This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Attachment B- bay 20275_Summary_Stn17_summary_costs.xlsx
Attachment A- BAY_20659_Replace Pressure Tank Sta 12-MKF
318
BAY 20537 1
319
BAY 20537 2
320
AX
POWER DATA
Plant Location:
PG & E Make:
Pump Make:
HP: General Electric15
Peerless
CUSTOMER INFORMATION
California Water Service Co. Bayshore341 N Delaware St
Test Date: 2/4/2009 Tester: Bill Power
Run Number: 1
Acre Feet per 24 Hr:
Cubic Feet per Second (CFS):
Horsepower Input to Motor: Percent of Rated Motor Load (%):
Kilowatt Input to Motor:
Kilowatt Hours per Acre Foot:
Cost to Pump an Acre Foot:
Overall Plant Efficiency (%):
1.2
0.6
16.09 99.8
$37.80
46.52
Pump Type: Centrifugal
All results are based on conditions during the time of the test. If these conditions vary from the normal operation of your pump, the results shown may not describe the pump's normal performance.
Overall efficiency of this plant is considered to be low assuming this run represents plant's normal operating condition.
This pump has an adequate test section.
This pump did not have a flow meter.
Energy Cost ($/Hours) $1.92
Meter #: 669T06 Serial Number:
Voltage: Amps:460 18.3
MPS 23-A
Mark Johnson
Phone: (650) 343-1731
Fax:
Cell:
San Mateo, CA 94401
Name Plate RPM: 1770
GPS Coordinates: 12231.85137 19.390LongNLat W
Measured RPM: 0
State Well #: 001396
Report and Data Prepared By Power Hydrodynamics - A Division of Power Services, Inc.
Agricultural and Domestic Pump Test Report
POWER COMPANY DATA
Rate Schedule: A1
Average Cost: 0.16
EQUIPMENT DATA
HYDRAULIC DATA
Pumping Water LevelRecovered Level
-12.70.0
Drawdown
Discharge Pressure
Discharge Level
Total Lift
0.0
52.0
120.1107.4
Well Yield 0.0 gpm/ft
ft
ft
psi
ftftft
Standing Level 0.0 ft
FLOW DATA
Of 1
Measured Flow 276
0.4 m g/day
gpm
Flow Velocity 1.510
Customer Flow 0 gpm
REMARKS
Power Services, Inc.
Tank/ReservoirWater Source
236.2714.97Brake Horsepower:
7.49Water Horsepower:
50.02Bowl Efficiency:
12.01
BAY 20581 1 321
nwales
Text Box
BAY 20581 1
6301 Bearden LaneModesto, CA 95357209.527.2908209.527.2921 fax800.808.9283www.powerhydrodynamics.comA Division of Power Services, Inc.
Tuesday, September 18, 2012CALIFORNIA WATER SERVICE CO. MIDDLE PE341 N DELAWARE ST
DAVID SILVA
SAN MATEO, CA 94401
It is recommended and assumed that:
1. Overall plant efficiency can be improved to:2. Water requirements will be the same as for the past year.3. All operating conditions (annual hours of operation, head above, and
water pumping level) will remain the same as they were at the time of the pump test.
It is sincerely hoped that this information will prove helpful to you, and that your concerns over maintaining optimum pumping efficiency will be continued.
The following Pumping Cost Analysis is presented as an aid to your cost accounting. This analysis is an estimate prepared from operating criteria supplied from the pump test performed 9/10/2012 and information provided by you during the pump test.
Overall Plant Efficiency: 60.0%
60.0%
212.1 35.2
Estimated Total kWh 637 547 91
Average Cost per kWh: $0.19
$2.02Average Cost per hour:
$46.99 $40.30Cost Per Acre Ft.:
$1.73 $0.29
$6.69
2.6Estimated Acre Ft. Per Year : 2.6
$121.10 $103.87Estimated Total Annual Cost: $17.23
If you have any questions, please contact Bill Power at (209) 527-2908.
