Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Chapter 10

Installing End-user Computer Systems

Page 2: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 2

• Site preparation steps for computer installations

• Tasks to prepare an installation site

• Purpose and contents of a site management notebook

• Tools needed to install hardware

• Steps to install and configure hardware

• Steps to install and configure an operating system

• Steps to install and configure software software packages

• Wrap-up tasks that installers often perform

Learning Objectives

Page 3: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 3

System Installation Overview

Page 4: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 4

• Pre-installation inspection

• Checklist of issues• Space requirements

• Space constraints

• Storage requirements

• Ergonomic issues

• ADA or OSHA accommodations or issues

• Adequate power supply accessible

• Power conditioning required

• Telephone and/or network access

• Air conditioning required

• Lighting problems

• Fire suppression

Site Preparation

Page 5: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 5

• Locate computer system and devise strategies to conserve space

• System Components

• System unit• The footprint of a desktop case is its length times its width (measured in

square inches)

• Keyboard and Mouse• Optimal desk height is 26-28 inches from the floor

• Monitor• Optimal user view is straight ahead or slightly down

• Printer• Optimal access for loading paper, retrieving print-outs, and clearing jams

Locating System Components

Page 6: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 6

Locating System Components (continued)

• Supplies (manuals, ink/toner cartridges, media, printer paper)• Convenient access

• Tip: avoid storing paper in damp area

• Tip: avoid storing magnetic media near generators, motors, electric and phone equipment

• Furniture considerations• Importance of adjustable chair

• Adjustable: seat height, seat swivel, tilt, backrest, arm rest

• Waterfall seat edge

• 5-leg base

Page 7: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 7

Space Constraint Solutions

• Separate computer worktable

• Flat panel display screen

• Monitor arm for CRT display

• Keyboard shelf

• Locate system unit and peripherals under or close to, but not on, user’s desk

Page 8: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 8

Ergonomic Concerns

• Ergonomics is the study of how to design computer systems and workspaces to

• Minimize health problems

• Maximize worker• Safety

• Productivity

• Comfort

• Job satisfaction

Page 9: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 9

Health Concerns Related to Ergonomic Problems (Overview)

• Back or Neck Muscle Pain

• Leg Pain

• Eyestrain and Headaches

• Wrist and Finger Pain• Repetitive strain injuries (RSI) result from

continuous use of joints in a limited range of motion

• Carpal tunnel syndrome is a common form of repetitive strain injuries that affects wrists and fingers

Page 10: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 10

Back or Neck Muscle Pain or Numbness

Page 11: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 11

Leg Pain or Numbness

Page 12: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 12

Eyestrain and Headaches

Page 13: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 13

Wrist and Finger Pain

Page 14: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 14

Workstation Ergonomics

Page 15: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 15

Devices to Address Ergonomic Problems

• Adjustable tables and work surfaces

• Adjustable chairs

• Footrests

• Keyboard shelves

• Alternative (natural/ergonomic) keyboards

• Alternative pointing devices (trackballs and touchpads)

• Wrist rests

• Mouse support rests

• Document holders

• Monitor arms

• Task lighting

• Antiglare screens

• Assistive devices

Page 16: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 16

Impacts of Ergonomic Problems

• Ergonomics are important concerns• Injuries

• Permanent disabilities

• Legal rules and regulations• Occupational Safety and Health Administration (OSHA)

• Americans with Disabilities Act (ADA)

• Tip: Ergonomics is an area where a user support specialist can develop special expertise to add value to their employment or résumé

Page 17: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 17

• Many small computer systems do not require special electrical power

• Special situations:• Outlets

• Outlet wiring

• Circuit amperage

• Shared circuits

• Power stability

• Multiple computers

Power Requirements Overview

Page 18: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 18

1. Outlets

• Old buildings may have two-pronged outlets

• Avoid “cheater” plug adapters

2. Outlet wiring

• Use LED tester

• Test three-prong outlets to make sure the hot, neutral, and ground prongs are wired correctly

continued

Special Power Requirements

Page 19: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 19

3. Circuit amperage

• Determine total amperage to see whether circuit can handle the load of devices

4. Shared circuits

• Do not install computer system on a circuit that services devices with heavy motors or generators• A dedicated circuit is preferable

continued

Special Power Requirements (continued)

Page 20: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 20

5. Power stability• Get advice from local electric company

• Use metering device to measure quality of power

• Power conditioner is a device placed between computer and power source that regulates electrical power to keep it within acceptable limits

6. Multiple computers• Consult electrical contractor to verify that power is

adequate and well-conditioned

Special Power Requirements (continued)

Page 21: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 21

Tips on Power

• Use an electrical power strip for convenience, but not as an extension cord

• Best power strips include surge suppression features• Certification: UL 1449 (second edition)

• Peak protection: at least 40,000 amps

• Clamping voltage: 330 volts or less

• Clamping response time: 1 nanosecond or less

• Energy rating (dissipation): 750 joules or more

• Status indicator: LED lamps

• Warranty against damage to protected equipment

Page 22: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 22

• Avoid• Stressed cables

• too tight

• hard bends

• Cables on floor or under carpet

• Use• Wall-mounted cable conduits (runways)

