7.0 Introduction
The preparation stage as illustrated in Figure 7.1: Preparation
Diagram is not part of the risk assessment process in MyRAM.
However, it is vital in determining the successful start of a
MyRAM. It is at this preparation stage that the risk assessment
team formed will understand the pre-requisites for a successful
risk assessment exercise. Prior to the Preparation stage, one must
recall that there is the High-Level Risk Assessment (HiLRA) which
determines whether a detail RA using MyRAM is necessary or not. For
the High-Level Risk Assessment, the senior management will be the
approving authority for this exercise.
Figure 7.1: Preparation Diagram
7.1 Overview of this process
The senior management of an agency has the responsibility for
meeting mission requirement and business objectives. As part as of
a good conduct of due diligence, senior management must ensure that
the necessary resources are effectively applied in the information
security initiatives to meet the mission requirement. The
Preparation stage is when decision has to be made with regards to
the feasibility of a proper risk assessment project. At the agency
level an existing ICT Steering Committee (Refer to Pekeliling. 4
Tahun 2004: Garis Panduan Mengenai Tatacara Memohon Kelulusan
Teknikal Projek ICT Agensi Kerajaan) may commission an initial
feasibility study for a RA project.
Goals
The preparation stage has the following goals;
1 To identify the requirements and justifications for a risk
assessment exercise.
2. To specify the objectives and the resources (budget,
manpower, time line) required to successfully complete the RA
exercise.
3. To obtain endorsement from the senior management to proceed
with the risk assessment exercise.
-
Chapter 7 - 40
MyRAM
MA
MPU
Preparation: Introduction
Tasks
1. Setting Up A Preliminary Risk Assessment Team
The preliminary risk assessment team should have a
representative from the core business areas and the ICT department.
The personnel selected should possess good understanding and
knowledge of the targeted area of operations in the organisation.
It is advisable that the ICTSO, or any other personnel member who
has a role and responsibilities similar to those of the ICTSO to
lead the team. These personnel members usually are those who are
familiar with Information security in general. The team should
consist of one to three people, based on the anticipated action
group workload that may include writing activities, presentations,
and discussions.
2. Deliverables of the Preparation Stage
The deliverable is a proposal to conduct risk assessment
exercise or project depending on the extent or size. The proposal
should highlight the importance and key benefits of a risk
assessment exercise in the context of the organisation’s security
objectives.
The following elements need to be presented to the senior
management for approval of the risk assessment activity.
i. Scope or Review Boundary – It is advisable that the scope is
determined based on core functions of the agency. When the scoping
is done for the first RA, only one (1) or two (2) core functions
should be looked at. Once experience in performing RA activities is
acquired, the agency can extend the boundary to include more
processes or functions. Examples of documents that can be reviewed
to determine the scope are:
• Client’s charter
• Work procedure manual
• Organisational structure
• Ketua Pengarah’s desk file/ fail meja
• Standard operating procedures
• Annual report.
ii. Manpower – Normally, it will take two (2) full-time RA team
members and two (2) part-time staff to identify and analyze risks
associated with two (2) core business functions.
iii. Duration – For core functions with approximately 100
assets, and at least two (2) full-time and two (2) part-time RA
team members, the whole exercise may take approximately three (3)
to four (4) months.
iv. Allocation of Budget – If the personnel of the agency
perform the exercise, then the agency must look at costs associated
with possible needs for training, software tools, and hiring
external consultants. If no internal officers are available, the
senior management will need to find alternatives to ensure that the
risk assessment activity is performed.
Tasks (Preparation):1. Setting Up A
Preliminary Risk Assessment Team
2. Identify Required Resources
3. Obtain Senior Management Commitment And Approval
-
Chapter 7 - 41
MyRAM
MA
MPU
Preparation: Introduction
3. Obtain Senior Management Commitment and Approval
The proposal may be presented by the preliminary RA team in any
suitable platform such as, a simple discussion session, a formal
meeting or a more serious formal forum. All pertinent information
that would assist in decision making should be tabled clearly and
rationalized. The written approval to proceed or otherwise with the
RA exercise should be obtained from the senior management.
Besides the endorsement on scope, objectives and timeline, the
following
commitment must be solicited:
i. Transparent, continual support of risk assessment activities
by senior management.
ii. Formal assignment of RA team members.
iii. General directive to all relevant organisational personnel
who may be required to cooperate in terms of information gatherings
and sharing.
iv. Agreement on the roles and responsibilities within the risk
assessment process.
v. Budget allocation if relevant.
vi. Commitment to review the results and to make informed
decisions upon presentation of the RA deliverables at every crucial
stage of the RA exercise.
The written approval or acknowledgment from the senior
management can be in a form of a letter, memo, e-mail or any formal
communication method specifying all the elements being
endorsed.
-
Chapter 7 - 42
MyRAM
MA
MPU
Preparation: Introduction
Output:a) Proposalb) A formalcommunicat ion method specifying
the members of the preliminary RA team
Table 7.1: Proposal
Table 7.2: Sample of Memo/Letter on Acknowledgement of RA
Exercise to Be Conducted
Output (Preparation)
1. Proposal
The output of the preparation stage is a proposal as in table
7.1 and a formal communication in the formal of a memo or letter
approving the RA exercise to be conducted as per table 7.2.
Proposal
1.0 Introduction
2.0 Purpose
3.0 Background of Risk Assessment
3.1 Objectives
3.2 Benefits
3.3 Implications
4.0 Recommended Scope
4.1 Scope
4.2 Resources
4.3 Budget
4.4 Timeline
5.0 Authorization
2. Sample of Memo/Letter
Memo/Letter Subject: Acknowledgement of Undertaking RA
Exercise
Thanks.
_______________________________
< Approving Authority >
-
Chapter 8 - 43
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Cha
pter
8: R
isk
Ass
essm
ent P
roce
ss
Intr
oduc
tion
Figu
re 8
.1 b
elow
sho
ws
that
ther
e ar
e te
n (1
0) e
ssen
tial s
teps
alto
geth
er in
a ri
sk a
sses
smen
t (R
A) a
ctiv
ity o
r exe
rcis
e.
Figu
re 8
.1: R
isk
Ass
essm
ent P
roce
ss D
iagr
am
-
Chapter 8 - 44
MyRAM
MA
MPU
Risk Assessment Process: Introduction
The input for one step of the RA activity may be taken from the
output of one of its previous steps.
Table 8.1 below provide the description of each step in the RA
process and the subtasks involved in each step.
Table 8.1: Description of RA Steps
Steps Description Task(s) Involved
Establishment of Creates a basic component of a (a) Identify the
risk Team (Step 1) risk assessment exercise. The assessment team
team members that possess vast members knowledge of the
organisation (b) Draw up Tasking are identified. The schedule and
Schedule List logistics are also established to ensure the smooth
implementation of the whole exercise. Establishment of Determines
the scope of the risk (a) Identify the scope of Review Boundary
assessment process. The final the risk assessment (Step 2) scope
will be submitted to the (b) Obtain approval from senior management
for approval. senior management Upon approval, the risk (c) Gather
information assessment team will collect all related to the review
the relevant materials and boundary information related to the
review (d) Prepare the Review boundary. Boundary Document (e)
Revisit Step 1 as necessary
Identification of Identifies all the assets which (a) Identify
related assets Assets (Step 3) are within the scope of the risk (b)
Group and classify assets assessment (review boundary). (c)
Identify assets’ owners and custodians (d) Verify and validate the
findings of the questionnaires
Valuation of Assets Assigns semi-quantitative values (a)
Identify dependencies and Establishment to the assets and
determines associated with the of Dependencies their dependencies.
assets Between Assets (b) Assign a quantified (Step 4) value to
each asset (c) Verify and validate the findings of the
questionnaires
-
Chapter 8 - 45
MyRAM
MA
MPU
Risk Assessment Process: Introduction
Steps Description Task(s) Involved
Assessment of Determines types of threats (a) Create a generic
Threat (Step 5) associated with the assets, and threat profile
their relative levels. (b) Identify all relevant threats to assets
(c) Verify and validate the findings of the questionnaires
Assessment of Identifies all potential (a) Identify potential
Vulnerability vulnerabilities which may be vulnerabilities
exploited (Step 6) exploited by threats. In addition, by threats it
will rate the relative (b) Verify and validate vulnerability
exposure levels. the findings of the questionnaires
Identification of Identifies all types of existing & (a)
Review existing and Existing & Planned planned safeguards which
have planned safeguards for Safeguards been or will be deployed to
protecting the assets (Step 7) protect the assets. (b) Verify and
validate the findings of the questionnaires
Analysis of Impact Quantifies the business impacts (a) Determine
the business (Step 8) of the assets accordingly. The loss
calculation will be based on the (b) Determine the impact assets’
values & business loss. levels (c) Verify and validate the
findings of the questionnaires
Analysis of Ascertains the likelihood of (a) Determine the
likelihood Likelihood threats & vulnerabilities that of threats
& (Step 9) may happen, with or without vulnerabilities that
safeguard(s) in place. may happen (b) Verify and validate the
findings of the questionnaires
Calculation of Calculates the risk level for (a) Calculate the
risk level Risk each asset, based on the for each asset (Step 10)
impact value & likelihood results.
