Page 1: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

1 101711160.ppt

Citizens Coordinating Council Meeting Silver Lake Pilot Study Results

December 5, 2007 December 5, 2007 Pittsfield, MassachusettsPittsfield, Massachusetts

Page 2: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

2 101711160.ppt

Silver Lake CCC Meeting Summary

December 1, 2004: Pre-Design Investigation Results

March 30, 2006: Capping Bench-Scale Study Results

September 13, 2006: Capping Pilot Study Work Plan

Tonight: Capping Pilot Study Results

Page 3: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

3 101711160.ppt

Pilot Study Objectives

• Assess potential for physical mixing of sediments and isolation layer materials as a result of cap placement

• Evaluate constructability issues related to placement of isolation layer materials in thin lifts

• Evaluate effectiveness of employing geotextile in cap configuration

• Assess potential for water quality impacts during cap placement

• Evaluate physical response of soft sediments to cap and armor stone placement

Page 4: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

4 101711160.ppt

Pilot Study Location and ComponentsOne acre study area split into contiguous cells with three cap configurations

ISOLATION LAYERONLY

COMPOSITE GEOTEXTILE/

ISOLATION LAYER

NON-WOVEN GEOTEXTILE/

ISOLATION LAYER

ARMOR STONE LAYER

OUTFALL TO HOUSATONIC RIVER

Page 5: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

5 101711160.ppt

Pilot Study Cap Configurations

Page 6: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

6 101711160.ppt

Pilot Study OperationsIsolation layer materials slurried on shore w/ lake water, and pumped via floating slurry line to spreader barge

FLEXIBLE FLOATINGSLURRY LINE

OUTFALL TO HOUSATONIC RIVER

SLURRY SPREADER BARGE

MATERIALS AND EQUIPMENT STAGING AREA

MATERIALS PREPARATIONAND SLURRYING

OPERATION

Page 7: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

7 101711160.ppt

Geofabric Placement• Non-woven geotextile and

geocomposite fabrics installed from barge– adjacent full length rolls sewn

together and loaded onto barge mounted rollers

– anchored to shore and barge moved away from shore

– sand bags and rebar used to weight fabric and secure to lake bottom

Page 8: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

8 101711160.ppt

Isolation Layer Material Placement• Spreader-box distributes slurried

isolation layer material over 20-ft span

• Barge speed and slurry delivery rate monitored/adjusted to achieve approximate 1-inch lifts

• Placement rate later increased for 2-to 3-inch/day trials

• Side discharge used in near shore areas (approx. 2- to 4-ft water depths)

Page 9: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

9 101711160.ppt

Cap Construction Along Bank• Bank soils excavated in anticipation of

finished cap elevations

• Isolation layer and armor layer placed

• Armor stone layer extends to elevations approximately 2.5 ft above and below the apparent mean water line

• Gravel habitat layer placed on top of armor below water surface

• Remaining bank areas graded and seeded/mulched

Page 10: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

10 101711160.ppt

Monitoring Program

Before During Immediately After

6-Months After

X -- X X-- -- X XX X -- --

-- X X X

-- X X X

X X X X-- X X --

-- X X XSediment/Cap Material Collection

Chemical/Physical Coring

Physical Settling PlatesSurface Water Quality Monitoring

Weekly Water SamplingContinuous Turbidity

Sub-Bottom ProfilingSediment Profile Imaging

Geophysical/Consolidation MonitoringVibrating Wire Settlement

Cells

Monitoring Event

Time Relative to Pilot Study Construction Activities

Lake Bottom ImageryBathymetric Survey

Page 11: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

11 101711160.ppt

Collection Pan Data

0

1

2

3

4

5

6

0-0.49 0.50-0.74 0.75-0.99 1.00-1.24 1.25-1.49 1.50-1.74 ≥1.75

Thicknes s (in)

# of

Set

tlem

ent P

ans

• Collection pans placed in path of barge travel to represent thickness of one 1-inch/day “pass”

• Data suggests success in placement of approximate 1-inch lifts

Page 12: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

12 101711160.ppt

Sediment Profile Imaging

• Collected prior to and at approximate midway point of cap placement (after 7 lifts)

