Top Banner
CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT, Boston
19

CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Dec 11, 2015

Download

Documents

Jared Thompson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

CFD Analysis for ITER FW/Shield Designs

Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA)Dennis Youchison James Bullock,

Mike Ulrickson (SNL)

July 8, 2009MIT, Boston

Page 2: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Count the pieces: 560 Be tiles/40 pieces of CuCrZr heat sinks/20 pieces of SS bodies/80 SS tubes inside Cu heat sinks/52 plugs40 welding pieces/Manifold, connectors, etc.

First wall / shield -- Geometric Complexity BLKT_04_FW_2009_DESIGN #2PTYX7

Page 3: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Total: 8 kg/s mass flow rate20 circuits each half module 0.2 kg/s per finger

80 circuits fed from a single inlet pipe

Velocity plot in water volume for FW Panel for BM_04 Design Issues:

• Flow non-uniformity and manifold design

• Hot spots and accommodation of local high heat flux

• Pressure drop optimization

• Structure thermomechanical optimization

CFD Challenges

• Large problem sizes

• Multiple materials

• Geometric complexity

• Temperature depended properties

• Incorporation of complex thermal loading conditions for other codes

Page 4: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Contact!!

It may be interesting to do CFD in one finger.

Preparation of CFD meshes and removal of all interferences and errors - (there are many details- Impact on fabrication/cost )

Page 5: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

In some cases, analysis can be done for a smaller compartment (here a SS panel of the FW) to reveal local design feature.

at outlet

at turn-around

Each SS panel houses 2 fingers

Inlet mass flow rate: 0.4 kg/s

CFD Analysis for SS Panel 1 (BLKT_04_FW_2009_DESIGN #2PTYX7)

Flow around the turn around and near the outlet collector show interesting recirculation flow.

Page 6: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Velocity magnitudes at different pipe mid-planes show slightly higher values for the top two pipes

1.7741.356 m/s

Uniformity of pipe velocity?

Page 7: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Be surface temperatures under 5 MW/m2

Cu wall temperature (at Cu/H2O interface)

Max. Cu surface temperature Max. Be surface temperature

SC/Tetra result*

1-D empirical correlation

SC/Tetra result (2 grooves)

1-D (with Cu k) 3 mm thick

SC/Tetra result

0.2 kg/s (3 grooves) 253-273 2631 313 (323) 303.76 (368 W/m2K)

793

0.4 kg/s (3 grooves) 240-270 2601 308 (310) 300.76 (368) 787

0.2 kg/s (toothless) 287-312 2902 350 330.92 (366.5) 839

0.4 kg/s (toothless) 278-286 2802 322 320.87 (367) 804

1.P. Chen, et. al. Correlation for Hypervaportron (2008)2.Shah correlation for flat surface (1977)

3rd Be tile (5 cm wide) exposed to 5 MW/m2 1st, 2nd and 4th Be tiles exposed to 0.2 MW/m2

400 g/s Hypervaportron Finger

Heat spread to the neighboring Cu results in a 30C lower than what reported last week

Adiabatic BC applied to surfaces: no heat communication with neighboring tiles except through Be/Cu contact

Next: 5 MW/m2 applied to both half of the 2nd and 3rd tiles

Hypervaportron heat transfer validation

Page 8: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

3 grooves

2 grooves

Max Cu surface Temp = 308 C

Max Cu surface Temp = 310 C

Velocity characteristics under the grooves – data used for groove optimization

Page 9: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

FW temperature response to single strip high heat flux of 5 MW/m2 (At toroidal location 0.282<y<0.332)

The rest of the surface is exposed to 0.2 MW/m2

Mass flow rate: 8 kg/s total or 200 g/s per finger

simplified model (without manifold)

• Maximum Be surface temperature ~778oC

• Previously, a single finger exposed to similar conditions, the maximum surface temperature was reported at 769oC

Page 10: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

at Y=0.35

Some fluid velocity details show flow non-uniformity

Page 11: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

CFD/thermal analysis for the BM04 shield block at different radial planes (color quantities: velocity m/s inside the pipe; temperature oC: SS)

Russian Design-4 series circuits -radial flow paths-large water volume fraction, -relatively cold compared with other designs.

IO is still yet to decide which design option should be considered

Page 12: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

2 inlets each with 4 kg/s Water enters the shield through the central pipe and distributes into 2 passes poloidally at the end of the pipe (x ~0.64 m)

Water leaves the shield through 4 outlet holes in this model

CFD analysis helps to see how water flows within the module

Page 13: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

BLANKET_2009_DESIGN#2PTXPT

the IO CAD transmitted to the US has a hole – water leaks out. Hole found in slot

Alternate shield design utilizing poloidal flow paths.

CFD analysis reveals design needs much improvement to fix the flow non-uniformity and consequent hot spots.

Page 14: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

CFD analysis for the modified BM04-shield Goal: to evaluate whether the back of the shield will be too hot under long pulse (3000 s) runs (using steady state run for initial check)

The model includes a coaxial connector

Cover plates modified

Modified BM04 model

Previous model Modified model

Page 15: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

CFD Analysis for BM04 Model BLKT_04_BSM_2009_DESIGN#2PCQZA-C-052609 (US fixed)

CFD model total nuclear heat to BM04 = 0.40473 MW

Water= 0.0494 MW

Steel = 0.35531MW

(MCNP calculated total nuclear heat = 0.395 MW with steel = 0.348 MW )

CFD water outlet temperature= 112.01C

(Inlet T= 100 C; inlet mass flow rate = 8 kg/s)

Fractional heat balance (Qinput/Qoutout) = 1.0006

Steady State AnalysisWater volume = 0.0284942 m3

Steel volume= 0.254979 m3

P = 148864 Pa

Page 16: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Plan X = 3.78

Temperature gradient plot shows heat flow directions and the relative location with respect to the coolant pipes

•Maximum temperature at the back ~ 250 C

•Shield maximum temperature = 266.1C

Page 17: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Velocity Distribution for BLKT_04_BSM

Inlet

Plan X=3.78

Some flow non-uniformity corresponding to ~ 30oC temperature non-uniformity

Again, use of parallel flow paths in the design results in some flow non-uniformity

Page 18: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

The Next Step: Pulsed Operation Analysis, Initial result: Steel Surface Temperature at the Plasma Shutdown after Ramp-down

Peak temperature drops ~19 degree lower than the steady state peak, but its location shifts to the back

Starting with steady state temperature conditions (time =0). Power is completely off at 60 s

No flow transient is observed, water velocity distribution remains the same during power ramp and down

Page 19: CFD Analysis for ITER FW/Shield Designs Alice Ying, Ryan Hunt, Hongjie Zhang (UCLA) Dennis Youchison James Bullock, Mike Ulrickson (SNL) July 8, 2009 MIT,

Main areas of future work for FW / Blanket / Divertor

• He cooled first wall and divertor simulations for TBMs and Demo Divertors

• Coupled HIMAG / CFD / Neutronics / Structural codes for virtual blanket