-
Chapter 8 - 46
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
8.1 Risk Assessment Steps
8.1.1 Step 1: Establishment of Team
Overview of this process
The establishment of the RA Team entails the appointment of RA
team leader and members. It is suggested that team leader should be
the designated ICTSO of the organisation. As for team members the
number and the area of representation depends on the scale of the
exercise and the targeted area for risk assessment. The team
members are selected carefully based on their level of involvement
in the organisation, as well as their experience particularly in
the ICT infrastructure and the organisation’s core business.
Goals
The goals of this process are:
1. To obtain dedicated team members.
2. To assign tasks to al l team members with associated roles
and responsibilities.
Tasks
1. Identify The Risk Assessment Team Members
The RA team plays a major role in ensuring the success of this
exercise. Since this team plays such a role in the assessment, it
is of utmost importance to select a string of team members who
possess sufficient skills and experience in the ICT infrastructure
of the organisation to ensure the smooth implementation of the
entire exercise.
a. Risk Assessment Team
The organisational chart for the RA team consists of the project
advisor, project manager, team leader(s) or team member(s). It is
important to acknowledge that the project advisor plays a vital
role in an RA project. The role played is not only as and when
advise is required but must conduct final evaluation, reviews and
authorization of all output and documents before they are presented
to the senior management at all stages and steps of the
project.
Members should possess good knowledge of and experience in their
organisation’s procedures and have relatively ample knowledge of
the ICT infrastructure of the organisation. Representatives from
the management and operational (technical) levels are needed to
ensure the success of the RA activity.
Tasks (Step 1):1. Identify The Assessment Team Members
2. Draw up Tasking Schedule List
-
Chapter 8 - 47
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Below is an example of the risk assessment team organisation
chart.
Figure 8.2: RA Team Organisation Chart
b. Roles and Responsibilities
The RA Team will be responsible for defining the boundary of the
assessment. The members will gather and analyze information as well
as produce the risk assessment’s final report. Some other roles and
responsibilities include:
i. Stating roles and responsibilities in general for all team
members to set the participation expectation for all members.
ii. Gathering, analyzing and reporting the findings of the risk
assessment exercise.
iii. Making sure that all tasks are performed properly.
iv. Coordinating logistics and schedules for the exercise.
Depending on the scope or the review boundary of the RA
exercise, agency may determine who should be appointed as the
project advisor. For example, the role of project advisor could be
executed by the Head of Section, Head of Department or business
owner. Below are the specific responsibilities for every designated
personnel member who is involved in the risk assessment
exercise.
ProjectAdvisor
ProjectManager
Team Leader (s)
Team Member (s)
-
Chapter 8 - 48
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.2: Roles and Responsibilities for the Risk Assessment
Team
Function in RA Team Responsibilities
Project Advisor (a) As the main and only advisory person for the
RA exercise.
(b) Ensure the required process(es) and procedure(s) are
followed.
(c) Resolve any RA exercise issues. (d) Conduct final
evaluations, reviews and authorization of
all output and documents before they are presented to the senior
management.
Project Manager (a) Manage the exercise as a whole on a daily
basis. (b) Ensure timely completion of the exercise. (c) Works
closely with the team leader and team
members. (d) Conduct reviews of all output and documents
before
they are presented to the Project Advisor. (e) Reports to:
Project Advisor.
Team Leader(s) (a) Regularly ascertain the scope of work. (b)
Evaluate results, assess gaps and provide feedback. (c) Perform(s)
all tasks defined under each step. (d) Report(s) to: Project
Manager.
Team (a) Perform all tasks defined under each step. Member(s)
(b) Report(s) to: Team Leader(s).
The recommended experience level in corresponding areas for
other risk assessment team members is as follows:
i. Team Leader: at least one (1) year experience in ICT
projects. A background in information security would greatly aid
the entire RA exercise’s success.
ii. Team Members: no risk assessment experience or training
necessary, though experience in ICT recommended.
2. Draw up Tasking Schedule List
The risk assessment team will identify some basic necessities of
logistics and will notify the management of its scheduled tasks.
The purpose of the schedule is to ensure that all team members are
aware of the time allocated for specific tasks and to make sure
that none of the organisation’s operations is interrupted.
The activities included in the schedule (using a Gantt Chart as
one of the tools) are:
(a) Activities (Tasks) (b) Duration (c) Start Date and Finish
Date (d) Assigned Personnel (e) Venue
-
Chapter 8 - 49
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Resources (such equipment) need to be allocated for the
following tasks: (a) Establishment of Review Boundary (b)
Identification and Valuation of Assets (Step 3 and Step 4) (c)
Assessment of Threats (Step 5) (d) Assessment of Vulnerabilities
(Step 6) (e) Identification of Safeguards (Step 7) (f) Analysis of
Impacts (Step 8) (g) Analysis of Likelihood (Step 9) (h)
Calculation of Risk (Step 10)
Documents produced for Establishment of Team (Step 1): 1. Team
Member List 2. Tasking Schedule List
-
Chapter 8 - 50
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Output (Step 1):a) Team Member Listb) Tasking Schedule List
MyRAM/Form/S1-1.0
Output (Step 1):
1. Team Member List
The team member list contains the names of the team members,
their respective job functions, and the associated
sector/unit/department/division/vendor. A letter, memo, e-mail or
any formal communication method of appointment will be attached
together with this Team Member List for the official establishment
of this RA team. The format of the memo or letter can vary
depending on the agency’s format. CIO as the senior management
personnel would approve the form. A sample format of the Team
Member List is as in Table 8.3.
Table 8.3: Team Member List
No. Name Job Sect/Unit/Dept/ RA Function Function Div/Vendor
Prepared by: Reviewed by: Approved by:
Note: The sign-offs should be with the official stamp.
2. Tasking Schedule List
The tasking schedule list contains tasks, personnel, and
duration. Table 8.4 is a sample format of the Tasking Schedule
List.
Table 8.4: Tasking Schedule List
No Activity Venue SRA Team Date Task Details
1.0 Activity Name (Y Days : Start Date – End Date)
Output: 1. Output A
Prepared by: Reviewed by: Approved by:
Note: The sign-offs should be with the official stamp.
MyRAM/Form/S1-2.0
-
Chapter 8 - 51
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
8.1.2 Step 2: Establishment of Review Boundary
Overview of this process
The appointed Team Leader(s) and Project Manager should initiate
this step, Step 2: Establishment of Review Boundary. The team will
gather some basic information on key business operations of the
organisation. Several key personnel should be interviewed as part
of the information-gathering activity related to the ICT
infrastructure. A review boundary must be identified and justified.
The results should be tabled for further approval and endorsement
by the senior management before the risk assessment process is
taken to another level.
Goals
The goals of this process are;
1. To identify the appropriate review boundary.
2. To get consensus and approval from the senior management on
the agreed review boundary.
Tasks
1. Identify the Scope of the Risk Assessment
The team will gather basic information regarding the key
business operations of the organisation. All the relevant business
processes are reviewed and studied closely. At this point, there
will be several discussion sessions, interviews and meetings with
the operational area key personnel. The requirements put forward
will be officially documented and presented to the senior
management. The scope of the review boundary can take various forms
as outlined below:
(a) By assets.
(b) By business processes or functions.
(c) By departments.
Nevertheless, it is recommended that the team use the core
business functions or processes as its review boundary. This is in
line with the requirement stipulated in BS 7799.
However, if they deem it fit, agencies can use assets or
departments/divisions as the basis of their scope of boundary.
