LAMPIRAN 3 1 CHECKPOINT UDARA BERSIH Tarikh Penilaian: 2 Jun 2017 Pelepasan Pencemar Udara dari: (Tandakan √ pada ruangan berkaitan) Pembakaran Bahan Api bagi Penjanaan kuasa dalam Dandang (Boiler) Pembakaran Bahan buangan (Incenerator) √ Penggunaan Pelarut/Bahan kimia (Kebuk asap) ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014 [P.U.(A) 151/2014] CHECKPOINT (CP) Obligation to notify Regulation 5 (1) (a-d) (1) The University shall give prior written notification to the Director General to — (1) To give prior written notification to DG if there is: (a) carry out any change in operation of the University’s premises; (a) any change in operation of the University’s premises; CP 1: Yes √ No NA Remarks: __________________________________________ (b) carry out any work on any premises that may result in a source of emission; (b) any work on any premises that may result in a source of emission; CP 2: Yes √ No NA Remarks: __________________________________________
19
Embed
CHECKPOINT UDARA BERSIHreg.upm.edu.my/eISO/portal/checkpoint_jkpk_ems/02... · 6/2/2017 · Pembakaran Bahan Api bagi Penjanaan kuasa dalam Dandang (Boiler) Pembakaran Bahan buangan
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LAMPIRAN 3
1
CHECKPOINT UDARA BERSIH
Tarikh Penilaian: 2 Jun 2017
Pelepasan Pencemar Udara dari: (Tandakan √ pada ruangan berkaitan)
Pembakaran Bahan Api bagi Penjanaan kuasa dalam Dandang (Boiler)
Pembakaran Bahan buangan (Incenerator)
√ Penggunaan Pelarut/Bahan kimia (Kebuk asap)
ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014
[P.U.(A) 151/2014] CHECKPOINT (CP)
Obligation to notify
Regulation 5 (1) (a-d)
(1) The University shall give prior written notification to the Director General to— (1) To give prior written notification to DG if there is:
(a) carry out any change in operation of the University’s premises; (a) any change in operation of the University’s premises;
CP 1: Yes √ No NA
Remarks:
__________________________________________
(b) carry out any work on any premises that may result in a source of emission; (b) any work on any premises that may result in a source of
emission;
CP 2: Yes √ No NA
Remarks:
__________________________________________
LAMPIRAN 3
2
ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014
[P.U.(A) 151/2014] CHECKPOINT (CP)
(c) construct on any land, any building or premises designed or used for a purpose
that may result in a new source of emission;
(c) any construction on any land, any building or premises
designed or used for a purpose that may result in a new
source of emission;
CP 3: Yes √ No NA
Remarks:
__________________________________________
(d) make, cause, or permit to be made any change of, to, or in any plant, machine,
or equipment used or installed at the premises that causes a material change in the
quantity or quality of emission from an existing source; or
(d) any change of, to, or in any plant, machine, or equipment
used or installed at the premises that causes a material
change in the quantity or quality of emission from an
existing source;
CP 4: Yes √ No NA
Remarks:
__________________________________________
(e) carry out any changes or modifications to an existing air pollution control
system.
(e) any changes or modifications to an existing air
pollution control system.
CP 5: Yes √ No NA
Remarks:
__________________________________________
Obligation to notify
Regulation 5
(2) The written notification shall be submitted to the Director General not less than
thirty days before the commencement of such work in such form
as determined by the Director General.
To submit written notification to DG not less than thirty days
before the commencement of such work in such form
as determined by the DG
CP 6: Yes √ No NA
Remarks:
__________________________________________
LAMPIRAN 3
3
ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014
[P.U.(A) 151/2014] CHECKPOINT (CP)
Measures to reduce emission
Regulation 6
If the University is involved in any activity or industry listed in the First Schedule,
the University shall incorporate measures to reduce the emission of air pollutants
to the atmosphere in accordance with the Best Available Techniques Economically
Achievable determined by the Director General.
See activities listed in First Schedule, if applicable,
incorporate measures to reduce the emission of air pollutants
to the atmosphere in accordance with the Best Available
Techniques Economically Achievable determined by the
Director General.
CP 7: Yes No √ NA
Remarks:
__________________________________________
Air pollution control system
Regulation 7
(1) The University shall be equipped with an air pollution control system in
accordance with the specifications as determined by the Director General.
Equipped with an air pollution control system in accordance
with the specifications as determined by the DG.
CP 8: Yes No √ NA
Remarks:
__________________________________________
Air pollution control system
Regulation 7
(2) The University shall appoint a professional engineer to design and supervise
the construction of the air pollution control system.
Appoint a professional engineer to design and supervise the
construction of the air pollution control system.
CP 9: Yes √ No NA
Remarks:
__________________________________________
LAMPIRAN 3
4
ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014
[P.U.(A) 151/2014] CHECKPOINT (CP)
Air pollution control system
Regulation 7
(3) The University shall operate and maintain the air pollution control system in
accordance with sound engineering practice and ensure that all components of the
air pollution control system are in good working condition.
Operate and maintain the air pollution control system in
accordance with sound engineering practice and ensure that
all components of the air pollution control system are in
good working condition.
CP 10: Yes No √ NA
Remarks:
__________________________________________
Air pollution control system
Regulation 7
(4) The operation of the air pollution control system shall be supervised by a
competent person who shall be on duty at all times during the operation of the air
pollution control system.
Supervision by a competent person who shall be on duty at
all times during the operation of the air pollution control
system.
CP 11: Yes No √ NA
Remarks:
__________________________________________
Air pollution control system
Regulation 7
(5) The University and the professional engineer shall submit a written declaration
to the Director General, in such form as determined by the Director General,
within thirty days after the commencement of operations at the University
premises, certifying that the design and construction of the air pollution control
system have complied with the specifications referred to in subregulation (1).
Submit written declaration to DG within thirty days after the
commencement of operations at the University premises that
design and construction of the air pollution control system
have complied with the specifications referred to in
subregulation (1).
CP 12: Yes √ No NA
Remarks:
__________________________________________
LAMPIRAN 3
5
ENVIRONMENT QUALITY (CLEAN AIR) REGULATIONS 2014
[P.U.(A) 151/2014] CHECKPOINT (CP)
Air pollution control system
Regulation 7
(6) The University shall submit to the Director General as-built drawings that show
the placement of any works or structures that form part of the air pollution control
system within thirty days after the commencement of the operations at the
University premises.
Submit as-built drawings to DG within thirty days after the
commencement of operations at the University premises that
show the placement of any works or structures that form part