THE CHANG SCHOOLRYERSON UNIVERSITY

Page 2: Chang school

Heaslip House O’KEEFE BREWING 297 VICTORIA ALFRED.H 1939COMPANY STREET

BUILDING CLIENT LOCATION ARCHITECT YEAR

CHANG SCHOOL

SITE VIEW

This art deco building style designed for chapman forO’KEEFE brewing company. The O’KEEFE BREWERY hadthe important 3-acre site just east of Yonge from late1800s. 297 Victoria street company become headofficeIn 1996 Ryerson purchased the property on both sidesof Victoria street and became Ryerson’s own radiostation. The building redeveloped retaining the originalfaçade.Part of city fabric Of Ryerson complex. In 2006 building won an award from Ontario Association of Architecture for design.

EXISTING BUILDING ORIGINAL BUILDING

Page 3: Chang school

• CLASSIFICATION• OCCUPANCYGENERAL BUILDING

COMPLIANCES

• PROVISIONS FOR FIREFIGHTINGFIRE SAFETY

• UNPROTECTED OPENINGSPATIAL SEPARATION

• MEANS OF EGRESS• TRAVEL DISTANCESAFETY WITHIN FLOORS

CO

DE

AND

REG

ULA

TIO

N

Page 4: Chang school

GENERAL DESCRIPTION

Area :573 Sq mBuilding Height: 7 StoreysHeight :25.8 MMajor Occupancy : Offices

Building SprinkleredNon Combustible ConstructionNon Combustible and Combustible Cladding

CLASSIFICATIONS

CO

DE

AND

REG

ULA

TIO

N

Page 5: Chang school

FIRE SAFETY

CO

DE

AND

REG

ULA

TIO

N

Floors Occupancy Classification Sprinklered N C / C Supporting elements FRR

Floor AssemblyFRR

Basement D 3.2.2.49 yes NC 2 hrs 2 hrs

Floors 1-6 D 3.2.2.49 yes NC 2 hrs 2 hrs

7th Floor A2 3.2.2.23 Yes NC 2 hrs 2 hrs

Roof - 3.2.2.17(a) - - - 0 hrs

Fire safety

The building is of non-combustible construction and is fully sprinklered. All floor assemblies are fire separation and has fire resistance rating of 2H. (Complies with: 3.2.2.49(b)) Roof need not be fire rated as the building is sprinklered in compliance with 3.2.2.17(a), but it is a fire separation.

Page 6: Chang school

CO

DE

AND

REG

ULA

TIO

N INTERCONNECTED FLOORS

Interconnected space which has been created between first and second floor. As the whole building is sprinkleredand has a Group D occupancy it is in compliance with 3.2.8.2(6) (b). An exit lobby is provided in area that contains 2-storey interconnected floor space. A 2-storey high space is in the third floor is separated from the fourth floor with a FRR rating 2 hrs.

Floor Occupancy Area Area per person

Occupant Load

Basement D 101 9.3 10F3 160 46 3

First Entrance lobby 265 8

Second D 448 9.3 48Third D 515 9.3 55

Fourth D 448 9.3 48Fifth D 448 9.3 48Sixth D 448 9.3 48

Seventh A2 150 0.95 157425

Occupant load is calculated based on 3.1.17.1 (1) and table 3.1.17.1

OCCUPANT LOAD

Page 7: Chang school

CODE AND REGULATIONSPATIAL SEPARATION

DISTANCE AREA UPO CONSTRUCTION CLADDING FRR CODESOUTH 0.0 - 0% NC NC 1 HR 3.2.3.5NORTH 44 645 100% NC C/ NC 0 T. 3.2.3.1.D

EAST Elevation

(First Floor) 8 98.50 100% NC C/NC 0 T. 3.2.3.1.D

East Elevation

East Elevation (2 -

7)

17 805.8 100% NC C/NC 0 T. 3.2.3.1.D

WEST 18 120.00 100% NC C/NC 0 T. 3.2.3.1.D

Page 8: Chang school

SAFETY WITHIN FLOOR AREAS

CODE AND REGULATION

LOCATION OF EXITS & DISTANCE BETWEEN EXITS

MEANS OF EGRESS:All above grade floors are served by two exit stairs at the end of the building. So it is in compliance with 3.3.1.5.

