Top Banner
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016 "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. 08/12/13 XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. 03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - "R.R. Seismundo Construction & Supply" 10961 Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Km.1822+821, Apokon Sect. 03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - "R.R. Seismundo Construction & Supply" / Davao Concrete Products Joint Venture JV-12-116 Const. of Flood Control Structure (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan 11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - 121 Construction Corporation (Formerly: 121 Construction) 21686 Improvement/Concreting with Drainage System along Ballesteros Street 29/11/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% 84.30% Satisfactory 12-30 CONSTRUCTION & SUPPLY 37025 Construction of 1-CL Trinidad Cario PS 11/13/15 Palawan 1st DEO 1.070 90 C 0.444 0.133 0.3 - - - 87.70% 87.7% Satisfactory 2M Construction & Enterprises 33331 Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., Matarling Sect. at K15+190-K15+249 03/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - 2-R CONSTRUCTION & SUPPLY 15304 Off Carriage Improvement at Lingayen, Captiol Loop 11/06/2015 Pangasinan 2nd DEO 9.34 105 C 0.28 0.3 0.15 0.03 0.06 0.03 85.20% - 2-R CONSTRUCTION & SUPPLY 15304 Raising of Grade of Dike Agno River Basin Flood Control Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/15 PANGASINAN 3RD DEO 9.167 120 OG 0.391 0.24 0.15 0.03 0.05 0.05 91.10% 91.1% Very Satisfactory 2-RCONSTRUCTION & SUPPLY 15304 Off Carriageway Improvement at Lingayen Capitol Loop, K0364+(-219) to K0364+836, Lingayen, Pangasinan 02/09/2016 Pangasinan 2nd DEO 9.34 105 C 0.473 0.133 0.3 - - - 90.60% *87.36% Satisfactory 3A'S BUILDERS 33251 Rehabilitation/Major Repair of Permanent Bridges Tagbinunga Bridge (B00549LT) along Daang Maharlika (LT), Mahaplag, Leyte 11/15/15 Leyte Fifth DEO 5.403 150 C 0.484 0.133 0.3 - - - 91.70% 91.7% Very Satisfactory 3C'SL CONSTRUCTION AND SUPPLY 36393 Construction/ Upgrading of Local Road 02/06/2015 AGUSAN DEL NORTE DEO 3.763 48 C 0.461 0.133 0.3 - - - 89.40% *89.4% Very Satisfactory 3K ROCK ENGINEERING 27908 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road including Drainage based on Pavement Management System/Highway Development & Management- 4 (HDM-4) (Intermittent Section), Asin Road, K0305+(-291) - K0305+958 12/06/2015 Baguio City DEO 22.149 170 C 0.414 0.196 0.3 - - - 90.97% *90.97% Very Satisfactory 3K ROCK ENGINEERING 27908 Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Sections) of Kabugao - Pudtol - Luna - Cagayan Bdry. Road, K0611+917 to K0612+961, K0612+973 to K0613+699, K0613+723 to K0614+500, Apayao 27/08/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% - 3K Rock Engineering/RVC Construction (J.V.) 27908 Road Upgrading (Gravel to Concrete) of Asin -Nanganban - San Pascual Road K0270+594 - K0272+220 ; K0275+5311 - K0275+7178 16/08/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 - 3RB Construction & Supply 19541 Prieto Diaz Port Development Project 08/19/15 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 - 4B Construction Corporation 2014 heavy maintenance works along SCTEX lot 2 - Bridge revetment, slope and drainage repair works 10/31/14 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 - 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/15 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 - 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/14 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 - 4B CONSTRUCTION CORPORATION 23445 Widening along Roman Expressway, K153+263 to K153+938, K153+938 to K154+780, Mariveles, Bataan 04/06/2015 Bataan 2nd DEO 22.523 99 C 0.4 0.2 0.3 - - - 90.00% *90% Very Satisfactory 5'S CONSTRUCTION & SUPPLY 32404 Construction of One (1) Storey, Two (2) Classroom School Building at Dumangas National High School 10/06/2015 Iloilo Second DEO 1.479 60 C 0.478 0.172 0.3 - - - 95.00% *95% Very Satisfactory 626 Construction and Trading 34990 Improvement of Balungao Hot and Cold Spring Resort 5/27/15 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74 ESH RDR STATUS CPES VISIT RATING WMS MTL TIME FAC FINAL RATING/ QUALITATIVE DESCRIPTION AMOUNT (Php, M) DUR (C.D.) CONTRACT *IMPL. AGENCY NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF EVALUATION *1st/Final * For DPWH, only the region and PMO office are listed 24th CPES Release Page1
278

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY … · cpes reports-on-going and completed projects from january 1, 2014 to december 31, 2016 status wms mtl time fac esh rdr cpes visit

Jul 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    "R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

    New Cortez-San Jose Carcor Panas Rd.08/12/13 XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -

    "R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

    New Cortez-San Jose Carcor Panas Rd.03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -

    "R.R. Seismundo Construction & Supply" 10961Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-

    Km.1822+821, Apokon Sect.03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -

    "R.R. Seismundo Construction & Supply" /

    Davao Concrete Products Joint VentureJV-12-116

    Const. of Flood Control Structure (Sheet Piles & Grouted

    Riprap) Agusan River, Brgy. Inambatan11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -

    121 Construction Corporation (Formerly: 121

    Construction)21686

    Improvement/Concreting with Drainage System along

    Ballesteros Street29/11/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%

    84.30%

    Satisfactory

    12-30 CONSTRUCTION & SUPPLY 37025Construction of 1-CL Trinidad Cario PS

    11/13/15Palawan 1st

    DEO1.070 90 C 0.444 0.133 0.3 - - - 87.70%

    87.7%

    Satisfactory

    2M Construction & Enterprises 33331Slope Protection (Grouted Riprap) along Isabela-Maluso Rd.,

    Matarling Sect. at K15+190-K15+24903/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -

    2-R CONSTRUCTION & SUPPLY 15304 Off Carriage Improvement at Lingayen, Captiol Loop 11/06/2015Pangasinan 2nd

    DEO9.34 105 C 0.28 0.3 0.15 0.03 0.06 0.03 85.20% -

    2-R CONSTRUCTION & SUPPLY 15304

    Raising of Grade of Dike Agno River Basin Flood Control

    Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/15PANGASINAN

    3RD DEO9.167 120 OG 0.391 0.24 0.15 0.03 0.05 0.05 91.10%

    91.1%

    Very Satisfactory

    2-RCONSTRUCTION & SUPPLY 15304Off Carriageway Improvement at Lingayen Capitol Loop,

    K0364+(-219) to K0364+836, Lingayen, Pangasinan02/09/2016

    Pangasinan 2nd

    DEO9.34 105 C 0.473 0.133 0.3 - - - 90.60%

    *87.36%

    Satisfactory

    3A'S BUILDERS 33251

    Rehabilitation/Major Repair of Permanent Bridges

    Tagbinunga Bridge (B00549LT) along Daang Maharlika (LT),

    Mahaplag, Leyte

    11/15/15 Leyte Fifth DEO 5.403 150 C 0.484 0.133 0.3 - - - 91.70%91.7%

    Very Satisfactory

    3C'SL CONSTRUCTION AND SUPPLY 36393 Construction/ Upgrading of Local Road 02/06/2015AGUSAN DEL

    NORTE DEO3.763 48 C 0.461 0.133 0.3 - - - 89.40%

    *89.4% Very

    Satisfactory

    3K ROCK ENGINEERING 27908

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road including Drainage based on Pavement

    Management System/Highway Development & Management-

    4 (HDM-4) (Intermittent Section), Asin Road, K0305+(-291) -

    K0305+958

    12/06/2015Baguio City

    DEO22.149 170 C 0.414 0.196 0.3 - - - 90.97%

    *90.97% Very

    Satisfactory

    3K ROCK ENGINEERING 27908

    Road Upgrading (Unpaved to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standards (HDM-4 Project Analysis) (Intermittent Sections)

    of Kabugao - Pudtol - Luna - Cagayan Bdry. Road,

    K0611+917 to K0612+961, K0612+973 to K0613+699,

    K0613+723 to K0614+500, Apayao

    27/08/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% -

    3K Rock Engineering/RVC Construction (J.V.) 27908

    Road Upgrading (Gravel to Concrete) of Asin -Nanganban -

    San Pascual Road K0270+594 - K0272+220 ; K0275+5311 -

    K0275+7178

    16/08/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -

    3RB Construction & Supply 19541 Prieto Diaz Port Development Project 08/19/15 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -

    4B Construction Corporation2014 heavy maintenance works along SCTEX lot 2 - Bridge

    revetment, slope and drainage repair works10/31/14 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/15 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/14 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -

    4B CONSTRUCTION CORPORATION 23445Widening along Roman Expressway, K153+263 to K153+938,

    K153+938 to K154+780, Mariveles, Bataan04/06/2015

    Bataan 2nd

    DEO22.523 99 C 0.4 0.2 0.3 - - - 90.00%

    *90% Very

    Satisfactory

    5'S CONSTRUCTION & SUPPLY 32404Construction of One (1) Storey, Two (2) Classroom School

    Building at Dumangas National High School10/06/2015

    Iloilo Second

    DEO1.479 60 C 0.478 0.172 0.3 - - - 95.00%

    *95% Very

    Satisfactory

    626 Construction and Trading 34990 Improvement of Balungao Hot and Cold Spring Resort 5/27/15 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page1

