Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update POLICY
19

Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

Dec 17, 2015

Download

Documents

Francine Wilson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

Cheryl CatheyChief of Preliminary EngineeringBureau of Design and EnvironmentIllinois Department of Transportation

Thursday November 14, 2013

UpdatePOLICY

Page 2: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

What’s New in Engineering Contracts

• Mentor Protégé

• Electronic Documents

• Initiatives in Process

Page 3: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

• Overall there are 78 different firms participating in the Program

- 41 Mentor Firms-37 Protégé Firms

• Contracts currently participating in the program

•2013 -64

Page 4: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

New in 2013

• Guidelines/Implementation-changes• Eliminating annual reports

• Plan Approval to IDOT PM

• Available on IDOT Website• Check List

• Plan Templates

• Reports Examples

• Assessments

• FAQ’s

Page 5: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

2014 and Beyond

• Lessons Learned Workshop/Questionnaire

• Guidelines/Implementation Improvements?

• Encourage/Increase Participation

Page 6: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.
Page 7: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

EPAS-Overview

Page 8: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

Resources

• EPAS

• SharePoint

• Vendor Documents

Page 9: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

Until “Summary and Submit” is selected, IDOT DOES NOT see the application

Page 10: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

LOGGING INFound on IDOT website: http://www.dot.il.gov

• Doing Business• Consultant Services• Vendor Documents System:

https://www.dot.il.gov/vendordocuments/Login.aspx

resources. vendor documents

Page 11: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

LOGGING INUsername: 9 digit TIN number

• One login per firm• No dashes• No spaces

Password – First time user• welcome (all lowercase)

Password – Forget?• Supply TIN (in username field)• “Reset Password” button• Answer security question(FYI –have it relate to the firm)• To reset (supply TIN) email [email protected] or

[email protected]

Page 12: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

LOGGING IN“New user Click here to register”

• DON’T CLICK!

• Not used for Consultant Engineering purposes

Page 13: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

SUBCONSULTANT DOCUMENTATION

• WHEN to upload documentation• If selected for a job

• After complete proposal package is received by Central Office

• Otherwise the contract will not be available on database

• What is being requested to be uploaded? • Copy of signed Subconsultant agreement(s)

• Subconsultants’ disclosure forms

Page 14: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

Continuing Disclosure Forms

• WHY is this requested?

• Per Senate Bill 51

• “In accordance with PA 96-0795, prime and sub consultants With multi-year contract-required to recertify by July 1st of each year

• For projects advertised after July 2010 (anything PTB 157 & on)(Not needed if job is completed, but submit Affidavit of Completion)

Page 15: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.
Page 16: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

IDOT Website• Secretary’s Transforming Transportation for Tomorrow

• Revamp/Redesign Website

• Innovative web technologies

• Improve access & sharing of information

• High –quality, timely ,and relevant information

• January Launch scheduled

Page 17: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

When to begin-The procurement process

Timing:

• Advertisements to BDE- out 110 days

• Advertise- out 83 days

• SOI due – out 92 days

• Selection

Page 18: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

When to begin – Delay causes

• Locals Demands

• ROW

• Environmental Clearances

• Public Input

• Letting Changes

Page 19: Cheryl Cathey Chief of Preliminary Engineering Bureau of Design and Environment Illinois Department of Transportation Thursday November 14, 2013 Update.

QUESTIONS