Vermelding onderdeel organisatie February 1, 2012 1 Breakwaters and Closure dams Kust- en oeverwerken II ct5308 Breakwaters and Closure Dams H.J. Verhagen Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering
Jun 19, 2015
Vermelding onderdeel organisatie
February 1, 2012
1
Breakwaters and Closure dams
Kust- en oeverwerken II
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering
February 1, 2012 2
elements
• Lectures • Book:
Breakwaters and Closure Dam Verhagen, d’Angremond & Van Roode published by Spon, UK £ 40 (paperback) available via VSSD (normal €39.50, members € 19) available as “netbook” via Library (only TU-ip)
• Website: via Blackboard go to course ct5308 • practical information • PowerPoint presentations • additional texts
• Assessment: • via exercise • via oral examinations
February 1, 2012 3
Netbook version
• goto http://discover.tudelft.nl
• type “breakwaters and closure dams”
• click on book (Spon version)
• click on “Go to full text”
• Good links, but only useful in online version
February 1, 2012 4
Example Netbook
February 1, 2012 5
Other references
• Rock Manual (2007)
• Closure of Tidal Basins (1987)
• Coastal Engineering Manual
• Various PIANC publications
• EN13383
• Manual on the use of… (2x)
• CD-ROM will be made available
February 1, 2012 6
1. Introduction
2. Coastal Hydrodynamics
3. Coastal Sediment Processes
4. Coastal Geology
5. Coastal Project planning and design
6. Design of coastal project elements
7 Appendices (Glossary)
http://chl.erdc.usace.army.mil/cemtoc
Coastal engineering manual (shore protection manual)
February 1, 2012 7
Design of Coastal Project Elements (Hughes, updated 6/1/2006)
1 Introduction to Coastal Project Element Design
2 Types and Functions of Coastal Structures
3 Site Specific Design Conditions
4 Materials and Construction Aspects
5.1 Fundamentals of Design - Part 1
5.2 Fundamentals of Design - Part 2
5.3 Fundamentals of Design - Part 3
6 Reliability in Design
7 Design of Specific Project Elements - Case Studies
8 Monitoring, Maintenance and Repair of Coastal Projects
February 1, 2012 8
February 1, 2012 9
February 1, 2012 10
February 1, 2012 11
February 1, 2012 12
organization Master Hydraulic Engineering
February 1, 2012 13
Making a mattress
February 1, 2012 14
Bed protection
February 1, 2012 15
??
February 1, 2012 16
Completed block mat
February 1, 2012 17
Block mat factory
February 1, 2012 18
Transport of the block mat
February 1, 2012 19
Placing the block mat
February 1, 2012 20
Caspian quarry, Dubai
February 1, 2012 21
Quarry in Bulgaria
February 1, 2012 22
Larvik, Norway
February 1, 2012 23
Loading a quarry train
February 1, 2012 24
Quarry train for the Maasvlakte 1
February 1, 2012 25
Loading a stone barge (Palm I, Dubai)
February 1, 2012 26
The split barge
February 1, 2012 27
Split barge
February 1, 2012 28
Heavy stonework (Palm I, Dubai)
February 1, 2012 29
Large construction cranes
February 1, 2012 30
Placing riprap by crane
February 1, 2012 31
Placing riprap by crane
February 1, 2012 32
Using the orange peel grab
February 1, 2012 33
Side stone dumping vessel
February 1, 2012 34
side stone dumping vessel
February 1, 2012 35
ship for placing concrete cubes
February 1, 2012 36
Placing cubes by helicopter
February 1, 2012 37
Helicopter in action
February 1, 2012 38
Emergency closure in New Orleans
February 1, 2012 39
Closure with a cable car
February 1, 2012 40
Horizontal closure by tipping (Korea)
February 1, 2012 41
Closing with sand bags and sack-gabions
February 1, 2012 42
Sirevåg Berm breakwater
February 1, 2012 43
Antifer blocks at Sines (Portugal)
February 1, 2012 44
Breakwater under construction
February 1, 2012 45
Xbloc armour units in Bar Beach