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 10/9/15 TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -

    626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 11/25/15 TIEZA 12.000 240 C 0.473 0.200 0.300 97.3089.1%

    Very Satisfactory

    722 CONSTRUCTION INC (Formerly 722

    Construction)21923

    Repair/Rehabilitation/Improvement along Baliuag-Candaba

    Road, K0054+000 to K0057+000, Baliuag-Candaba Road,

    Baliuag, Bulacan

    26/08/2015Bulacan First

    DEO12.104 72 C 0.394 0.2 0.3 - - - 89.40%

    *82.86%

    Satisfactory

    722 CONSTRUCTION, INC. (Formerly: 722

    Construction)21923

    Construction/Rehabilitation of Road with Drainage,

    Barangay Poblacion II, Phase III Constantino, Municipality of

    Marilao, Bulacan 4th LD

    11/19/15Bulacan

    Second DEO6.509 90 C 0.493 0.133 0.3 - - - 92.60%

    92.6%

    Very Satisfactory

    722 Construction, Inc.(Formerly: 722

    Construction)21923

    Repair/Rehabilitation/Improvement along Baliuag-Candaba

    Road K0054+000 to K0057+00024/11/2014 III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%

    78.50%

    Unsatisfactory

    739 BUILDERS 31174 Widening of Vigan - Sta. Catalina Road 05/06/2015Ilocos Sur 1st

    DEO15.404 96 C 0.22 0.2 0.3 - - - 72.00% *72% Poor

    808 CONSTRUCTION AND SUPPLY 18711 Construction of Local Roads, Ortiz-Baraoas-Roas 07/06/2015La Union 2nd

    DEO1.887 37 C 0.396 0.133 0.3 - - - 82.90% *82.9% Satisfactory

    888 ACY ENTERPRISES 32898

    Rehab/Major Repair of Permanent Bridges, Pandan Bridge,

    Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang

    Maharlika

    03/06/2015Southern Leyte

    DEO8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -

    888 ACY ENTERPRISES 32898

    Rehabilitation/Major Repair of Permanent Bridge, Pandan

    Bridge along Bdry. Southern Leyte-Macrohon-Sogod-Daang

    Maharlika (BOO344LT), Sogod, Southern Leyte

    30/08/2015Southern Leyte

    DEO8.812 150 C 0.411 0.2 0.3 - - - 91.10%

    *90.74% Very

    Satisfactory

    888 ACY ENTERPRISES 32898

    Rehabilitation/Major Repair of Permanent Bridges, Pangi

    Bridge Along Daang Maharlika (B00597LT), Libagon,

    Southern Leyte

    11/16/15Southern Leyte

    DEO14.826 180 C 0.442 0.2 0.18 - - - 82.20%

    82.2%

    Satisfactory

    8R'S CONSTRUCTION 22997Concreting of Daig - Tumapon - Maybo Farm to Market Road,

    Boac, Marinduque01/09/2015

    Marinduque

    DEO23.211 195 C 0.442 0.137 0.3 - - - 87.90%

    *87.9%

    Satisfactory

    8R'S CONSTRUCTION 22997Concreting of Farm to Market Road, Brgy. Maligaya and

    Brgy. Buliasnin (Brgy. Buliasnin-Maligaya)11/16/15

    Marinduque

    DEO1.947 41 C 0.405 0.147 0.3 - - - 85.20%

    85.2%

    Satisfactory

    A B Aponesto Construction, Parts & Supply 22998

    Repair/Rehab of Agusan River Flood Control, Osmena

    Section, Compostela along Montevista – Compostela – New

    Bataan – Maragusan – Mati Bdry. Road.

    09/08/2014 XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -

    A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Siffu Flood Control

    Project, Sittio Gabit Section, Roxas, Isabela28/08/2015

    Isabela 2nd

    DEO18.346 215 O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% -

    A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Stiffu River Flood

    Control Project, Sitio Gabit Section, Roxas, Isabela11/14/15

    ISABELA 2ND

    DEO18.347 219 C 0.3 0.133 0.3 - - - 73.30%

    73.3%

    Poor

    A J TAYLAN CONSTRUCTION &

    DEVELOPMENT/JLP CONSTRUCTION &

    SUPPLY JOINT VENTURE

    JV-14-518

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Roads including Drainage Based on Pavement

    Management System/Highway Development and

    Management- 4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-

    K0454+1013, K0455+884-K0456+433, Pinili Road, Ilocos

    Norte

    26/08/2015Ilocos Sur 2nd

    DEO37.519 219 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page2

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A. C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Construction of Bridge at Dodiongan Box Culvert along Sta.

    Felomina-Bonbonon-Digkilaan-Rogongon Road, Barangay

    Bonbonon, Iligan City, K01526+078.00 to K01526+108.00, K0

    0+000.00 to K0 0+000.00

    08/06/2015Lanao del Norte

    Second DEO24.567 295 C 0.433 0.2 0.3 - - - 93.30%

    *90% Very

    Satisfactory

    A. De Guia Construction 18228

    Construction of Drainage System / Protection Works along

    Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350,

    San Luis - Caquilingan

    27/10/2014 II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%

    Satisfactory

    A. De Guia Construction 18228Construction/ Rehabilitation of Flood Control Projects,

    Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+22412/08/2014 II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -

    A. DE GUIA CONSTRUCTION 18228Construction of Drainage System/Protection Works along

    Daang Maharlika07/06/2015

    Isabela 4th

    DEO19.403 261 C 0.422 0.133 0.3 - - - 85.50%

    *87.54%

    Satisfactory

    A. DE GUIA CONSTRUCTION 18228

    Construction/Rehabilitation of Flood Control Projects in

    Isabela 4th DEO/4th LD-Nagassican Flood Control Project,

    Sta. 0+000 - Sta. 0+224

    07/06/2015Isabela 4th

    DEO19.5 214 C 0.365 0.2 0.3 - - - 86.50%

    *83.86%

    Satisfactory

    A. I. P. CONSTRUCTION 32458

    Rehabilitation/ Reconstruction/ Upgrading of Damaged

    Paved National Roads Including Drainage Based on

    Pavement Management System/ Highway Development and

    Management-4 (HDM-4) (Intermittent Sections), Lt. Tacay

    Road, K0308+(-599)-K0308+000 & K0308+616-K0308+754,

    11/9/15 Baguio City 13.442 104 C 0.415 0.195 0.300 - - - 91.00%87.82%

    Satisfactory

    A. J. LAVA BUILDERS CORP. (Formerly: A. J.

    Lava Builders)22265

    Flood Management Services Construction/Maintenance of

    Flood Mitigation Structures and Drainage System

    Improvement/Riprapping of Sitio Kapatagan River

    (Downstream), Brgy. San Jose, Antipolo City, 2nd LD

    11/11/15RIZAL 1ST

    DEO27.612 180 OG 0.39 0.24 0.15 0.03 0.06 0.05 92.00%

    92%

    Very Satisfactory

    A. M. Oreta and Co., Incorporated 108 Region 2-PIDP-CBIMO 09/19/15 NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -

    A. P. B. CONSTRUCTION 17055

    Network Development/ Widening of National Roads-

    Secondary Road-Abra-Ilocos Norte Road K0409+000-

    K0409+100, K0409+115-K409+178, K0409+307-K0409+404,

    K0409+531-K0409+648, K0409+748-K0410+139, K0410+159-

    K0410+360, K0410+369-K0410+777, K0411+050-K0411+220,

    K0412+122-K0412+499, K0413+000-K0414+354, K0414+764-

    K0415+747, K0416+175-K0416+445, K041

    11/20/15 Regional Office 81.971 286 OG 0.318 0.29 0.15 0.022 0.045 0.033 85.80%85.8%

    Satisfactory

    A. SANDOVAL CONSTRUCTION & SUPPLY 35991

    Construction and Maintenance of Bridges along National

    Roads - Retrofitting/Strengthening of Permanent Bridges

    Leviste Bridge 1 (B03170LZ) along Talisay - Laurel -

    Agoncillo Road, Laurel, Batangas

    11/13/15BATANGAS

    3RD DEO4.557 150 C 0.372 0.2 0.3 - - - 87.20%

    87.2%

    Satisfactory

    A.A. DE VERA CONSTRUCTION 6191

    Concreting /Road Upgrading (Unpaved to Paved) Jct. (TNR)

    Cortes-Balilihan-Catigbian-Macaas Road, K0046+592.75 -

    K0046+858.9, Tubigon, Bohol

    11/16/15 Bohol 1st 8.485 155 C 0.344 0.2 0.3 - - - 84.40%84.4%

    Satisfactory

    A.B. OPEÑA BUILDERS 33996

    Concreting of Barangay Roads, Brgy. Sooc-Haluban, Lupi,

    Camarines Sur 11/12/15Camarines Sur

    Fifth DEO1.881 60 C 0.359 0.172 0.3 - - - 83.10%

    83.1%

    Satisfactory

    A.C. MOJARES CONSTRUCTION, INC. 1771Concreting and Sidewalk Improvement of Phase 2, Scout

    Tobias St., Brgy. Laging Handa, Quezon City03/06/2014

    Quezon City

    2nd DEO10.018 207 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% -

    A.C. MOJARES CONSTRUCTION, INC. (DOING

    BUSINESS UNDER THE NAME AND STYLE OF

    A.C. MOJARES CONSTRUCTION)

    1771

    Construction/Improvement of Road and Bridge, Brgy.