Those agencies that do not have a significant amount of ICT assets
(hardware, software, services, people, or data/information) may
want to use assets as their scope of review boundary. Agencies that
have multiple complex departments/divisions may choose to use those
departments/divisions as their scope of review boundary.
Final approval and endorsement from the senior management is
required before the whole exercise of analyzing and identifying
risks can commence. The subsequent steps for the entire RA activity
are based on the review boundary approved by the senior
management.
Tasks (Step 2):1. Identify the scope of the risk assessment2.
Obtain approval from senior management3. Gather information related
to the review boundary4. Prepare the Review Boundary Statement
Document5. Revisit Step 1 as necessary.
-
Chapter 8 - 52
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
2. Obtain Approval from Senior Management
Before obtaining approval from senior management on the review
boundary or scope of the risk assessment, the project advisor must
review and finalize the documents for approval. Approval from
senior management is required to ensure senior management is
committed to the RA activity.
3. Gather Information Related to the Review Boundary
The list of questionnaires as listed in Annex D must be answered
by the asset owner, custodian or relevant personnel and noted by
the RA team. Some of the questions may need to be forwarded to
others, either from the management or operational groups, for
answers and clarification. The findings to the questionnaires in
Annex D will assist the RA team in analyzing the current posture of
the infra and info structure of the defined scope. These
questionnaires are not limited to this step only. Some of the
questions may need to be asked at other steps, namely Step 3
through Step 9. Some of the findings may need to be re-examined to
ensure completeness and authenticity at other steps as well.
Relevant documentation, files (in hard and soft copies), and
agreements as well as any proprietary documentation which relates
directly and indirectly to the agreed scope are gathered.
Some means of information gathering include the following
documents:
(a) Network Topology.
(b) Service-Level Agreements.
(c) Security Policies.
(d) Standard Operating Procedures.
(e) Corporate Information security Statements.
(f) Process Flow of Business Functions.
To complement the above documents, the RA team may use other
means for information gathering, such as interviews and additional
tools, for example network topology scanning tool.
The documents required during this task are not limited to those
of the list above. Any relevant documents deemed necessary should
be analyzed as well.
MyRAM must also benefit by making use of existing support
services and recorded information in the Malaysian Public Sector.
The risk assessment team may obtain relevant information from the
Jabatan Perkhidmatan Awam (JPA), Jabatan Kerja Raya (JKR), building
maintenance contractor, Office of Chief Government Security Officer
(CGSO) and other supporting agencies.
4. Prepare the Review Boundary Document
The Review Boundary Document is as per Output (Step 2) of this
methodology. The risk assessment team needs to justify the content
for every topic in the document. It is in this document that we
will know vital information such as purpose of the risk assessment
(RA) exercise, core businesses, supporting business process and
external interfaces involved in the RA scope. Apart from that,
personnel, information assets, sites/buildings information are also
analyzed.
-
Chapter 8 - 53
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Risks which are imported and exported to and from an agency are
disclosed in the External Interfaces section. This section
deliberates on third parties (external interfaces) involved and the
risks they carry into or out of an agency. The RA team should take
note of these risks in order for them to estimate the final risk.
Depending on the scope or the review boundary of the RA exercise,
only then can an agency determine who will give approvals for the
output produced in the RA steps. For example, approval can be given
by the Head of Section, Head of Department or business owner.
Senior management must also be made aware of these risks in order
for them to decide whether to accept, reduce, transfer or avoid
them.
5. Revisit Step 1 as Necessary
After the review boundary is established, it may be necessary to
revisit Step 1 to ensure that the team established is sufficient in
number and skill.
Documents produced for the Review Boundary (Step 2):
1. Review Boundary Statement.
2. List of Related Materials Used.
3. List of Questionnaires With Findings
Output (Step 2)
The following are sample output documents of step 2.
1. Review Boundary Document
Table 8.5: Review Boundary Document
Output:
a) Review Boundary Documentb) List of Related Materials Usedc)
List of Questionnaires With Findings
Table of ContentAcronymsList of FiguresList of Tables
1.0 Purpose2.0 Background of Review Boundary3.0 Review Boundary
Statement4.0 Key Business Processes and Functions5.0 Supporting
Business Processes6.0 External Interfaces7.0 Personnel Involved in
the Scope8.0 Information Assets9.0 Sites/Buildings10.0
Conclusion
Prepared by: Reviewed by: Approved by:
< Project Manager > < Project Advisor > < Senior
Management Personnel >
Note: The sign-offs should be with the official stamp.
-
Chapter 8 - 54
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
2. List of Related Materials Used
Table 8.6: List of Related Materials Used
MyRAM/Form/S2-2.0
Name Description
Prepared by: Approved by:
< Team Leader > < Project Manager >
Note: The sign-offs should be with the official stamp.
3. List of Questionnaires With Findings
Table 8.7: List of Questionnaires
MyRAM/Form/S2-3.0
By Who (Function No. Question Answer Remark or Name – If
Applicable)
Notes: (a) A sign-off for the questionnaires is required at the
High-level Recommendations
stage. (b) The sign-offs should be with the official stamp.
-
Chapter 8 - 55
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
8.1.3 Step 3: Identification of Assets
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 3:
Identification of Assets. The team members will be heavily involved
throughout the process. Discussions as well as interviews with all
relevant systems owners and custodians are means of getting
necessary information on assets. Assets in the context of
information security management may be in three forms;
• information assets represent the organisation’s critical data
and information, either physical or electronic form;
• technical assets represent those that support the storage,
transmission, and processing of data and information which are an
important means to transforming data and information for use by the
organisation;
• people can be an asset to the organisation because they can be
the primary way of storing, transporting, and processing data.
All relevant assets within the review boundary established in
Step 2 needs to be identified by the risk assessment team. These
assets will be placed in their respective categories for ease of
processing at a later step. The assets will be verified for the
correctness of the classification, assets’ descriptions and further
un-documented utilization of the assets.
Goals
The goals of this step are;
1. To gather all the assets to be assessed (in relation to the
agreed review boundary).
2. To verify the validity of each asset before the assessment
begins.
Tasks
1. Identify Related Assets
This is one of the most important steps in the entire risk
assessment activity. All assets that are within the scope of the
review boundary are to be identified. Various techniques of
asset-gathering can be utilized. The most popular gathering method
is by scheduling brainstorming sessions where the risk assessment
team sits down with all the participants and comes up with answers
to questions like:
• “What are your most important assets in your daily job?”
• “Are there any specific policies to protect the assets?”
• “What will happen if an asset is compromised?”
2. Group and Classify Assets
After gathering all the important assets that need to be
assessed, the team has to classify all the assets based on each
one’s classification:
(a) Hardware (b) Software (c) Services (d) Data or Information
(e) People
Tasks (Step 3):
1. Identify Related Assets2. Group and Classify Assets3.
Identify Assets’ Owners and Custodians4. Verify & Validate the
Findings of the Questionnaires
-
Chapter 8 - 56
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
In some cases, the ICTSO will decide whether the identified
asset is a hardware, software or services asset based on the more
dominant classification of the asset. For example, in certain
cases, a firewall can either be a hardware or software asset.
Following is the asset classification with detailed
descriptions.
Table 8.8: Asset Classification and Description
Classification Definitions
Hardware A tangible asset which is used to support the
information-processing and storage facilities of the
organisation.
Examples: computers, servers, communication equipment, safes,
etc.
Software Application software or system software such as
operating systems, database systems, networking system software, or
office applications that provide information-processing facilities
to the organisation.
Examples: applications, development tools, utilities, system
software, etc.
Services Services or systems (not in nature of standalones
(Accessibility physical hardware or software) that support other
assets Services and to perform their functions. For
examples:SupportingServices) (a) Accessibility services ii. Network
services such as LAN, WAN, etc. iii. Access Restriction System such
as card access
system. (b) Supporting services – utilities such as electricity,
air-
condition, and suppression fire system, etc.Data or Documented
(paper or electronic) information or Information intellectual
information which is used to meet the missions
and/or objectives of the organisation. Examples: system
documentation, operational procedures,
business records, clients’ profiles, etc.People Persons who have
knowledge and skills to conduct the
daily in-scope business functions of agencies in order to
achieve business objectives or missions. The People assets are
listed based on their respective job functions, instead of the
individual personnel members.
Examples: general managers, software engineers, system
administrators, etc.
3. Identify Assets Owners and Custodians
Each asset identified must have its owner and/or a custodian.
