Top Banner
www.steinmueller.com Tel. +49 2261 78950-0 Völklingen- Fenne (FGD) Wesseling (SCR) Novaky (FGD) Hemweg (FGD) Deuben (FGD) Paroseni (FGD) Fusina Maritsa East 3 Trbovlje Ratclie on Soar (FGD) Cottam Pocerady Lesotho SOUTH AFRICA Medupi (FGD) Kusile (FGD) Pretoria CHP Govora, Unit 7 Retrofit with Efficiency Increase of Electrostatic Precipitator (ESP) Flue Gas Treatment Achievements: Dust: < 50 mg/m³ (originally 180 mg/m³) (STP @ 6 % O 2 ) Fuel: Romanian Lignite (a.r.) LCV: 6.7 8.3 MJ/kg (1.6 - 2.0 Mcal/kg) w: 34 43 % a: 15 32 % S: 0.9 1.5 % Boiler design: 420 t/h, 2-pass boiler Scope of Supply: Flow cross-section enlarged by introducing new roof design Flow distribution improved by installing guide vanes Mechanically more robust electrodes installed • High voltage system replaced Selected Flue Gas Treatment References of Steinmüller Engineering Please contact us for further information. Literature can be provided upon request • Presentation on Steinmüller Engineering Conference 2013 • Steinmüller Engineering Workshop 2012 “Retrofit with Efficiency Increase of ESP” Govora (ESP)
2

CHP Govora, Unit 7 - steinmueller.com · Tel. +49 2261 78950-0 Völklingen-Fenne (FGD) Wesseling (SCR) Novaky (FGD) Hemweg (FGD) Deuben (FGD) Paroseni Fusina (FGD) Maritsa East 3

Sep 03, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CHP Govora, Unit 7 - steinmueller.com · Tel. +49 2261 78950-0 Völklingen-Fenne (FGD) Wesseling (SCR) Novaky (FGD) Hemweg (FGD) Deuben (FGD) Paroseni Fusina (FGD) Maritsa East 3

www.steinmueller.comTel. +49 2261 78950-0

Völklingen-Fenne (FGD)

Wesseling (SCR)

Novaky (FGD)

Hemweg (FGD)

Deuben(FGD)

Paroseni(FGD)Fusina

Maritsa East 3

Trbovlje

Ratcliffe on Soar(FGD)

Cottam

Pocerady

LesothoSOUTH AFRICA

Medupi(FGD)

Kusile (FGD)Pretoria

CHP Govora, Unit 7

Retrofi t with Effi ciency Increase of ElectrostaticPrecipitator (ESP)

Flue Gas Treatment

Achievements:

Dust: < 50 mg/m³ (originally 180 mg/m³)(STP @ 6 % O2)

Fuel : Romanian Lignite (a.r.)

LCV: 6.7 – 8.3 MJ/kg (1.6 - 2.0 Mcal/kg)w: 34 – 43 %a: 15 – 32 %S: 0.9 – 1.5 %

Boiler design: 420 t/h, 2-pass boiler

Scope of Supply:

• Flow cross-section enlarged by introducing new roof design

• Flow distribution improved by installing guide vanes

• Mechanically more robust electrodes installed

• High voltage system replaced

Selected Flue Gas Treatment References

of Steinmüller Engineering

Please contact us for further information.

Literature can be provided upon request

• Presentation on Steinmüller Engineering Conference 2013

• Steinmüller Engineering Workshop 2012 “Retrofi t with Effi ciency Increase of ESP”

Govora (ESP)

Page 2: CHP Govora, Unit 7 - steinmueller.com · Tel. +49 2261 78950-0 Völklingen-Fenne (FGD) Wesseling (SCR) Novaky (FGD) Hemweg (FGD) Deuben (FGD) Paroseni Fusina (FGD) Maritsa East 3

Steinmüller Engineering GmbH IHI Group Company

Fabrikstraße 5 • D-51643 Gummersbach • Germany

Tel: +49 2261 78950-0 Fax: +49 2261 78950-199

[email protected] www.steinmueller.com

Co

nce

pt/

Layo

ut:

tsi

tro

ne

med

ien

Gm

bH

& C

o. K

G, C

olo

gne

Edition 2015