• Protective rubber conduits

• Plastic ties to bundle cables

More power tips

Page 23: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 23

• Determine location of access points before installation in case extension lines are necessary to reach installation site

• Identify type of network access• Dial-up modem

• DSL

• Cable modem

• ISDN

• Satellite

• T1 or T3

• Wireless

Telephone and Network Access

Page 24: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 24

• May be required in locations where a large number of computer systems will be installed close together• Small office

• Training room

• Computer lab facility

• Mainframe and minicomputer facilities

• Consult an HVAC specialist • Determine BTUs of air conditioning capacity required

Air Conditioning

Page 25: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 25

• Light intensity

• Reduce lighting in over-lit areas

• Light source

• Position display screen to avoid glare on screen

• Light type

• Florescent bulbs may flicker at same rate as CRT-type monitor

Lighting Problems

Page 26: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 26

• Electromechanical equipment can cause fires, primarily due to power supply problems

• If no fire extinguisher system exists:

• Use portable fire extinguishers rated for electrical fires (Class C)

• Use Halon-substitute in gas extinguisher

Fire Suppression

Page 27: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 27

• A site management notebook consolidates important information about a computer system

• Useful to operate, diagnose, troubleshoot, reconfigure, upgrade, and repair system and its components

• Critical in multiple-computer situations where many support staff are likely to work on various components

Site Management Notebook

Page 28: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 28

• Hardware configuration

• Operating system configuration

• Network configuration

• Software licenses

• Application software configuration

• Special operating procedures

• Warranty and repair information

• Problem log

• Backup media log

Contents of Site Management Notebook

Page 29: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 29

• Screwdriver set• Slotted

• Phillips

• Nut driver

• Pliers• Regular

• Needle-nose

• IC chip extractor/inserter

• Parts-picker

BasicHardware Installation Tools

Page 30: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 30

• Pocketknife

• Small parts container

• Mirror

• Small flashlight

• PC Pocket Reference

• Isopropyl alcohol

• Lint-free cloth or foam tip brush

• Antistatic wrist strap

• Electrician’s tape

• Compressed air

• Circuit tester

• Multi-meter

AdditionalHardware Installation Tools

Page 31: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 31

Typical Hardware Installation Toolkit

Page 32: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 32

• Following hardware installation safety precautions:

• Unpack the system

• Connect power and signal cables, basic components

• Install upgrades

• Test the system

Common Hardware Installation Steps

Page 33: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 33

Common Operating System and Network Installation Steps

• Make backup copies of existing system and data

• Install operating system software

• Configure network connectivity

• Install client software• Dial-up networking

• LAN networking

• Perform network administrative tasks• User accounts

• Access rights

Page 34: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 34

• Determine whether software is compatible with hardware and network

• Make backup copies of user data files• Choose type of installation• Install special devices drivers• Configure application to meet user needs• Install organization-specific utilities, templates, or style

sheets• Reboot and test all applications

Common Steps to Install Application Software

Page 35: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 35

Application Software Compatibility Issues

• CPU types the software runs on

• Amount of memory the software requires

• Amount of hard drive space the software requires for full installation

• Whether the software is compatible with hardware peripherals

• Whether the software is compatible with the user’s network environment

Page 36: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 36

Installation Media

• Distribution media is the original vendor copies of software

• CD-ROM

• Floppy disk

• Internet download

Page 37: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 37

• Express (typical or common)• Most commonly used features

• Custom (special or expert)• User selects specific features to install

• Minimal (laptop or space-saver)• For users with little hard drive space available

• Smallest set of functions and features possible

• Full (maximum or complete)• All program features

• Takes maximum amount of hard drive space

Installation Types

Page 38: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 38

• Close all open programs prior to installation as a precaution

• Retain license information, installation key codes (in Site Management Notebook), and distribution media

• To reduce staff time to install and maintain application software:• Download or launch software upgrades from server

• Use an application service provider (ASP), which is a vendor that sells or rents access to applications software

Tips on Applications Software Installation

Page 39: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 39

• Document system settings

• Back up critical files

• Create rescue disks

• Fill out warranty and registration cards

• Document problems

• Address ergonomic concerns

• Make sure user can use the system

Wrap-up Tasks

Page 40: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 40

• Basic steps to install a computer system • Site preparation• Hardware installation and configuration• Operating system and network installation and configuration• Application software installation and configuration• Wrap-up tasks

• Site preparation steps for computer installations• Location• Ergonomic concerns• Power requirements• Network connectivity• Air conditioning• Lighting• Fire suppression precautions

continued

Chapter Summary

Page 41: Chapter 10 Installing End-user Computer Systems. Guide to Computer User Support, 3e 2 Site preparation steps for computer installations Tasks to prepare.

Guide to Computer User Support, 3e 41

Chapter Summary (continued)• A Site Management Notebook organizes information about a

system in a convenient location

• Hardware installers need a variety of mechanical tools to aid with installation tasks

• Hardware installers follow several safety precautions when working inside the system unit

• Installers develop check lists of installation procedures for• Hardware

• Operating system and network software

• Application software

• Wrap-up tasks

• The ultimate measure of installation success: Is the user satisfied?