Chapter 10: Accelerating Infrastructure Development Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing (A) (B) (C) (D) (E) (F) (G) (H) (I) Outcome A: Globally competitive agriculture, and globally competitive and innovative industry and services Sub-outcome: Competitiveness enhanced and productivity increased INFRASTRUCTURE OUTCOME: Quality Adequacy and accessibility of infrastructure facilities and services enhanced Improve connectivity and efficiency among urban centers and regional growth hubs Upgrading, Rehabilitation and Construction of Airports Installation of Air Navigational Facilities at Laguindingan Airport (KEXIM) DOTC The project involves the implementation of Air Navigation System and Support Facilities (ANSFF) Region-Specific X 5 NAIA-Retroffiting/Renovation of Terminal 1 DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Proposed Rapid Exit Taxiway and Extension of Taxiway Lima at Runway 06/24 DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Terminal 3 Completion Works DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Cargo Terminal near Terminal 3 DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Proposed Strengthening of NAIA Terminal Parking Apron Wheel Path DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Construction of Taxiway November DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Upgrading of the Existing Fuel Storage Facility DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Expansion of Arrival and Departure Areas at NAIA Terminal 4 DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Construction of Arrival and Departure VIP Lounge at NAIA Terminal 2 DOTC - MIAA Region-Specific NCR 5 9, 10 NAIA-Structural Retrofitting Project of Terminal 3 DOTC - MIAA Region-Specific NCR 5 9, 10 Integration of International Passenger Service Charge with airline tickets DOTC - MIAA Region-Specific NCR 5 9, 10 Replacement of Weighing and Feeder Conveyor at Terminal-1 DOTC - MIAA Region-Specific NCR 5 9, 10 Replacement of Check-In Counters and Upgrading of Ceiling and Walls at Terminal-1 DOTC - MIAA Region-Specific NCR 5 9, 10 Supply and Installation of Additional Escalators at Terminal-2 DOTC - MIAA Region-Specific NCR 5 9, 10 Repair and Re-waterproofing of Terminal-2 Main Roof DOTC - MIAA Region-Specific NCR 5 9, 10 Upgrading of Public Address System DOTC - MIAA Region-Specific NCR 5 9, 10 Purchase of five (5) units Customized Shuttle Mini Bus DOTC - MIAA Region-Specific NCR 5 9, 10 Rehabilitation of Comfort Rooms DOTC - MIAA Region-Specific NCR 5 9, 10 Rehabilitation and Upgrading of Passenger Boarding Bridges at Terminal-3 DOTC - MIAA Region-Specific NCR 5 9, 10 Rehabilitation and Upgrading of Baggage Handling System at Terminal-3 DOTC - MIAA Region-Specific NCR 5 9, 10 Architectural Upgrading of Parapet Walls, Eaves and Elevated Roadway at Terminal-1 DOTC - MIAA Region-Specific NCR 5 9, 10 Program/ Project Title Agency Name Program/Project Description Spatial Coverage Region Nationwide/ Interregional/ Region-Specific PDP Chapter 16 Point Agenda Addressed PDP Results Matrices (RM) Critical Indicators Addressed Expected Date of Presentation to the ICC 2011-2016 Revalidated Public Investment Program Page 1 of 456
456

Chapter 10: Accelerating Infrastructure …Chapter 10: Accelerating Infrastructure Development Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment

Mar 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A) (B) (C) (D) (E) (F) (G) (H) (I)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    DOTC The project involves the implementation of Air

    Navigation System and Support Facilities (ANSFF)

    Region-Specific X5

    NAIA-Retroffiting/Renovation of Terminal 1 DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Terminal 3 Completion Works DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Cargo Terminal near Terminal 3 DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Construction of Taxiway November DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Upgrading of the Existing Fuel Storage Facility DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    NAIA-Structural Retrofitting Project of Terminal 3 DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Integration of International Passenger Service Charge

    with airline tickets

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Supply and Installation of Additional Escalators at

    Terminal-2

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Repair and Re-waterproofing of Terminal-2 Main Roof DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Upgrading of Public Address System DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Purchase of five (5) units Customized Shuttle Mini Bus DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Rehabilitation of Comfort Rooms DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Program/ Project TitleAgency