    Obrero and Kristong Hari, Quezon City12/4/15 QC 2nd DEO 9.105 102 C 0.481 0.133 0.3 - - - 91.40%

    91.4%

    Very Satisfactory

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Const./Completion of Subang Daku Bridge, Subang Daku

    River, San Miguel08/17/12 VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika

    Rd (Km1207+000 - Km1209+454.40)08/19/12 VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page3

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,

    K0913+721.75-K0917+915.72, w/ exceptions08/07/12 VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Rehab/Major Repair of Permanent Bridges, Amparo Bridge,

    Along Bdry, S. Leyte- Maasin-Macrohon-Sogod-Daang

    Maharlika

    03/06/2015Southern Leyte

    DEO8.928 150 C 0.426 0.133 0.3 - - - 85.90% *85.9% Satisfactory

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Off-Carriageway Improvement along Jct. Taft - Oras - San

    Policarpio-Arteche Road, K0950+000 - K0955+00029/06/2015

    Eastern Samar

    DEO33.355 150 O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Completion of Dodiongan Bridge along Sta. Felomina-

    Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,

    Iligan City K01526+058-K01526+118, K01526+910-

    K01526+297

    03/09/2015Lanao del Norte

    2nd DEO37.105 236 O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Replacement of Permanent Weak Bridge, Ramon Magsaysay

    Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road29/08/2015

    Zamboanga del

    Sur 1st29.101 230 O 0.288 0.299 0.15 0.03 0.051 0.05 86.79% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Construction and Maintenance of Bridges along National

    Rd. (Replacement of Permanent Weak Bridge) at Olingan

    Bridge along Dipolog-Oroquieta National Road, Olingan,

    Dipolog City, Zamboanga del Norte

    11/16/15Zamboanga Del

    Norte 1st DEO21.218 220 OG 0.371 0.22 0.15 0.022 0.042 0.05 85.50%

    85.5%

    Satisfactory

    A.C. RIVERO DEVELOPMENT

    CORPORATION/JQD CONSTRUCTION AND

    GENERAL SERVICES JOINT VENTURE

    JV-14-1038

    Rehabilitation/Major Repair of Permanent Weak Bridges,

    Otikon Bridge Along Daang Maharlika (B00598LT), Libagon,

    Southern Leyte11/16/15

    Southern Leyte

    DEO31.056 195 OG 0.249 0.3 0.15 0.03 0.06 0.05 83.90%

    83.9%

    Satisfactory

    A.C. SOLIVEN CONSTRUCTION & GENERAL

    MERCHANDISE19278

    Construction of River Bank Protection along Marusay River,

    San Vicente Section10/06/2015

    Pangasinan 4th

    DEO18.228 116 C 0.35 0.2 0.3 - - - 85.00% *85% Satisfactory

    A.C. SOLIVEN CONSTRUCTION & GENERAL

    MERCHANDISE19278

    Construction of Bank Protection Works, Agnooo River Basin

    Flood Control Project (Phase III) Brgy. Bantog, Asingan,

    Pangasinan

    11/16/15PANGASINAN

    3RD DEO18.336 180 OG 0.389 0.24 0.15 0.03 0.055 0.05 91.40%

    91.4%

    Very Satisfactory

    A.D.P CONST. & SUPPLY 3466

    Network Development, Widening of National Road,

    Secondary Road along Roxas City-Cagay-Sibaguan

    Balijuagan-Cudian-Ivisan Road Chainage 0-200, Chainage

    942-1182 (0-200(0+304.50) (K0104+122.50) 942-1182

    (K0104+760-K0105+000)

    02/09/2015 Capiz 1st 10.341 121 C 0.418 0.133 0.3 - - - 85.10%*85.1%

    Satisfactory

    A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

    A.D.P Construction & Supply 3466

    Rehab./Reconst./Upgrading of Damaged Paved National

    Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road,

    Capiz (KM.112+750-Km.122+705) with exception

    08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

    A.D.P Construction & Supply 3466

    Malag-it Box Culvert along Iloilo East Coast-Capiz Road

    (Construction of Malag-it Bridge along Iloilo East Coast-

    Capiz Road)

    29/10/2014 VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%75.40%

    Unsatisfactory

    A.D.P Construction & Supply 3466Widening of Caradio-an Bridge alog Bacolod South Road,

    Barangay Caradio-an23/10/2014 VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%

    74.10%

    Poor

    A.D.P Construction & Supply 3466Construction/Rehab. Of Drainage System along Balasan-

    Carles Road, Brgy. Barosbos29/10/2014 VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%

    87.50%

    Satisfactory

    A.D.P Construction & Supply 3466 Construction of Multi-Purpose Building 28/10/2014 VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%82.60%

    Satisfactory

    A.D.P Construction & Supply 3466

    Road Upgrading (Gravel to Paved) along Davao-Sarangani

    Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao

    Section

    07/08/2014 XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -

    A.D.P Construction & Supply 3466Rd. Upgrading (Gravel to Paved) along Davao-Sarangani

    Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect.08/06/13 XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -

    A.D.P Construction & Supply 3466Const. of Slope Protection along Jct. Bancal-Leon-Antique

    Boundary Rd., K0031+722-K0031+89103/22/13 VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page4

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.D.P. CONST. & SUPPLY 3466

    Network Development, Widening of National Road,

    Secondary Road along Roxas City, Cagay-Sibaguan

    Balijuangan-Cudian-Ijisan Road

    06/06/2015 Capiz First DEO 10.341 121 O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% -

    A.D.P. CONST. & SUPPLY 3466 Widening of Sara-San Dionisio Road 09/06/2015 Iloilo Third DEO 26.054 175 O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% -

    A.D.P. CONST. & SUPPLY 3466Construction of Drainage System along Iloilo East Coast

    Capiz Road09/06/2015 Iloilo Third DEO 44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -

    A.D.P. CONST. & SUPPLY 3466Retrofitting/Strengthening of Cabiri-an Bridge (B00165PN)

    along Guimbal-Tubungan Road03/06/2015 Iloilo First DEO 9.3 90 C 0.5 0.133 0.3 - - - 93.30%

    *93.3% Very

    Satisfactory

    A.D.P. CONST. & SUPPLY 3466Widening of Sara - San Dionisio Road, K0203+ (-882) -

    K0203+24329/08/2015 Iloilo 3rd 26.054 175 C 0.449 0.133 0.3 - - - 88.20%

    *87.3%

    Satisfactory

    A.D.P. CONST. & SUPPLY 3466

    Construction/Improvement of Access Road Leading to

    Declared Tourism Destination, Hanay-Hanay Road leading to

    Twin Lake, San Jose, 2nd District, Negros Oriental11/11/15

    Negros Oriental

    2nd DEO9.310 131 C 0.457 0.133 0.3 - - - 89.00%

    89%

    Satisfactory

    A.F.G. CONSTRUCTION AND

    CONSTRUCTION SUPPLY17161

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road including Drainage Based on Pavement

    Management System / Highway Development and

    Management - 4 (HDM-4) (Intermittent Section) along

    Hinigaran - Isabela Road, K0058+263 - K0059+000

    27/08/2015Negros

    Occidental 2nd12.674 127 O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% -

    A.F.G. Construction and Construction Supply 17161Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel

    to Paved), Km. 129+328-Km. 131+27508/15/13 VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -

    A.F.G. Construction and Construction Supply 17161Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora

    Salapantan NHS08/22/13 VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -

    A.F.G. Construction and Construction Supply 17161 Const. of Tangalan-Ibajay Rd. 03/19/13 VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -

    A.F.G. Construction and Construction Supply 17161 Replacement/Const. of Tubog Bridge, Brgy. Tubog 08/15/12 VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction of 2-CL Alimanguan National High School

    Brgy. Alimanguan05/06/2015

    Palawan 1st

    DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction/Improvement of J.M. Basa-Gen. Hughes-Fort

    San Pedro Road02/06/2015 Iloilo City DEO 23.375 155 C 0.386 0.2 0.3 - - - 88.60% *88.6% Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Widening of Jct. New Sagay - Old Sagay Rd with drainage,

    K0084 + (-828) - K0085+337, Sagay City, Negros Occidental 11/19/15Regional Office,

    NIR49.212 245 C 0.44 0.135 0.3 - - - 87.50%

    87.5%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction/Upgrading/Rehabilitation of Drainage along

    Bacolod North Road, K0005+(-135) - K0006+622, Talisay City,

    Negros Occidental

    11/18/15

    Negros

    Occidental 1st

    DEO

    9.297 252 C 0.454 0.133 0.3 - - - 88.70%88.7%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Rehabilitation /Reconstruction/ Upgrading of Damaged

    Paved National Road including Drainage Based on

    Pavement Management System / Highway Development and

    Management - 4 (HDM-4) (Intermittent Section), along

    Hinigaran-Isabela Road, K0058+263 - K0059+000, Barangay

    Paticui, Hinigaran, Negros Occidental

    11/16/15

    Negros

    Occidental 2nd

    DEO

    12.674 157 C 0.427 0.134 0.3 - - - 86.10%86.04%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY/REDSON CONSTRUCTION AND

    SUPPLIES (JOINT VENTURE)

    JV-13-257Rehab./Reconstruction/Upgrading/Concreting of Access

    Road Leading to Gawahon Resort, with exceptions12/06/2015

    Negros First

    DEO36.23 280 C 0.356 0.2 0.3 - - - 85.60% *85.6% Satisfactory

    A.F.G. CONSTRUCTION AND SUPPLY 27999

    Construction of Farm to Market Road, Barangay

    Laguinbanwa West, Numancia, Aklan11/16/15 Aklan 4.652 80 C 0.421 0.2 0.3 - - - 92.10%

    92.1%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page5

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.I.P. CONSTRUCTION 32458

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Roads including Drainage Based on Pavement

    Management System/Highway Development and

    Management-4 (HDM-4) (Intermittent Section), Lt. Takay

    Road, K0308+(-599) to K0308+000 & K0308+616 to

    K0308+754, Baguio City

    04/09/2015Baguio City

    DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -

    A.J Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road,

    Solsona-Kabugao Road, Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

    A.J. Lava Builders 22265Repair & Maint. of Flood Control & Drainage Structures

    along Rofriguez-San Jose-Quezon City Rd.11/19/12 IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -

    A.J. LAVA BUILDERS CORP. (Formerly: A.J.