William Thomas Power III
BAY 20581 2
322
AX
POWER DATA
Plant Location:
PG & E Make:
Pump Make:
HP: General Electric15
Peerless
CUSTOMER INFORMATION
California Water Service Co. Middle Peninsula341 N Delaware St
Test Date: 9/10/2012 Tester: Bill Power
Run Number: 1
Acre Feet per 24 Hr:
Cubic Feet per Second (CFS):
Horsepower Input to Motor: Percent of Rated Motor Load (%):
Kilowatt Input to Motor:
Kilowatt Hours per Acre Foot:
Cost to Pump an Acre Foot:
Overall Plant Efficiency (%):
1.0
0.5
14.21 88.1
$46.95
51.46
Pump Type: Centrifugal
All results are based on conditions during the time of the test. If these conditions vary from the normal operation of your pump, the results shown may not describe the pump's normal performance.
Overall efficiency of this plant is considered to be fair assuming this run represents plant's normal operating condition.
This pump has an adequate test section.
This pump did not have a flow meter.
HPI measured with direct read KWI.
Based on information obtained at the time the test was performed, this test represents the pumps standard operating conditions.Suggest you contact PG&E for Rate Analysis
Energy Cost ($/Hours) $2.02
Meter #: 669T06 Serial Number:
Voltage: Amps:230 36.6
MPS 23-A
David Silva
Phone: (650) 642-8584
Fax:
Cell:
San Mateo, CA 94401
Name Plate RPM: 1770
GPS Coordinates: 000 0LongNLat W
Measured RPM: 0
State Well #: 005587
Power Hydrodynamics, Inc 209 527-2908 / 800 808-9283
California Water Service Co. Bayshore341 N Delaware St
Test Date: 2/4/2009 Tester: Bill Power
Run Number: 1
Acre Feet per 24 Hr:
Cubic Feet per Second (CFS):
Horsepower Input to Motor: Percent of Rated Motor Load (%):
Kilowatt Input to Motor:
Kilowatt Hours per Acre Foot:
Cost to Pump an Acre Foot:
Overall Plant Efficiency (%):
1.3
0.7
17.07 75.8
$36.53
52.29
Pump Type: Centrifugal
All results are based on conditions during the time of the test. If these conditions vary from the normal operation of your pump, the results shown may not describe the pump's normal performance.
Overall efficiency of this plant is considered to be fair assuming this run represents plant's normal operating condition.
This pump has an adequate test section.
This pump did not have a flow meter.
Energy Cost ($/Hours) $2.04
Meter #: 669T06 Serial Number:
Voltage: Amps:440 24
MPS 23-B
Mark Johnson
Phone: (650) 343-1731
Fax:
Cell:
San Mateo, CA 94401
Name Plate RPM: 1760
GPS Coordinates: 12231.85337 19.392LongNLat W
Measured RPM: 0
State Well #: 001397
Report and Data Prepared By Power Hydrodynamics - A Division of Power Services, Inc.
Agricultural and Domestic Pump Test Report
POWER COMPANY DATA
Rate Schedule: A1
Average Cost: 0.16
EQUIPMENT DATA
HYDRAULIC DATA
Pumping Water LevelRecovered Level
-12.70.0
Drawdown
Discharge Pressure
Discharge Level
Total Lift
0.0
56.0
129.4116.7
Well Yield 0.0 gpm/ft
ft
ft
psi
ftftft
Standing Level 0.0 ft
FLOW DATA
Of 1
Measured Flow 303
0.4 m g/day
gpm
Flow Velocity 1.903
Customer Flow 0 gpm
REMARKS
Power Services, Inc.
Tank/ReservoirWater Source
228.2915.16Brake Horsepower:
8.93Water Horsepower:
58.88Bowl Efficiency:
12.74
BAY 20581 3
324
6301 Bearden LaneModesto, CA 95357209.527.2908209.527.2921 fax800.808.9283www.powerhydrodynamics.comA Division of Power Services, Inc.
Tuesday, September 18, 2012CALIFORNIA WATER SERVICE CO. MIDDLE PE341 N DELAWARE ST
DAVID SILVA
SAN MATEO, CA 94401
It is recommended and assumed that:
1. Overall plant efficiency can be improved to:2. Water requirements will be the same as for the past year.3. All operating conditions (annual hours of operation, head above, and
water pumping level) will remain the same as they were at the time of the pump test.
It is sincerely hoped that this information will prove helpful to you, and that your concerns over maintaining optimum pumping efficiency will be continued.