    NameProgram/Project Description

    Spatial Coverage

    RegionNationwide/

    Interregional/

    Region-Specific

    PDP

    Chapter

    16 Point Agenda

    Addressed

    PDP Results Matrices (RM)

    Critical Indicators

    Addressed

    Expected Date

    of Presentation

    to the ICC

    2011-2016 Revalidated Public Investment Program Page 1 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (J) (K) (L) (M) (N) (O) (P)

    4,619,370.00 5,370,980.00 - - - - 9,990,350.00

    - - - - - - -

    - - - - - - -

    - 36,000.00 - - - - 36,000.00

    1,890,000.00 624,000.00 - - - - 2,514,000.00

    - - - - - - -

    - - - - - - -

    - 538,000.00 - - - - 538,000.00

    - - - - - - -

    - - - - - - -

    - 30,000.00 - - - - 30,000.00

    - 52,800.00 - - - - 52,800.00

    - 212,200.00 - - - - 212,200.00

    - - - - - - -

    - 76,800.00 - - - - 76,800.00

    - 25,300.00 - - - - 25,300.00

    - 14,000.00 - - - - 14,000.00

    - 184,200.00 - - - - 184,200.00

    - 12,800.00 - - - - 12,800.00

    - 14,000.00 - - - - 14,000.00

    - 19,900.00 - - - - 19,900.00

    - 170,000.00 - - - - 170,000.00

    - 378,000.00 - - - - 378,000.00

    - 151,000.00 - - - - 151,000.00

    Investment Targets In Thousand Pesos (PhP '000)

    2013

    2011-2016 Revalidated Public Investment Program Page 2 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (Q) (R) (S) (T) (U) (V) (W)

    5,359,597.00 2,587,730.00 - 1,021,370.00 412,940.00 - 9,381,637.00

    179,310.00 - - 99,410.00 - - 278,720.00

    2,140,000.00 685,000.00 - - - - 2,825,000.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    Investment Targets In Thousand Pesos (PhP '000)

    2014

    2011-2016 Revalidated Public Investment Program Page 3 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (X) (Y) (Z) (AA) (AB) (AC) (AD)

    2,076,400.00 2,185,140.00 - - 2,675,790.00 - 6,937,330.00

    - - - - - - -

    - - - - - - -

    - 300,000.00 - - - - 300,000.00

    - - - - - - -

    - - - - 510,000.00 - 510,000.00

    - 300,000.00 - - - - 300,000.00

    - - - - - - -

    - 56,070.00 - - - - 56,070.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    Investment Targets In Thousand Pesos (PhP '000)

    2015

    2011-2016 Revalidated Public Investment Program Page 4 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (AE) (AF) (AG) (AH) (AI) (AJ) (AK)

    2,633,140.00 1,306,250.00 - - 3,613,970.00 - 7,553,360.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - 81,160.00 - - - - 81,160.00

    - - - - 1,000,000.00 - 1,000,000.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    Investment Targets In Thousand Pesos (PhP '000)

    2016

    2011-2016 Revalidated Public Investment Program Page 5 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (AS) (AT) (AU) (AV) (AW) (AX) (AY)

    14,688,507.00 11,450,100.00 - 1,021,370.00 6,702,700.00 - 33,862,677.00

    179,310.00 - - 99,410.00 - - 278,720.00

    2,140,000.00 685,000.00 - - - - 2,825,000.00

    - 336,000.00 - - - - 336,000.00

    1,890,000.00 624,000.00 - - - - 2,514,000.00

    - - - - 510,000.00 - 510,000.00

    - 300,000.00 - - - - 300,000.00

    - 538,000.00 - - - - 538,000.00

    - 137,230.00 - - - - 137,230.00

    - - - - 1,000,000.00 - 1,000,000.00

    - 30,000.00 - - - - 30,000.00

    - 52,800.00 - - - - 52,800.00

    - 212,200.00 - - - - 212,200.00

    - - - - - - -

    - 76,800.00 - - - - 76,800.00

    - 25,300.00 - - - - 25,300.00

    - 14,000.00 - - - - 14,000.00

    - 184,200.00 - - - - 184,200.00

    - 12,800.00 - - - - 12,800.00

    - 14,000.00 - - - - 14,000.00

    - 19,900.00 - - - - 19,900.00

    - 170,000.00 - - - - 170,000.00

    - 378,000.00 - - - - 378,000.00

    - 151,000.00 - - - - 151,000.00

    Investment Targets In Thousand Pesos (PhP '000)

