UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERING ENGINEERING TECHNOLOGY DEPT. Name: CET-3120 Advanced Construction Materials Quiz No. 5 Open Book & Notes A quarrying operation will require a several large hauling vehicles to remove the rock from the pit and transport it to the crushing machines. Determine the structural number (SN) for a flexible pavement for the following criteria and loading. (Show your work on this sheet and the attached homograph.) What thickness of ODOT Item 301 Asphalt Concrete Base would be needed if it were to be used as the only asphalt course for this haul road if placed on 8" of Item 304 Aggregate Base? 172,000 loaded passes of trucks over the life of the pit. Assume SN=3 for a starting point for axle load conversions. CBR=8.33 R=70% pt=2.0 MR= /ÿ,ÿ;ÿ/ÿ" W18= ÿ",fYtÿt,ÿ'dÿ, ODOT Item 301 thickness = ÿ h, &PSI = ÿ, ÿ' " 2,0 =ÿ. ÿ" SN (Graph) = 62k 58k 24k If,'7 /O, "7 '/3' D"? 301 Asphalt Conc. Base 8" 304 Aggregate Base Proposed Pavement Section SPRING 2020 CET-3120 Advanced Construction Materials
8
Embed
CET-3120 Advanced Construction Materials Quiz No. 5
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
Name:
CET-3120 Advanced Construction MaterialsQuiz No. 5
Open Book & Notes
A quarrying operation will require a several large hauling vehicles to remove the rockfrom the pit and transport it to the crushing machines. Determine the structural number(SN) for a flexible pavement for the following criteria and loading. (Show your work onthis sheet and the attached homograph.) What thickness of ODOT Item 301 AsphaltConcrete Base would be needed if it were to be used as the only asphalt course for thishaul road if placed on 8" of Item 304 Aggregate Base?
172,000 loaded passes of trucks over the life of the pit.
Assume SN=3 for a starting point for axle load conversions.
CBR=8.33 R=70% pt=2.0
MR= /ÿ,ÿ;ÿ/ÿ" W18= ÿ",fYtÿt,ÿ'dÿ,
ODOT Item 301 thickness = ÿ h,
&PSI = ÿ, ÿ' " 2,0 =ÿ. ÿ"
SN (Graph) =
62k 58k 24kIf,'7 /O, "7 '/3'
D"? 301 Asphalt Conc. Base
8" 304 Aggregate Base
Proposed Pavement Section
SPRING 2020 CET-3120Advanced Construction Materials
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
Table D.1, Axle load equivalency factors for flexible pavements,single axles and Pt of 2,0,
SPRING 2020 CET-3120Advanced Construction Materials
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
Flexible Pavement Design ChartSegment I
402-2July 2008
Reference Section & Figure402, 402.1 (step 3)
Ot 3-
/
£sTÿa t-ed T
Sÿngle Axle Iÿqad ÿ11171 ÿ 1 ' 11311
TL
tel 18-k[p Equivalent-ÿAL) Appl[¢oT[ons (millions)II1ÿ ÿ IIl][Itlrlll ' IIII]l
o tÿ ÿ Lt-)o d ÿ"
\\
\\\\
D'3 ,,.. 1 ÿ
Re!iÿbiHty, R[ÿ)
TL
a o o! I
TL
SPRING 2020 CET-3120Advanced Construction Materials
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
Flexible Pavement Design ChartSegment 2
402-3July 2008
Reference Section & Figure402, 402.1 (step 3)
OqI
O,Ira
ip
li)CII
t-
O4--
,5
9 8 7 6 5 4 3 2Design Structure Number, SN
Example:APSI = 2.0
:Solul-ion" SN = 4.5
SPRING 2020 CET-3120Advanced Construction Materials
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
CET-3120
Name: /ÿ7
Advanced Construction MaterialsQuiz No. 5
Open Book & Notes
A quarrying operation will require a several large hauling vehicles to remove the rockfrom the pit and transport it to the crushing machines. Determine the structural number(SN) for a flexible pavement for the following criteria and loading. (Show your work onthis sheet and the attached nomograph.) What thickness of ODOT Item 301 AsphaltConcrete Base would be needed if it were to be used as the only asphalt course for thishaul road if placed on 10" of Item 304 Aggregate Base?
129,000 loaded passes of trucks over the life of the pit.
Assume SN=4 for a starting point for axle load conversions.
CBR=3.33 R=70% pt=2.0 APSI = ÿ" "ÿ'- 20 =" ÿ. ÿ"
MR= 'ÿ:2,d'ÿ l'' W18= ÿt'j ÿdÿIÿ SN (Graph) = ÿ.'ÿ
ODOT Item 301 thickness = ÿ / t
64k 60k 24k
D"? 301 Asphalt Conc. Base
10" 304 Aggregate Base
Proposed Pavement Section
/S-
SPRING 2020 CET-3120Advanced Construction Materials
UNIVERSITY OF TOLEDO COLLEGE OF ENGINEERINGENGINEERING TECHNOLOGY DEPT.
TableD.I, Axle load equivalency feotors for flexible pavements,single axles and Pt of 2.0,.
Axle Pavemant Structural Number (SN)Load(kips) 1 2 3 (4j) 5