1 2 37 39 7 9 26 15 22 27 28 29 41 43 47 49 52 54 56 65 64 58 60 62 78 72 68 70 74 75 80 83 86 96 102 104 3 4 5 6 10 11 12 13 14 16 17 18 19 20 21 23 24 25 8 42 40 38 35 36 30 31 32 33 34 50 48 46 45 44 51 53 55 57 59 61 63 66 67 69 71 73 77 76 79 81 82 85 84 87 88 89 90 91 92 93 94 95 97 98 100 99 101 103 JANEIRO FEVEREIRO MARÇO ABRIL MAIO JUNHO JULHO AGOSTO SETEMBRO OUTUBRO NOVEMBRO DEZEMBRO 7 14 21 28 21 14 7 21 14 7 28 21 14 7 28 21 14 7 28 21 14 7 28 14 21 28 7 14 21 28 7 14 21 28 7 14 21 28 7 7 14 21 28 21 14 7 28 JANEIRO FEVEREIRO MARÇO ABRIL MAIO JUNHO JULHO AGOSTO SETEMBRO OUTUBRO NOVEMBRO DEZEMBRO 7 14 21 28 21 14 7 21 14 7 28 21 14 7 28 21 14 7 28 21 14 7 28 14 21 28 7 14 21 28 7 14 21 28 7 14 21 28 7 7 14 21 28 21 14 7 28 1 2 37 39 7 9 26 15 22 27 28 29 41 43 47 49 52 54 56 65 64 58 60 62 78 72 68 70 74 75 80 83 86 96 102 104 3 4 5 6 10 11 12 13 14 16 17 18 19 20 21 23 24 25 8 42 40 38 35 36 30 31 32 33 34 50 48 46 45 44 51 53 55 57 59 61 63 66 67 69 71 73 77 76 79 81 82 85 84 87 88 89 90 91 92 93 94 95 97 98 100 99 101 103 42 ACABAMENTOS DE ESCADARIA = GESSO + 3 SEMANAS 43 SERRALHERIA E ELEM. METÁLICOS = GESSO + 3 SEMANAS 46 COLOCAÇÃO LUMINÁRIAS = GESSO + 4 SEMANAS 47 PINTURA 3 FASE = GESSO + 4 SEMANAS 48 EQUIP. PREV. INCÊNDIO = GESSO + 3 SEMANAS 49 LIGAÇÃO BOMBAS = GESSO + 3 SEMANAS 50 BASE P/ ANTENAS = GESSO + 3 SEMANAS 51 AUTOMAÇÃO/INTERFONE/ANTENAS = GESSO + 3 SEMANAS 52 INSTALAÇÕES MECÂNICAS = GESSO + 4 SEMANAS 53 PISO LAMINADO E CARPETE (ELEVADORES) = GESSO + 5 SEMANAS 54 LIMPEZA FINA = GESSO + 6 SEMANAS 20 RASTREAMENTO DE DEFEITOS = ESTUQUE E CHAPISCO + 1 SEMANA 21 EMBOÇO INTERNO = RASTREAMENTO + 1 SEMANA 22 FIAÇÃO = EMBOÇO INTERNO + 1 SEMANA 23 CONTRA PISO = IMPERM. INT. + 1 SEMANA 24 PISO CERÂMICO = FORRO + 1 SEMANA 25 AZULEJO = PISO CERÂMICO + 1 SEMANA 26 GESSO EM TETO E PAREDE = AZULEJO + 1 SEMANA 27 DRY WALL = GESSO 28 FORRO = FIAÇÃO + 1 SEMANA 29 TAMPOS, BITS, FILETES GRANITO = GESSO 30 CABLAGEM = GESSO 31 LOUÇAS = TAMPOS, BITS + 1 SEMANA 32 ESQUADRIAS ALUMÍNIO = GESSO + 1 SEMANA 33 IMPERMEAB. ÁTICO = GESSO + 4 SEMANAS 35 VIDROS = GESSO + 2 SEMANAS 36 RODAPÉS E PORTAS MADEIRA = GESSO + 2 SEMANAS 38 LIMPEZA BRUTA = GESSO + 3 SEMANAS 39 MONTAGEM QUADROS ELÉTRICOS = CABLAGEM + 1 SEMANA 37 AMPLIAÇÃO DE REDES DEFINITIVAS = GESSO 02 PRUMADAS = SUPRAESTRUTURA + 3 PAVTOS 03 ALVENARIA EXTERNA = SUPRAESTRUTURA + 3 PAVTOS 04 EMBOÇO TETO ALV EXT + 1 SEMANA 05 ALVENARIA INTERNA = EMBOÇO + 1 PAVTO 06 DUTOS LAREIRA = ALVENARIA INTERNA 08 PREPARO IMPERMEAB. = ALV INT. + 1 SEMANA 09 ENCUNHAMENTO ALV = ALV INT + 1 SEMANA 10 PREPARO P/ BANHEIRA = ALV INT + 1 SEMANA 11 ABERTURA INSTALAÇÕES = ENCUNHAMENTO + 1 SEMANA 12 TAQUEAMENTO = ABERTURA INST + 1 SEMANA 13 DISTRIB. INSTAL. = TAQUEAMENTO + 1 SEMANA 14 CONTRAMARCO = TÉRMINO ALV EXT PLATIBANA 15 ESTUCAMENTO E CHAPISCO = DISTRIBUIÇÃO + 1 SEMANA 16 IMPERM. INTERNA = ESTUQUE E CHAPISCO + 1 SEMANA 18 PROTEÇÃO E ENCHERTOS DE BANHEIRA = COLOCAÇÃO BANHEIRA + 1 SEMANA 19 PREPARO POÇO ELEVADOR = EMBOÇO + 1 SEMANA 17 COLOCAÇÃO BANHEIRA = ESTUQUE E CHAPISCO + 1 SEMANA 34 PINTA 1 FASE = GESSO + 1 SEMANA 40 PINTURA 2 FASE = GESSO + 3 SEMANAS 41 DECK PISCINAS = GESSO + 3 SEMANAS 44 ACABAMENTO ELÉTRICOS/TELEFÔNICOS = GESSO + 3 SEMANAS 45 COLOCAÇÃO METAIS SANITÁRIOS = GESSO + 1 SEMANA 01 SUPRA ESTRUTURA 07 PRUMADA INCÊNDIO = ALVENARIA INTERNA EMPRESA: OBRA: ENDEREÇO: DATA: