Date Number Qty. Origin Unit price(€) Total price(€) 1 220000 1.a 70000 1 1 pack IR 2 1pack IR 2.1 1pack IR 3 1pack IR 4 1pack IR 5 1pack IR 6 1pack IR 7 1pack IR 8 1pack IR 9 1pack IR 10 1pack IR 11 1pack IR 2.b 85000 1 1 pack IR 2 1pack IR 3 1pack IR Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant Dana Noavaran Energy & industry Co. Engineering Genset Lubricating oil system Overhead Cranes Emergency Diesel Generator (1250 KVA) Power Transformer (11/33KV),3MVA ONAN-OCT 20KV Switchgear Panels Mechanical Engineering Electrical Engineering Water Treatment System HVAC Evaluation of Heat Consumption Market Detailed Design of Heat recovery system Exhaust gases system Cooling system Fuel gas system Fire Fighting System Power Plant LV Panels Procedure 1
17

CHP Proposal

Jan 26, 2017

Download

Documents

Alireza sabri
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

1 220000

1.a 70000

1 1 pack IR

2 1pack IR

2.1 1pack IR

3 1pack IR

4 1pack IR

5 1pack IR

6 1pack IR

7 1pack IR

8 1pack IR

9 1pack IR

10 1pack IR

11 1pack IR

2.b 85000

1 1 pack IR

2 1pack IR

3 1pack IR

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Engineering

Genset

Lubricating oil system

Overhead Cranes

Emergency Diesel Generator (1250 KVA)

