http://www.certify4king.com/asq-cssbb.html Questions and Answers Vendor: ASQ Exam Code: CSSBB Exam Name: Certified Six Sigma Black Belt Demo
12

Certify4King CSSBB Exam - Certified Six Sigma Black Belt

Mar 06, 2016

Download

Documents

Certify4 King

Certify4king provides quality ASQ CSSBB (Certified Six Sigma Black Belt) Questions and Answers which are same as actual certification exam.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

http://www.certify4king.com/asq-cssbb.html

Questions and Answers

Vendor: ASQ

Exam Code: CSSBB

Exam Name:

Certified Six Sigma Black Belt

Demo

Page 2: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 2 of 108

Topic 1, Volume A QUESTION NO: 1 SWOT is an acronym for: A. strengths, weaknesses, opportunities, threats B. statistics without tables C. sensory Weibull ordinal tools D. success wields optimal teams E. none of the above Answer: A QUESTION NO: 2 Perform a risk analysis to determine the expected profit or (loss) from a project which has four possible disjoint outcomes: Outcome A shows a profit of $340,000 and has a probability of 0.25 Outcome B shows a profit of $120,000 and has a probability of 0.40 Outcome C shows a loss of $40,000 and has a probability of 0.10 Outcome D shows a profit of $100,000 and has a probability of 0.25 A. $130,000 B. $520,000 C. $154,000 D. ($168,000) E. none of the above Answer: C QUESTION NO: 3 The leader in the quality movement who recommended that organizations "eliminate numerical quotas for the work force and numerical goals for management." : A. Juran B. Ishikawa C. Crosby D. Feigenbaum E. Taguchi F. none of the above Answer: F

Page 3: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 3 of 108

QUESTION NO: 4 The quality leader responsible for the term Total Quality Management (TQM): A. Juran B. Ishikawa C. Crosby D. Feigenbaum E. Taguchi F. none of the above Answer: D QUESTION NO: 5 The quality leader most associated with the concept of robustness: A. Juran B. Ishikawa C. Crosby D. Feigenbaum E. Taguchi F. none of the above Answer: E QUESTION NO: 6 The support for an important quality initiative was lacking in congress until Reagan's Secretary of Commerce was killed in a horseback riding accident in 1987. That initiative was: A. assigning National Institute for Standards and Technology (NIST) quality oversight duties B. "consensus of the House" proclamation for Deming's 14 points C. changing National Bureau of Standards to NIST. D. authorizing the American National Standards Institute (ANSI) to join with the International Standards Organization (ISO) to promulgate standards. E. none of the above. Answer: E QUESTION NO: 7 A quality leader who did extensive work with Japanese industry is:

Page 4: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 4 of 108

A. Juran B. Ishikawa C. Deming D. Ohno E. Taguchi F. all of the above G. none of the above Answer: F QUESTION NO: 8 In a series of linked processes and associated feedback loops the product or service flows ________ and the information flows ________. A. rapidly, slower B. downstream, upstream C. evenly, digitally D. sooner, later E. to the customer, from the supplier F. none of the above Answer: B QUESTION NO: 9 Causes in a cause and effect diagram often include management, measurement systems, mother nature and the four standard causes: A. man, material, methods, machines B. man, manufacturing, methods, material C. marketing, methods, material, machines D. man, material, millennium, machines E. none of the above Answer: A QUESTION NO: 10 The word "champion" in the context of Six Sigma projects refers to: A. the team that has had the most impact on the bottom line.

Page 5: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 5 of 108

B. the person who has coordinated teams most effectively C. the individual who has outpaced all others in six sigma knowledge D. none of the above Answer: D QUESTION NO: 11 George is an employee of Black, Inc. John is George's internal customer. Which statement is true? A. John is employed by Black, Inc. B. John is employed by another company that supplies material to Black, Inc. C. John is employed by a company that purchases material from black, Inc. D. John is employed by another company that has a fiduciary agreement with Black, Inc. E. John is employed by another company as an internal auditor. Answer: A QUESTION NO: 12 A team has been asked to reduce the cycle time for a process. The team decides to collect baseline data. It will do this by: A. seeking ideas for improvement from all stakeholders B. researching cycle times for similar processes within the organization C. obtaining accurate cycle times for the process as it currently runs D. benchmarking similar processes outside the organization Answer: C QUESTION NO: 13 Customer segmentation refers to: A. dividing a particular customer into parts that are more easily understood B. grouping customers by one or more criteria C. maintaining secure customer listings to minimize communication among them D. eliminating or "cutting off" customers with poor credit history Answer: B QUESTION NO: 14

Page 6: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 6 of 108

This is an example of part of a: A. QFD Matrix B. Activity Network Diagram C. Interrelationship Diagram D. Affinity Diagram Answer: A QUESTION NO: 15 Customer requirement #3 has a ______________ relationship with technical feature #3.

