CHEMICAL AND PHARMACEUTICAL PROJECT STUDY VALUE ORIENTED MAINTENANCE AND ASSET MANAGEMENT Highlights Importance of maintenance Value oriented Maintenance as the basis and driver for sustainable success Evaluation of maintenance and asset management performance by managers and operational staff in 67 chemical and pharmaceutical companies on site Benchmark with ideal situation and industry-specific value creation areas Key success factors and results in the chemical and pharmaceutical industry Excursus: Overall Equipment Effectiveness (O.E.E.)
5

Chemical and pharmaceutical project study

Jun 22, 2015

Download

Business

Increasing costs and new competitors from growth markets are challenging the industry. The consequences are the obligation to increase efficiency and a growing relocation and concentration process. But what is the benchmark for top performance in manufacturing chemical and pharmaceutical products? The ConMoto project study confirms: a Value oriented Maintenance and Asset Management is the key to sustainably increase production efficiency of the chemical and pharmaceutical industry.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Chemical and pharmaceutical project study

CHEMICAL AND PHARMACEUTICAL

PROJECT STUDY

VALUE ORIENTED MAINTENANCE AND ASSET MANAGEMENT

Highlights

• Importanceofmaintenance

• ValueorientedMaintenanceasthebasisanddriverforsustainablesuccess

• Evaluationofmaintenanceandassetmanagement performancebymanagers andoperationalstaffin67 chemicalandpharmaceutical companiesonsite

• Benchmarkwithidealsituationandindustry-specificvalue creationareas • Keysuccessfactorsand resultsinthechemicalandpharmaceuticalindustry

Excursus: Overall Equipment Effectiveness (O.E.E.)

Page 2: Chemical and pharmaceutical project study

Content

2

Page3 Preface

Page4-15 Chemicalandpharmaceuticalprojectstudy

Page4 ExecutiveSummary

Page5 Maintenanceasafactorworthbillions–There‘sstilllotstobedone

Page6 ValueorientedMaintenance–Basisanddriverforsustainablesuccess

Page7 Studydesign–TheConMotoMaintenanceScoreTest©

Page8 LevelmodelofMaintenanceandAssetManagementExcellence

Page9 Resultsofevaluation–Industrycomparison

Page10 Industry-specificvaluecreationareas

Page12 Keyfactorsinsuccessfulimplementation

Page13 Excursus:OverallEquipmentEffectiveness(O.E.E.)

Page14 Results–What‘sthebottomline?

Page16 Yourcontactperson

MarkusMärzDirectorBusinessDevelopmentConMotoConsultingGroupGmbHmaerz@conmoto.de

NilsBlechschmidtManagingDirectorConMotoConsultingGroupGmbHManagingDirector [email protected]

Dr.LeonhardWeckSeniorPartnerandManagingDirectorConMotoAkademieundTrainingweck@conmoto.de

©2014ConMotoConsultingGroupGmbH.Allrightsreserved.Forrepeatordersandreprintingauthorisationpleasecontact:

ConMotoConsultingGroupGmbHBoschetsriederStr.6981379MunichGermany

Tel.:+49(0)8978066-138Fax:+49(0)8978066-101Email:[email protected]

Authors

Page 3: Chemical and pharmaceutical project study

The huge significance of both the chemical andthepharmaceutical industries for theeconomy isbeyondquestion.In2012alone,thetwoindustriesturnedovermorethanfourbillioneurosworldwide.Aretheydifferentorsimilar?Howeverdifferenttheproductsof thechemical andpharmaceutical in-dustriesmaybe, they still havenumerouspointsincommon.Bothhaveahigh levelofequipmentintensity1 and automation, sophisticated processtechnology,complexvaluecreationprocessesandextensiveregulatoryrequirements.

The chemical industry primarily produces in-termediate goods and is therefore heavily dependenton itsuser industries.Accordingly, its developmenttendstobeaheadoftheoveralleco-nomy.Thus, for example, thesectorwasable torecoverrelativelyquicklyfromtheserioussetbackscausedby thefinancial crisisof2009and reporttwo recordyears in2011and2012.At thesametime, growth is distributed very unevenly. In par-ticular, someAsiancountries–withChinaaheadoftherest–wereabletogrowdisproportionately.TheforecastsoftheVCI2areevenpredictingthatby 2030, almost half of the chemical productionin theworldwillbe located inChina,whileespe-ciallyinEurope,thesliceofthecakewillbecomeeversmaller(seeFigure1).Evenso,Chinaiscur-rentlyfalteringsomewhatasanengineofgrowth.Althoughadeclineisanticipatedworldwideinthepolymerandspecialistchemicalssegments,pro-ductionremainsatahighlevel.Onthecostside,thechemicalcompaniesareconfrontedwithcons-tantpressureasaresultofincreasingrawmaterialandenergyprices.