The following Pumping Cost Analysis is presented as an aid to your cost accounting. This analysis is an estimate prepared from operating criteria supplied from the pump test performed 9/10/2012 and information provided by you during the pump test.
Overall Plant Efficiency: 61.0%
61.0%
200.9 -41.8
Estimated Total kWh 75663 95547 -19884
Average Cost per kWh: $0.19
$2.88Average Cost per hour:
$30.22 $38.17Cost Per Acre Ft.:
$3.63 ($0.76)
($7.94)
475.7Estimated Acre Ft. Per Year : 475.7
$14,375.97 $18,154.02Estimated Total Annual Cost: ($3,778.05)
If you have any questions, please contact Bill Power at (209) 527-2908.
William Thomas Power III
BAY 20581 4
325
CF
POWER DATA
Plant Location:
PG & E Make:
Pump Make:
HP: Reliance20
Pacific
CUSTOMER INFORMATION
California Water Service Co. Middle Peninsula341 N Delaware St
Test Date: 9/10/2012 Tester: Bill Power
Run Number: 1
Acre Feet per 24 Hr:
Cubic Feet per Second (CFS):
Horsepower Input to Motor: Percent of Rated Motor Load (%):
Kilowatt Input to Motor:
Kilowatt Hours per Acre Foot:
Cost to Pump an Acre Foot:
Overall Plant Efficiency (%):
2.3
1.1
20.24 89.9
$30.20
77.03
Pump Type: Centrifugal
All results are based on conditions during the time of the test. If these conditions vary from the normal operation of your pump, the results shown may not describe the pump's normal performance.
Overall efficiency of this plant is considered to be very good assuming this run represents plant's normal operating condition.
This pump has an adequate test section.
This pump did not have a flow meter.
HPI measured with direct read KWI.
Based on information obtained at the time the test was performed, this test represents the pumps standard operating conditions.Suggest you contact PG&E for Rate Analysis
Energy Cost ($/Hours) $2.87
Meter #: 669T06 Serial Number:
Voltage: Amps:220 49
MPS 23-B
David Silva
Phone: (650) 642-8584
Fax:
Cell:
San Mateo, CA 94401
Name Plate RPM: 1760
GPS Coordinates: 000 0LongNLat W
Measured RPM: 0
State Well #: 005586
Power Hydrodynamics, Inc 209 527-2908 / 800 808-9283
Benefit to Cost Ratio 4.95 Notes: 1) Year 1 through 6 purchased water costs are based on SFPUC Rate Administered estimate starting with 2015 estiamted cost in year 1.2) Purchased water cost increased begining in year seven at stated inflation rate.
Revised Worksheet
Capital Project Cost Impact Analysis (SSF Well)
Net Present Value
Average Cost
Total Expenditure
BAY 61318 1
342
BAY 61596 1
343
BAY 61596 1
344
BAY 61596 2
345
BAY 61596 2
346
0.173 MGD
Capital Cost for Project $2,269,941 113 AFY
Treatment Costs $16,372 $145/af 70 gpm
Depreciation Period 30 Years
Quantity 1
Inflation Rate 3.00%
Revenue Requirement Rate 13.0%
YearRate Base Value
Revenue Requirement
Depreciation Cost
Total Annual Customer Expenditure
Cost per AF O&M CostTotal Annual Customer Expenditure
Benefit to Cost Ratio 1.12 Notes: 1) Year 1 through 6 purchased water costs are based on SFPUC Rate Administered estimate starting with 2015 estiamted cost in year 1.2) Purchased water cost increased begining in year seven at stated inflation rate.
Revised Worksheet
Capital Project Cost Impact Analysis (SM Well)
Net Present Value
Average Cost
Total Expenditure
BAY 61972 & 61336 1
347
BAY 62832 1
348
BAY 62832 2
349
BAY 62832 2
350
BAY 62832 2
351
BAY 62832 2
352
BAY 62832 2
353
BAY 62832 2
354
BAY 62832 2
355
BAY 62832 2
356
BAY 63040 1
357
358
359
360
361
362
BAY 63044 1
363
364
365
366
367
368
BAY 63047 1
369
BAY 63047 2
370
BAY 63066 1
371
BAY 63066 1
372
BAY 63066 1
373
BAY 63066 1
374
BAY 63066 2
375
BAY 63192 1
376
377
378
379
380
BAY 63258 1
381
382
383
384
385
386
387
388
389
390
BAY 63397 1 391
March 26, 2013
John C. Kelterer, Jr.
