Vishwakarma Yojana Techno Economic Survey Report
PROGRESS REPORT: I Techno Economic Survey Phase
Prepared by
Prepared By:
Sr. No. Name Enrolment No.1. HITESH CHANDWANI 1363803060282. HARSHA VALAND
Parul Institute of Engineering and Technology
““VISHWAKARMA YOJNA: AN APPROACH TOWARDS VISHWAKARMA YOJNA: AN APPROACH TOWARDS RURBANISATION FORRURBANISATION FOR
CHOKARI - VILLAGE, PADRA - DISTRICTCHOKARI - VILLAGE, PADRA - DISTRICT
Page 2
Page
4
Vishwakarma Yojana Techno Economic Survey Report
3 NIRAKAR JOSHI
Nodal Officer: VIJAY LALWANI
YEAR: 2015-16Parul Institute of Engineering and Technology
P. O. Limda, Ta. Waghodia, Dist. Vadodara - 391760
Parul Institute of Engineering and Technology
Page 3
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Content
Sr. No.
Particulars Page No.
1 Introduction of Village 04
2 Geographical Detail 05
3 Demographical Detail 07
4 Occupational Detail 08
5 Physical Infrastructure Facilities 09
- Drinking Water 09
- Drainage Network 10
- Transportation & Road Network 10
- Electricity Electricity in village Government Norms (Rules &
Regulations)
11
Parul Institute of Engineering and Technology
Page 4
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Issues identification Approach So Far(Government
Schemes, Projects implemented for village Development specially for electricity supply or renewable energy )
- Sanitation Facilities 11
-Waste Management Facilities 12
- Irrigation Facilities 12
- Housing condition 12
6 Social Infrastructure Facilities 13
- Health Facilities 13
- Education Facilities 13
7 Socio-Cultural Facilities 16
-Community Hall 16
Parul Institute of Engineering and Technology
Page 5
Page
4
Vishwakarma Yojana Techno Economic Survey Report
-Public Library 16
-Public Garden /Park/Playground 16
-Village Pond/Lake 16
-Other Recreation Facilities 16
8 Other Facilities 18
9 Sustainable Infrastructure Facilities 21
10 Existing Condition of Public Buildings 22
Parul Institute of Engineering and Technology
Page 6
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-1
Introduction of Village
Chokari is a Village in Padra Taluka in Vadodara District of Gujarat State,
India. It is located 29 KM towards west From District head quarters Vadodara.
134 KM from State capital Gandhinagar.
Chokari Pin code is 391450 and postal head office is Karkhadi.
Padra, Vadodara, Karjan, Petlad are the nearby Cities to Chokari.
Majatan ( 3 KM ) , Dabka ( 3 KM ) , Sandha ( 4 KM ) , Narsipura ( 4 KM ) ,
Somjipura ( 4 KM ) are the nearby Villages to Chokari. Chokari is surrounded
by Anklav Taluka towards North, Vadodara Taluka towards East, Khambhat
Taluka towards west, Jambusar Taluka towards South.
MAP OF CHOKARI
Parul Institute of Engineering and Technology
Page 7
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-2
Geographical Detail
Table 1SR.NO.
DESCRIPTION INFORMATION
1. Area of village (approx)
(in hector)
1380.11
2. Forest Area (In hect) 0.00
3. Agricultural Land Area (In hect) 383.20
4. Residential Area (In hect) 96.09
5. Other Area (In hect) 898.32
6. Water bodies (In hector) 2.5
7. Nearest town with distance Padra (18km)
Fig.1 Other Area (898.32 hact)
Parul Institute of Engineering and Technology
Page 8
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Fig.2 Agricultural Land Area (380.20 hect)
Chapter-3
Demographical DetailTable 2
Parul Institute of Engineering and Technology
Page 9
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Sr. No.
