CASE HI STOR Y  Rev. 00, No. 1000027 -SK, Issue Date 14.07.2014  REINFORCED SOIL STRUCTURES Product: Terramesh ® System D1 DUBNÁ SKALA-TURANY, SO 231-00 RETAINING WALL SLOVAKIA, VRÚTKY Problem Embankment of juncon Žilina road interferes with the path 131 -00 to the pension Dubná Skala. Therefore, it is necessary to build a retaining wall between these two ways in order to retain soil of road embankment.  Soluon Retaining wall 231-00 is designed as a reinforced earth structure gabion facing units - system Terramesh with the reinforcement length of 3.0 m, width 3.0 m and gabions with height of 1.0 m respecvely 0.5 m made of double twisted wire mesh in combinaon with uniaxial geogrids PARAGRID 200/05. Retaining wall is from the perpendicular plane inclined at a rao of 10:1. Inclinaon is created by oseng baskets by 10 cm in each row. Construcon height of the wall is variable from 1.5 m to 8.5 m and length of 67.5 m. During construcon Date: August 2013 Client: NATIONAL MOTORWAY AUTHORITY Main contractor name: VÁHOSTAV-SK, a.s. Terramesh ®  System  - face area: 300 m 2 Construcon info: Consultant: Used product: Construcon start date: GEOCONSULT s.r.o. June 2013 September 2014 Construcon end date: Start of construcon Date: July 2013 Scheme 
3

CH_RWSR_SK_Retaining_Wall_Terramesh®_System_Highway_DDubna_Skala_Turany_Jul_14

Jul 07, 2018

Download

Documents

riteshreply
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CH_RWSR_SK_Retaining_Wall_Terramesh®_System_Highway_DDubna_Skala_Turany_Jul_14

8/18/2019 CH_RWSR_SK_Retaining_Wall_Terramesh®_System_Highway_DDubna_Skala_Turany_Jul_14

http://slidepdf.com/reader/full/chrwsrskretainingwallterrameshsystemhighwayddubnaskalaturanyjul14 1/2

CASE HISTORY 

 Rev. 00, No. 1000027 -SK, Issue Date 14.07.2014 

REINFORCED SOIL STRUCTURES 

Product: Terramesh® System 

D1 DUBNÁ SKALA-TURANY, SO 231-00 RETAINING WALLSLOVAKIA, VRÚTKY 

Problem 

Embankment of juncon Žilina road interferes with the path 131-00to the pension Dubná Skala. Therefore, it is necessary to build aretaining wall between these two ways in order to retain soil of road

embankment. 

Soluon 

Retaining wall 231-00 is designed as a reinforced earth structuregabion facing units -  system Terramesh with the reinforcementlength of 3.0 m, width 3.0 m and gabions with height of 1.0 mrespecvely 0.5 m made of double twisted wire mesh incombinaon with uniaxial geogrids PARAGRID 200/05. Retaining wallis from the perpendicular plane inclined at a rao of 10:1. Inclinaon

is created by oseng baskets by 10 cm in each row. Construconheight of the wall is variable from 1.5 m to 8.5 m and length of 67.5m. 

During construcon  Date: August 2013 

Client: 

NATIONAL MOTORWAY AUTHORITY 

Main contractor name: 

VÁHOSTAV-SK, a.s. 

Terramesh® System

 - face area: 300 m

Construcon info: 

Consultant: 

Used product: 

Construcon start date: 

GEOCONSULT s.r.o. 

June 2013 

September 2014 Construcon end date: 

Start of construcon  Date: July 2013 

Scheme 

Page 2: CH_RWSR_SK_Retaining_Wall_Terramesh®_System_Highway_DDubna_Skala_Turany_Jul_14

8/18/2019 CH_RWSR_SK_Retaining_Wall_Terramesh®_System_Highway_DDubna_Skala_Turany_Jul_14

http://slidepdf.com/reader/full/chrwsrskretainingwallterrameshsystemhighwayddubnaskalaturanyjul14 2/2

MACCAFERRI CENTRAL EUROPE s.r.o. Štverník 662, 906 13 Brezová pod BradlomCommercial-technical office: Kopčianska 15, 851 01 Bratislava Tel.: 02/ 202 400 56, e-mail: [email protected], www.maccaferri.sk  

MACCAFERRI CENTRAL EUROPE s.r.o. has implementedand applies a quality management system pursuant to thestandard EN ISO 9001:2008 certified by TSÚS CERTICOM.

 

Vzorový priečny rez - SO 207-00, opora 1 

Typical cross-secon 

Afer construcon  Date: June 2014