RBF Consulting
Asset Management Group
14725 Alton Parkway
Irvine, CA 92618-2027
Bayshore District Operations Building – Budget Approach
BCCI Estimate No. 2011-0389
321 North Delaware Street
San Mateo, CA 94401
Dear John:
BCCI is pleased to provide you with our budget process outline for the Bayshore District
Operations Building. We based our budget on schematic drawings by Brick Architects labeled
Pricing Set titled Bayshore District Operations Building dated May 26, 2011. Prior to the
schematic set, one of BCCI’s first priorities after our initial collaboration meeting with RBF
Consulting and the Brick design team was to provide budgets for different structural and building
systems. It was critical to engage all team members early on so that we were collectively
working together during the schematic planning phase of the project and to make certain that we
are meeting the design requirements, financial objectives and functional goals. BCCI acted as a
supporting design consultant focused on the financial goals of the client to enable the team to
continue moving forward with the design for the San Mateo Planning Department review.
After meeting with the design team, our priority was to assist in developing the best structural,
mechanical, electrical, plumbing and fire sprinkler systems approach to accommodate the
building’s functions and services. This in turn provides the best value approach to cost savings
solutions for the client. During this phase, it was imperative that BCCI have an extensive
understanding of the design expectations which are thoroughly explored and defined and the
design is clearly articulated, including alternatives to support the goals for your new building.
BCCI recommend construction techniques that will best achieve the quality and results you
envisioned for the project.
Our budget process included the following steps:
1. Provided detailed quantity surveys of each floor plan and elevations using On-Screen
Take-Off to ensure the accuracy of the square footages and areas used in the cost
calculations.
2. Defined the scopes of work for each anticipated trade.
3. Developed general conditions and specific general requirements for each scope of work.
4. Compared all budgets to our own in-house cost estimates, based on historical data
sourced from weekly bids.
5. Budget unit costs are then analyzed for site specific cost impacts due to fabrication
requirements, shipping, delivery, and site assembly issues.
BAY 63397 2 392
BCCI Construction Company / Bayshore Budget Approach I Page 2
6. BCCI indentified constructability challenges and potential conflicts, so the design team is
aware during the development of the Construction Bid documents.
7. BCCI was able to review our defined base scopes of work and the proposed cost
assumptions with several subcontractors for review and comment. This involved
structural steel, elevators, mechanical, electrical and plumbing systems. We thoroughly
and accurately evaluated these costs upfront and then measured performance each step
of the way to ensure that of recent bids.
Should you have any questions or need further assistance in reviewing the enclosed cost
proposal, please give me a call, direct line is 415.817.5171.
We look forward to working with you on this exciting project.