Census Population Male Female Sex ratio
Total house holds
1 2001 7880 4217 3663 868.62 15612 2011 8884 4706 4178 878.80 1811
Parul Institute of Engineering and Technology
Page 10
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-4
Occupational Details
Table 3
Name of Three Major Occupation groups
in Village
1.Cultivator
2. Animal husbandry
3. Industrial labour
Fig.3 Animal husbandry
Fig.4 Cultivating land
Parul Institute of Engineering and Technology
Page 11
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-5
Physical Infrastructure Facilities
5.1 Drinking WaterMain source of drinking water of the village is tube well/borehole. The village
has 30 tube wells & 50 hand pumps. In village one U.G. tank and O.H. tank.
Both have capacity of 50,000 lit. Tap water is untreated and salted, so
drinking water has significant negative health impacts on village dwellers.
Fig.5 U.G. water tank
Fig.6 O.H. tank
Parul Institute of Engineering and Technology
Page 12
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Provision of water treatment plant or Reverse Osmosis (RO) system can solve
this problem.
5.2 Drainage NetworkNo drainage facilities are present in the village. Rain water is discharged into
Mahi-Sagar River. Used water by households is discharged into khal-kuva.
Provide Proper drainage network.
5.3 Transportation & Road NetworkVillage approach road and Main road to the village are all weather roads. The
village approach road is in bad condition. Internal Streets in the village are
kutchha road (Soil). Nearest state highway SH-6 (Jambusar - Padra) is 8 km
from the village.
Provision of All-weather roads/Black Topped Pucca roads should be made for
the internal streets to solve the mud problem during rainy seasons.
Village approach road should be repaired as being in bad condition.
The village is not facilitated with any railway station. Nearest railway Station is
Vadodara Railway Station.
The Village has a Bus Station but routes are not allotted to the village.
Local transportation in the village is Chhakda and Private Vehicles.
Fig.7 chhakda
Parul Institute of Engineering and Technology
Page 13
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Fig.8 Bus station
Bus routes should be providing to the village for connectivity and ease of the
villagers.
5.4 Electricity
5.4.1 Electricity in village:MGVCL provides 24 hrs electricity for domestic use and 8 hrs for agricultural
use. Power Supply for domestic and commercial use is 230 volts and
agricultural use is 415 volts.
5.4.2 Issues identification:Street lights and renewable energy source facilities are not present in the
village.
Provision of the solar street light can solve above problem.
5.5 Sanitation FacilitiesThe village has not appropriate sanitation facilities. There are no facilities of
public latrine blocks and community toilet. The village also has not appropriate
Parul Institute of Engineering and Technology
Page 14
Page
4
Vishwakarma Yojana Techno Economic Survey Report
solid & liquid waste disposal system. Solid& liquid waste is dispose either into
khal-kuva or burnt.
Provision of public latrine blocks and community toilet can solve the sanitation
problem of villagers.
5.6 Waste Management FacilitiesWaste management facilities are not present in the village. There are not any
facilities for waste collection from road. Solid & liquid waste is dispose either
into khal-kuva or burnt.
Set the dustbin at each corners of the streets. For collection of waste provide
door to door garbage collection vehicles to solve the waste problem.
5.7 Irrigation FacilitiesThe main source of irrigation is from tube well and canal.
5.8 Housing conditionThe housing condition is poor in the village. 70% of the village houses are
kutchha & 30% of village houses are pucca.
Parul Institute of Engineering and Technology
Page 15
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-6
Social Infrastructure Facilities
6.1 Health Facilities
In a village only one government Homeopathic centre but which is not in
running condition.
Provide primary health care centre to solve the health problem of the villagers.
Fig. 9 government Homeopathic centre
6.2 Education FacilitiesTable 4
Aaganwadi/ Play group 9 nos.
Primary School 5 nos.
Secondary school 1 nos.