The owners and custodians will need to verify the validity and
correctness of the related information gathered. The assets
identified are those owned by the processes or departments defined
in the previous step – Step 2. In order to minimize efforts in
identifying relevant assets within the Review Boundary, the RA team
may refer to the Borang KEW 313 which contains a comprehensive
inventory list of assets in government agencies.
-
Chapter 8 - 57
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
4. Verify and Validate the Findings of the Questionnaires
The questionnaires distributed and asked in Step 2 need to be
revisited. The findings need to be verified and validated to ensure
completeness and authenticity.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document produced for Identification of Assets (Step 3):
1. List of Assets.
Output (Step 3)
The following are sample output documents of step 3.
1. List of Assets
Table 8.9: List of Assets
Output:a) List of Assets
MyRAM/Form/S3-1.0
Prepared by: Reviewed by: Approved by:
< Team Leader > < Project Manager >
Note: The sign-offs should be with the official stamp.
No. Asset Asset Asset Owner Custodian Location Description Group
ID Name of Asset
8.1.4 Step 4: Valuation of Assets and Establishment of
Dependencies between Assets
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 4:
Valuation of Asset and Establishment of Dependencies between
Assets. The team members will be heavily involved in this step.
Discussions as well as interviews will be held during this period
of time to gather necessary information for valuing of assets.
All of the identified assets will be assigned with values based
on the concept of Confidentiality, Integrity and Availability
(CIA). Each rating will be based on the value of the assets in
relation to CIA that is agreed upon by the owners or
custodians.
In addition, the dependencies of the assets are determined to
gauge their criticality within the infrastructure.
-
Chapter 8 - 58
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Tasks:1. Identify Dependencies Associated with The Assets2.
Assign a Quantified Value to Each Asset3. Verify & Validate the
Findings of the Questionnaires
Goals
The goals of this step are;
1. To establish the dependencies of the assets.
2. To assign a quantified value to each identified asset.
Tasks
1. Identify Dependencies Associated with The Assets
Most of the assets in any organisation are not independent or
‘stand-alone’. Usually they interact with other assets - hardware,
software, services, information. The dependency relationship must
be identified and verified by the owners and custodians, including
the owners of any supporting assets. Only immediate “neighbours” of
the assets which are within the scope of the review boundary will
be examined. For example, the asset in question (or within the
scope), asset A, depends on asset B. B is also within the scope,
but it depends on C, which is not. When considering the
dependencies between assets, we look only at the immediate
“neighbours” (in this example, asset B. Asset C is not considered
as an immediate “neighbour”).
2. Assign a Quantified Value to Each Asset
As it is hard for the team as well as the owners to place a
monetary value on each asset, a quantified value based on the
Confidentiality, Integrity and Availability (CIA) will be assigned
instead.
Notes:
(a) Agencies can modify the example criteria used to fit into
the agencies’ environments.
(b) Project advisor must advise the RA team the importance of
giving realistic asset values to ensure no false risk rating
result.
Table 8.10 details out the descriptions of CIA.
Table 8.10: CIA Descriptions
CIA Description
Confidentiality (C) This is the effect on the system and/or the
organisation that would result from the deliberate, unauthorized or
inadvertent disclosure of the asset. The effect of unauthorized
disclosure of confidential information can result in loss of public
confidence, embarrassment, or legal action against the
organisation.
Integrity (I) This is the effect on the system and/or the
organisation that would result from deliberate, unauthorized or
inadvertent modification of the asset. If the loss of system or
data integrity is not corrected, continued use of the contaminated
system or corrupted data could result in inaccuracy, fraud, or
erroneous decisions. Also, violation of integrity may be the first
step in a successful attack against system availability or
confidentiality. For all these reasons, loss of integrity reduces
the assurance of a system.
-
Chapter 8 - 59
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Availability (A) This is the effect on the system and/or the
organisation that would result from deliberate or accidental denial
of the asset’s use. If a mission-critical system is unavailable to
its end users, the organisation’s mission may be affected. Loss of
system functionality and operational effectiveness, for example,
may result in loss of productive time, thus impeding the end users’
performance of their functions in supporting the organisation’s
mission.
The next table (Table 8.11: Assets Group with Their Respective
CIA) explains
that the Confidentiality, Integrity, and Availability values
must be taken into consideration when it comes to asset groups of
Hardware, Software, Services and Data/Information. For the asset
group of People, only the Confidentiality and Availability values
need to be considered.
Table 8.11: Assets Group with Their Respective CIA
Asset Group Confidentiality(C) Integrity (I) Availability(A)
Hardware √ √ √
Software √ √ √
Services
(a) Accessibility Services √ √ √
(b) Supporting Services N/A N/A √
Data/Information √ √ √
People √ N/A √
Notes:
(a) Integrity is not applicable for People Asset Group as it is
immeasurable or unquantifiable.
(b) Confidentiality and integrity for Supporting Services Asset
Group is immeasurable or unquantifiable.
Legend:
√ Taken into consideration
N/A Not applicable (Not taken into consideration)
In considering the values of the CIA for assets identified, the
RA team, owners and custodians must be mindful of the dependencies
of assets. Some assets may not be critical on their own, however
may become critical when considering the type of information stored
or when other assets depend on availability of the assets in
question.
Agencies must decide what the acceptable, tolerable downtime for
the Hardware, Software, Services and Data/Information types of
assets when considering the Availability factor. The next tables
(Table 8.12: Hardware Value Rating, 8.13:
CIA Description
-
Chapter 8 - 60
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Software Value Rating, 8.14: Accessibility Services Value
Rating, 8.15: Supporting Services Value Rating, 8.16:
Data/Information Value Rating and 8.17: People Value Rating)
provide examples of tolerable downtime.
If there is a case where the attributes fall under two (2) or
more different levels (for example, the “Description” falls under
both Low and Medium levels in Table 8.12: Hardware Value Rating),
then best judgment must be made. The owners must at the end decide
what would best describe the asset value rating for the hardware
piece in question.
The following are guidelines on assigning a value to asset. Each
agency must decide what is the best way of determining the asset
values):
(a) Identify the highest value among the CIA values and use this
value as the final value for the asset. For example for Hardware
asset #1, the “C” value is Medium, the “I” value is Low, and the
“A” value is High, then the final asset value is High. The same
concept applies to all types of assets.
(b) A three (3)-quadrant value-rating table is used in
evaluating the CIA values resulting in a three (3)-level asset
values. The following six (6) tables provide guidelines on how to
determine assets’ values. Agencies can modify the criteria used in
the following tables (Table 8.12: Hardware Value Rating, 8.13:
Software Value Rating, 8.14: Accessibility Services Value Rating,
8.15: Supporting Services Value Rating, 8.16: Data/Information
Value Rating and 8.17: People Value Rating) to fit into the
agencies environments.
Table 8.12: Hardware Value Rating
Value Rating Description
C:
The hardware device is used maximally in processing and/or
storing information that is classified as “Terbuka” in the
Malaysian Public Sector.
I:
Low Security breaches to the device could result in loss of
public confidence. However, information is insignificantly affected
and the loss of functionality is minimal.
A:
The processes will still be operational or functional but slow
if the time of unavailability of the devices is more than 2
weeks.
C:
The hardware device is used maximally in processing and/or
storing information that is classified as restricted and/or
confidential or termed as “Terhad” and/or “Sulit” in the Malaysian
Public Sector.
I:
Medium Security breaches to the device could result in loss of
public confidence, inaccuracy, fraud, or erroneous decisions, as
well as cause the organisation’s mission to be affected with some
losses of functionality and operational effectiveness.
A:
Some of the operations/functions will be suspended if the time
of unavailability of the device is between 1 to 2 weeks.
-
Chapter 8 - 61
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Value Rating Description
C:
The hardware device is used maximally in processing and/or
storing information that is classified as highly confidential or
termed as “Rahsia” and/or “Rahsia Besar” in the Malaysian Public
Sector.
I:
High Security breaches to the device could result in loss of
public confidence, inaccuracy, fraud, or erroneous decisions, as
well as cause significant loss of core functions and operational
effectiveness.
A:
The operations/functions will stop if the time of unavailability
of the device is less than or equal to 1 week.
Table 8.13: Software Value Rating
Value Rating Description
Low C:
The software package or application is used maximally in
processing and/or storing information that is classified as
“Terbuka” in the Malaysian Public Sector.