    Total

    (2013-2016)

    2011-2016 Revalidated Public Investment Program Page 6 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (AL) (AM) (AN) (AO) (AP) (AQ) (AR)

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    Investment Targets In Thousand Pesos (PhP '000)

    Continuing Investment Targets

    2011-2016 Revalidated Public Investment Program Page 7 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Outcome A: Globally competitive agriculture, and

    globally competitive and innovative industry and

    services

    Sub-outcome: Competitiveness enhanced and

    productivity increased

    INFRASTRUCTURE OUTCOME: Quality Adequacy and

    accessibility of infrastructure facilities and services

    enhanced

    Improve connectivity and efficiency among urban

    centers and regional growth hubs

    Upgrading, Rehabilitation and Construction of Airports

    Installation of Air Navigational Facilities at Laguindingan

    Airport (KEXIM)

    NAIA-Retroffiting/Renovation of Terminal 1

    NAIA-Proposed Rapid Exit Taxiway and Extension of

    Taxiway Lima at Runway 06/24

    NAIA-Terminal 3 Completion Works

    NAIA-Cargo Terminal near Terminal 3

    NAIA-Proposed Strengthening of NAIA Terminal Parking

    Apron Wheel Path

    NAIA-Construction of Taxiway November

    NAIA-Taxiway H1 to C1 (Phase - 1) @ 115 Million

    NAIA-Upgrading of the Existing Fuel Storage Facility

    NAIA-Expansion of Arrival and Departure Areas at NAIA

    Terminal 4

    NAIA-Construction of Arrival and Departure VIP Lounge

    at NAIA Terminal 2

    NAIA-Structural Retrofitting Project of Terminal 3

    Integration of International Passenger Service Charge

    with airline tickets

    Replacement of Weighing and Feeder Conveyor at

    Terminal-1

    Replacement of Check-In Counters and Upgrading of

    Ceiling and Walls at Terminal-1

    Supply and Installation of Additional Escalators at

    Terminal-2

    Repair and Re-waterproofing of Terminal-2 Main Roof

    Upgrading of Public Address System

    Purchase of five (5) units Customized Shuttle Mini Bus

    Rehabilitation of Comfort Rooms

    Rehabilitation and Upgrading of Passenger Boarding

    Bridges at Terminal-3

    Rehabilitation and Upgrading of Baggage Handling

    System at Terminal-3

    Architectural Upgrading of Parapet Walls, Eaves and

    Elevated Roadway at Terminal-1

    Program/ Project Title

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (AZ) (BA) (BB) (BC) (BD) (BE) (BF)

    14,688,507.00 11,450,100.00 - 1,021,370.00 6,702,700.00 - 33,862,677.00

    179,310.00 - - 99,410.00 - - 278,720.00

    2,140,000.00 685,000.00 - - - - 2,825,000.00

    - 336,000.00 - - - - 336,000.00

    1,890,000.00 624,000.00 - - - - 2,514,000.00

    - - - - 510,000.00 - 510,000.00

    - 300,000.00 - - - - 300,000.00

    - 538,000.00 - - - - 538,000.00

    - 137,230.00 - - - - 137,230.00

    - - - - 1,000,000.00 - 1,000,000.00

    - 30,000.00 - - - - 30,000.00

    - 52,800.00 - - - - 52,800.00

    - 212,200.00 - - - - 212,200.00

    - - - - - - -

    - 76,800.00 - - - - 76,800.00

    - 25,300.00 - - - - 25,300.00

    - 14,000.00 - - - - 14,000.00

    - 184,200.00 - - - - 184,200.00

    - 12,800.00 - - - - 12,800.00

    - 14,000.00 - - - - 14,000.00

    - 19,900.00 - - - - 19,900.00

    - 170,000.00 - - - - 170,000.00

    - 378,000.00 - - - - 378,000.00

    - 151,000.00 - - - - 151,000.00

    Investment Targets In Thousand Pesos (PhP '000)

    Overall Total

    2011-2016 Revalidated Public Investment Program Page 8 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A) (B) (C) (D) (E) (F) (G) (H) (I)