    Lava Builders)22265

    National Road Services - Network Development - Widening

    of National Road - Arterial Roads, Marikina-Infanta Roads,

    K0 035+540 - K0 036+440, K0 037+290 - K0 037+484

    26/08/2015 Rizal 1st 19.6 180 C 0.454 0.133 0.3 - - - 88.70%*88.7%

    Satisfactory

    A.J. Taylan Construction Corp/FR Espiritu Jr.

    Builders (JV)JV-14-074 Additional Priority Flood Control Project 21/10/2014 I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%

    86.10%

    Satisfactory

    A.J. TAYLAN CONSTRUCTION CORPORATION 2336

    Laoag River Basin Flood and Sabo Project, Concrete

    Revetment along Bongo River Brgy. Sta. Monica, Sitio 2,

    San Nicolas, Ilocos Norte

    11/13/15

    ILOCOS

    NORTE 2ND

    DEO

    9.650 194 OG 0.38 0.24 0.15 0.03 0.055 0.05 90.50%90.5%

    Very Satisfactory

    A.J. Taylan Construction Corporation/Zedik

    Builders (JV)JV-13-345

    Road Upgrading (Gravel to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved

    Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu)

    Road

    08/08/2014 I 28.942 236 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 -

    A.L Gantuangco Construction 30872Construction of the Diversion Works and Canal System of

    Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

    A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

    A.L. Dare Construction 11932Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.

    Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+18407/29/13 III 11.909 139 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30

    A.L. DARE CONSTRUCTION -Rehabilitation/Construction of Slope Protection along

    Cabetican, Bacolor, Pampanga01/06/2015

    Pampanga 1st

    DEO6.32 118 C 0.333 0.2 0.3 - - - 83.30% *83.3% Satisfactory

    A.L. SALAZAR CONSTRUCTION INC. 3899Drainage Improvement of Commonwealth Avenue Drive to

    Zuzuaregui, Brgy. Batasan Hills, Quezon City25/08/2015 QC 1st DEO 17.562 270 O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% -

    A.L. Salazar Construction, Inc. 3899Rehabiliation/Improvement of drainage System along C-3

    Road22/11/2014 NCR 17.425 209 O 0.380 0.240 0.150 0.030 0.045 0.033 87.80%

    87.80%

    Satisfactory

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-

    Bantulan Port (Km.210+000-Km.214+211)03/12/13 IVB 89.312 450 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Road

    (Km.210+000-Km.214+211)08/03/12 IVB 81.362 349 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -

    A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

    A.M. AYUNAN CONSTRUCTION 13983Construction/Rehabilitation of Brgy Hall

    11/11/15Cotabato First

    DEO0.924 75 OG 0.363 0.16 0.052 0.03 0 0.016 62.10%

    62.1%

    Poor

    A.M. Oreta & Co., Inc./IBC Int'l Builders Corp.

    (JV)JV-07096 Kalibo Airport Development Project 06/17/15 DOTC 287.056 360 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 -

    A.M. Oreta / IBC (Joint Venture) JV-11-210Const. of Drainage System along Iloilo-Capiz Rd. (Old

    Route) Nat'l Rd. CPU Sect., Iloilo City08/06/12 VI 42.875 240 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -

    A.M. TABAYAG BUILDERS 15008

    Construction/Concreting of Local Road, Lower Bayao,

    Tukuran, Zamboanga del Sur 11/13/15Zamboanga Del

    Sur 1st DEO2.938 45 C 0.422 0.133 0.3 - - - 85.50%

    85.5%

    Satisfactory

    A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Cnstruction of Barangay Road (New Road with PCCP

    Surfacing), Brgy. Tagumpay Sta. 000+008.10- Sta. 000+22504/06/2015

    Palawan 1st

    DEO1.866 40 C 0.456 0.133 0.3 - - - 88.90% *88.9% Satisfactory

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Construction of Barangay Road (New Road with PCCP

    Surfacing) Brgy, Tagumpay Sta. 000+0008.10-Sta.

    000+225.00, Roxas, Palawan

    26/08/2015 Palawan I DEO 1.866 40 C 0.425 0.136 0.3 - - - 86.10%*86.1%

    Satisfactory

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Repair/Maintenance of Tagbulan River Revetment,

    K0143+955, Roxas-Taytay Road, Brgy. Minara11/13/15

    Palawan 1st

    DEO2.415 45 C 0.428 0.133 0.3 - - - 86.10%

    86.1%

    Satisfactory

    A.P.B. Construction 17055Rehab./Reconst./Upgrading of Damaged Paved National

    Road, PMA cut-off Road 2 K0+000-K0+36008/18/11 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page6

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.P.B. CONSTRUCTION 17055

    Off-Carriageway Improvement along Baguio-Bontoc Road,

    K0253+(-586) to K0253+000, K0259+450 to K0259+600,

    K0260+500 to K0262+000

    02/06/2015Benguet 1st

    DEO18.999 150 O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% -

    A.P.B. CONSTRUCTION 17055

    Improvement/Upgrading of Naguilian-Bagulin Road Leading

    to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to

    Sta. 271+279, Naguilian, La Union

    30/08/2015La Union 2nd

    DEO41.295 179 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% -

    A.P.O. General Construction 7010

    Road Upgrading (Gravel to Paved) along Acop-Kapangan-

    Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -

    K0287+685, K0289+214 - K0289+473, K0289+549 -

    K0289+709, K0290+901 - K0291+000, K0292+016 -

    K0292+114, K0298+781 - K0299+514, K0299+531 - K0299+816

    20/11/2014 CAR 72.026 267 O 0.362 0.240 0.150 0.030 0.061 0.050 89.30%89.30%

    Very Satisfactory

    A.P.O. General Construction 7010Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan-

    Kibungan-Bakun Rd., K0348+000-K0349+00008/01/13 CAR 23.654 207 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 -

    A.P.O. General Construction 7010

    Rd. Upgrading (gravel to concrete) along Acop-Kapangan-

    Kibungan-Bakun Rd., K0285+444-K0286+840 V.S.

    (K0285+423-K0286+836 as per RBIA) & K0345+470-

    K0348+000 V.S. (K0345+500-K0348+000 as per RBIA)

    11/21/12 CAR 59.896 237 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -

    A.P.O. GENERAL CONSTRUCTION 7010

    Road Upgrading (Gravel to Paved) along Acop-Kapangan-

    Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -

    K0287+685, K0289+214 - K0289+473, K0289+549 -

    K0289+709, K0290+901 - K0291+000, K0292+016 -

    K0929+114, K0296+781 - K0299+514, K0299+531 - k0299+816

    03/06/2015 CAR 72.026 267 C 0.398 0.175 0.3 - - - 87.30% *88.5% Satisfactory

    A.P.O. GENERAL CONSTRUCTION 7010

    Road Upgrading (Unpaved to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standards (HDM-4 Project Analysis) (Intermittent Sections)

    along Mt. Province - Ifugao Road (Kiling - Paracelis Section),

    K0460+508 to K0460+868, K0467+904 to K0469+000,

    K0471+451 to K0472+061, K0473+155 to K0473+582,

    K0474+350 to K0474+368, K0477+312 to K0477+341,

    Paracelis, Mt. Province

    29/08/2015 CAR 54.883 237 O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% -

    A.R. & Mark Builders 31673 Const. of Multi-Purpose Building, BUSECO Compound 21/10/2014 X 7.920 124 O 0.304 0.240 0.017 0.010 0.022 0.033 62.60%62.60%

    Poor

    A.R. & Mark Builders 31673Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag

    South PS, Pob.08/08/13 X 1.448 187 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 -

    A.R. & MARK BUILDERS 31673

    Cluster 2014-28, Construction of Roads; Municipalities of El

    Salvador (Brgy. Sinaloc, Bolisong, Himaya, Sambulawan);

    Jasaan (Brgy. Kimaya, Luz Banson), Misamis Oriental11/16/15

    Misamis

    Oriental 2nd8.348 105 C 0.207 0.2 0.3 - - - 70.70%

    70.7%

    Poor

    A.R. Lustre Jr. Construction 7680Conc. of Puerto Princesa South Rd. (Aborlan Sect.