Thepharmaceutical industry isvery importantbe-cause of demographic change and medical ad-vancesalone.Itisoneofthemostdynamicindus-try sectors in theworld. In2011,more than three quartersof its total turnoverwasstillgenerated inNorth America, Europe and Japan. But here too,countriessuchasChinaandBrazilarecatchingup.Overall,thesectorischaracterisedbylesssensiti-vitytoeconomicfluctuations.Atthesametime,therateofexpansionhasslowednoticeably in recentyears.This is linked,amongother things,with therequirementsandregulationsofhealthpolicy,whichhaveastrong impactonthebasicconditionsandearningspotentialofthepharmaceuticalindustry.

There are certainly some factors that have a ne-gative effect on business development and thuson long-term competitiveness in both industries.The chemical and pharmaceutical companiesshould now focus on pushing their efficiency tosustainably withstand the increasing cost andrelocation pressures and to defend their marketshares.TheConMotoprojectstudymakesitclearthat chemical andpharmaceutical companies dohave a future in Europe, too. The key to this is Value oriented Maintenance and Asset Manage-ment–asoneofthemostimportantcostblocksinproductionthatissusceptibletoinfluence.

Yourssincerely,

NilsBlechschmidt

Preface

3

Source: VCI-Prognos-Studie (Oct. 2012)

Rest of Europe

Germany

USA

Rest of World

China

Japan

2011[%]

2030[%]

15,012,1

24,4

16,5

3,45,6 29,0

47,1

11,07,4

13,415,0

Figure 1: Distribution of worldwide chemical production in 2011 and 2030 in percent

1) Intensity of equipment (investment rate) = Fixed assets ÷ Total assets2) Verband der Chemischen Industrie e. V.

Page 4: Chemical and pharmaceutical project study

Cost ef�ciency

Shutdown optimisation

Stock of spare partsInvestments

Overall Equipment Effectiveness (O.E.E.)

Reliability

PROFIT ORIENTED VALUE CREATION

VALUE ORIENTEDMAINTENANCE/

ASSET MANAGEMENTEFFICIENT CAPITAL

EXPENDITURE

Executive Summary

4

ChemicalandPharmaceuticalprojectStudy

There is hardly any other industry in which pro-ductionsystemsandequipmenthavesuchahugeimportance as in the chemical andpharmaceuti-cal industry. And yet, inmany companies, thosesystems are too often shut down. The cause isfrequentlyinadequateMaintenanceandAssetMa-nagement–companieswastebillionsinthisway.

One thing is clear: the importance of mainte-nance increases as the equipment intensity andinterconnection or the automation of productionincreases. In the investment-intensivecompaniesof the chemical and pharmaceutical industry, upto60percentofthetotalproductioncostscanbeinfluenceddirectlyandindirectlybytheefficiencyofmaintenanceandassetmanagement.This isasignificant lever for the successof thecompany.Butwhatisthebenchmarkfortopperformanceinmaintenanceandwherearethecompaniestoday?

The ConMoto Consulting Group has examined indetail the Maintenance and Asset Performanceof a total of 158 companies and production siteson fourcontinentsover therecentyears.Thiswasnot completed on the basis of questionnaires butof severalweeksofprojectworkwitheachofourclientsonsite.Intheindustrysectorchemicalsandpharmaceuticals,theefficiencyof67differentsitesinGermany,Austria,Switzerland,France,theUSA,BrazilandIndiawasanalysedandoptimised.Theseincludebothconcernsandcorporationslistedonthestockmarketaswell asmediumsizedcompaniesfromthesegmentsbasicinorganicchemicals,petro-chemicals, polymers, silicones, fine and specialistchemicals,detergentsandbody-careproducts,ba-sicpharmaceuticalmaterialsandspecialities.

The companies are currently a long way fromfirst-class maintenance and asset management. The average evaluation of the chemical/pharma-

ceuticalsector is just47%incomparison tobestpractice. Even the best company in the class stillhasconsiderableroomforimprovementat70per-centmaintenancematurity.

