Top Banner
View L&SI’s Digital Edition & Archive online - register FREE at www.lsionline.co.uk/digital March 2010 entertainment, presentation, communication www.lsionline.co.uk Eros Ramazzotti The Italian superstar’s latest European tour PLUS . . . Deals & Developments • ATEÏS in Profile • Teatro Petruzzelli reborn Sennheiser’s RF Masterclass • Burj Khalifa • Classic Gear: Yamaha O2R Show Reviews: ISE & ARC • White Light with Eddie Izzard Crew Cuts • Audio File • Green Room • Second Fix & more . . . Lostprophets Live at Leeds O2 Academy Technical Focus The Vari*Lite VLX Wash Christian Engsted Martin Professional in 2010 ProLight&Sound A look forward to Frankfurt
7

Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

Feb 20, 2019

Download

Documents

duongthuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

View L&SI’s Digital Edition & Archive online - register FREE at www.lsionline.co.uk/digital

March 2010 entertainment, presentation, communication

www.lsionline.co.uk

ErosRamazzotti

The Italian superstar’s latest European tour

PLUS . . . Deals & Developments • ATEÏS in Profile • Teatro Petruzzelli rebornSennheiser’s RF Masterclass • Burj Khalifa • Classic Gear: Yamaha O2RShow Reviews: ISE & ARC • White Light with Eddie IzzardCrew Cuts • Audio File • Green Room • Second Fix & more . . .

LostprophetsLive at Leeds O2 Academy

Technical FocusThe Vari*Lite VLX Wash

Christian EngstedMartin Professional in 2010

ProLight&SoundA look forward to Frankfurt

Cover:Cover 08/03/2010 11:09 Page 1

Page 2: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

Lighting&Sound - March 2010

ontour

www.lsio

nlin

e.c

o.u

k

76

Produced by Trident Management

in collaboration with Live Nation

Italia, this 10-truck tour features a

production design by Lemon and

Pepper. The project and show

direction is by Serge Denoncourt.

Lemon and Pepper’s productiondesigner Giorgio Ioan explains: “Theidea behind the tour’s title - Ali e Radici(Wings and Roots) is that no matterhow high you fly, you’re always tied toyour roots. In this case, Eros’s rootswere imagined as the industrial suburbsof a large city, based on which setdesigner Guillame Lord built two hugestacks of four containers (full-scale, butbuilt in thermoformed plastic) withrough, rusty exteriors. These aretransformed by the spectacularprojections into a cathedral,

a photograph album, a tree during thefour seasons, and more. Our job was toput everything together and solve thevarious technical problems involved.”

Set & RiggingLemon and Pepper called in Teyco, a highly specialised new companyfounded by two trade veterans -Giuliano Luvisotto (founder and MD ofLitec for 18 years) and VincenzoMazzilli, who provided trussing andbespoke fabrication.

Due to the ambitious set design, theshow makes a rather unusual use ofCyberhoists. These, instead of raisingand lowering trussing, move ‘fifthwheels’, similar to those used to rotatecranes, to rotate containers containingprops or scenery such as the interior ofa train compartment, for example.

Italian pop star and Sony BMG

recording artist Eros Ramazzotti

recently embarked on the first

European leg of his Ali e Radici

world tour, a world-class

production including a lot of

firsts. The tour is due to include

venues across Italy and the rest

of Europe before heading to the

Americas in May. Mike Clark

reports on the latest Ramazzotti

production . . .

Eros Ramazzotti

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 10:44 Page 76

Page 3: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

ontour

Lighting&Sound - March 2010

www.lsionline.co.uk

77Lighting&Sound - March 2010

Backstage, seated at his MacBook Pro,Steve Waddington of Vertigo Rigging(UK) programs and controls theCyberhoists (supplied by Italstage ofNaples) and explains: “We’re using eightCyberhoist CH1000 1000kg motors totrack and pivot the eight backlinecontainers, split into four groups of two.One motor tracks a pair of containersand one pivots the upper or lower one,according to their position. Four 500kgCH500 Cyberhoists are used to raiseand lower the stage-centre container,inside which Eros arrives and leaves atthe end of the show. StandardCyberhoist CHM software handlescontrol and power distribution.”