Power Transformer (11/33KV),3MVA

ONAN-OCT

20KV Switchgear Panels

Mechanical Engineering

Electrical Engineering

Water Treatment System

HVAC

Evaluation of Heat Consumption Market

Detailed Design of Heat recovery system

Exhaust gases system

Cooling system

Fuel gas system

Fire Fighting System

Power Plant LV Panels

Procedure

1

Page 2: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

4 1pack IR

5 1pack IR

6 1pack IR

7 1pack IR

8 1pack IR

9 1pack IR

10 1pack IR

11 1pack IR

12 1pack IR

13 1pack IR

III. 65000

1 1 pack IR 40000

1.1

1.1.1

1.1.2

1.1.3

Control Panel for Monitoring and Control

of entire 9 Generators and substation

sequences with Operator and engineering

stations

Auxiliary Transformer

Earthing and Lighting System,Cables

Cable Tray and Terminations

Detialed Design

Generator – Transformer Unit Protection

Panel

Generator Metering Panel

Power plant Control panels

Civil Engineering

110V DC System

Power Plant protection panels

11KV Suitable Generator NGR

Calculation Data Sheet

Engine Room

Plant Civil & Architectal Design

Layout

2

Page 3: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

1.1.4

1.2

1.2.1

1.2.2

1.2.3

1.2.4

1.3

1.3.1

1.3.2

1.3.3

1.3.4

2 1 pack 25000

2 10144000

2.a 8514000

1 9 set EU 750000 6750000

Part Description

1.1.2 Engine typeMTU

20V4000L62

1.1

Engineering Procurement

Mechanical Engineering Procurement

Evaluation of Soil, water sources,Power Grid

Detialed Design

Calculation Data Sheet

Layout

Switchgear Room

MTO

Genset

MTO

Engine Specification

Detialed Design

Calculation Data Sheet

Layout

Plant Control Room

MTO

3

Page 4: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

1.1.3 Cylinder arrangement V

1.1.4 Number of cylinder 20

1.1.5 Bore /stroke 170/210 mm

1.1.6 volume 9533 liter

1.1.7 Speed 1500 rpm

1.1.8 Mean piston speed 10.5 m/s

1.1.9 Compression ratio 12.1:1

1.1.10 Mean effective pressure 16.8 bar

1.1.11Standard power according to

ISO 30462000 kWmech

1.1.12 Specific full-load consumption2.42

kWh/kWhmech

1.1.13Gas consumption(based on

LHV = 10/03 kWh/m3n)482.9 m3/h

1.1.14 Lube oil consumption 0.3 g/kWhmech

1.1.15 Electric starter2 x 9 kW, 24

VDC

Part Description

1.2.1 Generator spannung 1100 V

1.2.2 Rating 2744 KVA

1.2.3 Insulation class F

Generator specificatoin

1.2

4

Page 5: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

1.2

1.2.4 Temperature-rise rating F

1.2.5 Cos ɸ 0.8-1

1.2.6 Frequency 50Hz

1.2.7 speed 1500 rpm

1.2.8 efficiency 97.50%

1.2.9 Stator connection Star star

1.2.10 Voltage tolerance ± 5%

1.2.11 Frequency tolerance ± 5%

1.2.12 Max. Ambient temperature. 40°C

1.2.13 Installation altitude max. 1000m

1.2.14 Type of protection IP 23

1.3

1.3.1

1.3.1.1 Thermal output 1244 KW

1.3.1.2Cooling water temperature,

inlet / outlet78 / 90°C

1.3.1.3 Cooling water volume flow 94m³/h

1.3.1.4 Pressure loss 2.6 bar

Heat Generation

Engine Cooling

Generator specificatoin

5

Page 6: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

1.3.2

1.3.2.1 Thermal output 99 KW

1.3.2.2Mixture cooling water volume

flow30 m³/h

1.3.2.3Inlet temperature mixture

cooling water max.52°C

1.3.2.4Outlet temperature mixture

cooling water max.55°C

1.3.2.5

Maximum permissible

pressure loss outside the heat

recovery

0.5 bar

1.3.2.6System pressure permitted

maximum6 bar

1.3.3

1.3.3.1 Thermal output by 120°C 1089 KW

1.3.3.2 Exhaust temperature 444°C

1.3.3.3 Exhaust gas mass flow, dry 10027 kg/h

1.3.3.4 Exhaust gas mass flow, moist 10787 kg/h

1.3.3.5 Exhaust gas volume flow, dry 7607 m³/h

1.3.3.6Exhaust gas volume flow,

moist8498 m³/h

1.4 Engine manegment system MMC-400

1.3.3.7

Permissible back-pressure

downstream of engine min. /

max.

30 / 60 mbar

Mixture Cooling

Exhaust Gas

6

Page 7: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

2 9 set EU 72000 648000

2.1

2.2

3 9 set IR 16000 144000

3.1

3.2

3.3

3.4

3.5

4 1 pack IR 36000 36000

4.1

4.2

4.3

4.4

4.5

4.5

5 1 pack IR 65000 65000

5.1

steam heat exchanger system with 622 KW

Thermal power

Heat Recovery System

HVAC

hot water heat exchanger system with 524 KW

Thermal power(Hot water max 80 C)

Firefighting pump house

Water treatment package

Water Treatment System

Diffusers

Distribution Duct

Control & Admin room air condition Unit

Fire Fighting System

Miscellaneous pumps

Chemical storage tanks

Waste water treatment

Raw water tank

Engine room ventilation & Exhaust fan

Engine room Air condition (Air Washer)

Permeate water tank

7

Page 8: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

5.2

5.3

5.4

5.5

5.6

6 1 pack IR 68000 68000

6.1

6.2

6.3

7 1pack IR 42000 42000

7.1

7.2

7.3

7.4

8 9 IR 38000 342000

8.1

8.2

8.3 Standby heater

Maintenance water tank

Expansion tank

Pipework for gas distribution

Gas regulating station (250 psi to 60 psi)

Fuel gas system

pipework for sprinkler

Fire alarm system

CO2 for transformers & control room

Foam tank

Cooling system

Elastic hoses

Waste lube oil tank

Lube service tank

Lube oil storage tank

Lubricating oil system

Pipework for gas venting

Sprinkler

8

Page 9: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

8.4

8.5

9 9 set IR 22000 198000

9.1

9.2

9.3

9.4

11 3 set IR 32000 96000

12 1 set IR 125000 125000

12.1

12.2

12.3

2.b 1340000

13 9 set IR 95000 855000

14 1pack IR

15 1 set IR

16 1 set IR

18 9 set IR

24000020KV Switchgear Panels

Power Plant LV Panels

11KV Suitable Generator NGR

240000

Generator – Transformer Unit Protection

Panel

Power Transformer (11/33KV),3MVA ONAN-

OCT

Raidiator Cooler

Circulated pump

Electrical Engineering Procurement

Overhead Cranes

Emergency Diesel Generator (1250 KVA)