    Km.60+024.80-Km.64+000 w/ exceptions)03/15/13 IVB 62.614 240 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -

    A.R. Lustre, Jr. Construction 7680Const. of Taguliat Bridge along PPSR-JCT-Napsan-

    Apurawan Rd., K0037+67508/15/13 IVB 18.839 515 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 -

    A.R.T. DWELL LIFESTYLE STORE and ECO

    BUILDERS38284

    Rehab./Reconst./Upgrading of Damaged Paved National

    Road Including Drainage Based on Pavement Management

    System Highway Development & Management-4 (Intermittent

    Section), Angeles-Porac-Floridablanca-Dinalupihan Road at

    K0084+(-305) - K0084+122

    11/13/15Pampanga

    Third DEO5.855 75 C 0.458 0.133 0.3 - - - 89.10%

    89.1%

    Very Satisfactory

    A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

    A.S.T. BUILDERS 34104Widening of National Roads, Secondary Roads, R. Palma

    Street, Chainage 0 - Chainage 38, Chainage 0 - Chainage 37903/09/2015 Cebu City 7.71 150 C 0.432 0.178 0.3 - - - 91.00%

    *91% Very

    Satisfactory

    A.T. DUMLAO CONSTRUCTION INC. 34028

    Rehabilitation/Reconstruction of National Roads with Slips,

    Slope Collapse and Landslide along NRJ Cuevas-Bislig

    Road, K1378+327 - K1378+443 (RBIA Chainage), K1378+320 -

    K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)

    11/11/15Agusan del Sur

    2nd DEO25.215 208 OG 0.383 0.252 0.15 0.03 0.045 0.05 91.00%

    91%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page7

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.T. DUMLAO CONSTRUCTION, INC. 34028

    Construction/Widening of Adlayan Bridge Along Daang

    Maharlika (Agusan-Davao Section) (B00914MN) K1307+585-

    K1307+614.80

    25/08/2015Agusan del Sur

    2nd36.641 377 C 0.463 0.133 0.3 - - - 89.60%

    *85.52%

    Satisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumalao Civil Engineer -

    Contractor)

    34028

    Construction/Widening of Adlayan Bridge along Daang

    Maharlika (Agusan - Davao Section) K1307+585 -

    K1307+614.8

    08/08/2014 XIII 36.650 196 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao Civil Engineer-Contractor)34028

    Replacement of San Pedro Bridge along Daang Maharlika

    (Surigao-Agusan Rd.) Brgy. San Pedro11/21/12 XIII 14.945 390 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao Civil Engineer-Contractor)34028

    Replacement of Lengigon Bridge (Temporary to Permanent)

    along Argao - Moalboal Road, Municipality of Argao24/10/2014 VII 12.230 270 O 0.400 0.300 0.000 0.030 0.055 0.000 78.50%

    78.50%

    Unsatisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer - Contractor)34028

    Reconst. of Timamana Bridge along Daang Maharlika

    Highway (Surigao-Agusan Rd.), Brgy. Timamana03/14/13 XIII 24.213 496 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -

    A.T. DUMLAO CONSTRUCTION, INC.

    (Formerly: Andoni T. Dumlao, Civil Engineer -

    Contractor)

    34028Widening of Permanent Bridge (from 1 lane to 2 lane) at

    Sumaguan Bridge along Argao - Moalboal Road29/08/2015 Cebu 4th 24.872 191 C 0.355 0.2 0.3 - - - 85.50%

    *85.5%

    Satisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer-Contractor)34028

    Replacement of San Pedro Bridge along Daang Maharlika

    (Surigao-Agusan Rd.), Brgy. San Pedro03/14/13 XIII 15.781 435 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer-Contractor)34028

    Rehab./Reconst. of Hubang Bridge along Daang Maharlika

    (Agusan-Davao Rd.) Km.1307+369-Km.1307+53603/09/13 XIII 19.141 380 O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -

    A.T. DUMLAO CONSTRUCTION, INC.

    (Formerly: Andoni T. Dumlao, Civil Engineer-

    Contractor)

    34028Replacement of Lengigon Bridge( Temporary to Permanent)

    along Argao-Boalboal Road11/06/2015

    Cebu Fourth

    DEO13.23 300 C 0.477 0.16 0.3 - - - 93.70%

    *84.58%

    Satisfactory

    A.V. CONSTRUCTION & SUPPLY (Formerly:

    A.V. Construction)13202

    Construction of Two (2) Storey, Two (2) Classroom School

    Building at Marcos E/S12/06/2015

    Laguna 3rd

    DEO4.196 90 C 0.365 0.161 0.3 - - - 82.60% *82.6% Satisfactory

    A.V. CONSTRUCTION AND SUPPLY

    (Formerly: A.V. Construction)13202

    Concreting of Tiguion-Canaon-Talao Farm to Market Road11/16/15

    Marinduque

    DEO5.698 85 C 0.449 0.133 0.3 - - - 88.20%

    88.2%

    Satisfactory

    A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project 10/24/14 NHA 19.225 330 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 -

    A.Y.U. ENGINEERING AND CONSTRUCTION 25632

    Improvement/Rehabilitation @ Quimpo Boulevard Ecowest

    Drive, Ecoland, Barangay Bucana, Brgy. 76-A, Davao City 11/19/15Davao City 1st

    DEO0.000 149 C 0.479 0.133 0.3 - - - 91.20%

    91.2%

    Very Satisfactory

    AB Aponesto Construction, Parts & Supply 22998Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-

    Km.278+71109/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -

    ABJ CONTRACTOR SERVICES 35865Construction of Farm-to-Market Road, Guiwan, Zamboanga

    City11/18/15

    Zamboanga

    City DEO2.819 68 C 0.402 0.133 0.3 - - - 83.50%

    83.5%

    Satisfactory

    Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

    Abulug Developers & Builders Co., Inc. 2366Reblocking along Manila North Road (Fugu Bdry.-Bangag

    Section)05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

    AC RIVERO DEVELOPMENT CORPORATION 5122

    Const./Imprv't of Access Road to Sabsaban Falls & Eco Park

    11/10/15Palawan 2nd

    Deo31.345 172 OG 0.308 0.3 0.15 0.006 0.035 0.033 83.20%

    83.2%

    Satisfactory

    AC Rivero Development Corporation

    (Formerly: AC Rivero Construction)5122

    Const. of Bridge at Dodiongan Box Culvert along Sta.

    Felomina-Bonbon-Digkilaan-Rogongon Road29/10/2014 X 24.567 295 O 0.339 0.278 0.150 0.010 0.051 0.050 87.80%

    87.80%

    Satisfactory

    ACCELERATED METAL TECHNOLOGY &

    CONSTRUCTION, INC. (Formerly: A.M.

    Tumolva Construction and Development

    Corp.)

    32073Construction of Multi-Purpose Building at Delnacia Subd.,

    Brgy. Talipapa, Quezon City25/08/2015 QC 1st DEO 4.749 120 C 0.487 0.2 0.3 - - - 98.70%

    *98.7%

    Outstanding

    Accuracy Builders Enterprise 27507 Rehabilitation of Banaue Hotel Roofing 01/13/14 TIEZA 19.880 180 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 -

    ACJ Construction Resources 10635

    Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l

    Secondary Rd., Km.1628+584-Km.1630+803 along

    Kidapawan-Magpet-Pangao-an Rd.

    08/17/11 XII 24.178 180 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -

    ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section

    (Km. 1648+300-Km.1649+385.63)09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

    ACJ Construction Resources 10635Concreting of Poblacion Magpet-Nowa Road (Nowa Basak

    Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page8

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    ACJ Construction Resources 10635

    Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd.,

    K1657+(-247)-K1659+824 along Paco-Roxas-Arakan Valley

    Rd.

    08/10/12 XII 46.844 384 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 -

    Acme Builders Corporation 6442Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000-

    K0911+500 & K0913+000-K0913+90008/22/13 VIII 55.416 270 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 -

    Acme Builders Corporation 6442Rehab./Strengthening of Rosales Bridge along Daang

    Maharlika (SM) (San Isidro-San Juanico Bridge)08/14/13 VIII 25.251 165 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 -

    Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of Damaged Pavement,

    Tacloban Baybay South Rd.06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -

    Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

    Acme Builders Corporation / B. Vicencio

    ConstructionJV-07-066

    Const. of Palo East By Pass Road (Const. of Bernard Reed II

    Bridge)08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

    Acme Builders Corporation / MWJ

    Construction (JV)JV-08-243

    Const. of Albuera-Burauen Road including Bridges, Burauen

    Sect.09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

    Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads

    Gingoog-Calveria-Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

    Adfil Corporation 14437Const./Improvement of Road to Support River Rhine Cruise

    leading to Banza Ruins, Barangay Banza14/08/2014 XIII 26.706 148 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 -

    Adfil Corporation 14437

    Rehab./Reconstruction/Replacement/Retrofitting of

    Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan

    (Agusan - Misamis Oriental)

    15/08/2014 XIII 36.843 234 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 -

    Adfil Corporation 14437Construction of Agusan - Bukidnon Road, Sta. 1262+260 -

    Sta. 1265+12005/08/2014 XIII 40.140 209 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 -

    Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of Tabon-Tabon

    Slip along Agusan- Davao Road06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -

    Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -

    Adfil Corporation 14437

    Rehab./Reconst. of Damaged Paved National Rd. along

    Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental

    Sect.)Libertad-Bancasi Sect.

