CHERRY GARDEN PROGRESS PHOTOS – W/E 16 TH June Image 01, 16-06-2017; concrete blinding to oversite in preparation for concrete floor slab; grids 7-13/A-C Image 02, 16-06-2017; striking formwork from side walls to concrete walls to hydrotherapy pool
CHERRY GARDEN PROGRESS PHOTOS – W/E 16TH June
Image 01, 16-06-2017; concrete blinding to oversite in preparation for concrete floor slab; grids 7-13/A-C
Image 02, 16-06-2017; striking formwork from side walls to concrete walls to hydrotherapy pool
CHERRY GARDEN PROGRESS PHOTOS – W/E 16TH June
Image 03, 13-06-2017; preparation to lift pit, blinding concrete to base, cutting away concrete top of piles
Image 04, 16-06-2017; tanking detail, concrete base and reinforcement to lift walls in progress
CHERRY GARDEN PROGRESS PHOTOS – W/E 16TH June
Image 05, 16-06-2017; installing underground drainage within the building footprint in progress
Image 06, 16-06-2017; excavated trench as part of the Japanese Knot Weed treatment works in progress