It is in compliance with 3.4.2.3(1). The distance between the two exits should be one-half the maximum diagonal dimension of the floor area and not less than 9 m.

Location of exit is in compliance with 3.4.2.5.(1)(c) .

Page 9: Chang school

CODE AND REGULATION

TRAVEL DISTANCE

Travel Distance to an Egress doorway is less than 45 meters and is in compliance with code 3.4.2.5(c).The floor area is more in than the area given in the table 3.3.1.5.B , So it has two doorways.

In compliance with 3.4.5.1(1), exit signs are provided with every exit door.In compliance with 3.4.5.2(1) exit signs within exist stairs indicates the continuity of exit facility to the street level exit.

EXIT SIGNS

As per 3.2.9.1 (b), a standpipe system is installed in each floor of the building.

STANDPIPE SYSTEM

Page 10: Chang school

EXITS

CODE AND REGULATION

Width and heights of exitsThe minimum width of the stairs is in compliance with 3.4.3.2.(7)(c) and is 1100 mm.

Fire separation of exitsFire separation of exits are in compliance with 3.4.4.1(1). The exits in Chang School building is in compliance with 3.4.4.4(1) and (2) . Exits within scissors stairs are separated from each other by a smoke-tight fire separation having a fire resistance rating not less than 2h.

Fire resistance rating of exit separation Egress stairs has 2H fire rating and doors of egress stairs has 1.5 fire rating. And are in compliance with 3.4.4.1(1)

Page 11: Chang school

CO

DE

AND

REG

ULA

TIO

N

Summary: Building codes are enforced to ensure that the structure created are safe for occupants. Thisbuilding is in compliance with all applicable codes. Required number of firefighting access routes areprovided and accessible. Egress and Exits are adequate and operational

BARRIER FREE ACCESS

According to 3.8.2.1(3) a barrier free path need not extend to basement and Roof spaces. Based on 3.3.1.7 every floor area above or below the first-storey that has Barrier Free Path shall be served by an elevator is in compliance as all the floors are served by two elevators. There is one Barrier Free Water Closet for Male and female, each is in compliance with Table 3.8.2.3.B

Page 12: Chang school

BUILDING ENVELOPE

WALL SYSTEM FLOOR SYSTEM ROOF SYSTEM

STRUCTURAL SYSYTEM • FOUNDATION• FRAMING SYSTEM

MAT

ER

IAL

AND

MET

HO

DS

Page 13: Chang school

MAT

ER

IAL

AND

MET

HO

DS

BUILDING ENVELOPE

The Chang building is an interesting mix of both historical restoration and contemporary construction. This seven storey building designed by Rounthwaite Dick & Hadley Architects associated with Lett Architects in 2005 measures 42,000 sq. ft in area. The four distinct materials used on the facade are

• limestone • copper sheets • glass • aluminum

Where black aluminum spine wall separates the copper and glass elements of the building.

Page 14: Chang school

MA TERIAL AND METHODS

WALL SYSTEM

Stick system

Unitized system

COPPER CLADDING

ALUMINUM PANEL

Exterior wall and Fenestrations

The curtain wall system used here are both Stick system and Unitized system. In stick system the curtain wall frames and glass are installed and connected together piece by piece. Where as in the Unitized, the wall is composed of large units that are assembled and glazed in the factory and erected on site.Aluminum panels used has a very high Thermal Conductivity. Thermal performance of opaque areas of the curtain wall is a function of insulation and air vapor barrier. Water penetration resistance is a function of glazing frame construction apart from being giving a glazing appearance.Copper cladding another important material used for this building apart from aluminum and glass. This material is strong, light weight, malleable, highly corrosive resistant. Apart from being durable and long lasting it is completely recyclable without losing its physical attributes.