I:
Security breaches to the software could result in loss of public
confidence; however, information is insignificantly affected and
the loss of functionality is minimal.
A:
The processes will still be operational or functional but slow
if the time of unavailability of the software is more then 2
weeks.
C:
The software package or application is used maximally in
processing and/or storing information that is classified as
restricted and/or confidential or termed as “Terhad” and/or “Sulit”
in the Malaysian Public Sector.
I:
Medium Security breaches to the software could result in loss of
public confidence, inaccuracy, fraud, or erroneous decisions, as
well as cause the organisation’s mission to be affected with some
losses of functionality and operational effectiveness.
A:
Some of the operations/functions will be suspended if the time
of unavailability of the software is between 1 to 2 weeks.
-
Chapter 8 - 62
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
C:
The software package or application is used maximally in
processing and/or storing information that is classified highly
confidential or termed as “Rahsia” and/or “Rahsia Besar” in the
Malaysian Public Sector.
I:
High Security breaches to the software could result in loss of
public confidence, inaccuracy, fraud, or erroneous decisions, as
well as cause significant loss of core functions and operational
effectiveness.
A:
The operations/functions will stop if the time of unavailability
of the software is less than or equal to 1 week.
Table 8.14: Accessibility Services Value Rating
Value Rating Description
C:
The services are used maximally in transferring information that
is classified as “Terbuka” in the Malaysian Public Sector.
I:
Low Security breaches to the services component could result in
loss of public confidence; however, information is insignificantly
affected and the loss of functionality is minimal.
A:
The processes will still be operational or functional but slow
if the time of unavailability of the services is more than 2
weeks.
C:
The services are used maximally in transferring information that
is classified as restricted and/or confidential or termed as
“Terhad” and/or “Sulit” in the Malaysian Public Sector.
I:
Medium Security breaches to the services could result in loss of
public confidence, inaccuracy, fraud, or erroneous decisions, as
well as cause the organisation’s mission to be affected with some
losses of functionality and operational effectiveness.
A:
Some of the operations/functions will be suspended if the time
of unavailability of the services is between 1 to 2 weeks.
Value Rating Description
-
Chapter 8 - 63
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Value Rating Description
High C:
The services are used maximally in transferring information that
is classified as highly confidential or termed as “Rahsia” and/or
“Rahsia Besar” in the Malaysian Public Sector.
I:
Security breaches to the services could result in loss of public
confidence, inaccuracy, fraud, or erroneous decisions, as well as
cause significant loss of core functions and operational
effectiveness.
A:
The operations/functions will stop if the time of unavailability
of the services are less than or equal to 1 week.
Table 8.15: Supporting Services Value Rating
Value Rating Description
Low A:
The processes will still be operational or functional but slow
if the time of unavailability of the services is more than 24
hours.
Medium A:
Some of the operations/functions will be suspended if the time
of unavailability of the services is between 6 to 24 hours.
High A:
The operations/functions will stop if the time of unavailability
of the services are less than or equal to 5 hours.
Table 8.16: Data/Information Value Rating
Value Rating Description
C:
The data/information that is classified as “Terbuka” in the
Malaysian Public Sector.
I:
Low Any security breaches would affect the security objectives
of the organisation. However, they would NOT introduce operational
issues.
A:
The processes will still be operational or functional but slow
if the time of unavailability of information is more than 2
weeks.
-
Chapter 8 - 64
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
C:
The data/information that classified as restricted and/or
confidential or termed as “Terhad” and/or “Sulit” in the Malaysian
Public Sector.
I:
Medium Any security breaches would not cause significant
damages; however, they would introduce operational issues as well
as insignificant loss of public confidence.
A:
The non-critical operations/functions will be temporarily
suspended if the time of unavailability of information is between 1
to 2 weeks.
C:
The data/information that is classified as highly confidential
or termed as “Rahsia” and/or “Rahsia Besar” in the Malaysian Public
Sector.
I:
High Any security breaches would cause significant damages to
some of the business functions and threaten the survival of the
organisation.
A:
The operations/functions will stop if the time of unavailability
of information is less than or equal to 1 week.
Table 8.17: People Value Rating
Value Rating Description
C:
The role of the personnel requires him/her to handle* “Rahsia”
and/or “Rahsia Besar” information less than 10% of the time, and
“Sulit” and/or “Terhad” information less than 10% of the time,
Low and “Terbuka” information most of the time.
A:
If the personnel is unavailable,
• operations in the organisation will meet objectives,
however
• operations are slow compared to normal/usual.
Value Rating Description
-
Chapter 8 - 65
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
C:
The role of the personnel requires him/her to handle* “Rahsia”
and/or “Rahsia Besar” information less than 20% of the time, and
“Sulit” and/or “Terhad” information less than 20% of the time.
Medium A:
If the personnel is unavailable:
• operations in the organisation will meet objectives,
however
• certain operations will be put on hold temporarily,
nevertheless, it can still be passed on to another personnel member
with the same role for handling.
C:
The role of the personnel requires him/her to handle “Rahsia”
and “Rahsia Besar” information more than 20% of the time.
A:
High If the personnel is unavailable:
• operations in the organisation will fail to meet their
objectives.
• most or all critical processes will have to be suspended with
no substitutions.
Note:
The term “handle” here does NOT refer to handling by couriers.
It refers to handling of information by authorized personnel who
can read or see the information.
3. Verify and Validate the Findings of the Questionnaires
The questionnaires distributed and asked in Step 2 need to be
revisited. The findings need to be verified and validated to ensure
completeness and authenticity.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document produced for Valuation of Assets and Establishment of
Dependencies between Assets (Step 4):
1. Summary of Asset Value and Dependencies.
Value Rating Description
-
Chapter 8 - 66
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Output:a) Summary of Asset Value and Dependencies
Output (Step 4)
The following are sample output documents of step 4.
1. Summary of Asset Value and Dependencies
Table 8.18: Summary of Asset Value and Dependencies
MyRAM/Form/S4-1.0
8.1.5 Step 5: Assessment of Threats
Overview of this process
\The appointed Team Leader(s) should initiate this step, Step 5:
Assessment of Threats. The team members will be heavily involved in
this step. Discussions as well as interviews will be held during
this period of time to gather necessary information for determining
threats.
A generic threat profile now needs to be created. It will
consist of the related threat list (based on the catalogue provided
in Annex A), as well as other related threats that are not on the
list. For consistency and relevance, owners and custodians will
need to be consulted accordingly. Each asset will then be mapped to
the associated threats.
Goals
The goals of this step are;
1. To produce a generic organisational threat profile.
2. To identify all relevant threats to assets.
Tasks
1. Create A Generic Threat Profile
Based on the provided threat list in Annex A, the team will come
up with a threat profile specific to the organisation. The simple
guidelines below can be used to create the generic organisational
threat profile.
C I ANo. Asset
GroupAsset
IDAsset Name
Value Asset Depended
On
Dependent Asset
Asset Value
Prepared by: Reviewed by: Approved by:
< Team Leader >
Note: The sign-offs should be with the official stamp.
Tasks (Step 5):1. Create A Generic Threat Profile2. Identify All
Relevant Threats
-
Chapter 8 - 67
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
To Asset3. Verify and Validate The Findings of The
Questionnaires
Output:a) Generic Threat Profileb) Relevant Threats
Note: The sign-offs should be with the official stamp.
(a) Threats which have occurred before.
(b) Threats which may occur if there is no pro-active prevention
action taken.
(c) Threats which may occur even if proactive prevention has
been taken.
2. Identify All Relevant Threats To Assets
All assets that have been identified in Step 3 are mapped to
their relevant threats. One asset may correspond to various
threats. This task will be initiated by the risk assessment team
and will, at a later stage, be verified by owners and
custodians.
3. Verify and Validate the Findings of the Questionnaires
The questionnaires (provided in Annex D) distributed and asked
in Step 2 need to be revisited. The findings need to be verified
and validated to ensure completeness and authenticity.
Notes:
(a) To avoid a ‘false’ risk rating at the end of the risk
assessment process, careful assessment must be done when
identifying the threats.
(b) A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document(s) produced for Threat Assessment (Step 5) are:
1. Generic Threat Profile.
2. Relevant Threats to Assets.
Output (Step 5)
The following are sample output documents of step 5.
