CHAPTER III
REPORT ON JOB / TASK / ASSIGNMENT / PROJECT
3.1 Unit Attached
3.1.1 Documentation Department
At Bird Technology Sdn. Bhd, the work processes are survey, installation,
testing and lastly operation and maintenance. So, at this department after all the part
is done there will be a site report to do which Site Design Report, Site Installation
Document and Site Acceptance Document.
3.2 Maxis Node B
3.2.1 Site Installation Document
Site installation document is the last process of summary the site which is
install/design the floor plan, cable ladder, top view and side view of site. After it is
done, the Report will make to prove the task done.
16
Page 2
3.2.2 Eastern Maxis 3G W900 (Site Design Document)
This SDD Document contains:
1. Front Page
2. General Info
3. Situation Plan
4. Configuration Data
5. AutoCad Drawing
Floor Plan
Cable ladder
Top View
Side View
6. IE Photo
7. Material Checklist & Reservation Form (MCRF)
8. Local Material Reservation (LMR)
9. Signal Performance Report
17
Page 3
3.2.2.1 Front Page
This part is to show the site name and sub region.
Illustration 3.1 : Front Page
3.2.2.2 General Info
This part is consist IPA Number of site and summary of Maxis
responsibilities after installation of Ericsson’s scope of work.
Illustration 3.2 : General Info
18
Page 4
3.2.2.3 Situation Plan
This part shows the address and geographical coordinates of that site.
Illustration 3.3 : Situation Plan
3.2.2.4 Configuration Data
This part is the details about general, RBS Technical Data, Floor Load,
Electrical Data, Antenna System (propose antenna 3G W900), propose
antenna feeders, and Antenna System 2G.
19
Page 5
Illustration 3.4: Configuration Data
3.2.2.5 AutoCad Drawing
The software used to make the drawing is AutoCad 2009.
Illustration 3.5 : AutoCad 2009 Software (example display)
20
Page 6
1. Floor Plan
Illustration 3.6 : Floor Plan
2. Cable ladder
Illustration 3.7 : Cable Ladder
21
Page 7
3. Top View
Illustration 3.8 : Top view
4. Side View
Illustration 3.9 : Side View
22
Page 8
3.2.2.6 IE Photo
This part is insert all the picture of:
1. Site view location
2. Site access
3. Equipment handling
4. Equipment room view
5. AC distribution
6. View of full rectifier
7. Propose location new 1 x 150A DC breaker
8. View of full rectifier
9. Full view of DDF location
10. Close up view showing the E1 location
11. Existing RBS 3206 location (to be upgrade)
12. Existing feeder inlet and IGB
13. Existing feeder inlet and EGB
14. Existing EGB
15. External Grounding Bar Location (Top Tower)
16. External Grounding Bar Location (Tower Leg)
17. New Sector 1, 2 and 3 (3G)
18. Proposed new feeder route 6 x 1 5/8” with 3 in 1 feeder clamp W900
19. Full view of 3G (W2100) antenna sector 1, 2 and 3
20. View of TMA and RET unit sector 1, 2 and 3.
21. View of antenna port and label sector 1, 2 and 3
22. Existing 2G antenna sector 1, 2 and 3
23. View of antenna port and label sector 1, 2 and 3.
23
Page 9
Illustration 3.10 : IE Photo 1
24
Page 10
Illustration 3.11 : IE Photo 2
25
Page 11
3.2.2.7 Material Checklist & Reservation Form (MCRF)
This part is a form to order the new equipment which is cable feeder ½ per
meter, cable feeder 1 5/8” per meter and clamp feeder 1 5/8” (3 inlet).
Illustration 3.12 : Material Checklist & Reservation Form
26
Page 12
3.2.2.8 Local Material Reservation (LMR)
This part is a form to order new equipment which is DC Power Cable,
Grounding Cable (35mm), Grounding Cable (50mm) and coaxial cable
Illustration 3.13: Local Material Reservation
27
Page 13
3.2.2.9 Signal Performance Report
This part is to testing and display the signal performance of the system.
Illustration 3.14: Signal Performance
As a conclusion, about three and a half month the student have finished 6 Site
Survey Report and Site design Report including the amended after the supervisor has
checked it.
28
Page 14
3.3 DIGI Node B
3.3.1 Site Acceptance Document
The Site Acceptance Document is making after all the part of survey, testing,
installation and operation and maintenance are completed. This Site Acceptance
Document contains:
a. Front page
b. Site Acceptance Checklist
c. Document List
d. Situation Plan
e. Configuration Data
f. Drawing
g. Site Photo
h. Site Installation
i. OAT (product list)
j. Integration Test
k. Antenna Test Record
l. VSWR & DTF
m. Ant Test S1, VSWR
n. Ant Test S2, VSWR
29
Page 15
o. Ant Test S3, VSWR
p. Ant Test S1, DTF
q. Ant Test S2, DTF
r. Ant Test S3, DTF
s. Sign off page
3.3.1.1 Front Page
This part is to show the site name and sub region.
