Chap 9. Estimating Volatility : Consolidated Approach. Estimating Volatility : Consolidated Approach. Volatility of a project is not the same as the volatility of any of the input variables, nor is it equal to the volatility of the company’s equity. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Chap 9

Chap 9

Estimating Volatility : Consolidated Approach

Page 2: Chap 9

Estimating Volatility : Consolidated Approach

Volatility of a project is not the same as the volatility of any of the input variables, nor is it equal to the volatility of the company’s equity.

How to use a Monte Carlo approach to value a project.

Monte Carlo tools are fairly simple to use and can model the cross correlations among various inputs such as price and quantity, as well as time series properties such as mean reversion.

Page 3: Chap 9

Two approaches for estimating a consolidated measure of the volatility of a value-based event tree are discussed later in this chapter.

We call them the historical and the subjective approaches.

We use the term “consolidated” because the output is a single estimate of volatility, built up from the many uncertainties that contribute to it .

Estimates of these separate uncertainties are taken either from historical data, or from the subjective estimates of management.

Page 4: Chap 9

Monte Carlo analysis for combining uncertainties

Each sampling of a set of parameters generates an estimate of the present value of a project ( or a company), PVt

rtt ePVPV 0

rtPV

PVt 0

ln

Page 5: Chap 9
Page 6: Chap 9

We start with a present value spreadsheet, model the variable uncertainties, use the Monte Carlo simulation to estimate the standard deviation of rates of return, and then construct the event tree binomial lattice.

1. Price per unit 2. Quantity of output 3. Variable cost per unit

Page 7: Chap 9
Page 8: Chap 9

If the weighted average cost of capital is 12 percent, the present value is $1,507.63; and if the investment outlay is $1,600, the net present value is -$92.37.

The expected price per unit starts out at $10,but declines over time due to anticipated competitive pressure.

The expected quantity sold grows at 20 percent in the year after the product is released, but despite price cuts, growth shows to 5.8 percent in the last year of the forecast.

Page 9: Chap 9

The variable cost per unit is expected to decline from $6.00 in the first year of operation to $3.56 per unit in the last year.

They believe that their errors of estimation will be highly positively correlated through time (autocorrelation of 90%), implying that if they underestimate the price that is achievable in one year, they are highly likely to have underestimated it the next year as well.

Page 10: Chap 9
Page 11: Chap 9

This time dependence is called autocorrelation, and if it is negative, implying that a high value is more likely to be followed by a low value (and vice versa), then it is called mean reversion.

1. Define Assumption. 2. Set Autocorrelations.

“correlate icon”

Crystal Ball to “select an assumption” 3. Define Forecast Variable.

Page 12: Chap 9

0

11lnPV

FCFPVz

7

211 )1(t

tt

WACC

FCFPV

4. Run the Simulation.

“run” icon

“reset” “run preferences”

Page 13: Chap 9

The mean return was 13 percent, and the annual standard deviation was 21 percent.

The standard deviation of prices was equal to 10 percent, but the standard deviation of the rate of return on the project is 21 percent.

The input variables that drive uncertainty is not the same as the volatility of the project.

Page 14: Chap 9
Page 15: Chap 9

Building the event tree

T = 1; therefore, and d = 1/u = 0.8106.

The present value of the project, after the free cash flows have been paid out at the end of the first time period, is $1,569.12.

By the end of the second time period, we can see from Exhibit9.7 that the value can be either $1,935.79 or $1,271.90.

2337.121.0 eeu T

Page 16: Chap 9
Page 17: Chap 9
Page 18: Chap 9

The present value of the expected free cash flow that period is $262 and the expected present value at that point in time is

7

23 (1 )

$261 $265 $253 $233 $209 $180

$1401

tt

t

FCFPV

WACC

$261/$1,401 = 0.1863

Page 19: Chap 9
Page 20: Chap 9

Multiplying this ratio times the up state value, $1,935.79 yields the up state dividend, namely $360.66.

The down state dividend is the same ratio multiplied by the down state value, namely $236.95.

Page 21: Chap 9

More on auto-correlation

1 [ ( )]t t t tX X b X E X

( ) (1 ) t tbE X b X

t tX

1 1t t tX X

1

1

( , )t t

t t

COV X X

)(

),( 1

t

tt

XVAR

XXCOV

Page 22: Chap 9
Page 23: Chap 9

And therefore Consequently This implies that the r-squared and beta

coefficient are identical, that is, . Note also that beta is equal to one minus the

speed of adjustment, 1-b,

)()( 122

tt XX

1 tt )(2

1 tttt XVAR

Page 24: Chap 9

Positive autocorrelation will result in greater volatility than assuming independence across time.

Negative autocorrelation, with the simple mean reversion that we have been describing, assumes that positive error terms are followed by negative errors.

Note that positive autocorrelation increase the standard deviation of project returns and negative autocorrelation decreases it.

Page 25: Chap 9
Page 26: Chap 9
Page 27: Chap 9

Using historical data

Use the r-squared of the time serious regression to capture the autocorrelation effect.

Cross-correlation between variables is captured by the r-squared between them.

The standard deviation for each of the variables is the standard deviation of the residuals that results from the time serious regression.

Page 28: Chap 9

22

20

)(

)(1)95.0,2(ˆ eysxS

xEx

nnty

2

0 2 22 2

2

2 2

2

( )1 1 21 10

( ) 20 ( )

( ) 20(11) 1 11

20 ( ) 20 ( )

1 12

20 ( )

ey ey

ey ey

ey

x E xs s

n S x S x

S xs s

S x S x

sS x

Page 29: Chap 9
Page 30: Chap 9

Therefore, the confidence interval, out-of-sample, increase approximately as T

Page 31: Chap 9

Subjective estimates provided by management

Geometric Brownian motion ]2,2[ TTrTTrr

[ ] 2upper r rT T

[ ] 2lower r rT T

20[ ] rT T

Tupper V V e 2

0[ ] rT TTlower V V e

Page 32: Chap 9

T

iiT rR

1

2

0[ ]rT T

Tupper V V e

2

0[ ]rT T

Tlower V V e

T

rV

V n

ii

upperT

2

ln10

T

V

Vr

lowerT

n

ii

2

ln01

rtttt eVV

Page 33: Chap 9

A more complicated case : mean-reverting procedures

The general model for mean reversion may be written as :

dzVVVV ttttt )(

VVE tt )(

0 ttVVE 0)( dzE

VVEVE ttt )()(

Page 34: Chap 9

2

2

)1(

T

t

tTtT

2

2

2

2

)1(2,)1(2T

t

tTt

T

t

tTtT VVV

2

2

2

2

)1(2)1(2

T

t

tT

upperT

T

t

tT

lowerT

T

VVVV

dzVVVV ttttt )(

Page 35: Chap 9
Page 36: Chap 9