F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 CERN High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale recent activities, workshops, and plans http://care-hhh.web.cern.ch/care-hhh/
16

CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

Jan 12, 2016

Download

Documents

Brian Scott
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero CARE Steering Committee, CERN, 05/04/

2004CERN

High Energy High Intensity Hadron Beams

CARE-HHH Network:coordinators: F. Ruggiero and W. Scandalerecent activities, workshops, and plans

http://care-hhh.web.cern.ch/care-hhh/

Page 2: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 2CERN

CARE-HHH Network: 3 workpackages

WP1: Advancements in Accelerator Magnet Technologies (AMT)• coordinated by L. Rossi (CERN) and L. Bottura (CERN)• keywords: stability and quench limit of LHC insertion magnets,

pulsed magnets for LHC and GSI accelerator complex upgrade, magnets for booster ring, high field magnet design, optimisation of the overall cost

WP2: Novel Methods for Accelerator Beam Instrumentation (ABI)• coordinated by H. Schmickler (CERN) and K. Wittenburg (DESY)• keywords: tools and diagnostic systems for luminosity, wire for

beam-beam compensation, advanced transverse beam diagnostics, feedback loops for orbit, chromaticity and coupling, advanced beam halo diagnostics, remote diagnostics and maintenance of instrumentation

WP3: Accelerator Physics and synchrotron Design (APD)• coordinated by F. Ruggiero (CERN) and F. Zimmermann (CERN)• keywords: Interaction Region design for LHC luminosity

upgrade, optics design for booster synchrotrons, impedance calculations, structured list of intensity limits, electron cloud effects, beam measurements and advanced theoretical studies (including collimation, halo formation, and loss mechanisms)

Page 3: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 3CERN

CARE-HHH progress (first 18 months)

Page 4: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 4CERN

CARE-HHH implementation plan (2nd 18 months)

Page 5: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 5CERN

CARE-HHH implementation plan (2nd 18 months)

Page 6: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 6CERN

HHH activity/plans in 2005• Meeting with LHC experiments on LHC Upgrade

issues, CERN, 14/01/2005 Topics: possible reduction of L*, shorter bunch spacings, split-wall

chamber to shield AC long range beam-beam effects, possible help from the experiments to study radiation effects.

Follow-up meeting scheduled at CERN on 13/04/2005.• W. Scandale and F. Zimmermann, CERN seminar 03/02/2005 Highlights of HHH-2004 Workshop: “Beam Dynamics in Future

Hadron Colliders and Rapidly Cycling Synchrotrons”. Proceedings ready for publication as CARE and CERN Yellow Report:

http://care-hhh.web.cern.ch/CARE-HHH/HHH-2004/Proceedings/proceedings_hhh2004.htm

CERN Courier article will be published in April 2005.• New Pulsed-Magnet Working Group:

first meeting at CERN, 17-18/02/2005 Participants: CERN-GSI-INFN-IHEP-CEA/Saclay

web site at http://pmwg.web.cern.ch/PMWG/ Topics: Fast pulsed SC magnets for GSI and LHC injector upgrade.

Page 7: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 7CERN

Beam dynamics code repository

Page 8: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 8CERN

electron-cloud code table code contact dim e-model features Parallel (max CPU) PEI K.Ohmi, KEK SR, SE build-up; dipole inst. EPI K.Ohmi, KEK SR, SE build-up; dipole inst. CLOUDLAND L.Wang, BNL 3 SE, build-up; N ECLOUD G.Rumolo,GSI,

D.Schulte, F.Zimmermann, CERN

2-3 SR, SE, IZ

buildup; multibunch dipole inst.

N

POSINST M.Furman, LBNL; M.Pivi, SLAC

2.5 SR, SE, IZ, BPL

buildup; multibunch dipole inst.

