    Los Angeles

    Cultural Heritage Commission

    6th Street Viaduct

    Bridge Improvement Program

    CHC Staff Update

    April 27, 2010

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    2/13

    Todays Agenda

    1. Introductions

    2. Environmental Status & Milestone Dates

    3. CHC DEIR/EIS Comments/Replies

    4. Recap of ASR Workshop

    5. Preferred Alternative

    6. SHPO MOA

    7. CHC May 20th Hearing

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    3/13

    Status of 6th ST EIR/EIS

    DEIR/EIS circulated June 16 - August 24, 09 25 written comments received

    Responses to all comments included in Draft

    FEIR/EIS Two additional Bridge Concepts (1A and 4A)

    evaluated in Draft FEIR/EIS

    Preferred Alternative workshop conducted

    on 9/29/09

    Draft FEIR/EIS is awaiting Caltrans

    Headquarters and Legal review

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    4/13

    Next Environmental Milestones

    MOA Concurrence by SHPO 5/14/10

    Cultural Heritage Commission Hearing 5/20/10

    BPW Public Hearing 5/31/10

    Caltrans Approval of Final EIR/EIS

    (Head quarters & Legal)

    7/31/10

    Community Advisory Committee (Mtg. #10) TBD (June)

    City Council Committee Hearings

    Public Works

    Budget and Finance

    Transportation

    TBD

    (June/July/Aug 2010)

    City Council Approval/Certification 8/31/10

    File CEQA Notice of Determination (NOD) 9/1/10

    Notice of Availability (NOA) in Federal

    Register

    10/1/10

    Approve NEPA Record of Decision (ROD) 10/1/10

    CEQA Approvals City of Los Angeles, Lead Agency

    NEPA Approvals Caltrans, Lead Agency

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    5/13

    CHC Comments and Replies

    DEIR/EIS1. Designation as Historic-Cultural Monument

    2. Retaining HCM Status

    3. Full Replication/Reconstruction Alternative

    4. Proposed Viaduct Width

    5. Partial Preservation Alternative

    6. Mitigation Measures

    7. Reuse of Steel Arches

    8. Architectural Elements that are not part of Viaduct

    9. AASHTO Guidelines for Historic Bridges

    10. MOA with SHPO

    11. SHPO Concurrence

    12. CAC Vote

    13. CAC Meeting Minutes

    14. Mailing List Information

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    6/13

    ASR Attack is triggered by:1. Reactive form of silica in aggregates

    2. Sufficient alkali (Na or K) in cement

    3. Sufficient available moisture

    Alkali-Silica Reaction

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    7/13

    ASR Attack of Concrete Material

    ASR deterioration is throughout structure

    Columns & foundations are most damaged

    Repairs have been ineffective

    ASR will continue

    Light Damage Moderate to Severe Damage

    Moderate Damage Severe Damage

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    8/13

    ASR Treatments - Existing Structures

    Slow the Reaction

    Epoxy Injection Methacrylate Injection

    Lithium Injection

    Provide 3-D Confinement Pressure

    Replace Most Severely Damage Members

    Re lace Structure

    Surface of Girder

    Penetration intoMember

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    9/13

    Alternative 1 No Action

    Alternative 2 Retrofit Infill Walls & Heavy Steel Casing

    Substructure Replacement

    Alternative 3 Replacement Alignments 3A, 3B, 3BM, 3C

    Bridge Concepts 1 5, 1A and 4A

    Project Alternatives for

    Environmental Assessment

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    10/13

    Provides Seismically Safe Structure with a 75 yr Design Life

    Retrofit not Preferred as it does not Stop or Mitigate ASR

    High Life Cycle Cost

    Doesnt Correct Deficiencies

    Doesnt Meet Railroad Operator Requirements

    Provides only for No-Collapse Criteria, Likely Significant Damage

    After the Design Earthquake Event

    Preferred Alternative

    Replacement

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    11/13

    Staffs Recommended Alternative

    Concept 4ACorridor 3B

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    12/13

    Status of MOA

    10/27/09 - PDT submitted Draft MOA toCaltrans for HQ review

    1/12/10 - Caltrans HQ submitted Draft MOA

    for SHPO review

    3/23/10 SHPO requested to add the drawing

    review in the MOA

    4/22/10 SHPO requested to add drawing

    review at various stages of bridge design

  • 8/22/2019 CHC staff briefing 4_27_10.ppt

    13/13

    May 20th Meeting

    Time Allocation Topics to be Address

    Other