    09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

    Adfil Corporation 14437Const./Completion/Continuation of Unfinished Bridge and

    Approaches, Brgy. Libertad09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

    Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Construction of Agusan-Bukidnon Road, Sta. 1262+260 -

    Sta. 1265+12021/10/2014 XIII 40.140 271 O 0.387 0.182 0.150 0.024 0.065 0.050 85.80%

    85.80%

    Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 08/23/13 XIII 19.207 219 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening/Conc. of Add'l. Lane Both Directions along Butuan

    City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.5008/06/13 XIII 86.661 240 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Road Upgrading (Gravel to Paved) of Butuan City-Pianing-

    Tandag Road, K1237+055 - K1240+040, with exceptions30/10/2014 XIII 127.287 270 O 0.346 0.240 0.150 0.024 0.056 0.050 86.60%

    86.60%

    Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Reconstruction/Replacement/Completion of Minusong

    Bridge along Butuan-Cagayan de Oro-Iligan Road (Agusan--

    Misamis Oriental), Km1269+217

    21/10/2014 XIII 34.627 270 O 0.343 0.286 0.150 0.030 0.065 0.050 92.40%92.40%

    Very Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Replacement/Retrofitting of Salvacion

    Bridge along NRJ Cuevas - Bislig Road, K1374+670 -

    K1374+731

    08/08/2014 XIII 36.656 196 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro-

    Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692-

    K1499+712; c)K1500+678-K1500+902; d)K1501+905-

    K1507+000; e)K1508+000-K1508+919

    03/12/13 X 48.167 285 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds.,

    Butuan City-Cagayan de Oro City-Iligan City Rd.:

    a.)K1494+049-K1495+240; b.)K1499+692-K1499+712;

    c.)k1500+678-K1500+902; d.)K1501+905-K1507+000;

    e.)K1508+000-K1508+919

    11/23/12 X 44.537 255 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 03/21/13 XIII 18.426 171 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening/Conc. of Add'l Lane along Daang Maharlika

    (Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540-

    Sta.1215+520

    03/11/13 XIII 29.059 142 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page9

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Completion of Maraput Bridge along Daang Maharlika

    (Surigao-Agusan Rd.), Sta.1207+19203/11/13 XIII 9.115 120 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Const./Impv't of Rd. to Support River Rhine Cruise, Banza

    Ruins03/21/13 XIII 29.509 155 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Completion of La Union Bridge along Pandanon-Magallanes

    Rd.03/11/13 XIII 15.889 150 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Conc. of Agusan-Malaybalay Road, Km. 1283+183.50-

    Km.1284+78003/31/12 XIII 39.495 300 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan-

    Misamis Oriental Sect.) Pob., Buenavista Sect.08/06/12 XIII 24.129 255 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab. of Salvacion (Crossing Luna Flood Control) 08/20/12 XIII 16.733 285 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob.,

    Cabadbaran Sect.08/06/12 XIII 27.390 255 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Minusong Bridge along

    Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental)

    Km.1269+217, Aclan, Nasipit

    08/06/12 XIII 28.848 270 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Minusuang Bridge along

    Daang Maharlika (Surigao-Agusan Rd.) Km.1206+56108/07/12 XIII 23.512 270 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Maraput Bridge along

    Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy.

    Victory

    08/07/12 XIII 23.512 285 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 -

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Construction/Upgrading of Banza to Magallanes Road

    leading to Centennial Tree and Beaches, Magallanes,

    Agusan del Norte

    11/19/15Agusan del

    Norte DEO37.219 185 C 0.403 0.2 0.3 - - - 90.30%

    90.3%

    Very Satisfactory

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Widening of Daang Maharlika (Agusan-Davao Section),

    K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San

    Francisco, Agusan del Sur

    11/11/15 Regional Office 169.799 300 OG 0.257 0.3 0.15 0.03 0.065 0.033 83.50%83.5%

    Satisfactory

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Widening of Permanent Bridges to more than 2 lanes, Wawa

    Bridge (B00896MN) along Daang Maharlika (Agusan-Davao

    Road Section), Brgy. Wawa, Sibagat, Agusan del Sur11/9/15 Regional Office 207.695 340 OG 0.317 0.24 0.15 0.03 0.055 0.033 82.50%

    82.5%

    Satisfactory

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the Help for Catubig

    Agricultural Advancement Proj.05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the HELP for Catubig

    Agricultural Project (HCAAP)08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

    Adimre Construction 25534 Taytay Airport Development Project 07/22/15 DOTC 10.794 154 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 -

    Adimre Construction 25534 Marinduque Airport Development Project 08/07/15 DOTC 6.293 120 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 -

    Adimre Construction 25534 Balagtas Port Development Project 07/10/14 DOTC 7.802 180 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 -

    Adimre Construction 25534 Obando Port Development Project 08/18/14 DOTC 8.109 194 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 -

    Adimre Construction 25534 Malolos Port Development Project 08/19/14 DOTC 9.625 254 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 -

    Adimre Construction 25534 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS 08/14/13 III 7.027 180 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 -

    Adimre Construction 25534Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan

    Section Km. 46+000-Km. 47+20008/02/12 III 11.886 170 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 -

    Adimre Construction 25534 Meycauayan Port Development Project 07/09/14 DOTC 8.300 150 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 -

    ADIMRE CONSTRUCTION 25534 Marinduque Airport Development Project 11/12/15 DOTC 6.293 120 C 0.498 0.200 0.300 - - - 99.7595.31% V.

    Satisfactory

    ADIMRE CONSTRUCTION 25534 Taytay Airport Development Project 12/17/15 DOTC 10.794 105 C 0.440 0.200 0.300 - - - 94.0488.43%

    Satisfactory

    ADIMRE CONSTRUCTION 25534 Puerto Princesa Airport Development Project 03/29/16 DOTC 64.553 420 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page10

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Adimre Construction 25534 Puerto Princesa Airport Development Project 9/20/16 DOTC 64.553 420 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 -

    ADP Construction & Supply 3466 Const. of Sta. Barbara Catching DAM and Canal Struc. 04/05/14 NIA 16.962 150 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 -

    ADP Construction & Supply 3466 Const. of Various CIP's Package 1 - Badbaran CIP 04/13/13 NIA 24.770 210 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 -

    ADP CONSTRUCTION AND SUPPLY 3466

    Construction of Juaneza-Aguirre-Malapaya Farm-to-Market

    Road (Sta. 0+000-Sta.4+000 with exceptions), Sara, Iloilo 11/14/15 Iloilo 3rd 47.767 190 C 0.365 0.2 0.3 - - - 86.50%86.5%

    Satisfactory

    ADP CONSTRUCTION AND SUPPLY 3466

    Reconstruction/Improvement of Dumalag Municipal Road,

    Brgy. Poblacion, Dumalag, Capiz (Section I) 11/13/15 Capiz 2nd 35.960 224 OG 0.366 0.232 0.15 0.03 0.07 0.05 89.80%89.8%

    Very Satisfactory

    Advance Foundation Const. System Corp. /

    Abulug Developer Builders Const. Inc. (JV)JV-09-289

    Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao

    Road03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -

    Advance Tech Construction & Trading Corp. 35288 Cabucgayan Seaport Construction 08/11/15 DOTC 8.606 240 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 -

    Advance Tech Construction & Trading Corp/ 35288 Miag-ao Feeder Port Development 11/16/16 DOTC 7.161 120 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 -

    Advance Tech Construction & Trading

    Corporation35288 Construction of Brgy. Iquiran Wharf 10/14/15 DOTC 9.438 180 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 -

    Advance Tech Construction & Trading

    Corporation35288 Construction of Iquiran Wharf 01/21/16 DOTC 9.438 180 C 0.492 0.200 0.300 - - - 99.15

    95.91%

    V. Satisfactory

    Advance Tech Construction & Trading

    Corporation35288 Cabucgayan Port Development Project 02/16/16 DOTC 8.602 240 C 0.467 0.200 0.300 - - - 96.70

    95.30%

    V. Satisfactory

    ADVANCED FOUNDATION CONSTRUCTION

    SYSTEM CORP./PULSAR CONSTRUCTION

    (JV)

    JV-13-601

    Construction and Maintenance of Bridges along National

    Roads-Construction of Bridges-On-going, Lucban Bridge

    along Manila North Road

    01/06/2015Regional Office

    No. I278.183 674 O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% -

    Advanced Foundation Construction System,

    Corp.15449

    Lucban Bridge & Approaches Phase I along Manila North

    Rd.08/01/13 II 153.067 450 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 -

    Advanced Foundtaion Construction System

    Corp./Pulsar Construction(JV)JV-13-601

    Construction and Maintenance of Bridges along National

    Roads - Construction of Bridges - On going; Lucban Bridge

    along Manila North Road

    22/10/2014 II 253.267 650 O 0.456 0.225 0.150 0.030 0.033 0.033 92.70%92.70%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873 Structural Retrofitting of Buildings at PICC Phase 1 1/27/16 BSP 36.535 240 C 0.481 0.200 0.300 - - - 98.1092.50%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873Rehabilitation of Common Maintenance Shop (CMS) at BSP,

    SPC1/27/16 BSP 19.053 188 C 0.466 0.200 0.119 - - - 78.50

    86.90%

    Satisfactory

    Advanced Matrix Construction Inc. 32873 Full Upgrading of Toilets at PICC 1/26/16 BSP 29.298 210 C 0.481 0.200 0.300 - - - 98.1093.50%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873 New Roofing System for Building E Roofdeck 3/2/16 BSP 23.296 321 C 0.469 0.200 0.194 - - - 86.3084.30%