Page 15: Chang school

MA TERIAL AND METHODS

COPPER CLADDING AND GLAZINGDETAIL

Page 16: Chang school

WALL AND FLOOR SECTIONDETAIL

MA TERIAL AND METHODS

FLOOR SYSTEM INTERIOR WALL

General interior wall system used is concrete blocks and gypsum board. The flooring in all floors are carpeted except in ground floor where tiles and in the basement vinyl is used. In work zone areas, the box effect is avoided by drop ceilings, where mechanical services, which are hidden by the ceiling, are painted black.

Page 17: Chang school

MAT

ER

IAL

AND

MET

HO

DS

Page 18: Chang school

TOP SOIL

FILTER FABRIC

19mm CLEAR CRUSHED STONE

POURED IN PLACE CONCRETE SEAT WALL AND FOOTING

FIBROUS EXPANSION JOINTPRECAST CONCRETE PAVING ON CONCRETE BASE

CLEAR CRUSHED STONE

UNDISTURBED SUB GRADE

100mm DIA PERFORATEDPVCSUBDRAIN WRAPPED IN FILTER SOCK

NEW UNDERPINNING

15 400 *600 DOWELS FASTEN TO CONCRETE

REMOVED EX STRUCTURE IN ORDER TO BUILT NEW ONE

MATT FOOTING

BASEMENT FLOOR

DRY PACK FOE WATER PROOFING

EXISTING FOOTING

MAT

ER

IAL

AND

MET

HO

DS

FOUNDATION DETAIL

ISOLATED FOOTING DETAIL

The foundation wall system of the below grade building enclosure is designed and constructed to support both vertical and lateral loadings.

The first line of control is the upper screen at the exterior surface. Here the upper screen consists pavers and concrete or asphalt surface that shed the majority of surface moisture.

Page 19: Chang school

MAT

ER

IAL

AND

MET

HO

DS

Framing system in a building comprises of columns, beams and shear walls that support the structure.This building is with a frame assembly of steel beams and steel columns. Where steel beams are designed to act compositely with the concrete on the steel deck floor.The shear wall, reinforced concrete framed structure encases the shafts of elevator and stairwell providing the required stability.

STRUCTURAL SYSYTEM

Page 20: Chang school

BU

ILD

ING

INFO

RM

ATIO

N

MO

DEL

ING

(R

EVIT

)Building Information

Modeling

COLLABORATION

PROJECT PROCESS

• WORK SHARING• WORK SETS• VIEW TEMPLATES• PHASING

Page 21: Chang school

Uses and Benefits of BIM

BU

ILD

ING

INFO

RM

ATIO

N

MO

DEL

ING

(R

EVIT

)PEOPLE

HARDWARESOFTWARE

Bim Tools

Uses of Bim

“It is the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings”

Page 22: Chang school

BUILDING INFORMATION MODELING (REVIT)

COLLABORATION

WORKSHARING

“to work on a project in a workshared environment”

is a method of collaboration that allows multiple team members to work on the same project model simultaneously.

WORK SETSIt is the collection of elements in a workshared environment.

Worksets Eugene Azadeh Yassir Shantha Poulia

Building Envelope

Structures

Site Components

Interiors

Furnitures & Fixtures

Presentations

FILTERING with WorksetsUsing filters in graphic overrides will give you more controls.

Page 23: Chang school

BUILDING INFORMATION MODELING (REVIT)

In this report we explored on how View Templates can really aid our productivity rate when using Revit. There is a huge variety of parameters that control the look and “style” of the views that we created within Revit.

View Templates Phasing

Within Revit, Phases are distinct, separate time periods (or “milestones”) within the life of the project. They can represent either the time periods themselves or the status of the project at specified points in time.

Project Process

Page 24: Chang school

Interior Wall and Ceiling

Furniture & Fixtures

Building Envelope

Site Components

Structural Components

BUILDING INFORMATION MODELING (REVIT)

Page 25: Chang school
Page 26: Chang school
Page 27: Chang school
Page 28: Chang school
Page 29: Chang school
Page 30: Chang school
Page 31: Chang school

BUILDING INFORMATION MODELING (REVIT)

Page 32: Chang school

BUILDING INFORMATION MODELING (REVIT)

Page 33: Chang school