LightingLighting designer Baz Halpin hadalready worked with Ramazzotti, whenhe was DP for a DVD the artist recorded

at Rome’s Olimpico soccer stadium; hewas also LD on a previous tour by theRome-born singer.

Halpin explains: “This is definitely avideo show, so the big issue was to getthe right balance between lighting andprojections. It’s an arena rock show, somust be big, so we decided in advancewhen projections would dominate andwe’d come down on lighting. However,we also have [Komaden] Image-Meshscreens in the containers, which caneither duplicate the main images or beefthem up, so if we want a song withprojection, but also want big lighting, webring in the Image-Mesh.”

Regarding the actual lighting, the LDcontinues: “Another tricky thing is thatEros’s songs are hugely dynamic andhis audiences love to sing along, so

Tour CreditsTour manager: Jerry di Pirro

Production director: Giorgio Ioan

Production manager: Stefano Copelli

Project & show director: Serge Denoncourt

Project team director: Nathalie Goodwin

Musical director: Claudio Guidetti

Video content production:Olivier Goulet (Geodezik)

Video content co-design:Gabriel Coutu Dumont, Isabelle Painchaud

Production design: Lemon and Pepper

Set design: Guillaume Lord assisted by Olivier Landreville

Load out manager: Marco Silvaggi

Loading coordinators: Dario di Giulio, Ettore Monaco, Dmytro Hunchak

FOH sound engineer: Jon Lemon

PA: Davide Grilli

Artist monitor engineer: Stevan Martinovic

Band monitor engineer: Umberto Polidori

Backline techs: Fabio Oliva, Massimo Flego, Miguel Vargas, Alessandro Carli

PA techs: Fabrizio de Amicis, Matteo Armellini

Lighting designer: Baz Halpin

Lighting director: Kathleen Anne Beer

Lighting tech: Nicola Tallino

Dimmer tech: Ivan Russo

Electricians: Roberto Torbidoni, Nicola Visentini, Emanuele Vangelatos

Video director: Emigliano Napoli

Show content director: Marco Bazzano

Camera control: Saverio Maris

Pandoras Box operator: Marco Astolfi

Projection responsible/cameraman:Matteo Plantamura

LED display: Roberto Catrambone

Image-Mesh LED display techs: Francesco Ferro, Alessandro Caglio

Cyberhoist operator: Steve Waddington

Head rigger: Emiliano Bitti

Riggers: Filippo Lattanzi, Simone Bugatti,Andrea Lazzarini

Catering: Marco Tiberia, Maurizio Gambino,Walter d’Ambrosio

Suppliers:Management: Radiorama

Tour production: Trident Management in collaboration with Live Nation Italia

Audio & lighting: Agorà

Displays & video: STS Communication, Le Grandi Immagini

Set construction: Teyco

Staging and Cyberhoists: Italstage

Catering: Giro Mangiando

Trucking: Trans Show

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 10:44 Page 77

Page 4: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

Lighting&Sound - March 2010

ontour

www.lsionline.co.uk

78

you’re often tempted to go bigger, but afterthe first night, the majority of the notes I tookwere to pull back on some songs.”

Explaining the choice of fixtures on the rig,Halpin says: “The Clay Paky Alpha 700definitely gives you a different brush in yourpaint box. I knew that so much of thelighting was going to have to take place onthe stage, and I like to have lighting at lotsof different levels, but with the containersfilling up the entire back wall, I couldn’t haveanything between the floor and the top ofthe containers, so everything had to comefrom directly above the stage. As anybodywill tell you, putting a light straight down isnot the best way to see the beam. But, withthe Alpha Beam, you can do just that - youcan have a really big angle and still get a good beam, even in a dark corner. I likethe shape of them and now you can havegobos, rotating gobos and colour wheels.They’re also super-reliable, really quick andreally small. I think it’s almost an all-700 rig -we have the 700 Spots - which are great -and the Beams, and we’re also using MartinMAC 2K washes.