1. Generic Threat Profile
Table 8.19: Generic Threat Profile
MyRAM/Form/S5-1.0
Threat Threat ID Threat Name Threat Description Group
Prepared by: Reviewed by: Approved by:
< Team Leader >
-
Chapter 8 - 68
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
2. Relevant Threats to Assets
Table 8.20: Relevant Threats
8.1.6 Step 6: Assessment of Vulnerabilities
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 6:
Assessment of Vulnerabilities. The team members will be heavily
involved in this step. Discussions as well as interviews will be
held during this period of time to gather necessary information for
determining vulnerabilities.
All potential vulnerabilities that may be exploited by threats
(Step 5) are identified. The generic vulnerability catalogue is in
Annex B. These vulnerabilities must be thoroughly reviewed.
Goals
The goal of this step is specifically to determine the
vulnerabilities for each asset.
Tasks
1. Identify Potential Vulnerabilities Exploited By Threats The
respective vulnerabilities which may compromise the security of
assets need to
be identified. In most cases, assets that belong to the same
classification or group have the same vulnerabilities. However,
this is not always true.
Based on the vulnerability list provided in Annex B, the team
will come up with a vulnerability profile specific to the assets
identified. One asset may have several vulnerabilities. The list
created needs to be verified by the team, the owners, and the
custodians of the assets.
2. Verify and Validate the Findings of the Questionnaires The
questionnaires distributed and asked in Step 2 need to be
revisited. The findings
need to be verified and validated to ensure completeness and
authenticity.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document produced for Vulnerability Assessment (Step 6):
1. List of Potential Vulnerabilities to Assets.
MyRAM/Form/S5-2.0
No. Asset Group
Asset ID Asset Name
Threat Group
Threat ID Threat Name
Prepared by: Reviewed by: Approved by:
< Team Leader >
Note: The sign-offs should be with the official stamp.
Tasks (Step 6):1. Identify Potential Vulnerabilities Exploited
By Threats2. Verify and Validate Findings of The Questionnaires
-
Chapter 8 - 69
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Out
put (
Step
6)
A s
ampl
e ou
tput
doc
umen
t for
this
ste
p is
as
per t
able
8.2
1.
1.
Lis
t of P
oten
tial V
ulne
rabi
litie
s To
Ass
ets
Tabl
e 8.
21: L
ist o
f Pot
entia
l Vul
nera
bilit
ies
to A
sset
s
M
yRAM
/For
m/S
6-1.
0
N
o.
Ass
et
Ass
et I
D
Ass
et
Thr
eat
Thr
eat
Thr
eat
Vuln
erab
ility
Vu
lner
abili
ty
Vuln
erab
ility
Gro
up
N
ame
Gro
up
ID
Nam
e G
roup
ID
N
ame
Pr
epar
ed b
y:
Rev
iew
ed b
y:
App
rove
d by
:
<
Team
Lea
der >
<
Proj
ect M
anag
er >
N
ote:
The
sig
n-of
fs s
houl
d be
with
the
offic
ial s
tam
p.
Out
put:
a) L
ist O
f Po
tent
ial
Vul
nera
bilit
ies
to A
sset
s
-
Chapter 8 - 70
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
8.1.7 Step 7: Identification of Existing and Planned
Safeguards
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 7:
Identification of Existing and Planned Safeguards. This step is to
determine the relevant existing or planned safeguards for each
identified asset. Chosen planned safeguard must be based on Annex
C: Generic Safeguard List.
Goal
The goal of this step is specifically to identify all relevant
existing and planned safeguards or controls for each asset.
Tasks
1. Review Existing and Planned Safeguards For Protecting the
Assets
Safeguards (control)s are identified. The types of safeguards
that need to be considered are classified according to the ten (10)
domains in Annex C which are as the following:
(a) Security Policy
(b) Organisational Security
(c) Asset Classification and Control
(d) Personnel Security
(e) Physical and Environmental Security
(f) Communications and Operations Management
(g) Access Control
(h) System Development and Maintenance
(i) Business Continuity Management
(j) Compliance
One asset may have several safeguards already in-placed or
planned. Project advisors must consider the most cost effective
safeguards in his/her recommendations.
2. Verify and Validate the Findings of the Questionnaires
The questionnaires distributed and asked in Step 2 need to be
revisited. The findings need to be verified and validated to ensure
completeness and authenticity.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document produced for Identification of Existing and Planned
Safeguards/Controls (Step 7):
1. Existing and Planned Safeguards.
Tasks (Step 7):1. Review Existing and Planned Safeguards for
Protecting The Assets2. Verify and Validate The Findings of The
Questionnaires
-
Chapter 8 - 71
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Out
put (
Step
7)
A s
ampl
e ou
tput
doc
umen
t for
this
ste
p is
as
per t
able
8.2
2.
1.
Exi
stin
g an
d Pl
anne
d Sa
fegu
ards
Tabl
e 8.
22: E
xist
ing
and
Plan
ned
Safe
guar
ds
M
yRAM
/For
m/S
7-1.
0
N
o.
Ass
et
Ass
et I
D
Ass
et
Thr
eat
Thr
eat
Thr
eat
Safe
guar
d
Cur
rent
Ty
pe
Gro
up
N
ame
Gro
up
ID
Nam
e ID
with
Sa
fegu
ard
Rel
ated
So
lutio
n
Sa
fegu
ard
Nam
e
Exi
stin
g Pl
anne
d
Pr
epar
ed b
y:
Rev
iew
ed b
y:
App
rove
d by
:
<
Team
Lea
der >
<
Proj
ect M
anag
er >
N
ote:
The
sig
n-of
fs s
houl
d be
with
the
offic
ial s
tam
p.
Out
put:
a) E
xist
ing
and
Plan
ned
Safe
guar
ds
-
Chapter 8 - 72
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
8.1.8 Step 8: Analysis of Impact
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 8:
Analysis of Impact. The team members will be heavily involved in
this step. Discussions as well as interviews will be held during
this period of time to gather necessary information for determining
impact to the agencies if an asset is compromised.
The impact value resulting from a specific asset being
compromised (damaged, destroyed, or stolen) is quantified. Output
from several of the previous steps is used here as input.
Goals
The goals for this step are;
1. To determine the business loss if an asset is
compromised.
2. To determine the impact level of each compromised asset.
Tasks
1. Determine The Business Loss
When considering the business loss on assets, it may be
necessary to consider not only the replacement value of the assets,
but also their reputation value, since not all assets can be
quantified. However, while it is hard to put a value on reputation,
business loss calculation due to compromise of reputation may be
determined by the highest decision-making authority with consensus
from the respective people involved with the asset.
In determining the business loss of each asset, the following
guidelines can be used. Agencies can modify the criteria used in
the tables (Table 8.23: Business Loss Value Rating - Hardware,
8.24: Business Loss Value Rating - Software, 8.25: Business Loss
Value Rating - Services, 8.26: Business Loss Value Rating –
Data/Information and 8.27: Business Loss Value Rating - People) to
fit into the agencies’ environments. As one can see, three
(3)-quadrant value-rating tables are used here in evaluating the
business impact.
For the asset group of Hardware, Software and Services, the
business loss value rating tables 8.23, 8.24 and 8.25 are used
respectively. Please refer to the aforementioned tables when
assigning hardware, software or services values.
Notes:
(a) Agencies can modify the criteria used to fit into the
agencies’ environments.
(b) Project advisor must advise the RA team the importance of
giving realistic asset values to ensure no false risk rating
result.
Tasks (Step 8):1. Determine The Business Loss2. Determine The
Impact Levels3. Verify and Validate The Findings of The
Questionnaires
-
Chapter 8 - 73
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.23: Business Loss Value Rating – Hardware
Business Explanation and OutcomeLoss Level
Low The impact of loss or unavailability of the asset is minor
or negligible and will NOT bring any financial loss. Security
breaches to the device will NOT cause disruptions to conduct daily
operations of the organisations.
Medium The impact of loss or unavailability of the asset is
considerable and could possibly bring financial loss. Security
breaches to the device could result in inconveniences/disruptions
to conduct daily operations of the organisations.
High The impact of loss or unavailability of the asset is
intolerable and could bring high financial loss. Security breaches
to the device could result in total disruptions to conduct daily
operations of the organisations.
Table 8.24: Business Loss Value Rating – Software
Business Explanation and OutcomeLoss Level
Low The impact of loss or unavailability of the software package
or application is minor or negligible and will NOT bring any
financial loss. Security breaches to the software will NOT cause
disruptions to conduct daily operations of the organisations.