    Program/ Project TitleAgency

    NameProgram/Project Description

    Spatial Coverage

    RegionNationwide/

    Interregional/

    Region-Specific

    PDP

    Chapter

    16 Point Agenda

    Addressed

    PDP Results Matrices (RM)

    Critical Indicators

    Addressed

    Expected Date

    of Presentation

    to the ICC

    Supply and Installation of Remote Controlled and

    Monitored Air Navigation Hazard Prevention System

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Commissioning of Two (2) Units Mobile X-ray Security

    Screening System

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Commissioning of four (4) units Explosive Detection

    Security Screeing System

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Commissioning of 24 Units Baggage X-ray DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Secondary Fence along Runway 06/24 and T3 Apron DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Commissioning of 13 units Hydraulic Barriers at 9 Gates DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Purchase of 2 Units Airport Rescue Firefighting Vehicle

    and one (1) unit Rapid Intervention Vehicle

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Acquisition of Philippine Village Hotel (PVH) DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Terminal-2 Northwing Expansion DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Additional Passenger Terminal DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Remote Aircraft parking & Connecting Taxilane (Twy

    Kilo Extension Phase 1) @ former Nayong Pilipino Area

    DOTC -

    MIAA

    Region-Specific NCR

    5 9, 10

    Full Acquisition of Nayong Pilipino DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Taxiway Kilo Extension (Phase 2) DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Commercial Strip Development @ Pildera and Rivera

    Villages

    DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Monorail or PRT Project DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Lifting Bag for 747 Aircraft DOTC -

    MIAA

    Region-Specific NCR5 9, 10

    Supply and installation of Thermoplastic paint at

    Taxiways F7, F5, F4, F2,F1,A&D

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    Replacement of Navigational Aids Equipment

    (NAVAIDS)

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    Rehabilitation of pavement at portion of Taxiway Delta DOTC -

    CIAC

    Region-Specific III5 9, 10

    Replacement of passenger boarding bridges to two

    finger passenger boarding bridge

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    Passenger Terminal Phase II Expansion DOTC -

    CIAC

    Region-Specific III5 9, 10

    Upgrading of Airfield Ground Lighting System (AGLS) DOTC -

    CIAC

    Region-Specific III5 9, 10

    Upgrading of Perimeter Security Lighting System DOTC -

    CIAC

    Region-Specific III5 9, 10

    Supply, Installation, Testing and Commissioning of one

    (1) Passenger and Baggage Screening EquipmentDOTC -

    CIAC

    Region-Specific III

    5 9, 10

    Procurement of Two (2) Major Tender and Two (2)

    Rapid Intervention Vehicle (Fire Truck)

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    Procurement of Motor Vehicles DOTC -

    CIAC

    Region-Specific III5 9, 10

    Upgrading of Centralized Airconditioning System at

    Passenger Terminal Building

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    Upgrading of Standby-Power System ot Passenger

    Terminal Building

    DOTC -

    CIAC

    Region-Specific III5 9, 10

    2011-2016 Revalidated Public Investment Program Page 9 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Program/ Project Title

    Supply and Installation of Remote Controlled and

    Monitored Air Navigation Hazard Prevention System

    Commissioning of Two (2) Units Mobile X-ray Security

    Screening System

    Commissioning of four (4) units Explosive Detection

    Security Screeing System

    Commissioning of 24 Units Baggage X-ray

    Secondary Fence along Runway 06/24 and T3 Apron

    Commissioning of 13 units Hydraulic Barriers at 9 Gates

    Purchase of 2 Units Airport Rescue Firefighting Vehicle

    and one (1) unit Rapid Intervention Vehicle

    Acquisition of Philippine Village Hotel (PVH)

    Terminal-2 Northwing Expansion

    Additional Passenger Terminal

    Remote Aircraft parking & Connecting Taxilane (Twy

    Kilo Extension Phase 1) @ former Nayong Pilipino Area

    Full Acquisition of Nayong Pilipino

    Taxiway Kilo Extension (Phase 2)

    Commercial Strip Development @ Pildera and Rivera

    Villages

    Monorail or PRT Project

    Lifting Bag for 747 Aircraft

    Supply and installation of Thermoplastic paint at

    Taxiways F7, F5, F4, F2,F1,A&D

    Replacement of Navigational Aids Equipment

    (NAVAIDS)