Sincerely,
BCCI
Don Tiefenbrunn
Vice President
BAY 63397 2 393
Spreadsheet Report Page 1CA Water Bayshore 3/26/2013 4:35 PM
CALIFORNIA WATER SERVICE CO. - BAYSHORE NEW OFFICE BUILDINGBAYSHORE SCHEMATIC BUDGET- ISSUED AUGUST 16, 2011
Schematic Documents Dated May 26, 2011 REV.4 FRAMING OPTION
Project name CA Water Bayshore321 North Deleware StreetSan MateoCA USA
Client CA Water Services Co
Architect BRICK LLP
Estimator Don Tiefenbrunn
Labor rate table Bid L 7-08 thru 7-09
Equipment rate table Bid E 7-08 thru 7-09
Job size 18724 GSF
Duration 10 Mnth
Bid date 8/16/2011
Report format Sorted by 'Location/CSI''CSI' summary
BCCI Construction Company
BAY 63397 3
394
Spreadsheet Report Page 2CA Water Bayshore 3/26/2013 4:35 PM
Location CSI Description Total Amount
01 Site Work02000 Site Work 654,03716000 Electrical 37,720
01 Site Work 691,757
02 Building02000 Site Work 86,50803000 Concrete 207,35904000 Masonry 325,44005000 Metals 157,72506000 Wood & Plastics 66707000 Thermal & Moisture Protection 415,73108000 Doors & Windows 1,181,17109000 Finishes 807,29110000 Specialties 2,50014000 Conveying Systems 90,00015000 Mechanical 533,07216000 Electrical 296,110
Contractor cost to install 400 Amps panel board and metering service panel
CWS Field MGR / SUPV
CWS Field Labor / EMT
Flowmeter
Power Monitor
Pressure transducers
175kw Generator and Transfer Switch
BAY 20275 1
473
PROJECT DESCRIPTION: DISTRICT:
PROJECT ID: PREPARED BY:
BUDGET YEAR: TITLE:
COMPLETION YEAR:
BUDGET VALUE: DATE:
EXHIBIT A:
Replace Panelboard stn 17
20275
$559,531
San Mateo
PROJECT ESTIMATE
Msrinivasan
Electrical Engineer2013
2013
2013
SUBTOTAL $452,730
3% ESCALATION $0 Per year
SUBTOTAL $452,730
20.0%CONSTR. OVERHEAD $90,500
SUBTOTAL $543,230
3% $16,300 Per year
$559,530
$559,531
CAP. INTEREST
TOTAL
Pumps Total
BAY 20275 1
474
QUOTATION
Date: 9/15/11 To: CALIFORNIA WATER ATTN: MURLI Quote No: 28348 Project: SAN MATEO STATION 17 ____________________________________________________________________________________________
IEM is pleased to offer the following quotation for your consideration. Any order resulting from this quotation will be accepted by IEM only on the basis of IEM’s General Terms and Conditions of Sale. Notice of exception to any conflicting requirements is hereby given. This quotation will expire thirty calendar days from the date of issue and can be withdrawn by notice within that period. Any order is subject to credit review and/or arrangements for payment in a manner acceptable to IEM prior to acceptance by IEM. Specifically excluded from this quotation is any IEM warrant of merchantability or fitness for a particular purpose for the IEM equipment described. ____________________________________________________________________________________________ Item Qty Description
1 1
MAIN SWBD - OUTDOOR 3PH-4W 277/480V 400 AMP CU BUS $15,398.00
NOTE: IEM TO INSTALL & WIRE PHOENIX (4) CONTACTS, 1-MAPLE SYSTEM OIT3185A/7431-0096-12, PHOENIX POWER SUPPLY,MAPLE OIT3185-00, 3- B/W RELAYS, 2 HONEYWELL CHART RECORDERS,RTU SCADA PACKAGE, PM800 POWER METER W/OUTPUT CARD & 3-CT’S
3 3
O/M MANUALS AND RECORD DRAWINGS
TOTAL: $45367.00 PLUS APPLICAABLE TAXES FREIGHT IS PREPAID AND ALLOWED DELLIVERY: 12-14 WEEKS
This quotation is per this bill of material only, any change to bill of material will result in a change in price. This quotation represents IEM’s best interpretation. Notes:
1. No field start-up, testing, training, power study, arc flash study, or seismic calculations are included.
2. No fuses are provided with this bill of material.
3. Sales tax is not included.
BAY 20275 10
476
4. Quote is valid for 30 days.
5. Freight prepaid and allowed (F.O.B. Point of Shipment). Joyce Gotschall Senior Inside Sales [email protected] 510.360.1204 direct 408.691.1815 cell 510.656.6249 fax www.iemfg.com
ATTENTION: Mr. Murli Srinivasan California Water Service Co. EMAIL: [email protected] RE: Cal Water – Station #17 and #25 San Mateo, CA SUBJECT: Electrical Proposal – Updated 10/22/12 SCOPE: Per Drawings:
- Electrical Work at Station #17-San Mateo - $100,823.00 - Electrical Work at Station #25-San Mateo - $5,488.00 -Civil Work per West Valley Quote (7/27/12) - $72,794.00 -Temporary Generator (2 Day Minimum) - $5,380.00 -Provide Temporary Starters for 2-50HP Motors - $1,623.00 -Di-Electric Testing - $980.00 -F&I 3-Fixed Bollards and 2-Removable Bollards - $3,823.00 -Building Permit (City of San Mateo) - $1,000.00 (Subject to Final City Fees) -Bonding (If required) – 1.5%
INCLUDED: 1. Supply and Installation of 1-5” PG&E PVC Primary Conduit with Pull Rope from
existing pole to New (Cal Water Supplied) 400Amp/480Volt PG&E Meter/Main Service Panel is included.