Page 7: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 7 of 108

A. strong B. moderate C. weak Answer: B QUESTION NO: 16 There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPU = A. 87 ÷ 328 B. 87 ÷ (328 × 14) C. 14 ÷ 87

Page 8: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 8 of 108

D. 87 ÷ 14 E. 328 ÷ 87 F. 87 × 1,000,000 ÷ (14 × 328) Answer: A QUESTION NO: 17 There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =: A. 87 ÷ 328 B. 87 ÷ (328 × 14) C. 14 ÷ 87 D. 87 ÷ 14 × 1,000,000 E. 328 ÷ 87 F. 87 × 1,000,000 ÷ (14 × 328) Answer: F QUESTION NO: 18 A random sample of 2500 printed brochures is found to have a total of three ink splotches. The rate of ink splotches in PPM is: A. 1,000,000 ÷ 2500 × 3 B. 2500 ÷ 1,000,000 × 3 C. 3 ÷ 2500 × 1,000,000 D. 3 × 2500 ÷ 1,000,000 Answer: C QUESTION NO: 19 If DPU = 0.022, the RTU is approximately: A. 0.022 B. 0.078 C. 0.0022 D. 0.98 E. 0.098 E. 0.0098 Answer: D

Page 9: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 9 of 108

QUESTION NO: 20 A project activity not on the critical path has required 20% longer than the time originally allocated. The project team should: A. inform all concerned that the entire project will be delayed by 20% B. inform all concerned that the entire project will be delayed but by less than 20% C. study the effect this will have on other activities because the project may still be on schedule Answer: C QUESTION NO: 21 After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are: I. nominal group technique II. multivoting III. cause and effect diagram IV. activity network diagram V. matrix diagrams A. III and IV B. IV and V C. II and III D. I and II Answer: D QUESTION NO: 22 A team studies a coil steel banding process and makes five changes resulting in productivity improvements of 2%, 2.8%, 2.4%, 2% and 3% respectively. These improvements are best described by which approach to problem solving? A. 5S B. Poka yoke C. Kaizen D. PDCA E. Re-engineering Answer: C QUESTION NO: 23 The operators of a manufacturing cell work out a more orderly arrangement for tool storage and establish a schedule to maintain cleanliness on a daily basis. These improvements are best described by which approach to problem solving?

Page 10: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 10 of 108

A. 5S B. Poka yoke C. Kaizen D. PDCA E. Re-engineering Answer: A QUESTION NO: 24 A quality engineer employed by a hospital is asked to improve the process of medication storage in locked cabinets near patient doors. One defect that occurs rarely is that the medication caddy is left out when the cabinet is relocked. The engineer installs a gravity activated arm that will not permit the door to close when the caddy isn't inside. This improvement is best described by which approach to problem solving? A. 5S B. Poka yoke C. Kaizen D. PDCA E. Re-engineering Answer: B QUESTION NO: 25 A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that "fans out" using the power outage as the handle of the fan. These improvements are best described by which approach to problem solving? A. Affinity diagram B. Inter-relationship digraph C. Tree diagram D. Process decision program chart E. Matrix diagram F. Prioritization matrix F. Activity network diagram Answer: C QUESTION NO: 26

Page 11: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 11 of 108

A team's goal is to improve information flow in a payroll function. They make thirty-three Post-It® notes, each listing an issue for further investigation. After some discussion, they group them into four categories: mandated record keeping, privacy concerns, insurance concerns and transfer concerns. This grouping process is best described by which approach to problem solving? A. Affinity diagram B. Inter-relationship digraph C. Tree diagram D. Process decision program chart E. Matrix diagram F. Prioritization matrix G. Activity network diagram Answer: A QUESTION NO: 27 The team in the above problem draws arrows from Post-It® notes that are causes to notes that are the effects of these causes. This step is best described by which approach to problem solving? A. Affinity diagram B. Inter-relationship digraph C. Tree diagram D. Process decision program chart E. Matrix diagram F. Prioritization matrix G. Activity network diagram Answer: B QUESTION NO: 28 A team working with a plant relocation is tasked with designing a process for moving 180 pieces of equipment. Incoming orders may need to be filled during the move at either the old site or the new one. Transportation equipment availability is uncertain. Construction schedules at the new site is very weather dependent. The team designs a chart that attempts to cover these and other contingencies with appropriate measures dealing with each. The tool best fitted for this task is: A. Affinity diagram B. Inter-relationship digraph C. Tree diagram

Page 12: Certify4King CSSBB Exam - Certified Six Sigma Black Belt

ASQ CSSBB Exam

Page 12 of 108

D. Process decision program chart E. Matrix diagram F. Prioritization matrix G. Activity network diagram Answer: D QUESTION NO: 29 A management team lists nine goals across the top of a rectangle and 15 activity initiatives along the left hand side of the rectangle. If one of the activities strongly supports one of the goals a circle is placed in the box where that activity's row intersects the goal's column. If the activity's support is very strong a "bulls eye" is placed in the box and if the support is weak a triangle is used. This best describes which problem solving tool?

A. Affinity diagram B. Inter-relationship digraph C. Tree diagram D. Process decision program chart E. Matrix diagram F. Prioritization matrix G. Activity network diagram Answer: E