Top Banner
Christchurch Town Hall Christchurch Town Hall November 27th, 2013 November 27th, 2013
26

Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Dec 16, 2015

Download

Documents

Melina Cole
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Christchurch Town HallChristchurch Town Hall

November 27th, 2013November 27th, 2013

Page 2: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Introduction

• What happened– Settlement– Lateral Spread– Measurements

• Analysis– Current capacity

• Repair and strengthening– Foundation options and implications– Superstructure strengthening

• Relevelling• Peer Review

Page 3: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Damage sustained

Page 4: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Damage sustained

Page 5: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 6: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 7: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Level Survey

300mm

210m

m

150mm

90mm

Page 8: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Verticality Survey

50 mm

50 mm

30 mm

55 mm 20 m

m

16 m

m

35 mm

Page 9: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Analysis

• Full 3D computer analysis model developed– Non-linear, i.e. models strength and then

determines outcomes

• Quake records run– From major Canterbury earthquakes– Scaled to reflect code demands

• Performance assessed– Compared to current code, IL3

Page 10: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Computer Modelling

Page 11: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Computer Analysis – Canterbury earthquake sequence

Page 12: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Computer Analysis – Code comparison

Page 13: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Current Seismic Status

45%NBS

14%NBS

45%NBS

63%NBS

27%NBS

Page 14: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Repair and Strengthening

• Repair– Reinstate as nearly as practical to

original condition• Accept or reinstate concrete damage where

no structural implications

• Strengthen– Upgrade of foundations critical to

prevent future damage• Option 1 – Piles• Option 2 – Grouting

– CCC policy is to achieve 100%NBS

Page 15: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Option 1 - Piles

Page 16: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Option 2 - Grouting

Page 17: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Beneficial effect

• Movement under moderate earthquake– Piles: 10mm lateral, 15mm vertical– Grouting: 0mm lateral, 15mm vertical

• Movement under design level earthquake– Piles: 150mm lateral, 30mm vertical– Grouting: 50mm lateral, 75mm vertical

Conclusions:• Jet Grouting selected as preferred option

as:– Less intrusive construction process– Superior resistance to lateral spread– Easier waterproofing detailing

Page 18: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Structural Work Summary

• Upgrade foundations first– Primary need before any other

work– Jet grouting

• Re-level (Limes Room)• Strengthen• Repair & refurbish

Page 19: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Strengthening

• Minimal strengthening required to Auditorium, James Hay Theatre and Kitchen

• Foyer – Columns too flexible and under-strength:

rebuild– Bracing excluded as too intrusive– Steel frame alternative under consideration

• Limes Room/restaurant– Columns too flexible and under-strength:

add bracing below level1

Page 20: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 21: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 22: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 23: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Page 24: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Relevelling Consideration

• All of ground floor slab must be removed to complete foundation work

• Relevelling of structure– Must be done, in case of Limes Room– Could be accommodated by careful

detailing in case of Auditorium, Foyer, James Hay Theatre

Page 25: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

Peer Review

Page 26: Christchurch Town Hall November 27th, 2013. Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.

End