2. Installation of the New (Cal Water Supplied) 400Amp/480Volt PG&E Meter/Main Service Panel is included.
3. Supply and Installation of Electrical Grounding at the New PG&E Service Panel is included.
4. Installation of the New (Cal Water Supplied) 175KW Generator Set is included. 5. Supply and Installation of Electrical Grounding at the New Generator Set is
included. 6. Installation of the New (Cal Water Supplied) 4 Section Distribution Panel is
included. 7. Supply and Installation of Electrical Grounding at the New 4 Section Distribution
Panel is included. 8. Supply and Installation of underground PVC Conduit and Wire is included. 9. Supply and Installation of exterior mounted GRC Conduit and Wire 10. Supply and Installation of new underground boxes and ground rods as noted are
included. 11. Installation and Connection of New Cal Water Supplied Equipment (FM1A, XDCR1,
SCADA Antenna & Panel, HYDENC, Flow Meter, Pressure Transducers, BW Relays, Temporary Starters, and Back-up Radio Panel) are included.
12. Relocation of the 3 Cathodic Panels is included. 13. Reconnection of the 3 existing Pump Motors are included. 14. Make Safe Electrical Disconnect and Removal of specifically indentified equipment
items as noted on the project plans is included. 15. Supply and Installation of New Lighting and Switching Devices are included. 16. Supply and Installation of Interior EMT Conduit and Wire as specifically noted on
the project plans are included. 17. City/County of San Mateo Electrical Permit is included. 18. Crane required to set the New Generator Set is included (By Barri Electric). 19. 2 Temporary Starters for 2 – 50HP motors is included (See Adder Pricing). 20. We will be on site for testing and start up of the new Cal Water supplied Generator,
Main Service Panel, and Distribution/MCC Panel board.
EXCLUDED: 1. Utility company service charges are excluded. 2. Hazardous waste removal, remediation, mitigation, monitoring, or encapsulations
are excluded. 3. Painting of exposed electrical conduit, boxes, equipment, etc. is excluded. 4. Building entrance cable for telephone, television, and PG & E is excluded.
5. Performance bonding is excluded. 6. Supply of the New PG&E Metering Panel is excluded (By Cal Water). 7. Supply of the New Indoor 4 Section Distribution Panel is excluded (By Cal Water). 8. Supply of the New Generator Set is excluded (By Cal Water). 9. Fuel for the New Generator Set is excluded (By Cal Water). 10. Permits for the New Generator Set are excluded (By Cal Water). 11. Supply and Installation of Protective Steel/Concrete Bollard around the Generator
Set is excluded. 12. Overtime is excluded. 13. Civil work in its entirety (Trenching, Backfill, Concrete Pads, Bollards), is excluded.
CLARIFICATIONS: 1. All work to be performed during normal business hours. These hours are Monday
through Friday 7:00 A.M. to 3:30 P.M. 2. Barri Electric Company Inc. assumes that all areas requiring electrical work will be
open and accessible at the time of work. 3. A copy of this proposal must be incorporates in the subcontract in its entirety. 4. Acceptance of this proposal shall signify acceptance of all the terms and conditions
outlined above. 5. This proposal is good for 60 days.
6. FINAL AS BUILT DRAWINGS after construction 7. Cut sheets of all items used such as conduits, conductors, junction boxes
etc 8. All items supplied and used by contractors will be recognized by NRTL or
UL 9. Test reports after insulation an panel board start up tests to be included
as a part of submittal 10. Cal Water needs pictures of installation including progress in
installation. Digital pictures can be emailed to Project contact. Project engineer will suggest when and what pictures will be emailed. The number of pictures will be less than 100.
Barri Electric Company Inc. is a union electrical contractor certified by various agencies as a minority business enterprise. Our contractor license number is 550342. Our HRC Certification Number as a bona-fide LBE/MBE San Francisco Electrical Contractor is #HRC041312181.
