Introduction of Certification Procedure and Implementation rules for Compulsory Certification of AV/IT/TTE China Quality Certification Centre 2014.11.03
Jul 06, 2015
Introduction of Certification Procedure
and Implementation rules for Compulsory
Certification of AV/IT/TTE
China Quality Certification Centre
2014.11.03
Main Content
Introduction of Certification Procedure
Introduction of Implementation Rules
Communication and Discussion
Register in
http://www.cqc.com.cn
Make the application
Prepare and send the
needed documents to CQC
Send the samples and related
documents to the assigned lab
Prepare the factory inspection
(if need)
Pay the fee
Purchase/apply for printing or molding
the CCC Certification Mark
Applicant CQC Lab
Send the acceptance notice
Check the application documents
Arrange the
Factory Inspection
(if need)
Accept the sample and
carry the type testing
Issue the Type
Testing Report
and Upload to the
CQC system No need testing Type Testing
Send sample
testing notice
Assessment and Evaluation
(Testing report,
factory inspection report, etc.)
Issue the Invoice
Issue the certificate
Confirm
the fee
to the
account
Certification Procedure
Certification Procedure
All of the notice and infomation CQC sent to the applicants can be seen
in the client-side.(including the application number, needed documents,
sample sending notice, Invoice notice, etc. )
For the factories abroad, type testing and factory inspection arrangement
can be done in paralell.
Certification Procedure
Application documents
Stamped or signed application form
Business license(if needed)
Questionaire of factory inspection (if needed)
Product info(list of critical components/materials, circuit diagram or
system block, name plate and warnings in Chinese, description of the
difference between models in the same application unit, etc.)
contract between manufacturer and factory(if needed)
Certification Procedure
Factory quality assurance statement
( Meet the requirements of the factory quality assurance ability and
promise to cooperate and finish the initial factory inspection in 3 months
after the CCC certificate approval)
Implementation Rules
According to the Notice No.23, 2014 promulgated by CNCA, from the
implementation date (Sep. 1,2014), the Certification Body should
engage in certification activitie according to the new implementation
rules for new applications.
For the CCC certificates approved before sep.1,2014, the rules
conversion can be done together with other modification applications(
e.g. product changes, components changes, standard version
changes,etc.)
Implementation Rules
Implementation Rule: 0.Foreword
1.Scope
2.Certification standards
3.Ceritification mode
4.Application unit
5.Application for certification
6.Certification implementation
7.Follow-up inspecion
8.Certificate
9.Use of CCC certification mark
10.Charge
11.Certification responsibility
12.Detailed Implementation rules
Rules Version Number
Implementation Rules Detailed Rules:
CNCA-C08-01:2014 CQC-C0801-2014
CNCA-C09-01:2014 CQC-C0901-2014
CNCA-C16-01:2014 CQC-C1601-2014
Implementation Rules
CNCA-01C-017:2010
CNCA-01C-020:2010
CNCA-07C-031:2007
General requirements
Certification body should formulate corresponding implementation
detailed rules according to the Implenmentation rule.
Implementation Rules
Implementation Rules
1. Scope
Same as the CCC catalogue promulgated by AQSIQ and CNCA.
For example:
No. Products discription Standards
0801 Powered loudspeakers under 500W (R.M.S.) max output GB8898-2011
GB13837-2012
GB17625.1-
2012 0802 Audio amplifiers
0804 Tuners ,Radio receivers
0805 Audio/video recorder/player/dealer with kinds of carrier media (including cassette tape recorder/player, disc player, CD/MD player, LD/VCD/Super VCD/ DVD player, MP3 recorder/player, etc).
