    BUILDING APPRAISAL

    PRESENTED BY:

    Aditi Dekate 111110019

    Ayushi Hajare 111110029

    Prasenjit Shukla 111110030

    Asmita Patil 111110039

  • 8/22/2019 Checklist Building Appraisal

    2/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    I. DrainageStudy of

    topography of site

    Slope

    contours

    Appropriate slope is1:60

    How are the

    contours on site?

    Climatic data of

    the site

    Precipitation(

    rainfall), areas

    where water

    logging and

    occasional flooding

    occurs

    study of rainfall and

    any king of flooding( if

    any) gives us an idea

    about minimum

    elevation of building

    from ground

    What methods

    have been used

    for surface run

    off?

    Natural slope of

    ground?

    Open drains?

    Closed drains?

  • 8/22/2019 Checklist Building Appraisal

    3/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    Placement ofunderground

    drain pipes on

    site

    Size of drainage

    pipes

    Placement of

    open drain

    Size of drains

    Is their any kindof backflow in

    open drains?

    In case of backflow,study of ways used

    on site to prevent

    this.

  • 8/22/2019 Checklist Building Appraisal

    4/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    Is their any placewhere water

    logs?

    How has this beenprevented?

    Where is theplacement of

    gutter pipes?

    What is the

    slope of pipes?

    Where are the

    man holes

    placed? What is

    the spacing

    between them?

    Ideally 2 manholes

    are at a minimum

    distance of 400 m

  • 8/22/2019 Checklist Building Appraisal

    5/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    WATER SUPPLY

    1. Any nearby

    watercourses.

    2. Capacity of

    sump well tank

    and storage

    tank.

    3. Total no. of tanks

    and their position.

    4. Pressure of

    pump.

    5.Height at whichgravity tank is

    placed.

  • 8/22/2019 Checklist Building Appraisal

    6/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    RAINWATERHARVESTING

    SYSTEM

    1. Storage capacity

    of tank.

    2. Underground/

    overhead tank.

    3. Is filtration

    system present.

    FIRE PROTECTION

    SYSTEM

    1. Capacity of

    tank.

    2. Presence of

    sprinkers or

    pumps.

  • 8/22/2019 Checklist Building Appraisal

    7/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    SEWAGE1. Presence of

    open or closed

    drains.

    2. Depth at which

    pipelines are

    placed.3. How is waste

    disposed off.

    4. Placement and

    height of vent

    pipes.

    5. Dimensions

    and placement of

    gully traps.

  • 8/22/2019 Checklist Building Appraisal

    8/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    AIR CONDITIONINGI. Kind of system

    Unitary

    Centralized

    Packed terminal

    Capacity ofcooling systems

    according to

    rooms

    , 1 , 1 , 2 , 2 ,and of larger

    capacity

    Kind of units

    used in room

    Split , window ac,

    cube ac, or any

    other

    Help to determine the

    space occupied by

    units

  • 8/22/2019 Checklist Building Appraisal

    9/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    Where is theplacement of

    compressor

    units?

    Is their any kind

    of leakage?

    Does the placementeffect the faade in

    any way?

    Proper placement ofunits

    II. DUCTS What is the duct

    network system?

    Placement of ducts.Are all the ducts

    concealed or

    visible?

    What materialhas been used

    for ducts

  • 8/22/2019 Checklist Building Appraisal

    10/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    What are thesizes of the

    ducts?

    III. Cooling fans Placement of

    cooling units in

    rooms

  • 8/22/2019 Checklist Building Appraisal

    11/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    ELEVATORS

    UsageNo of people using

    Elevators

    Load on elevator

    Small 400kg

    (passenger withhand baggage)

    Medium 650 kg (+

    prams and wheel

    chairs)

    Large 1000 kg (+

    furniture, coffins

    Helps in determining

    the no of elevatorsrequired and size of

    elevators

    Hoisting

    machinery

    Placement of

    hoisting machinery

    And its dimensions

    It placed on the

    roof above the

    elevator

  • 8/22/2019 Checklist Building Appraisal

    12/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    Elevator shaft

    1. What is theheight of shaft

    at the top floor?

    2. What are the

    dimensions ofthe shaft?

    3. What is the

    depth of

    elevator pit?

    It usually dependson the distance

    between top floor

    and the roof.

    Provisions for

    services andcounter weights

    have to be

    provided.

    These are usually

    1500 mm to 3500

    mm deep

  • 8/22/2019 Checklist Building Appraisal

    13/13

    QUESTION STANDARDS What exist @

    site.

    Inference/

    Recommendation

    Dimensions of

    lifts

    The dimension for

    different loads aredifferent

    minimum criterion

    for wheel chair

    bound person is

    o 2000 mm width

    of elevatoro 1300 depth of

    elevator

    o 900 minimum

    opening

    What is the

    positioning of

    control button?