N

CSEC M.Blaskiewicz, BNL

2-3 SE, IZ, BPL

build-up; single-bunch instability

N

HEADTAIL D.Schulte, F.Zimmermann, G.Rumolo

2 build-up; single-bunch instability

PEHT K.Ohmi, KEK head-tail PEHTS K.Ohmi, KEK head-tail; SC CLOUD_MAD T.Raubenheimer,

SLAC MAD-tracking particles with

ecloud "lenses"

PARSEC A.Adelmann, PSI 3 SE; IZ; SR; BPL

SC; lattice description Y (4048)

ORBIT J.Holmes, ORNL 2-3 SE; IZ SC; lattice description Y WARP+POSINST J.L.Vay, LBNL 3 SE; IZ;

SR; BPL SC; lattice description Y

QUICKPIC W.Mori, UCLA 2-3 PIC plasma code; initially-prescribed ecloud

Y (128)

BEST H.Qin, PPPL 3 SC; Vlasov-Maxwell; no e-wall collisions

Y (512)

MEC U.Iriso, BNL empirical maps

SR=synchrotron rad. photoelectrons; SE=secondary electron emission; IZ=ionization of resid. gas; BPL=beam-particle lossesSC=self-consistent;

[courtesy M. Furman,modified by F. Zimmermann]

Page 9: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 9CERN

• CARE-HHH coordination meeting, CERN, 2/03/2005 Topics: HHH Network strategy, future events, and (P+M) resources. Alternative options, realistic set of milestones, project phases, and tentative dates for LHC luminosity upgrade requested by CERN management. Tentative milestones for future machine studies could be:• 2005/2006: installation and test of a beam-beam long range

compensation system at RHIC to be validated with colliding beams

• 2006/2007: new SPS experiment for crystal collimation• 2006: installation and test of Crab cavities at KEKB to validate

higher beam-beam limit and luminosity with large crossing angles• 2007: if KEKB test successful, test of Crab cavities in a hadron

machine to validate low RF noise and emittance preservation• HHH-AMT Workshop on “Beam-Generated Heat

Deposition and Quench Levels for LHC Magnets”, CERN, 3-4/03/2005 Topics: stability margin of ultimate LHC and validation of design for LHC upgrade, thermal transfer and superconductor stability, modeling and experiments, code comparison, experience on quench levels from magnet operation at CERN and from beam and magnet operation at other labs.

Page 10: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 10CERN

• CARE-HHH-APD mini-Workshop on “Crystal Collimation in Hadron Storage Rings” ('CC-2005‘), CERN 7-8/03/2005 Topics: beam cleaning, crystal extraction, experience with crystals at various colliders, crystal production technology and experimental procedures, crystal simulations, collimation requirements for the LHC, possible new crystal experiment at the CERN-SPS.

• Two discussions of F. Ruggiero and F. Zimmermann with P. McIntyre (magnet expert from Un. Texas visiting CERN for CARE-HHH-AMT studies) on 21-30/03/2005 Topics: SC magnet technology and design, radiation resistent "levitating" dipole-first, IR design and chromaticity correction for quadrupole-first, LHC energy tripler and photon stops, possible counter-measures against electron cloud.

• HHH-AMT seminars by P. McIntyre: "Recent Advances in Collider Dipole Technology", CERN, 18/03/2004, and "Novel Magnet Technologies for the LHC upgrade", CERN, 4/04/2005. Future seminars at CERN include: "LHC energy tripler", 14/04/2005, and "Novel method to avoid e-cloud limitation in the LHC", 15/04/2005. There will be also seminars on the "LHC energy tripler" at Saclay and at Dipartimento di Fisica, Milano.

Page 11: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 11CERN

“Levitated” magnet design

IR

20 40 60

.02

.04

.06

.08

Q1270 T/m3 m long30 mm aperture

Q1270 T/m6 m long40 mm aperture

Q1270 T/m3 m long45 mm aperture

D18.7 T10 m long56 x 120 mm aperture

D28.7 T10 m long56 mm aperture

strain-tolerant Bi-2212 cable, with strands of superconductor in a silver matrix surrounding an inner flexible cooling tube

(courtesy P. McIntyre)

Page 12: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 12CERN

• CARE-HHH-AMT Topical Meeting on “Insulation and Impregnation Techniques”, CERN, 22-23/03/2005 Topics: conductor insulation, insulation of metallic pieces, interlayer insulation, resins composition, radiation resistance (connection to fusion research), fibre filling and sizing, heat transfer properties.