Should you have any question concerning this proposal, please do not hesitate to contact Ernie Ulibarri (ext. 14) or Tim McGrew (ext. 15). We appreciate your consideration and look forward to working with you. CC: Ernie Ulibarri
Quotation Cummins West Inc 4601 East Brundage Lane Bakersfield CA 93307 United States Direct: (661)325-9404
October 27, 2011 California Water Service Attention: Murli Srinivasan Project Name: CWS - San Mateo Station 17 Quotation: 242000000377402R Thank you for your inquiry. We are pleased to quote as follows:
F229-2 Brackets-Genset Overhead Lift, Two Point, Removable 1 F206-2 Wind Rating-150 MPH, Steel Housing 1 C259-2 Fuel Tank-Dual Wall Subset, 24 Hour Capacity 1 C127-2 Separator-Fuel/Water 1 H574-2 Warning-Fuel in Rupture Basin 1 H645-2 Warning-Low Fuel Level 1 A422-2 Engine Starter - 12 VDC Motor 1 A333-2 Battery Charging Alternator-Normal Output 1 E125-2 Engine Cooling-High Ambient Air Temperature 1 H389-2 Shutdown-Low Coolant Level 1 E089-2 Extension-Engine Coolant Drain 1 H036-2 Coolant Heater-120 Volt Ac, Single Phase 1 D036-2 Engine Air Cleaner-Heavy Duty 1 L031-2 Genset Warranty- Standby Comprehensive Extended, 5 Years / 1,500 Hours 1 L050-2 Literature-English 1 A322-2 Packing-Skid, Poly Bag 1 F065-2 Rack-Battery 1 H268-2 Extension-Oil Drain 1 0541-1468 Emergency Vent Extension Kit 1 0541-1466 5 Gallon Round Spill Box Kit 1 0541-1507 High Fuel Switch Kit 1 0541-1467 Normal Vent Extension Kit 1 Group 8-D Lead Acid Battery 1 12VDC, 3.5 AMP Sens Battery Charger 1 CWI Fuel tank field pressure test 1 CWI Start-up, Test, and Training 1 Racor Crankcase emission kit 1 Manuals O & M manuals 3 Sub Total Net $52,022.00 Transfer Switch-Power Command: 400A OTPC400 Transfer Switch-Onan,PwrCmd,400 Amp 1 A028-7 Poles-3 1 A035-7 Application-Utility To Genset 1 A046-7 Listing-UL 1008/CSA Certification 1 A044-7 Frequency-60 Hertz 1 A042-7 System-3 Phase,3 Wire Or 4 Wire 1 R026-7 Voltage-480 Vac 1 B004-7 Construction - Open 1 C024-7 Control-Transfer Switch, Level 2 1 D009-7 Meters-Bar Graph Display 1 M017-7 Switch Key, Front Panel Security 1 M018-7 Display-Digital 1 M022-7 Monitoring-Load 1 M031-7 Interface-Communications Network,FTT-10 1
BAY 20275 8
493
G013-7 Transfer Switch Warranty - Yr 0-5: Comprehensive, Yr 6-10: Main Contacts Only
1
Sub Total Net $5,595.00 Commercial Accessories 0541-1149 Modlon Gateway Kit (FTT10) 1 Sub Total Net $329.00 Grand Total Net (sales tax not included) $57,946.00
This quote is based on California Water Service specifications for this model size.
Permits: No permit or permit costs (AQMD, Fire, Building, Etc.) are included in this quote.
Emissions: The AQMD will perform a Risk Screen Analysis for all new generator installations. The RSA will determine the annual test/maintenance hours allowed.
Start and Test: The price quoted above for startup and testing of the generator is contingent on the ability to locate the service truck with the temporary load bank(s) (if required) within 50’ of the generator set in a location where the heat generated by the load bank will not affect any Fire/BAS systems on site. The quote is based on normal work business hours (M-F, 7-4). Additional charges will apply for overtime hours and/or if the load bank(s) cannot be located as described above. Fuel for the Start and Test shall be supplied by Purchaser.
Retention: CWI is a supplier of material, and related services, we are not a contractor. Retention is not acceptable. We will invoice only as delivered, and our invoices are payable in full, within stated terms.