Higher Sec. School No
Art, Commerce& Science
/Polytechnic/ Engineering/ Medical/
Management/ other college facilities
No
ITI college/ vocational Training
Centre
No
Parul Institute of Engineering and Technology
Page 16
Page
4
Vishwakarma Yojana Techno Economic Survey Report
The village is not having any Art, Commerce & Science /Polytechnic/
Engineering/ Medical/ Management/ other college facilities but these facilities
are available nearby the village. There is ITI College situated at Mobha which
is 12kms away from the village and also in Mohvad which is 9kms away.
There is Arts/Commerce College situated at Moval which is 6kms away from
the village.
Provide higher secondary school in village to solve the further study problem.
Also provide periphery wall in secondary school.
Fig. 10 Anganwadi
Fig. 11 Primary School
Parul Institute of Engineering and Technology
Page 17
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Fig. 12 Secondary School
Parul Institute of Engineering and Technology
Page 18
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-7
Socio-Culture Facilities
Table 5Community Hall (With or without TV)
No
Public Library (With daily newspaper
supply: Y/N)
Yes
Public Garden
No
Village Pond Yes
Recreation Centre
No
Cinema/ Video Hall
No
Assembly Polling Station
Yes
Birth & Death Registration Office
Yes
The village has not facilities of any Community Hall, Public garden,
Recreational centre, cinema hall.
In the village there is public library, Assembly Polling Station, ponds, Birth &
death registration office in which the public library is in very bad condition and
now it is closed.
There are 2 ponds in the village one is Gopal which is 1km away and another
is vad which is 1/2km away from the village centre and they are in bad
condition.
Villagers need the at least one community hall and one public garden.
Public library also needs a renovation and maintenance.
Parul Institute of Engineering and Technology
Page 19
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Villagers also have the problem of pond so that the pond is needed to be
cleaned so they can use the water of pond for domestic uses.
Fig.13 Pond
Parul Institute of Engineering and Technology
Page 20
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-8
Other Facilities
Table 6Post-office Yes
Telecommunication Network/ STD booth No
General Market No
Shops (Public Distribution System) 2 Nos.
Panchayat Building Yes
Pharmacy/Medical Shop No
Bank & ATM Facility No
Agriculture Co-operative Society No
Milk Co-operative Soc. No
Small Scale Industries No
Internet Cafes/ Common Service Centre No
Other Facility No
The village has facilities of post-office, Shops (Public Distribution System) and
panchayat building but postman is not available to deliver the post and the
panchayat building is in bad condition.
The village hasn’t facilities of Telecommunication Network/ STD booth,
General Market, Pharmacy/Medical Shop, Bank & ATM Facility, Agriculture
Co-operative Society, Milk Co-operative Soc., Small Scale Industries, Internet
Cafes/ Common Service Centre.
Employ the postman in post-office can solve the problem of delivering the
post.
The panchayat building needs a renovation and periphery wall is be
constructed which is fallen down.
Parul Institute of Engineering and Technology
Page 21
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Fig.14 Shop
Fig.15 Dairy
Fig.16 Panchayat Office
Parul Institute of Engineering and Technology
Page 22
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-9
Sustainable Infrastructure Facilities
Table 7Descriptions Information/
Details
Adoption of Non-Conventional Energy Sources/
Renewable Energy Sources
No
Bio-Gas Plant
Solar Street Lights
Rain Water Harvesting System
No
Any Other No
The village is not having any source of non-conventional energy.
The village is also not having any source of sustainable infrastructure facilities
like Bio-Gas Plant, Solar Street Lights and Rain Water Harvesting System.
Provision of the solar street light is the best alternative to solve the problem of
street lights for the villagers.
Rain Water Harvesting System can solve the drinking water problem of the
village dweller.
We should provide bio-gas plant to get the fertilizer for agriculture and gas for
the cocking purpose.
Parul Institute of Engineering and Technology
Page 23
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Chapter-10
Existing Condition of Public Buildings
The Condition of the bus stand is not that good and should be repaired.
The condition of the panchayat building is also bad and require for the new
building.