Gas oil storage tank

Gas oil daily tank

Automatic transfer switch

Exhaust Stack

Oxidization catalyst convertor

Exhaust silencer

Exhaust duct

Exhaust gases system

9

Page 10: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

19 9 set IR

20 1 set IR

21 1 set IR

22 1 set IR

21 1 pack IR 145000 145000

22 1 set IR 45000 35000

23 1 pack IR

24 1pack IR

2.c 290000

26 1 pack

27 1 pack

28 1 pack

29 1 pack

30 1 pack

31 1 pack

32 1 pack

240000

Civil Engineering Procurement

240000

65000

Cable Tray and Terminations

Generator Metering Panel

Power plant Control panels

Power Plant protection panels

110V DC System

Genset Foundation

Warehouse Building

Machine Room Structure

Switchgear Room Stucture

Plant control Room structure

Office room Stucture

Salon Foundation

Control Panel for Monitoring and Control of

entire 9 Generators and substation sequences

with Operator and engineering stations

Auxiliary Transformer

Earthing and Lighting System,Cables

65000

10

Page 11: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

33 1 pack

34 1 pack

35 1 pack

36 1 pack

37 1 pack

3 693550

3.a 305550

1 9 IR 11000 99000

2 9 IR 4000 36000

Construction

Mechanical Installation

Genset

Transport of all equipment to iranian border

custom

Erection

Assembly

Piping

Cabeling

Combustion air ducting

Testing,Start up , Commissioning & Training

Heat recovery system

Transportation

Erection

Landscaping

Security Building

Water treatment pump station Building

Fire Fighting pump station Building

Excavation

11

Page 12: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

3 9 IR 1600 14400

4 1 5400 5400

5 1 12000 12000

Testing

Fire Fighting System

Transportation

Water treatment System

Transportation

Erection

Piping

Cabeling

Erection

Piping

Ducting

Cabeling

Testing

Pipe and piping work for Heat exchanger

Cabeling

Testing

HVAC

Transportation

12

Page 13: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

6 1 11600 11600

7 1 8400 8400

8 9 7600 68400Cooling system

Transportation

Erection

Piping

Cabeling

Testing

Erection

Piping

Cabeling

Testing

Lubricating oil system

Cabeling

Testing

Fuel gas system

Transportation

Construction

Erection

Piping

13

Page 14: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

9 9 3300 29700

10 3 4800 14400

12 1 6250 6250

Testing

Emergency Diesel Generator

Transportation

Erection

Testing

Overhead Cranes

Transportation

Erection

Cabeling

Testing

Exhaust gases system

Transportation

Erection

Ducting

Transportation

Erection

Piping

Cabeling

14

Page 15: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

3.b 268000

1 1

2 1

3 1

4 1

5 1

6 1

7 1

8 1

9 1

10 1

11 1

3.c 120000

26 1

Installation of 110 V DC

Electerical Installation of auxiliary

transformers

Installation of medium voltage system

Test,Start up & Commissionig

Installation of low voltage Switchgear

Installation of station auxiliary

transformers

Cabeling

Testing

Installation Of Electrical Equipment

Electrical installation of generators

Installation of automation system

Installation of system Grounding system

Plant electrification

Installation Of transmission line

Piping

Civil construction

Machine Room Structure

Construction

15

Page 16: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

1

27 1

28 1

29 1

30 1

31 1

32 1

33 1

34 1

Switchgear Room Stucture

Construction

Plant control Room structure

Transportation

Construction

Genset Bedframe

Construction

Fire Fighting pump station Building

Construction

Erection

Office room Stucture

Construction

Salon Foundation

Construction

Excavation

Warehouse Building

Construction

Water treatment pump station Building

16

Page 17: CHP Proposal

Date

Number

Qty. Origin Unit

price(€)Total price(€)

Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant

Dana Noavaran Energy & industry Co.

Procedure

35 1

36 1

4 115000

898000

1772000

155000

573550

475000

11172550EPC & Testing

Mechanical BOP & Electrical BOP

Genset & Auxiliary

Mechanical & Electrical engineering

Mechanical & Electrical installation

Civil Engineering & Construction

Testing, Filling & 3 months Operation

Security Building

Construction

Landscaping

Construction

17