Halpin adds: “We also have a special usinga Zap Technology MiniBig fixture inside oneof the containers. The director wanted oneof the containers to spin around for onesong, a window to open up and a big shaftof light to come out and light Eros. GiorgioIoan found an aluminium Venetian blindwhich we control via DMX, so it comes onand tracks across the audience until itreaches Eros - the effect is amazing.”

Very much a hands-on LD, from the FOHplatform Halpin enthuses: “Martin desks arehuge in America and I specifically asked fortwo Maxxyz consoles for this show. They’rethe quickest, and really reliable. I like to doall my own programming and, with theMaxxyz, I can program something quickerthan I can say it! The lighting director on theshow, Kathleen Ann Beer, who worked withme on the Tina Turner show, also has a good understanding of the desk.”

Halpin adds: “The most difficult thing here isto find the balance between theatrics androck‘n’roll. In the latter, lighting becomes avisual extension of the music, whereas hereit’s slightly deeper and theatrical. Gabriel[Coutu Dumont - content co-designer] hasdone wonderful things with the visuals - forthe dynamic pieces in Eros’s songs, he’soften done something really beautiful andsubtle, but emotionally big, so slamming inthe lights at that point would detractcompletely from the atmosphere.”

AudioAudio and lighting contractor Agorà gavethe tour exclusive use of its recentlypurchased L-Acoustics K1 system, beingused here for the first time in Italy. VeteranPA system designer Daniele Tramontanisays of the K1: “They’re very efficient - themanufacturer put 10 years’ experience withV-DOSC to good use. The sound is cleaner,it’s rigging facilitated, the enclosureconstruction is improved and has a bettertop end - I think they’ll soon become a reference point for other systems.”

Tramontani explains that when designingthe system, as well as the acoustic aspects,

other factors to be taken into considerationon such a large, important show includeavoiding obstructing projections orsightlines for the camera crew and thespectators.

After set-up, design and tour start-up,Tramontani left the PA in the capable handsof system engineer Davide Grilli and thenAntonio Paoluzi. Grilli says: “After testing theK1 rig at production rehearsals, theconfiguration chosen is 14 K1 enclosuresper side on the main hangs. We put four K1bass units below each array to test themduring rehearsals and on the first night.We’ve got 11 SB28 subs on the floor oneither side of the stage in cardioid format,and four more stage-centre. Seating runsright up to the side of the stage in somevenues, so we’ve also got side arrays witheight V-DOSC and six dV-DOSC.”

Due to set width, two centre clusters areflown from the stage roof, each with six dV-DOSC. 16 Meyer Sound M1D are installedalong the stage front.

Grilli says: “I must say that the K1 has a great impact, great sound and great off-axis coverage - 90 degrees over theentire frequency range.”

At the FOH DiGiCo SD7, Jon Lemon (TheCure, Oasis, Pink Floyd and many more)explained: “I’d only previously used the SD7with Smashing Pumpkins. As I went right onto Janet Jackson after their tour and didn’thave much time on band rehearsals, I decided to just stick with D5 for that.

“Sound quality is a lot more extended,particularly on the high end. This isobviously down to the processing power,which is great on these consoles. Themulti-brand compressors built into thesystem are great - I’m using a couple, andquite a lot of onboard effects, such asdelays and reverbs. I love being able to runthe console off my laptop, so during

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 10:45 Page 78

Page 5: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

Lighting&Sound - March 2010

www.lsionline.co.uk

79

Philips MSR Gold MiniFastFit has a smaller lamp base that lets you change all lower

wattage lamps in seconds. And for 2010, there’s even a further extension of the

range, so you will always find the perfect lamp to save you time, size and weight.

Visit us at Prolight & Sound, booth #11.1 D39, and see for yourself why these lamps

are music to every professional’s ears. www.philips.com/lighting/entertainment

Faster fitting for more free time.

production rehearsals, I can sit at the deskand do a lot of things, rather than doingthem on the touch-screens - thenetworking is really solid. With the twoengines, everything works so seamlessly -I’ve not had the slightest problem, evenrunning the console 10 hours a day atrehearsals.”