    Rehabilitation of pavement at portion of Taxiway Delta

    Replacement of passenger boarding bridges to two

    finger passenger boarding bridge

    Passenger Terminal Phase II Expansion

    Upgrading of Airfield Ground Lighting System (AGLS)

    Upgrading of Perimeter Security Lighting System

    Supply, Installation, Testing and Commissioning of one

    (1) Passenger and Baggage Screening Equipment

    Procurement of Two (2) Major Tender and Two (2)

    Rapid Intervention Vehicle (Fire Truck)

    Procurement of Motor Vehicles

    Upgrading of Centralized Airconditioning System at

    Passenger Terminal Building

    Upgrading of Standby-Power System ot Passenger

    Terminal Building

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (J) (K) (L) (M) (N) (O) (P)

    Investment Targets In Thousand Pesos (PhP '000)

    2013

    - 45,000.00 - - - - 45,000.00

    - 42,000.00 - - - - 42,000.00

    - 225,500.00 - - - - 225,500.00

    - 93,600.00 - - - - 93,600.00

    - 23,000.00 - - - - 23,000.00

    - 71,000.00 - - - - 71,000.00

    - 200,000.00 - - - - 200,000.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - 7,920.00 - - - - 7,920.00

    - 230,000.00 - - - - 230,000.00

    - 18,970.00 - - - - 18,970.00

    - 110,000.00 - - - - 110,000.00

    - 418,000.00 - - - - 418,000.00

    - - - - - - -

    - - - - - - -

    - 9,800.00 - - - - 9,800.00

    - 116,000.00 - - - - 116,000.00

    - 36,000.00 - - - - 36,000.00

    - - - - - - -

    - - - - - - -

    2011-2016 Revalidated Public Investment Program Page 10 of 456

  • Chapter 10: Accelerating Infrastructure Development

    Annex B2: List of Non-Core Investment Programs and Projects (Non-CIPs) with Annual Investment Targets By Source of Financing

    (A)

    Program/ Project Title

    Supply and Installation of Remote Controlled and

    Monitored Air Navigation Hazard Prevention System

    Commissioning of Two (2) Units Mobile X-ray Security

    Screening System

    Commissioning of four (4) units Explosive Detection

    Security Screeing System

    Commissioning of 24 Units Baggage X-ray

    Secondary Fence along Runway 06/24 and T3 Apron

    Commissioning of 13 units Hydraulic Barriers at 9 Gates

    Purchase of 2 Units Airport Rescue Firefighting Vehicle

    and one (1) unit Rapid Intervention Vehicle

    Acquisition of Philippine Village Hotel (PVH)

    Terminal-2 Northwing Expansion

    Additional Passenger Terminal

    Remote Aircraft parking & Connecting Taxilane (Twy

    Kilo Extension Phase 1) @ former Nayong Pilipino Area

    Full Acquisition of Nayong Pilipino

    Taxiway Kilo Extension (Phase 2)

    Commercial Strip Development @ Pildera and Rivera

    Villages

    Monorail or PRT Project

    Lifting Bag for 747 Aircraft

    Supply and installation of Thermoplastic paint at

    Taxiways F7, F5, F4, F2,F1,A&D

    Replacement of Navigational Aids Equipment

    (NAVAIDS)

    Rehabilitation of pavement at portion of Taxiway Delta

    Replacement of passenger boarding bridges to two

    finger passenger boarding bridge

    Passenger Terminal Phase II Expansion

    Upgrading of Airfield Ground Lighting System (AGLS)

    Upgrading of Perimeter Security Lighting System

    Supply, Installation, Testing and Commissioning of one

    (1) Passenger and Baggage Screening Equipment

    Procurement of Two (2) Major Tender and Two (2)

    Rapid Intervention Vehicle (Fire Truck)

    Procurement of Motor Vehicles

    Upgrading of Centralized Airconditioning System at

    Passenger Terminal Building

    Upgrading of Standby-Power System ot Passenger

    Terminal Building

    NG GOCC/ GFIs LGUs ODA Grant Private Sector Others Subtotal

    (Q) (R) (S) (T) (U) (V) (W)

    Investment Targets In Thousand Pesos (PhP '000)

    2014

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - 45,000.00 - - - - 45,000.00

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - 110,000.00 - - - - 110,000.00

    - - - -