Shipping: F.O.B. the factory, freight allowed to the jobsite, on a truck, curbside. Off loading and placement is the responsibility of others. Full or Partial Shipments will be invoiced as shipped, payable 30 days after shipment. All orders changed or canceled after release for manufacture are subject to cancellation fees.
Credit: Subject to approval of Cummins West, Inc credit department.
Terms: Net 30 Days, in full, without retention, setoff, or deduction. A 1½% per month will be charged on past due accounts.
Availability: Submittals: 2 weeks after receipt of purchase order.
Equipment: Subject to manufacturer lead time, currently 8-9 weeks, after receipt of approved submittals.
Cancellation Policy: Rates for change orders and / or cancellations will be consistent with those of Cummins Power Generation, Inc. at time of order. Please contact Cummins West, Inc. for a copy of the most current rate policies in effect.
Validity: The above quotation will be honored for 30 days
BAY 20275 8
494
Installation: Permits. CWI is a supplier of material, not a contractor; and will not be responsible for (a) providing installation services or other services, for which a contractor’s license is required, or (b) procuring governmental permits (i.e. AQMD permits), licenses, or other consents necessary to install or operate materials or services, or any permit or license fees. Lien Rights. CWI may give and record a Preliminary 20-Day Notice with regard to Equipment delivered to Project jobsite. If full payment is not made as provided in these terms and conditions, CWI may, as appropriate, record a mechanic’s or materialman’s lien, file a stop notice, assert a claim against a payment bond, and/or pursue any other creditor rights it may have under applicable law. Warranty. The Equipment is sold subject to express warranties provided by the manufacturer. CWI warrants that any modifications to the Equipment done by CWI or its subcontractor will be free from defects in material and workmanship for a period of one year from the date of delivery of the Equipment. As the sole and exclusive remedy for breach of CWI’s warranty, CWI will repair or replace any defective component of the Equipment. Alternatively, at CWI’s election, CWI may accept return of the Equipment and refund to Buyer the purchase price of the Equipment. LIMITATION OF WARRANTY AND LIABILITY. EXCEPT FOR THE EXPRESS WARRANTY PROVIDED IN THE PRECEDING PARAGRAPH, CWI DISCLAIMS ANY AND ALL EXPRESS OR IMPLIED WARRANTIES WITH RESPECT TO THE EQUIPMENT, INCLUDING THE IMPLIED WARRANTIES OR MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. NO ORAL OR WRITTEN STATEMENTS OR REPRESENTATIONS TO THE CONTRARY WILL BE BINDING ON CWI UNLESS IN WRITING SIGNED BY AN AUTHORIZED REPRESENTATIVE OF CWI. IN NO EVENT WILL CWI BE LIABLE FOR ANY INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES, EVEN IF CWI HAS BEEN APPRISED OF THE POSSIBILITY OF SUCH DAMAGES. CWI’s TOTAL LIABILITY, WHETHER FOR BREACH OF CONTRACT, WARRANTY, LATE DELIVERY, OR NON-DELIVERY, NEGLIGENCE, STRICT LIABILITY IN TORT OR OTHERWISE, IS LIMITED TO THE PRICE OF THE EQUIPMENT SOLD THEREUNDER
Delay in Taking Delivery: Storage Charges. If Buyer cannot accept delivery of the Equipment by the agreed delivery date, or Buyer otherwise requests that delivery be delayed, CWI may invoice Buyer for the purchase price of the Equipment and will store equipment at no charge for up to 30 days following the scheduled date of delivery. Thereafter, storage charges will accrue at a monthly rate of one and on-half percent of the invoiced purchase price for every month or portion thereof during which the Equipment is stored by CWI. Buyer is responsible for any additional freight or special equipment charges as a result of the delay in taking delivery.
Thank you for this opportunity to quote Cummins Power Generation products. Please call if we may answer any questions, or be of further service.
By ________________________________ Jeff Thompson - Sales Engineer Direct Phone: 661-326-4002 Fax Number: 661-861-8719
BAY 20275 8
495
Please accept my order for the equipment per the above prices, terms, and conditions. Signed______________________________ Title:________________________________