    Satisfactory

    Advanced Matrix Construction Incorporated 32873 Rehabilitation of Building B Lighting System 10/08/13 BPS 2.000 60 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 -

    Advanced Matrix Construction Incorporated 32873Proposed Renovation of Executive Offices Located at 5th

    Floor, 5-Storey Building-Phase IV03/06/14 BSP 14.500 146 C 0.431 0.200 0.300 - - - 93.10

    *93.10%

    V. Satisfactory

    Advanced Matrix Construction, Inc. 32873 New Roofing System for Building E Roofdeck 11/19/14 BSP 22.300 120 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page11

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Advanced Matrix Construction, IncorporatedImprovement of BSP-SPC Parking Lot at BSP Security Plant

    Complex03/31/13 BSP 13.800 180 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 -

    AEJ Hardware Construction & Enterprises 34740

    Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria

    Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500-

    K1851+600

    03/11/13 IX 1.880 64 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 -

    AFG CONSTRUCTION AND SUPPLY 17161

    Construction of Academic Building at: 6. Construction of 2-

    CL Alimanguan National High School, Brgy. Alimanguan,

    San Vicente, Palawan

    26/08/2015 Palawan I DEO 1.712 120 C 0.485 0.167 0.3 - - - 95.20%*95.2% Very

    Satisfactory

    Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

    AGUERO CONSTRUCTION 23338

    Cluster XII- Construction of Classrooms in Areas

    Experiencing Acute classroom Shortage in Lake Sebu,

    South Cotabato (1 Unit-2CL/1 Unit-3CL & 1 Unit-1CL)

    02/06/2015South Cotabato

    DEO4.808 210 C 0.45 0.133 0.3 - - - 88.30% *88.3% Satisfactory

    AGUINSOD GENERAL CONSTRUCTION 34741

    Construction of Slope Protection/Retaining Wall along Pico-

    Lamtang Road, K0256+300 - K0256+420, K0258+163 -

    K0258+235, K0259+670 - K0259+700, K0260+665 -

    K0260+725, K0262+500 - K0262+585

    02/06/2015Benguet 1st

    DEO8.292 120 O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% -

    AHMADI BUILDERS 31752

    Construction of roads at Iligan City a) Purok 8, Upper

    Tominobo, Iligan City, b) Purok Mauswagon to Purok Pag-

    asa, Barangay Ditucalan, Iligan City, c) Purok 5, Barangay

    Sta. Elena, Iligan City

    08/06/2015Lanao del Norte

    Second DEO1.927 45 C 0.424 0.2 0.3 - - - 92.40%

    *92.4% Very

    Satisfactory

    Ahnex Builders & Ready Mix Corporation 32296 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 11/23/12 IVA 30.797 369 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 -

    Ahnex Builders & Ready Mix Corporation 32296Widening of Governors Drive (Carmona-Dasmariñas-Trece

    Martires City Rd.) inc. Drainage System08/15/12 IVA 38.813 190 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 -

    AJ TAYLAN CONSTRUCTION

    CORPORATION/DJCM

    CNSTRUCTION/ALTHEA CONSTRUCTION (JV)

    JV-14-867

    Rehabilitation/Reconstruction of National Roads with Slips,

    Slope Collapse and Landslide, Batac-Pinili via Maipag Road,

    K0472+520, K0479+192, K0479+735, Batac, Ilocos Norte11/12/15

    REGIONAL

    OFFICE56.537 242 C 0.478 0.147 0.3 - - - 92.50%

    92.5%

    Very Satisfactory

    AJ Tylan Const., Corp./DJCM Const/VVH

    Const., Corp./ZEDIK Builders (DAVZ JV)JV-13-702

    Construction and Maintenance of Bridges along National

    Roads-Widening of Permanent Bridges, Subec Bridge along

    MNR

    21/10/2014 I 36.706 304 O 0.330 0.249 0.150 0.030 0.056 0.050 86.50%86.50%

    Satisfactory

    Ajan Jaeda, inc. 17869Corollary Works for Banquerohan Resettlement Project, Ph.

    29/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -

    Ajan Jeada, Inc. 17869 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) 08/03/11 V 18.989 221 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.

    (New Carment Sect.)03/11/13 XII 17.419 214 O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 -

    AJYSC Marketing 26924Const./Replacement of Banga Bridge and Approaches

    Phase II03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -

    AJYSC Marketing 26924Rehab./Improvement of Bulok Bridge along Marbel-Makar

    Road06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.,

    New Carmen Sect.11/24/12 XII 17.419 214 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawqan-Marbel Rd.

    (New Carment Sect.)08/08/12 XII 17.419 196 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 -

    AJYSC MARKETING 26924Repair/Rehab./Improvement along Dulawan-Marbel Road

    (Griño- Tacurong Section) 03/06/2015

    Sultan Kudarat

    1st DEO10.349 143 C 0.441 0.133 0.3 - - - 87.40% *87.4% Satisfactory

    AJYSC MARKETING 26924Construction of Revetment at the Side of Damaged River

    Bank of Banga Bridge along Cotabato-Marbel Road02/06/2015

    South Cotabato

    DEO5.798 150 C 0.398 0.133 0.3 - - - 83.10% *83.1% Satisfactory

    AJYSC MARKETING 26924

    Midsayap-Marbel Road, K1777+409-K1780+1020 ( with

    exceptions), Luayan-Dumadalig Section, Tantangan, South

    Cotabato Modified to: MF01- Widening of Secondary Road-

    Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with

    exceptions), Luayan-Dumadalig Section

    02/06/2015South Cotabato

    DEO43.944 174 O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page12

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    AJYSC MARKETING 26924

    Midsayap-Marbel Road K1777+353 to K1779+553.16 with

    exception Luayan-Dumadalig Section, Tantangan South

    Cotabato, 2nd LD

    11/9/15South Cotabato

    First DEO47.958 234 OG 0.36 0.248 0.15 0.03 0.042 0.05 88.00%

    88%

    Satisfactory

    AJYSC MARKETING 26924

    Construction and Namleaning of Bridges along National

    Roads- Widening of Permanent Bridges to more than 2

    lanes, Bawing Bridge along Makar-Kiamba Road11/18/15

    South Cotabato

    Second DEO25.481 176 OG 0.346 0.3 0 0 0.023 0 66.90%

    66.9%

    Poor

    AJYSC MARKETING 26924

    Construction/Rehabilitation of Drainage Protection Works

    along National Roads - Nationwide: Construction of the

    Revetment along the Damaged Riverbank of Banga Bridge

    along Cotabato-Marbel Road

    02/09/2015 South Cotabato 5.24 98 C 0.411 0.147 0.3 - - - 85.80%*85.8%

    Satisfactory

    AKH Construction and Trading Corporation 20759

    Preventive Maintenance Based on Pavement Management

    System/Highway Development and Management-4 (HDM-4)

    along V. Mapa Street

    24/11/2014 NCR 22.598 206 O 0.381 0.240 0.150 0.030 0.045 0.033 87.90%87.90%

    Satisfactory

    AKH Construction and Trading Corporation 20759Proposed Repair/Rehab. Of Road along Jalandoni St., CCP

    Complex17/08/2014 NCR 8.100 90 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 -

    AKH Construction and Trading Corporation 20759

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd.

    (Int. Sect.) of Mendiola Extension (Chainage 0000-Chainage

    0119, A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-

    085)

    03/13/13 NCR 2.678 69 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 -

    AKH CONSTRUCTION AND TRADING

    CORPORATION20759

    Concrete Reblocking along commonwealth Ave., Quezon

    City, K0017+061 - K0020+(-262), K0016+938 - K0019+731,

    Quezon City

    06/06/2015 NCR 17.988 273 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% -

    AKH CONSTRUCTION AND TRADING

    CORPORATION20759

    Rehabilitation/Reconstruction/Upgrading of Damaged South

    Super Highway East Service Road, K13+890 to K16+793,

    Parañaque City

    03/09/2015 NCR 27.364 165 O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% -

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Slope Protection of Estero Tripa De Gallina, Barangay

    Bangkal19/11/2014 NCR 17.321 150 O 0.357 0.300 0.059 0.030 0.049 0.050 84.50%

    84.50%

    Satisfactory

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at

    corner Pacheco)04/15/11 NCR 17.977 248 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Rehab./Reconstruction of Muntinlupa Insular Prison Road

    and its Vicinity, Brgy. Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -

    AKN CONSTRUCTION CORPORATION

    (Formerly: AKN Construction)11845

    Dredging of Marala River, (from C-3 to C-4), Sta. 1+400 to

    Sta. 2+750, Navotas City06/06/2015 NCR 50.541 120 C 0.48 0.2 0.3 - - - 98.00% *98% Outstanding

    AKN CONTRUCTION CORP. 11845Dredging of Paranaque River Mouth (Phase I), Paranaque

    City, Metro Manila12/3/15

    Metro Manila

    2nd DEO86.133 240 OG 0.4 0.2 0.05 0.036 0.25 - 93.60%

    93.6%

    Very Satisfactory

    AL CHRIS CONSTRUCTION 12406Health Facilities and Multi-Purpose Buildings (Cluster II) a)

    Construction of Public Market27/08/2015 Bohol 2.877 140 C 0.473 0.078 0.3 - - - 85.10%