Under the huge stage, Stevan Martinovicand Umberto Polidori helm the two monitordesks. Martinovic explains: “Umberto usesa DiGiCo D5 for the band and I have a DiGiCo SD7 for the artist’s monitor set-up,which comprises an array with eight L-Acoustic Kudo on either side of the stageand two SB28s under a grille at the centre of

the stage. Eros also has in-ear monitors andfour Clair Brothers wedges along the front ofthe stage.”

Polidori continues: “The musicians all havein-ear monitors and the drummer andkeyboard player have a subwoofer each formore poke at the bottom end.”

With nine band members, plus 16 channelsof sequences, click tracks and SMPTE forvideo sync, channels total about 70 andKlark Teknik splitters feed the signalsanalogically to two DiGiCo stages boxes forthe FOH system and two for the monitors,ensuring two completely independent signalpaths.

Video STS Communication is one of Italy’s best-known specialist video contractors in theentertainment field, so was a natural choicefor the Eros Ramazzotti show as video playsa key role in the concert, requiring acomplete mobile production unit backstage.The set-up includes a Hanabi HVS-3800video switcher, eight Coolux Pandora’s Boxmedia servers and three Pandora’s Boxmedia players with the latest (4.5) software.Instead of passing through the servers, livecoverage played out on the LED screens isconverted from DVI to SDI and keyingeffects added by the mixer, which feeds itdirectly to the screens, reducing delay onthe cameras’ images to a minimum.

Above: LD Baz Halpin.

Right: The video crew.

Above: Monitor engineers Stevan Martinovic(left) and Umberto Polidori.

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 10:45 Page 79

Page 6: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

Lighting&Sound - March 2010

ontour

www.lsionline.co.uk

80

EQUIPMENT LIST:LIGHTING

60 x Martin MAC 2000 Wash XB

52 x Clay Paky Alpha Spot 700

56 x Clay Paky Alpha Beam 700

12 x Martin Atomic 3000 strobes

71 x DTS DWE inline 4-lights

40 x Coemar PAR LED

2 x Zap Technology MiniBig

3 x Coemar 1200 followspots

4 x Lycian 4kW followspots

2 x Martin Pro Maxxyz consoles

96 x 2.5k channels of GrandMA dimmers

AUDIO

L-Acoustics PA: 16+16 K1 cabinets plus 4+4K1 subs; 12 + 12 + 4 SB 28 subs; 6 + 6 dV-Dosc (centre clusters); 10 + 10 V-Dosc (side); 6+6 dV-Dosc (side)

20 x L-Acoustic LA8 (power amp/processor racks)

Front-fill: 16 x Meyer Sound M1D

FOH console: DiGiCo SD7

Monitor consoles: DiGiCo SD7, DiGiCo D5

Monitors (artist): 8+8 L-Acoustic Kudo; 2 x SB28

4 x Clair Bros wedges

VIDEO

200 x Barco MiStrip bars

80sq.m of Komaden Image-Mesh LED screen

8 x Pandoras Box media servers

3 x Coolux Media Players

1 x Coolux Media Manager

2 x GrandMA lighting consoles

6 x Barco FLM R20 video projectors

4 x Sony DXC-55W cameras

3 x Toshiba “lipstick” micro cameras

1 x 60x HD Long throw lens

1 x Fully automated track with motorizedtelescopic pedestal and motorisedpan/tilt/roll head

1 x Flex track dolly and tripod equipped withcustom made roll head

3 x Pan/tilt/roll heads for Toshiba lipstickcameras

Mobile production unit with a Hanabi HVS-3800 video switcher, multiviewer and largeLCS monitors

Video content is by Olivier Goulet forGeodezik - a multimedia companyspecialising in video content productionand system design for stage shows byartists of the calibre of JustinTimberlake, Cher, Cirque du Soleil, BetteMidler, The Killers, Linkin Park, and TinaTurner. For the Ramazzotti show, contentwas co-designed by Gabriel CoutuDumont and Isabelle Painchaud.