Page 13: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

13 101711160.ppt

During-Construction SPI Without

GeofabricWith

Geofabric

• Isolation layer materials appear fairly homogenous

• Mixing appears limited to the first inch of isolation layer materials in non-geofabric areas

Page 14: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

14 101711160.ppt

SPI Based Cap Thickness Estimate

• SPI images collected at 20 locations

– suggests achievement of cap thickness goals at mid-point of construction (after 7 lifts)

6”

6”

6”

6”

6.5”

6” 6”

6”

5.5”

7”

7”

7”

7” 7”

8”

8” 8”

8”

8”

8”

Page 15: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

15 101711160.ppt

Cap Thickness Probing Results at Settlement Plates

4.8”/13.3”

5.4”/ 14.0”

6.6”/ 21.3”

5.0”/ NA4.2”/

12.3”

6.0”/ 11.6”

4.3”/ 16.5”

6.1”/ 12.5”

4.8”/ 12.8”

• 9 physical settlement plate locations probed by divers to confirm cap thickness and placement rates at interim/immediately after events

• Cap material well distributed using thin lift placement technique

Page 16: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

16 101711160.ppt

Bathymetric Surveying

• Performed prior to; immediately after; and 6-months after construction for comparative purposes

Page 17: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

17 101711160.ppt

Pre- & 6-Mo Post-Construction Bathymetry –Net Comparison of Surface Elevations

• In general, data suggests final surface is near pre-construction elevations• No indications of significant movement of underlying materials• No apparent difference related to presence/absence of geofabric

Page 18: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

18 101711160.ppt

Post-Construction Sub-Bottom Profile

• Acoustic survey capable of identifying unique layers and material interfaces

• Images provide visual information related to cap surface consistency/relief

• Suggests no apparent difference in performance related to presence/ absence of geofabric

Page 19: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

19 101711160.ppt

Geophysical/Consolidation Monitoring

1 2 3 4A

B

CDE

F

G

• 28 individual vibrating wire settlement cells and 9 physical settlement plates installed on top of sediment (above geofabric)

• Monitored during and after construction to assess sediment response (i.e., consolidation) to cap placement

Page 20: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

20 101711160.ppt

Vibrating Wire Settlement Cells-10

0

10

20

30

40

50

60

7010.19.06 10.29.06 11.08.06 11.18.06 11.28.06 12.08.06 12.18.06 12.28.06

Set

tlem

ent (

in)

D4

E4

F4

10/25 - Firs t lift; da te of tra ile r movement

11/8-9 - 7 lifts ; approximate ha lf-way point; ha lt placement for SPI and probing

11/13 - Initia tion of placement from bank

11/21 - Fina l lift placed

11/17 - Increased placement ra te

• Confirms general patterns of settlement as indicated by bathymetric mapping and conventional survey at physical settlement plates

• Provided insight into sediment response to initial shoreline capping approach• No apparent difference related to presence/absence of geofabric

Page 21: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

21 101711160.ppt

Cap Coring and Sample Collection Program

COMPOSITE GEOTEXTILE& ISOLATION LAYER

ISOLATION LAYERONLY

NON-WOVEN GEOTEXTILE& ISOLATION LAYER

• Performed immediately after, and 6 months after construction• Cores visually observed to evaluate cap thickness and extent of mixing• Cap materials analyzed for PCBs and TOC

Page 22: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

22 101711160.ppt

Cap Coring PCB Results –6-Months After

ND

A

NDND

NA

0.14

ND

B

NDND

NA

0.15

ND

C

NDND

ND

2.91

ND

D

NANA

NA

0.15

0.43

K

NDND

ND

ND

0.33

1482.49NDND

0.66

H

ND

1780.15NDND

ND

G

ND

L

NDND

ND

0.07

ND

M

NDND

NA

0.27

ND

88.80.16NDND

NA

FTOP

REM

4-6”2-4”0-2”SED

• 43 of 55 total samples contained no detectable PCBs• 9 of 13 cores have no detectable PCBs below the surface increment• Excluding TOP and 0-2” sample intervals, only one core has a detection in the

remaining interior intervals

Page 23: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

23 101711160.ppt

Cap Coring TOC Results

REMAINDER

2- to 4-inch

0- to 2-inch

4- to 6-inch

TOP

• Dry isolation layer material samples pre-characterized for TOC:

– Average: 1.1%

• Sedimentation pans collected outside study area:– Average TOC ~ 4.0%

• Depth weighted average TOC ~ 0.5 %

0.47%

0.51%

0.44%

0.44%

0.58%

Average TOC

Page 24: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

24 101711160.ppt

Water Quality Monitoring Program

PILOT STUDY TEST AREA

WATER MONITORINGLOCATION

SILT CURTAIN LOCATION

OUTFALL TO HOUSATONIC RIVER

MON-1

MON-2

MON-3

• Weekly collection at all three locations (PCBs, TSS)• Continuous turbidity monitoring performed• Turbidity >50 NTU at MON-2 or MON-3 triggered sample collection at all three

locations (PCB, TSS)

Page 25: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

25 101711160.ppt

Turbidity Results

0

10

20

30

40

50

60

70

80

90

100

110

120

10.10.06 10.20.06 10.30.06 11.9.06 11.19.06 11.29.06 12.9.06 12.19.06 12.29.06 1.8.07

Turb

idity

(NTU

)

0

50

100

150

200

250

300

350

Dai

ly C

ap V

olum

e (c

y)

Daily Isola tion Layer Volume (cy)15-Min. Moving Avg. (Mon-3)15-Min. Moving Avg (Mon-1)15-Min Moving Avg. (Mon-2)

10/25 - Firs t Lift

11/21 - Fina l Lift

11/1 - Mate ria ls Switch

11/14 – Increased Placement Rate

• Few exceedances of 50 NTUs observed at outfall location • Turbidity appears to approach pre-construction levels within 1 month of

completion of placement activities

Page 26: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

26 101711160.ppt

Surface Water PCB, TSS Results

11/14 – Increased Placement Rate

Turb

idity

(NTU

) &

TS

S (m

g/l)

PC

B (m

g/l)

0

10

20

30

40

50

60

70

80

10.10.06 10.20.06 10.30.06 11.9.06 11.19.06 11.29.06 12.9.06 12.19.06 12.29.06 1.8.070

0.0001

0.0002

0.0003

0.0004

0.0005

0.0006

0.0007

MON-3 TSS (ppm)

MON-3 PCB (ppm)

15-Min. Moving Avg. (Mon-3)

10/25 - Firs t Lift

11/21 - Fina l Lift

11/1 - Materia ls Switch

• PCBs concentrations in surface water were lower during the pilot study than PCB concentrations found before the study.

Page 27: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

27 101711160.ppt

Pilot Study Objectives & Conclusions• Assess potential for physical mixing of sediments and

isolation layer materials as a result of cap placement

– Minimal mixing observed at the sediment/cap interface only• appears limited to the first 1- to 2-inches of isolation layer

material

• where detected, PCB concentrations 1 to 3 orders of magnitude below that of underlying sediment

• Evaluate effectiveness of employing geotextile in cap configuration

– No significant differences noted between geofabric and non-geofabric areas based on physical or analytical data

Page 28: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

28 101711160.ppt

Pilot Study Objectives & Conclusions (cont’d)

• Evaluate constructability issues related to placement of isolation layer materials in thin lifts– Generally successful from barge with fabricated spreader-box

– Important to use appropriate near-shore placement methods

• Evaluate physical response of soft sediments to cap and armor stone placement– With exception of near-shore areas, settling observed to be fairly

uniform in time and space

– Majority of locations exhibited settlement within 1- to 2-ft range

Page 29: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

29 101711160.ppt

Pilot Study Objectives & Conclusions (cont’d)

• Assess potential for water quality impacts during cap placement

– Short-term increased turbidity observations related to isolation layer placement

– No increase in surface water PCB concentrations observed

Page 30: Citizens Coordinating Council Meeting Silver Lake Pilot Study … · 2018-07-14 · 1 101711160.ppt Citizens Coordinating Council Meeting Silver Lake Pilot Study Results December

30 101711160.ppt

Questions ?