    *85.1%

    Satisfactory

    AL Chris Construction 12406BERRRP-Candumayao (Catigbian) - Cabanugan (San Isidro)

    rd.01/19/15 Bohol 8.874 209 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 -

    AL HUSSEIN CONSTRUCTION 18438

    Rehabilitation/Reconstruction of National Road with Slips,

    Collapse and Landslides, Lanao del Norte Interior

    Circumferential Road (LDN1CR), K1536+610-K1536+750;

    K1544+120-K1544+725, Tagoloan, Lanao del Norte

    03/09/2015Lanao del Norte

    1st DEO44.744 205 O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% -

    Al-B Construction 11740Rehab./Reconst./Upgrading along Angeles-Porac-

    Floridablanca-Dinalupihan Rd.06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -

    AL-B DEVELOPMENT CORP./PING-ANN'S

    CONSTRUCTION AND TRADING (JV)JV-14-075 Reconstruction of Loboc River Terminal 8/27/15 TIEZA 19.500 240 C 0.481 0.200 0.300 98.10

    93.9%

    Very Satisfactory

    AL-B DEVELOPMENT CORPORATION

    (Formerly ALB Construction)11740

    Network Development, Widening of National Roads, (Arterial

    Roads-Outside N1), Angeles-Porac-Floridablanca-

    Dinalupihan Road at KO084+(-615) to KO085+(-024), Angeles

    City, Pamapanga 1st LD

    29/08/2015Pampanga

    Third DEO34.069 210 O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% -

    AL-B Dev't Corp./ Ping-Ann's Construction

    and Trading (JV)JV-14-075 Reconstruction of Loboc River Terminal 6/24/15 TIEZA 19.550 240 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 -

    ALBERTO UY CONSTRUCTION &

    DEVELOPMENT20924

    Rehabilitation/Upgrading of Mapang (Taas) Formon Road,

    Bongabong, Oriental Mindoro28/08/2015

    Southern

    Mindoro DEO14.477 149 O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% -

    ALBERTO UY CONSTRUCTION &

    DEVELOPMENT20924

    Rehab./Upgrading of Mapang Road (Taas) Formon Road11/19/15

    Southern

    Mindoro DEO14.477 149 C 0.471 0.133 0.3 - - - 90.40%

    90.4%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page13

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Alcel Construction 15129

    Road Upgrading (Gravel-Paved) Along Gurel-Bokod-

    Kabayan-Buguias-Abatan Road, K0338+481-K0339+838,

    Kabayan, Benguet

    14/08/2014 CAR 46.461 240 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 -

    Alcel Construction 15129 Const. of Access Rd. to Airport, Alaminos City Airport 03/15/13 I 1.821 45 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 -

    Alcel Construction 15129 Const. of Access Rd. for Alaminos Airport (Phase I) 08/16/12 I 17.991 253 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 -

    ALCEL CONSTRUCTION 15129

    Rehabilitation/Improvement of Gurel - Bokod - Kabayan -

    Buguias - Abatan Road Including ROW, Bokod and Kabayan

    Section, K0301+(-797) - K0326+004 (I.S.)

    26/02/2015 CAR 97 403 C 0.392 0.2 0.3 - - - 89.20%*89.2% Very

    Satisfactory

    ALCEL CONSTRUCTION 15129

    Rehabilitation/Reconstruction/Upgrading of Alaminos-

    Bolinao Road, K0325+000 to K0326+000, K0321+(-204) to

    K0323+133, Alaminos City, Pangasinan

    01/09/2015Pangasinan 1st

    DEO43.823 240 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% -

    ALCEL CONSTRUCTION 15129Construction of Road (Baywalk) Brgy. Libsong East,

    Lingayen to Baybay Lopez, Binmaley, Pangasinan11/19/15

    PANGASINAN

    2ND DEO28.812 180 C 0.376 0.24 0.15 0.03 0.05 0.05 89.60%

    89.6%

    Very Satisfactory

    Alcel Construction/Oriental Sales Center and

    Contractor (J.V.)JV-12-432

    Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/

    exception w/n the District08/09/13 I 34.285 150 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 -

    Alebon Genuine Merchandising 26300Widening of Butuan City - Cagayan de Oro City - Ilagan City

    Road Km1425+500 - Km.1426+50004/08/2014 X 18.578 191 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 -

    Alebon Genuine Merchandising 26300Construction of Concrete Revetment along Kinoguitan By-

    Pass Road11/08/2014 X 13.482 210 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -

    Alebon Genuine Merchandising 26300 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect. 03/11/13 X 4.198 37 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 -

    ALEBON GENUINE MERCHANDISING 26300

    Rehab/Reconst/Upgrading of Damaged Paved National

    Roads Including Drainage Based on Pavement Management

    System/Highway Development and Management-4 (HDM-4)

    (Intermittent Section) CDO-Cadre Circumferential Ext., Rd.,

    Chainage 0-556.00, Cagayan de Oro City

    11/06/2015

    Cagayan de

    Oro City First

    DEO

    8.865 170 O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% -

    Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta.

    1602+000-Sta. 1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -

    Al-Fahdel Const. and Eng'g. 17953Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon

    Nat'l Rd. (Secondary Rd.), K2007+860-K2007+90011/28/12 X 3.790 59 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 -

    Alfalfa Construction 29712Road Upgrading of Banaue-Hungduan Benguet Bdry. Road

    Hapao-Abatan Section04/08/11 CAR 16.560 177 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -

    Alfie's Const. & Const. Supply, Inc. (Formerly:

    Alfie's Construction & Const. Supply)17162

    Completion of Binalbagan Bridge 2 - Km. 66+910 along

    Hinigaran-Isabela Road03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -

    Alfie's Const. & Const. Supply, Inc. (Formerly:

    Alfie's Construction & Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -

    Alfie's Construction & Const. Supply, Inc.

    (Formerly: Alfie's Construction & Construction

    Supply)

    17162Const. of Access Rd. for Himoga-an Bridge, Bacolod North

    Rd., Sta. 71+035.20-Sta. 74+557.2008/12/13 VI 109.290 310 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 -

    Alfie's Construction & Const. Supply, Inc.

    (Formerly: Alfie's Construction & Construction

    Supply)

    17162Road Upgrading of Villahermoso-Canla-on City-La

    Castellana Road, K0074+205-K0074+99508/10/13 VI 23.131 182 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 -

    Alfie's Construction & Construction Supply

    Inc. (Formerly: Alfie's Construction and

    Construction Supply)

    17162Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061-

    K0088+00308/11/12 VI 32.631 222 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 -

    Alfie's Construction & Construction Supply

    Inc. (Formerly: Alfie's Construction and

    Construction Supply)

    17162

    Road Upgrading (Gravel to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standard (HDM-4 Project Analysis - Intermittent Sections)

    National Secondary Road, Kabankalan Jct. Salong Tapi

    Dacongcogon Bantayan Road - Package B

    24/10/2014 VI 48.461 209 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40%0%

    Poor

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page14

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Alfies Construction & Construction Supply,

    Inc.17162

    Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-

    Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception,

    Brgy. Salong & Batayan

    09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162Rehabilitation/Reconstruction/Upgrading of Bacolod North

    Road, 25/08/2015

    Regional Office

    No.VI65.069 250 O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% -

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Construction/Replacement of Permanent Weak Bridges

    along National Road, Tapi Bridge (B00211NR), along

    Kabankalan Jct. Salong Tapi Dacongcogon Bantayan Road,

    Brgy. Tapi, Kabankalan City, Negros Occidental

    11/14/15

    Negros

    Occidental 3rd

    DEO

    10.094 286 OG 0.363 0.241 0.15 0.03 0.045 0.05 87.90%87.9%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Widening of National Roads along Bacolod South Road,

    K0048+542-K0051+468; K0052+444-K0053+600; K0064+250-

    K0065+360, Hinigaran, Negros Occidental11/16/15

    Regional Office,

    NIR119.102 310 OG 0.373 0.238 0.15 0.03 0.055 0.05 89.60%

    89.6%

    Very Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Widening of Bacolod Circumferential Road (South) with

    Drainage (including RROW), K0006+451 - K0011+476,

    Bacolod City, Negros Occidental11/9/15

    Regional Office,

    NIR81.443 255 OG 0.337 0.3 0.078 0.03 0.06 0.033 83.80%

    83.8%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road along Bacolod North Road, K0039+771-

    K0040+288; K0061+420-K0062+000; K0075+903-K0075+953;

    K0076+620-K0077+000; K0080+060-K0081+000; K0081+558-

    K0082+000; K0082+000-K0083+000; K0036+902-K0036+952;

    K0038+200-K0038+406; K0041+843-K0042+300; K0042+500-

    K0043+000, Manapla, Negros Occidental

    11/19/15Regional Office,

    NIR75.626 265 OG 0.34 0.214 0.15 0.03 0.055 0.05 83.90%

    83.9%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Rehabilitation/Reconstruction/Upgrading of Bacolod North

    Road, K0086+000 - K0087+000, K0087+540 - K0088+327,

    K0088+362 - K0090+933, Sagay City, Negros Occidental11/19/15

    Regional Office,

    NIR68.500 280 OG 0.371 0.237 0.15 0.03 0.055 0.05 89.30%

    89.3%

    Very Satisfactory

    Alfie's Construction & Construction Supply,

    Inc. (Formerly: Alfie's Construction &

    Construction Supply)

    17162Const. of the Remaining Structures: Himogaan Bridge, Sta.

    7