The Power Company of Wyoming LLC (PCW) has proposed to build the Chokecherry and Sierra Madre Wind Energy Project (CCSM) in south- central Wyoming. When fully constructed, the CCSM Project may be the largest wind farm in the United States, with up to 1,000 turbines and the capacity to generate enough electricity for up to 1 million homes. There may be eagle mor- tality due to the operation of the CCSM Project. Take, including killing, of eagles is prohibited by the Bald and Golden Eagle Protection Act. However, the U.S. Fish and Wildlife Service (USFWS) has been delegated the authority to issue eagle take permits, including programmatic permits such as for a wind farm. A programmatic take permit authorizes the take of eagles where the take is compatible with the preservation of eagles. The USFWS will issue programmatic permits for such take only after an applicant has committed to undertake all practical measures to avoid and minimize such take and mitigate anticipated take to the maximum extent achievable. We expect to receive an application for a programmatic eagle take permit from PCW for Phase I Wind Turbine Development (500 turbines). In 2012, the Bureau of Land Management (BLM) signed the Record of Decision for the CCSM Project in which the BLM determined that more than 200,000 acres within the CCSM Project site are suitable for wind energy development subject to the requirements described under the Selected Alter- native. The USFWS has an independent statutory responsibility under the National Environmental Policy Act (NEPA) to evaluate its own actions related to the CCSM Project, Fact Sheet Environmental Impact Statement (EIS) Process Publish Notice of Intent December 2013 60-Day Scoping Period December 2013-February 2014 Publish Draft EIS June 2014 45-Day Public Comment on Draft EIS June-August 2014 Publish Final EIS December 2014 30-Day Public Review of Final EIS December 2014-January 2015 Record of Decision Signed February 2015 Sinclair Saratoga 71 130 80 Rawlins Exit 221 Chokecherry Sierra Madre NorthPl atte Riv e r § ¨ ¦ 80 Sage Creek Rd M i l le r H il l R d C R 3 47 § ¨ ¦ Wyoming Cheyenne § ¨ ¦ Rock Springs Rawlins § ¨ ¦ Casper ± 0 25 Miles T 20 N T 19 N T 20 N T 19 N T 17 N T 16 N R 89 W R 88 W R 86 W R 85 W R 89 W R 88 W R 86 W R 85 W Surface Ownership Bureau of Land Management No warranty is made by the Bureau of Land Management for use of the data for purposes not intended by the BLM Private State U.S. Forest Service T 17 N T 16 N Note: Wind turbine pad locations shown on this map have not been finalized. Final wind turbine locations will be determined based on coordination with the U.S. Fish and Wildlife Service. Wind Turbine Facilities Initial Disturbance Road Rock Quarry West Sinclair Rail Facility Haul Road and Facilities for Phase I (Haul Road for Phase II not shown) CCSM Wind Energy Project 2012 Record of Decision Boundary CCSM Wind Energy Project Phase I Wind Development Area CCSM Wind Energy Project Phase II Wind Development Area >> Chokecherry and Sierra Madre Wind Energy Project U.S. Fish and Wildlife Service Mountain Prairie Region – Migratory Birds Program