improvements 3,325,000
Distribution System Improvements 6,780,000
Reports, Studies, and Miscellaneous Projects 1,607,000
Total Cost 24,254,000
Angels WMJuly 2013
12 R
[1] An
[2] SeCo
[3] CiInc
[4] Ciad
[5] IntSu
[6] An
[7] FloTrW
[8] CiAs
[9] CaAgUt
[10] CaSta
[11] Co23
[12] Ca
[13] Filan
[14] CrW
[15] Thme
[16] 20<h
[17] E-Ce
[18] Ci
MP
Referen
ngels Camp
econd Amenourse, City o
ity of Angels c., May 2002
ity of Angels dopted Decem
ternal City oubject: Conti
ngels Camp
ow Meter Rereatment Dep
Water in our S
ity of Angels ssociates, Inc
alaveras Cougreement, Attica/Angels P
alifornia Codandards.
orrespondenc, 2012.
alifornia Cod
lter Backwasd Drinking W
ryptosporidiuater and Env
he 2011 Annuemorandum p
010 Improvemhttp://www.ang
4 Populationensus Counts
ity of Angels
nces
2020 Gener
ded Agreemof Angels an
Water Mast2.
Municipal Smber 2009.
of Angels coinuance of th
Water Audit
eport, Internpartment StaSystem and P
Water Treac., May 2012
unty Water Dttachment AProjects from
de of Regulati
ce from CDP
de of Regulati
sh Recycling Water, EPA 8
um Action Plavironmental M
ual Inspectionprepared by T
ment Standargelscamp.gov/d
n Estimates s, prepared b
Wastewater
al Plan, adop
ment for Golfd Greenhorn
ter Plan 200
Service Revi
rrespondenche 2002 City
t, Prepared b
nal City of Aaff to City APotential Sol
atment Facili2.
District and NA, Schedule om combined
ions, Title 22
H to the City
ions, Title 22
Rule Technic816-R-02-014
an, CaliforniManagement,
n Summary oTahir Manso
rds, City of Adocs/Improvem
for Cities, Cby California
r Master Pla
12-1n:\m
pted 3 Febru
f Course Irrign Creek Asso
01-2015, Pre
iew, Prepared
ce from Garey of Angels M
by Stetson En
Angels CorreAdministrator
lutions, Apri
ities Operati
Northern Caof Maximumflow of Mil
2, Division 4
y of Angels r
2, Division 4
cal Guidance4, December
ia Departmen, April 1995.
of City of Angoor, CDPH, A
Angels, Counment-Standards
Counties, anda Departmen
an, prepared
mtb020401\docume
uary 2009.
gation Wateociates L.P.,
epared by We
d by LAFCO
ett Walker toMaster Plan,
ngineers, Inc
spondence fr, Subject: Gil 20, 2012.
ions Plan, Pr
alifornia Powm Delivery inll Creek Tap
4, Chapter 16
regarding the
4, Chapter 17
e Manual, Ur 2002.
nt of Health S.
gels Water SyApril 7, 2011
ncil Resolutio-2010.pdf>
d the State, 2nt of Finance
by NV5, Inc
ents\_water master
er for Greenh, July 1998.
eber, Ghio &
O of Calaver
o City Admin, January 20
c., October 1
from Water/WGrowing Con
repared by W
wer Authorityn Acre-Feet and Mill Cr
, California
2012 WTP i
, Surface Wa
S EPA Offic
Services, Div
ystem (No. 0.
on 10-42,
2001-2010 we, August 20
c., April 201
MTB0r plan\final\0713 m
horn Creek G
& Associates
ras County,
nistrator, , 2011.
12, 2011.
Wastewater ncerns over L
Weber, Ghio
y, Restated to the reek, 1995.
Waterworks
inspection, A
ater Treatmen
ce of Groundw
vision of Drin
510003),
with 2000 & 011.
12.
020401 mp.docx
Golf
s,
Lost
o &
April
nt.
water
nking
2010
City of Angels Water Master Plan
Chapter 12: References
Angels WMP 12-2 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx
[19] Email correspondence with Jennifer Tinnin, Account Clerk, City of Angels, 19 June 2012 and 31 January 2013.
[20] IWA/AWWA Water Audit Method, American Water Works Association Water Wiser. <http://www.awwa.org/Resources/WaterLossControl.cfm?ItemNumber=48055&navItemNumber=48162>
[21] Telephone communication with Garett Walker, Senior Supervisor Water/Wastewater Treatment, City of Angels, 13 June 2012, 15 June 2012, and 7 January 2013.
[22] California Department of Public Health, Permit Amendment No. 03-10-96PA-001-Revised, City of Angels, Issued September 12, 1996.
[23] California Department of Public Health, Division of Drinking Water and Environmental Management, Citation No. 03-10-09C-009, Issued November 2, 2009.
[24] Where does your water come from? The heritage of the Utica Power Authority, by Alan M. Patterson, Ph.D., July 2009.
[25] Brief overview of NCPA in Calaveras County as related to UPA, prepared by UPA and provided as a handout.
[26] Key Points of Settlement Agreement between Calaveras County Water District and Utica Power Authority, Roger K. Masuda, Griffith & Masuda, Water Law Counsel for UPA, March 2010.
[27] Water Supply within the North Fork Stanislaus River-Mill Creek-Angels Creek System, Roger K. Masuda, Griffith & Masuda, Water Law Counsel for UPA, March 2010.
[28] Comprehensive Water Use Agreement, Between PG&E, City of Angels, and UPUD, September, 1992.
[29] Calaveras County Emergency water Supply Activities for the Communities of Murphys, Vallecito , Douglas Flat, Carson Hill, Six Mile Village, and City of Angels (Angels Camp), compiled by California Department of Water Resources, Central District, September 12, 2001.
[30] Water Treatment Plant Design, American Water Works Association and American Society of Civil Engineers, McGraw-Hill, 1998.
[31] 2003 Drinking Water Infrastructure Needs Survey and Assessment – Modeling the Cost of Infrastructure, Prepared by The Cadmus Group, Inc. for the US EPA, June 2006.