Illustration 3.15 : Front Page
30
Page 16
3.3.1.2 Site Acceptance Checklist
Illustration 3.16 : Site Acceptance Checklist
3.3.1.3 Document List
This part consists of IPA No. Of document.
Illustration 3.17 : Document List
31
Page 17
3.3.1.4 Situation Plan
This part shows the address and geographical coordinates of that site.
Illustration 3.18 : Situation Plan
3.3.1.5 Configuration Data
This part is the details about general, Node B RBS Technical Data,
Floor Load, Electrical Data, Antenna System 2G, Antenna System
(propose antenna 3G W900) and Qualification Summary.
32
Page 18
Illustration 3.19 : Configuration Data
3.3.1.6 AutoCad Drawing
The software used to make the drawing is AutoCad 2007.
33
Page 19
Illustration 3.20 : AutoCad Software 2009(example display)
Top View
34
Page 20
Illustration 3.21 : Top View
Side View
Illustration 3.22 : Side View
35
Page 21
3.3.1.7 Site Photo
This part is insert all the picture of:
- Site Location
- New Node B Location
- Installed DC Breaker at Rectifier/SubDb (close up)
- Node B Grounding
- RF Cables (At Inlet)
- 3G Antenna Sector 1, 2 and 3
- RRU Sector 1, 2 and 3
- External Grounding for RRUW
- Feeder Grounding for RRUW
- Others (Additional CME Works)
36
Page 22
Illustration 3.23 : Site Photo
37
Page 23
3.3.1.8 Site Installation
Illustration 3.24 : Site Installation
38
Page 24
3.3.1.9 OAT (Product List)
Illustration 3.25 : OAT (Product List)
3.3.1.10 Integration Test
Illustration 3.26 : Integration Test
39
Page 25
3.3.1.11 Antenna Test Record
Illustration 3.27: Antenna Test Record
3.3.1.12 VSWR & DTF
Illustration 3.28 : VSWR & DTF
40
Page 26
The software to read the VSWR and DTF is ANRITSU.
Illustration 3.29 : Anritsu Software
Below is the step to configure the VSWR and DTF:
1) Select file, open, and choose the folder.
2) Select the 3G Swap folder and choose the TX1 (VSWR) first and then following
by RX1 (VSWR).
3) Repeat the step for sector 2 and 3.
4) The step for DTF also same with VSWR.
41
Page 27
3.3.1.13 Antenna Test S1, (VSWR)
42
Page 28
Illustration 3.30 : Antenna Test S1, (VSWR)
3.3.1.14 Antenna Test S2, (VSWR)
43
Page 29
Illustration 3.31 : Antenna Test S2, (VSWR)
3.3.1.15 Antenna Test S3, (VSWR)
44
Page 30
Illustration 3.32 : Antenna Test S3, (VSWR)
3.3.1.16 Antenna Test S1, (DTF)
45
Page 31
Illustration 3.33: Antenna Test S1, (DTF)
3.3.1.17 Antenna Test S2, (DTF)
46
Page 32
Illustration 3.34 : Antenna Test S2, (DTF)
3.3.1.18 Antenna Test S3, (DTF)
47
Page 33
Illustration 3.35 : Antenna Test S3, (DTF)
3.3.1.19 Sign Off Page
Illustration 3.36 : Sign Off Page
As a conclusion, about three and a half month the student have finished 15 Site
Acceptance Document including the amended after the supervisor has checked it.
The Site Acceptance Document is:
48
Page 34
Site Acceptance Document 8031AU Chenderawaseh
Site Acceptance Document 8047AU Transport SB
Site Acceptance Document 8048AU Hotel Brumatsu
Site Acceptance Document 8052AU Atabara
Site Acceptance Document 8201AU Lembaga Tabung Haji
Site Acceptance Document 8204AU Blok PT
Site Acceptance Document 8214AU Jln Kebun Sultan
Site Acceptance Document 8215AU Batu 2 Kuala Krai
Site Acceptance Document 8216AU Jln Sultanah Zainab
Site Acceptance Document 8243AU New Pacific Hotel
Site Acceptance Document 8573AU Kolej Profesional MARA
Site Acceptance Document 8574AU BIM Maxis Tower
Site Acceptance Document 8954AU Indera Mahkota 6
Site Acceptance Document 8955AU Taman Muhibbah (Celcom)
Site Acceptance Document 8046AU Bandar Indera Mahkota
49
Page 35
3.4 Project Assignment Switching System
3.4.1 Test DTRU and TRU
Objective of the project is to do the installation and testing on the TRU and DTRU
units. trainees are exposed in testing DTRU and TRU first. During the practical, in
the five weeks, trainees are inducted into repairing centre to help staff to make the
testing. After week 12, a trainee should make preparation for the MLTN
documentation. Refer to the appendix D. The steps taken are same for both of TRU
and DTRU except the coding are different for each of them.