Thequestionnowarisesastowhatistobedonetosetnewstandardsforprofitorientedvaluecreationwithefficientcapitalexpenditure.Forward-thinkingdecisionmakersrecognisethenecessity,aboveall,ofpushing forwardwith increasing technical avai-labilityandreliabilitywhilereducinglife-cyclecostsof production systems and equipment. Both theindustry-specific valuecreationareasand thekeyfactors in successful implementation are summa-risedinthisstudy.

Thesuccessesachievedinthechemicalandphar-maceutical industries speak for themselves. Thecompanieswereabletomoveupagood1.5levelsonaverageontheirwaytoMaintenanceandAssetManagementExcellence.The implementationpro-jectscompletedalsoshowthat inall relevantKeyPerformance Indicators, objectively measurableimprovementswereachieved.Forexample, itwaspossible to improve theOverall Equipment Effec-tivenessbybetween2and15percentagepoints.As a consequence, one of the central profitabilityindicators, themaintenancecost rate,wascutbybetween7and27percent.Inotherwords,itwaspossibletoachieveasignificantlyhigheravailabilityand therefore additional value creationwith lowerresourcecosts.

These advances in operational performance alsohad a sustainably positive impact on financial results: companies that combine a high level ofeffectiveness and efficiency are among themosteconomicallysuccessfulintheirindustry.Theche-mical/pharmaceutical project study by ConMotopointsoutthewayforward.

Page 5: Chemical and pharmaceutical project study

Yourcontactperson

´

ConMoto Consulting Group GmbH, MunichBoschetsrieder Str. 69

81379 Munich

Germany

Tel.: +49 (0)89 78066-0

Fax: +49 (0)89 78066-101

ConMoto Consulting Group GmbH,

Stuttgart

Gerokstr. 11

70184 Stuttgart

Germany

Tel.: +49 (0)711 76779-0

Fax: +49 (0)711 76779-205

ConMoto Consulting Group

Ges.m.b.H, Wien

Schottenring 16

1010 Vienna

Austria

Tel.: +43 (0)1 5850274-0

Fax: +43 (0)1 5850274-11

ConMoto Consulting Group GmbH,

St. Gallen

Notkerstr. 10

9000 St. Gallen

Switzerland

Tel.: +41 (0)71 2440871

Fax: +41 (0)71 2431881

ConMoto LeanSupport s.r.o.,

Bratislava

Na vŕšku 8

811 01 Bratislava

Slovakia

Tel.: +421 (0)2 54413304

Fax: +421 (0)2 54410635

ConMoto Consulting Group Co. Ltd.,

Shanghai

Unit 1606, Time Square

93 Huai Hai Zhong Rd.

200021 Shanghai

People‘s Republic of China

Tel.: +86 (0)21 614152-75

Fax: +86 (0)21 614152-76

HeadofConMotoCompetenceCentre ValueorientedMaintenanceandAssetInnovation

NilsBlechschmidtManagingDirectorConMotoConsultingGroupGmbHManagingDirectorConMotoStrategieundRealisierung

Tel.:+49(0)8978066-114Fax:+49(0)8978066-101Email:[email protected]

ConMotoConsultingGroup

We have been supporting companies for more than 24 years to secureandimprovetheircompetitivenessandsustainability.Around80consultants,distributedacrossourofficesinMunich,Stuttgart,Vienna,St.Gallen,BratislavaandShanghai,workcompetentlyandwithcommitmenttorealisethebestpossiblebenefitsforourclients. Wecreateadvantage!This is the guiding approach of our implementation-oriented consultancy.

Nils Blechschmidt is managing director at ConMoto ConsultingGroupGmbHaswell asmanagingdirector atConMotoStrategieundRealisierung.Heisresponsibleforthefieldof“ValueorientedMaintenanceandAsset Innovation”.Asanexpert inthisareaandwith extensive knowledgeof various sectors, such as aerospace,engineering and plant construction, automotive and componentsupplier,plasticsprocessing,pulpandpaperandtransporttechnol-ogyaswellasprocess(chemicals,steel,pharmaceuticalsandfood),hegivesnumerouslectures.Since1997hehasbeenspeakerinre-nowned expert forums, like PlantMaintenance, EuroMaintenance,WorldMaintenanceForumandconferencesofVDIwithparticularemphasisonMaintenanceExcellenceandLeanProduction.BeforehistimeatConMoto,NilsBlechschmidtwasemployedastheTech-nicalHeadofanaircraftmaintenancebusinessforsevenyears.HecompletedhiseducationasagraduateengineerinAerospaceTech-nologyattheUniversityoftheBundeswehrinMunich.HepassedapostgraduatestudiesleadingtoaMasterofBusinessAdministra-tionatHenleyManagementCollege(UK).