0806 Combination of the above equipments
Implementation Rules
No. Products description Standards
0807 Power adapters for audio/video products GB8898-2011
GB13837-2012
GB17625.1-
2012
0808 Color television receiver
0809 Monitor
0811 Cathode-ray tubes GB8898-2011
0812 Vediocassette recorder GB8898-2011
GB13837-2012
GB17625.1-
2012
0813 Electronic organte
0814 Tevision-antenna amplifiers
2、Certification Standards
Audio and Video Products:
GB8898-2011 (IEC 60065:2005 MOD)
GB13837-2012 (IEC/CISPR 13:2009, IDT)
GB17625.1-2012 (IEC 61000-3-2:2009, IDT)
Information Technology equipments:
GB4943.1-2011 (IEC 60950-1:2005, MOD)
GB9254-2008 (IEC/CISPR 22:2006, IDT)
GB17625.1-2012(IEC 61000-3-2:2009, IDT)
Implementation Rules
Class A, Class B factories
Class C, Class D factories
Class A,B,C,D can choose voluntary
3. Certification Mode
Implementation Rules
Implementation Rules
Certification Mode1
Certification Mode2
Type testing + follow-up inspection (one of or combination)
Certification Mode3
Type testing+initial factory inspection +follow-up inspection
Class I, Class II equipments
Type testing + fullow-up inspection
Other equipments
Type testing + follow-up surveillance
Implementation Rules
Follow-up inspection
Follow-up surveillance
Sampling test or inspection
in production lines, storehouses
Sampling test or inspection
in Market
Implementation Rules
4、Application Unit
The series of the models/types applied in one application unit should
have the same safety critical components or EMC major components
and the similiar electrical and mechanical constructions.
Implementation Rules
5、Application for Certification
Application documents
...
add: Factory quality assurance statement
6、Certification Implementation
Using manufacturer's testing laboratory
TMP:Testing at manufacturers' premises
WMT:Witnessed manufacturers' testing
TMP Laboratory: A manufacturer's laboratory besing used by CCC
contract laboratory.
WMT Laboratory: A manufacturer's laboratory being used for witnessed
testing by the CCC contract laboratory.
Implementation Rules
Implementation Rules
Conditions:
The laboratory is approved in accordance with the ISO/IEC 17025 by
accredited bodies within ILAC mutual recognition agreement.
Meet the related requirements established by CNCA.
Also, the information of TMP, WMT will be written in the CCC TRF.
Implementation Rules
The following two documents have been published on the CQC website.
-Application form applying for using manufacturer's testing laboratory
-Guidelines
components recognition
For components listed in the CCC catalugue should have CCC certificates
(e.g. plug, power cord, power supply used in Computers, servers, etc)
Voluntary certificates
Test with the product
Implementation Rules
Implementation Rules
7、Factory inspection
Factory Inspection
Initial factory inspection
Follow-up inspection
For appliction for the first time or
extended applicaton needed
factory inspection, the first factory
inspection can be done in 3 months
after the CCC certificate approval.
Quality Assurance ability inspection
Product consistency check
Routine factory inspection
Follow-up inspection:
Enterprise Frequency Content
Class A Once every
two years
1. Quality Assurance ability inspection (partlly)
2. Product consistency check
Class B annually 1. Quality Assurance ability inspection (partlly)
2. Product consistency check
Class C one or two
times a year
1. Quality Assurance ability inspection
2.Product consistency check or Sampling test /
inspection in production lines or markets
Class D at least 2
times a year
1. Quality Assurance ability inspection
2.Product consistency check or Sampling test /
inspection in production lines or markets
Implementation Rules
8. The classification of the factories:
For a new enterprise for the first time to apply for the CCC
certificate, the default is Class B.
Upgrading:D-C-B-A
Degrading:A-B-C-D or A-C or A-D or B-D, etc.
Implementation Rules
Implementation Rules
Classification terms and conditions:
Results of the factory inspection
Results of the sampling test/inspection in production lines, markets
Results of the national/provincial level sampling test/check, etc.
Others(media exposure, feedback by the users, etc.)
Implementation Rules
9. List of safety critical components, materials
10. List of EMC critical compoents
delete some EMC components
Implementation Rules
Summarization:
Certification Mode
Using the manufacturer's testing laboratory
follow-up inspection
The classification of the factories
List of safety and EMC critical components
Thank you!