1. Identify the type of RBS cabinet
50
RBS 2202
RBS 2206
Page 36
Illustration 3.37 : RBS cabinet
2. TRU (transceiver unit) is installed on RBS 2202 while DTRU (double
transceiver unit) is installed on RBS 2206.
Illustration 3.38 : Types of cabinet
51
Page 37
3. Let the installation of TRU begins.The TRU unit has to be installed properly
to avoid any disfunctional. Switch on the power supply and it takes three to
four minutes for the TRU to be ready.
52
Page 38
Illustration 3.39 : The installation of TRU/DTRU
4. On the front panel there are five indicators and three push buttons for
RESET, LOCAL/REMOTE and TEST CALL.
53
Page 39
Illustration 3.40 : TRU front panel
Table 3.4 : TRU indicator
5. After waiting for 3 to 4 minutes, the TRU are ready to be tested. The unit is
connected to CPU. Insert the program coding from the CPU to test whether
the TRU is operational or faulty. Coding is provided by the Ericsson's
company to let the system to be functional.(refer to appendix A)
54
Page 40
Illustration 3.41 : Coding interface in winfiol software
6. If the coding has successfully been programmed on the TRU without any
problem, the indicator light on the front panel will appeared green. Therefore,
it is clearly stated that the TRU is fully operational. Besides that, TRU can be
corrupted if the program is buffering and detect any faulty when coding is
been inserted. Therefore, the indicator light will appeared red. Then, the test
result form has to be filled.(refer to Appendix B)
55
Page 41
Illustration 3.42 : TRU result form
56
Page 42
Illustration 3.43 : TRU packing
7. Lastly, deliver the TRUs that have been inspected and packing to the
Ericsson’s company.
3.5 Project Assignment Mini link – traffic node team
3.5.1 Introduction
The trainee had been attached to the unit so called Mini Link – Traffic Node or
MLTN after week 12. This unit had been formed under the Transmission Division to
carry out the transmission project awarded by Ericsson Malaysia Bhd. for the client
Digi Telecommunication Sdn. Bhd. MLTN (Mini Link TN) itself is the name of the
product produced by Ericsson AB Sweden for transmission, which Bird Technology
Sdn. Bhd. (Bird Tech) carry out the survey, installation, testing and commissioning
for Mini Link equipment. Furthermore, Bird Tech is among the telco service
provider in Malaysia registered with Ericsson to carry out the installation of the
Ericsson’s equipment either for Node B project or transmission project. Bird Tech
also renowned as the expertise in switching led by the company’s Managing
Director, Tuan Haji Pauzi B. Yusoh. Besides that, Bird Tech also has a lab which
57
Page 43
equipped with Ericsson’s Mini Link TN test bed for training purposes and equipment
testing.
In the MLTN Unit, the trainee had been appointed by the company as a trainer under
MLTN project coordinator to support and complete the MLTN documentation(refer
appendix C) after Planning, Installing & Testing and Commisioning were done or
running.
.
3.5.2 Project Assignment Documention
3.5.2.1 Mini Link Traffic Node (MLTN)
58
Page 44
Illustration 3.44 :MLTN flow chart(refer to appendix C)
3.5.2.2 Project Implementation
In the project implementation, there were divided by six stage which is installation,
testing,pre acceptance,cutover ,dismantling and final acceptance.
After all the process has been done, trainer must do the documentation of this
project. The MLTN document include site survey and site design document.
3.5.2.2.1 Survey Document
59
Page 45
Illustration 3.45 : Example Of Site Survey Document
3.5.2.2.2 Site Design Document (MLTN)
The trainer responsible to prepare the SDD for the MLTN project after all the data
required given by the supervisor.
This Document contain :
a. Site Document
b. Test Result
c. Check List
d. TND Report
e. Site Photo
60
Page 46
3.5.2.2.2.1 Front Page
Illustration 3.46 : Front Page Example
As a conclusion, trainer have complete three Site Document for MLTN including
the amended after the supervisor has checked it.
The documentation written by using Microsoft excel and Autocad 2009 for drawing
sheet and must be convert into PDF file after all the document sheet approve by the
supervisor.
61
Page 47
3.6 Installation
Do the installation at Celcom Tower, City Square Plaza.
Observe and help install new equipment.
62
Page 48
Illustration 3.47 : Site Installation View
63
Page 49
Illustration 3.48 : Some equipment used
64
Page 50
Illustration 3.49 : some what we are doing
65