Top Banner
MoRTH / CMVR / TAP-115/116 (Issue 4) Page 296 CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR TESTING OF 4 GAS ANALYSER 1 PHYSICAL CHECKING AND VERIFICATION i) Instrument Model number ii) List of accessories iii) Sensor detector type and model number iv) Sample cell dimensions v) All PCB model numbers, size and quantity vi) Display : type, number of digits, scale and resolution vii) Probe length and diameter viii) Input/output connectors and cables ix) Printout sample x) Front panel controls xi) Electrical calibration xii) Software programme version 2 Following tests as per type approval test procedure for 4 gas analyzer given in chapter III shall be carried out for Conformity of Production test. 1. Check of the calibration curve (Clause 9.1 of chapter III) 2. Environmental condition and electrical supply (Clause 9.4.1 of chapter III) 3. Influence of gas components other than the measured. (Cross sensitivity)(Clause 9.4.2 of chapter III) 3 In addition to above conformity test, the test agencies at their sole discretion may determine to carry out any other test, if found necessary.
1

CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR ...€¦ · CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR TESTING OF 4 GAS ANALYSER 1 PHYSICAL CHECKING AND VERIFICATION

May 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR ...€¦ · CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR TESTING OF 4 GAS ANALYSER 1 PHYSICAL CHECKING AND VERIFICATION

MoRTH / CMVR / TAP-115/116 (Issue 4)  Page 296 

CHAPTER VI : CONFORMITY OF PRODUCTION PROCEDURE FOR TESTING OF 4 GAS ANALYSER 1 PHYSICAL CHECKING AND VERIFICATION

i) Instrument Model number ii) List of accessories iii) Sensor detector type and model number iv) Sample cell dimensions v) All PCB model numbers, size and quantity vi) Display : type, number of digits, scale and resolution vii) Probe length and diameter viii) Input/output connectors and cables ix) Printout sample x) Front panel controls xi) Electrical calibration xii) Software programme version

2 Following tests as per type approval test procedure for 4 gas analyzer given in chapter III shall be carried out for Conformity of Production test.

1. Check of the calibration curve (Clause 9.1 of chapter III) 2. Environmental condition and electrical supply (Clause 9.4.1 of chapter III) 3. Influence of gas components other than the measured. (Cross

sensitivity)(Clause 9.4.2 of chapter III) 3 In addition to above conformity test, the test agencies at their sole discretion may

determine to carry out any other test, if found necessary.