Goulet enthuses: “I’ve used this systemsince 2005, for projects such as theCirque du Soleil’s Macau show and inLas Vegas with Cher. It’s my personalfavourite and I’m the first to use thelatest version of Pandora’s Box - the 4.5.We’re using the MA Net - I’m impressedwith the new version - all the features arethere and it’s a lot faster. The containersmove a lot during the show, but the crewonly does one focus, as Pandora’s Boxallows us to do 3D shapes based onone map, so I map the containers flatand when they rotate, the images followthe movement.”

For the high profile spectacle, STSfielded several custom products,including a Hexagon motorised track,

a camera roll system on two cameras,three-axis (pan, tilt and roll) movementsystems on a pair of micro cameras anda computer-assisted control set-up forthe camera used on the track.

During rehearsals for the performance ofsongs in which the entire productionruns in perfect sync with the music, theSTS team stored dolly movements thatcould not be carried out in real time, butwere recalled and run automaticallyduring the actual show. Communicationbetween the operator’s desk and thecamera is via standard Ethernet 10/100connection and each movementmechanism has its own IP address,enabling the entire system to beperfectly interfaced with the outsideworld.

STS general Alessandro Rosaniexplains: “The two Toshiba micro-cameras with wide-angle lenses, usedfor close-ups of the drummer andkeyboard player, are mounted onspecial three-axis movement systems(pan, tilt and roll), which were alsocustom-made for the Ramazzotti tourand are connected to the same

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 12:36 Page 80

Page 7: Christian Engsted Eros Ramazzotti - Home |  · Eros Ramazzotti On_Tour_Eros_Ramazzott i :On tour.qx d 05/03/2010 10 : 44 Page 76. on tour Lighting & Sound - March 2010 online.co.uk

ontour

Lighting&Sound - March 2010

www.lsionline.co.uk

81

REVOLUTIONARY

BRIGHTNESS

PLATINUM SPOT 5R

www.elationlighting.eu

MSD Platinum 5 R 2,000hr 7,950lux 8,000°k

standard Ethernet network as the maincameras. In the control room, we use a portable computer to controlmovement or call up presets.Graphically, the preset buttons show theimage of the scene that will be covered.”

STS developed the products withTecnopoint from Ceriano Laghetto, nearMilan, a company specialising in remotecontrolled and manually operated virtualset equipment and robotics. The nine-member STS Communication videoteam led by Emigliano Napoli (fourcameramen and five at the control set-up) also mans a control system (with hotbackup) which features Coolux MediaManager software for the Pandora’s BoxMedia Servers. This in turn is controlledby the GrandMA consoles (twin desksfor backup). All connections are in fibreoptics to ensure utmost quality - theBarco FLM R20 projectors seem to beclose, but 200m cables are required toreach them up in the trussing.

Napoli adds: “Apart from the new versionof the software, a rock show with asystem of this size and complexity is nota frequent event and the entire system is

also on hot back-up. This is also the firsttime the Win Vision 8.75 LED 8mmscreen has been used in Italy. As well ashaving a very high impact, the 90 squaremetre screen has no delay on its imagefeed-out.”

Having worked with some of the world’sleading artists, Halpin said of Lemon andPepper’s production standards:“Although there is more touringexperience in the UK and the US, I thinka lot of the UK productions have a sort ofsnobbish, elitist attitude, but thisRamazzotti tour and the previous one Iworked on with Lemon and Pepper areright there with the top players - all theright equipment, the guys know whatthey’re doing and are all one hundredpercent committed to the show. It’s ahuge undertaking and has one of themost complicated sets - 10 metres high,with eight of these custom containerscontaining LED, lighting, scenic areasinside and even hosting some vignetteperformances - it’s mind-blowing 3Dmotion and every detail has beenstudied carefully. It’s a truly world-classshow.”

On_Tour_Eros_Ramazzotti:On tour.qxd 05/03/2010 13:08 Page 81