The one of primary school building is old more than 100years so require for
the new building.
The periphery wall is not available for Secondary School.
The public library building condition is also poor.
Parul Institute of Engineering and Technology
Page 24
Page
4
Vishwakarma Yojana Techno Economic Survey Report
12.0 PLANNING PROPOSAL:- Planning proposal is provide amenities which required most in village for
prevent migration of population which live in chokari village.
As discuss above in ch.9
The village is not having any source of non-conventional energy.
The village is also not having any source of sustainable infrastructure facilities
like Bio-Gas Plant, Solar Street Lights and Rain Water Harvesting System.
We should provide bio-gas plant to get the fertilizer for agriculture and gas for
the cocking purpose.
Propose the green infrastructure facility bio-gas:We should design ARTI bio gas plant which is economical to the village
dwellers. Installation of ARTI bio-gas plan is easy.
ARTI has developed a compact biogas plant which uses waste food rather
than dung/manure as feedstock, to supply biogas for cooking. The plant is
sufficiently compact to be used by urban households, and about 2000 are
currently in use – both in urban and rural households in Maharashtra. A few
have been installed in other parts of India and even elsewhere in the world.
The design and development of the bio-gas plant is simple.
The impending scarcity of petroleum threatens the world’s fuel supply.
Mankind can face this threat successfully with the help of biogenous methane,
but the world is yet to take full advantage of this technology, because its
practitioners have so far ignore the basic tenet of science – viz. output of work
is dependent on the energy available for doing that work. This fact is seen in
the current practice of using low calorie inputs like cattle dung, distillery
effluent, municipal solid waste or sewerage, in biogas plants, which makes
methane generation highly inefficient.
Parul Institute of Engineering and Technology
Page 25
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Fig.Just 2 kg of such feedstock produces about 500 g of methane, and the
reaction is completed with 24 hours. The conventional biogas systems, using
cattle dung, sewerage, etc. use about 40 kg feedstock to produce the same
quantity of methane, and require about 40 days to complete the reaction.
Thus, from the point of view of conversion of feedstock into methane, the
system developed by Dr. Anand Karve is 20 times as efficient as the
conventional system, and from the point of view of reaction time, it is 40 times
as efficient. Thus, overall, the new system is 800 times as efficient as the
conventional biogas system.
Parul Institute of Engineering and Technology
Page 26
Page
4
Vishwakarma Yojana Techno Economic Survey Report
Some numerical value of ARTI bio-gas plant is given below in tabular form:
Conventional Biogas Systems
ARTI Biogas system
Amount of required feedstock
40 kg + 40 lit water 1-1.5 kg + 15 lit water
Nature of required feedstock Dung Any starchy material
Amount and Nature of slurry to be disposed of
80 lit, sludge 15 lit, watery
Reaction Time for full utilization of feedstock
40 days 48-72 hours
Standard size for household 4000 lit 1000-1500 lit
Capital Investment per unit including stove
INR 20,000 INR 10,000
Running Expenses per meal INR 25 0 to INR 5
Parul Institute of Engineering and Technology
Page 27
Page
4
Vishwakarma Yojana Techno Economic Survey Report
ARTI Compact Biogas Plants:
Some numerical value of ARTI bio-gas plant model is given below in tabular
form:
ARTI Compact Biogas– Terrace Model:
ARTI Compact Biogas– Balcony Model:
Size: 1 m3 digester Size: 0.5 m3 digester
Capacity: up to 2 kg kitchenwaste
Capacity: up to 1 kg kitchenwaste
Quantity of gas produced:up to 1 kg biogas, capable ofreplacing 250 gm of LPG
Quantity of gas produced:up to 0.5 kg biogas, capableof replacing about 100 gmof LPG.
Depending on type ofcooking done, eitherbreakfast or one meal canbe cooked entirely on
Depending on type ofcooking done, about 15-20min of cooking (tea, snacks,