Medium The impact of loss or unavailability of the software
package or application is considerable and could possibly bring
financial loss. Security breaches to the software could result in
inconveniences /disruptions to conduct daily operations of the
organisations.
High The impact of loss or unavailability of the software
package or application is intolerable and could bring high
financial loss. Security breaches to the software could result in
total disruptions to conduct daily operations of the
organisations.
-
Chapter 8 - 74
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.25: Business Loss Value Rating – Services
Business Explanation and OutcomeLoss Level
Low The impact of loss or unavailability of the asset is minor
or negligible and will NOT bring any financial loss. Security
breaches or interruption to the service(s) will NOT cause
disruptions to conduct daily operations of the organisations.
Medium The impact of loss or unavailability of the asset is
considerable and could possibly bring financial loss. Security
breaches or interruption to the service(s) could result in
inconveniences /disruptions to conduct daily operations of the
organisations.
High The impact of loss or unavailability of the asset is
intolerable and could bring high financial loss. Security breaches
or interruption to the service(s) could result in total disruptions
to conduct daily operations of the organisations.
For the asset group of Data/Information, reputation values, as
well as efforts required in replacing and/or recovering information
compromised can be used. To better explain the process in
determining business loss for asset group of Data/Information,
please refer to the guideline in Table 8.26: Business Loss Value
Rating – Data/Information. If there is a case where the attributes
fall under two (2) different levels (for example, the “Explanation
and Outcome” falls under both Low and Medium levels in Table 8.26:
Business Loss Value Rating – Data/Information), then best judgment
must be made. The owners must then decide what would best describe
the business loss value rating for the data or information in
question.
Table 8.26: Business Loss Value Rating – Data/Information
Business Explanation and OutcomeLoss Level
Low No loss of confidence by the public or other parties.
Requires very minimal resources in terms of time, and personnel
with minimal skills needed to replace and/or recover the
information.
Medium Some loss of confidence by the public or other parties.
Requires some resources, in terms of time, with personnel with
minimal skills needed to replace and/or recover the
information.
High Total loss of confidence by the public or other parties.
Requires significance resources in terms of time, with skilful and
qualified personnel needed to replace and/or recover the
information.
For the asset group of People, qualitative replacement values
can be used. To do so, the RA team needs to consider the knowledge,
and skills required by the job functions. To better explain the
process in determining business loss for asset group of People,
please refer to the guideline Table 8.27.
-
Chapter 8 - 75
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.27: Business Loss Rating – People
Business Explanation and OutcomeLoss Level
Low Understanding of the business processes and some skills
required.
Medium Substantial knowledge and skills in handling business
process with minimal guidance required.
High Must be extremely knowledgeable and the only reference for
the subject matters with vast skills in relation to the business
processes.
2. Determine The Impact Levels
At this point the asset value variable that was discovered in
Step 4 is utilized. Impact is a function of asset value and
business loss of a particular asset.
The impact level matrix table below is a recommended table. It
is derived from experiences in RA activities carried out for
telecommunication and financial institutions. An agency may come up
with another matrix table that may represent its organisation
better than what is presented here.
Impact = Function (Asset Value, Business Loss)
If three (3)-quadrant value-rating tables are used throughout
the whole exercise, then a three (3)-quadrant matrix table needs to
be used here as well.
Table 8.28: Impact Level Matrix
Business Asset Value
Loss Low Medium High
Low L L M
Medium L M H
High M H H
Legend of Impact Level:
Low Medium High
3. Verify and Validate the Findings of the Questionnaires
The questionnaires distributed and asked in Step 2 need to be
revisited. The findings need to be verified and validated to ensure
completeness and authenticity.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
-
Chapter 8 - 76
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Document produced for Impact Analysis (Step 8): 1. Impact Level
List.
Output:a) Impact Level List
Output (Step 8)
A sample output document for this step is as per table 8.29.
1. Impact Level List
Table 8.29: Impact Level List
MyRAM/Form/S8-1.0
No. Asset Asset Asset Asset Business Group ID Name Value Loss
Impact Level
Prepared by: Reviewed by: Approved by:
< Team Leader > < Project Manager >
Note: The sign-offs should be with the official stamp.
8.1.9 Step 9: Analysis of Likelihood
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 9:
Analysis of Likelihood. The team members will be heavily involved
in this step. Discussions as well as interviews will be held during
this period of time to gather necessary information for determining
likelihood of the threats happening.
The probability or likelihood of an asset being compromised must
be assessed as precisely as possible. This will ensure that
critical assets are not overlooked and non-critical assets are not
over-protected.
Goal
The goal of this step is specifically to determine the
likelihood values of threats and vulnerabilities, taking into
consideration the existing and planned controls.
Tasks
1. Determine The Likelihood Of Threats And Vulnerabilities That
May Happen
The output from Step 5: Assessment of Threats, Step 6:
Assessment of Vulnerabilities and Step 7: Identification of
Existing/Planned Safeguards will be used in determining the
likelihood values.
Tasks (Step 9):1. Determine The Likelihood Of Threats And
Vulnerabilities That May Happen2. Verify and Validate The Findings
of The Questionnaires
-
Chapter 8 - 77
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.30: Result From Selected Step
From Step Result
Step 5 Threats
Step 6 Vulnerabilities
Step 7 Safeguards
It is also recommended that the worst-case scenarios (key
disaster scenarios) be examined when the likelihood is
determined.
By analysing the threats, vulnerabilities and controls which
have been identified earlier on, the risk assessment team can gauge
the approximate likelihood that a specific asset may be
compromised.
When possible, the following attributes should be taken into
consideration.
(a) Past experiences. Historical data should be considered
whenever possible.
(b) Probability of future occurrences. Current trends of threat
occurrences should be taken into consideration to see the viability
of probability of future occurrences.
(c) Implementation of safeguards or controls. Any existing or
planned safeguards should be considered as this will most likely
cause reduction to the likelihood of a threat compromising
assets.
Guidelines on assigning a value to likelihood:
(a) If there are more than one match of the attributes (in the
column named “Explanation and Outcome” in Table 8.31: Likelihood
Value Rating) for one particular level of likelihood, choose the
level which has the most matches.
(b) If there are more than two levels which have the same count
of matches, then choose the higher level value rating. This is as a
precautionary measure to ensure that the asset is given the best
protection when and where possible.
As one can see, a three (3)-quadrant value-rating table is used
here in evaluating the likelihood. Agencies can modify the criteria
used in the following table (Table 8.31: Likelihood Value Rating)
to fit into the agencies’ environments. An example of a likelihood
rating table that can be utilized is as follows:
-
Chapter 8 - 78
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Table 8.31: Likelihood Value Rating
Likelihood Explanation and Outcome Level
Low • Threats seldom occur and the type of threats that occur
may cause minimal operational danger.
• Little or not capable in exploiting vulnerabilities, however,
would act if provoked. Or, possesses knowledge and skills to
exploit vulnerabilities (with not enough resources), or has enough
resources with lack of knowledge and skills but not inclined to
breach the security.
• Security controls in placed have been tested and
effective.
Medium • Threats often occur and they may slow down some
operations.
• Possesses knowledge, skills, and resources to exploit
vulnerabilities but not inclined to breach the security. Or, little
or not capable in exploiting vulnerabilities but very motivated to
attempt attacks. Or, possesses knowledge and skills to exploit
vulnerabilities (with not enough resources), or has enough
resources with lack of knowledge and skills and would attempt to
attack if provoked.
• Security controls exist; however, they are not very
effective.
High • Threats occur frequently and they may suspend most of
critical operations.
• Possesses knowledge, skills, and resources to exploit
vulnerabilities and would attempt to attack if provoked. Or,
possesses knowledge and skills to exploit vulnerabilities (with not
enough resources), or has enough resources with lack of knowledge
and skills and very motivated to attempt attacks.
• Security controls are not planned yet.
2. Verify and Validate the Findings of the Questionnaires
The questionnaires distributed and asked in Step 2 need to be
revisited. The findings need to be verified and validated to ensure
completeness and authenticity. At this stage, ensure that all the
questions have some valid answers.
Note: A sign-off for the questionnaires is required at the
High-level Recommendations stage.
Document produced for Likelihood Analysis (Step 9):
1. Likelihood List.
-
Chapter 8 - 79
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Out
put:
a) L
ikel
ihoo
d Li
st
Out
put (
Step
9)
A s
ampl
e ou
tput
doc
umen
t for
this
ste
p is
as
per t
able
8.2
2.
1.
Lis
tliho
od L
ist
Tabl
e 8.
32: L
istli
hood
Lis
t
M
yRAM
/For
m/S
9-1.
0
N
o.
Ass
et
Ass
et
Ass
et
Thr
eat
Thr
eat
Vuln
erab
ility
Vu
lner
abili
ty
Cur
rent
Gro
up
ID
Nam
e ID
N
ame
ID
Nam
e Sa
fegu
ard
Lik
elih
ood
So
lutio
n
Pr
epar
ed b
y:
Rev
iew
ed b
y:
App
rove
d by
:
<
Team
Lea
der >
<
Proj
ect M
anag
er >
N
ote:
The
sig
n-of
fs s
houl
d be
with
the
offic
ial s
tam
p.
-
Chapter 8 - 80
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Tasks (Step 10):1. Calculate The Risk Level For Each Asset
Low Medium High
8.1.10 Step 10: Calculation of Risk
Overview of this process
The appointed Team Leader(s) should initiate this step, Step 10:
Calculation of Risk. The team members will be heavily involved in
this step as well. The risk levels determined are verified with the
designated owners and custodians.
A risk matrix or index is then produced. The risk levels of all
the identified assets are calculated. A combination of impacts and
likelihood is used as the basis for the calculation. When
calculating risks, a qualitative method is used. It is important to
note that not all assets have quantitative values. Most assets
nowadays, like health information of citizens, are not assets that
can easily be quantified. However, with a careful valuation
process, they can be given values (Low, Medium and High) via a
qualitative method.
Goals
The goal of this step is specifically to get each asset’s risk
level rating based on the risk matrix table.
Tasks
1. Calculate The Risk Level For Each Asset
The team will calculate the risk level for each asset based on a
risk matrix table. The attributes that are used in this matrix are
impact values (Step 8) and likelihood values (Step 9).
Risk = Function (Impact, Likelihood)
Risk can be expressed as a function of impact and likelihood. It
is a likelihood (probability) of identified threats exploiting the
vulnerabilities taking into consideration the existing and planned
safeguards in the context of business loss and values of the
associated assets.
The risk matrix in Table 8.33: Risk Level is a recommended
table. It is derived from experiences in RA activities carried out
for telecommunication and financial institutions. An agency may
come up with another matrix table that may represent its risk
distribution better than what is presented here. If three
(3)-quadrant value-rating tables are used throughout the whole
exercise, then a three (3)-quadrant matrix table needs to be used
here as well.
Table 8.33: Risk Level
Impact Likelihood
Low Medium High
Low L L M
Medium L M H
High M H H
Legend of Risk Level:
Document produced for Risk Calculation (Step 10): 1. Risk
Matrix.
-
Chapter 8 - 81
MyRAM
MA
MPU
Risk Assessment Process: Risk Assessment Steps
Output (Step 10)
A sample output document for this step is as per table 8.34.
1. Risk Matrix
Table 8.34: Risk Matrix
MyRAM/Form/S8-1.0
No Asset Asset Asset Threat Threat Impact Like Risk Group ID
Name ID Name Level lihood Level
Prepared by: Reviewed by: Approved by:
< Team Leader > < Project Manager >
Note: The sign-offs should be with the official stamp.
-
Chapter 9 - 82
MyRAM
MA
MPU
High-Level Recommendations: Introduction
Chapter 9: High-level Recommendations
9.0 Introduction
Figure 9.1 shows that decisions of whether to accept, reduce,
transfer, or avoid risks that have been identified must be made
only after the risk assessment exercise has been completed.
Figure 9.1: High-level Recommendations Diagram
This chapter explains how users can decide on the next cause of
action after risk levels are obtained for all identified
assets.
From a technical standpoint, risk assessment results obtained
can be useful in identifying appropriate safeguard measures.
However, the final decision to either accept, reduce, transfer, or
avoid is left to the senior management. For this reason, the
Summary Report to the senior management should assist the
management in making the required decisions. This report lists the
groups to which the assets belong, the assets’ names, and their
appropriate risk levels. This technical report should assist
audiences or users in Part I: Management to choose the proper
approach to safeguard their assets that are critical to the
survival of the core business functions.
-
Chapter 9 - 83
MyRAM
MA
MPU
High-Level Recommendations: Decisions
9.1 Decisions
Overview
The appointed Project Manager should initiate this stage. The
Project Advisor will advise on the suitability of the decisions
made. The team must now advise the senior management on what to do
with the risks identified.
When selecting an option (whether to accept, reduce, transfer,
or avoid risks), the attributes of risks must be thoroughly and
carefully examined.
Tasks
1. Analyse The Attributes To Be Considered Prior To The
Decision-Making
The decision of whether to accept, reduce, transfer, or avoid
the risks catalogued must take the following factors into
consideration:
(a) Time: Time is normally a constraint in successfully
executing a plan. It is everybody’s enemy. However, it is a crucial
factor when deciding what to do with a particular identified risk
in relation to each critical asset. For example, if there is
downtime that causes Server A containing all e-commerce activities
to fail, how long will it take for the Server to be fully
functioning?
(b) Money: Should an asset be compromised, what would be the
cost to the agency? Frequently, monetary values are not available;
however, one can quantify the values by considering the following
principles: Confidentiality, Integrity, and Availability.
(c) Manpower: Human resources play a very active role when
controls need to be deployed in order to reduce risk to an
acceptable level.
(d) Equipment: Facilities or instruments involved must also be
taken into consideration.
2. Determine The Option Of How To Handle The Risk
(a) The result of Step 10: Calculation of Risk (from Chapter 8:
Risk Assessment Process) details out the risk level associated with
each identified asset.
(b) If the risks are accepted, there is no immediate plan
carried out or action taken to protect the asset.
(c) The risks are reduced when they are regarded as having
High/H or Medium/M impact. Here, risks are mitigated by deploying
the proper controls (counter-measures) to ensure that critical
business operations continue with no downtime.
(d) In transferring risks, the risks are moved to another
organisation or entity or cause. However, transferring of risks in
this context means partial transfer of risks (sharing of risks)
between the organisation and a third party. One may want to
transfer risks when they are at the level of Low/L or Medium/M. An
example of this is transferring risks to a third party
organisation.
-
Chapter 9 - 84
MyRAM
MA
MPU
High-Level Recommendations: Decisions
(e) Risks should be avoided altogether when there is no
reasonable control available to be implemented by the organisation.
This decision needs to be treated with caution, since most of the
time the only way to avoid risks is to totally disconnect the
system.
(f) Good security controls combine most of the options above.
When an asset has a high value of business impact as well as a high
likelihood of getting “attacked”, it is advisable to first reduce
the risk by deploying more controls and then transfer the remaining
risk to a third party organisation. In the end, what is left is an
acceptable residual risk level for that particular asset.
The presentation to the senior management on risk analysis
information obtained contains the following information:
(a) An understanding of the relation between risk calculation
results and senior management decisions in protecting critical
assets.
(b) Any terms and concepts that may be new or different - for
example, assets, threats, risk and risk profile - explained
precisely and concisely.
(c) Composite, analysed results of the survey data, presented in
a table or graphical easy-to-read information. Each identified
level of risk should also state specific implications.
(d) Data on protection strategy practices and organisational
vulnerabilities, segregated in tables according to practice
areas.
(e) Threat, risk and vulnerability information for each critical
asset tabled.
The senior management will then determine the best approach to
combat all identified risks – do some of them need to be mitigated?
If so, then how would that affect the resources and budget of the
organisation?
-
Chapter 9 - 85
MyRAM
MA
MPU
High-Level Recommendations: Decisions
Out
put
(Dec
isio
ns)
A s
ampl
e ou
tput
doc
umen
t fo
r th
is s
tep
is a
s pe
r ta
ble
9.1.
1. D
ecis
ion
on O
ptio
ns
Tabl
e 9.
1: D
ecis
ion
on O
ptio
ns
M
yRAM
/For
m/S
9-1.
0
N
o.
Ass
et
Ass
et
Ass
et
Thr
eat
Thr
eat
Cur
rent
R
isk
Rec
omm
enda
tion
Dec
isio
n
G
roup
ID
N
ame
ID
Nam