• W. Scandale, presentation on “LHC Upgrade” at IFAE2005 conference, Catania, 30/03-2/04/2005

• LARP Collaboration meeting, Port Jefferson, 6-8/04/2005. Web site at

http://www.agsrhichome.bnl.gov/LARP/050406_danfords/ Topics: technical and resource loaded plans for FY06 and FY07.

• F. Ruggiero, presentation on “LHC Upgrade, R&D and impact on LHC detectors”, CPPM workshop on Future Accelarators, Marseille, 7-8/04/2005.

• Proceedings of the 1st CARE-N3-ABI networking meeting (held in Aumühle, 22-23/06/2004) on “Trajectory and Beam position measurements using digital techniques”, CARE-Conf-04-024-HHH. The Proceedings of the 2nd CARE-HHH-ABI networking meeting (held in Lyon, 1-2/12/2004) on “DC current transformers and beam-lifetime evaluations” will follow soon, CARE-Conf-04-023-HHH.

Page 13: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 13CERN

Future CARE-HHH workshops in 2005• CARE-HHH-APD Workshop on “Scenarios for the

LHC luminosity upgrade”, Arcidosso, 31/08-3/09/2005

Topics: optical designs and luminosity performance for alternative IR layouts (dipole first vs quadrupole first (Nb-Ti or Ni3Sn) vs ironless magnet at very low beta*, beam-beam compensation schemes and machine-experiment interface), machine and magnet parameters for high energy injectors: lattice, magnet aperture, injection and extraction for new ring in the ISR tunnel, super-SPS with new transfer lines, or booster ring in the LHC tunnel.

• US-LARP mini-Workshop on “LHC IR upgrade”, FNAL, October 2005

Topics: heat deposition and magnet quench limits, TAS/TAN integration and follow-up of HHH-2004 workshop, feasibility of large crossing angles and CRAB cavities in hadron storage rings, beam-beam compensation schemes. CARE-HHH may support attendance of 2-3 people from CERN. This mini-workshop will be followed by a US-LARP coordination meeting.

Page 14: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 14CERN

Future CARE-HHH workshops in 2005

• Joint HHH-BENE-HIPPI Workshop on “Rapid Cycling Synchrotrons and Low Energy injectors”, September-October/2005?

• CARE-HHH-AMT Workshop on “SC Pulsed Magnets for Accelerators”, Frascati(?), end October 2005

Topics: define set of agreed parameters for the development of SC magnets ranging from low field, continuously pulsed (typically 2 T peak, 4 T/s, 100 mm aperture, 108 cycles) to medium field, high-duty cycle magnets for storage and booster rings (typically 6 T peak, 1 T/s, 80 mm aperture, 106 cycles), translate requirements into specifications for performance of strand, cable, magnet and auxiliaries, define R&D required to achieve the above specifications and produce a tentative road-map for a procurement and prototyping activity.

Page 15: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 15CERN

Tentative conclusions• All new HHH milestones and deliverables in the

first quarter of 2005, i.e. workshops and proceedings, have been met!

• The CARE-HHH Network had weak/missing links to • the experimental physics community• the vacuum science community• collimation, dump, and machine protection experts• cryogenic experts

• A systematic review, optimization, and possible re-design of the LHC injector complex was not clearly identified as a topic within the CARE-HHH scope

• This is being partly corrected by re-scoping the HHH Network (see HHH-2004 workshop programme and plans for 2005), but properly addressing all the weak/missing topics will require additional resources

• Further R&D on pulsed magnets and optimized injector chain may justify a new request to Brussels

Page 16: CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.

F. Ruggiero HHH Network 16CERN

Possible EU NEST proposals• “Fast SC pulsed magnets” for GSI

and LHC injectors upgrade: CERN(Scandale)-GSI(Moritz)-INFN(Fabbricatore-Volpini)-CEA/Saclay(Rifflet)

• “EURODIP” (a possible NED extension): CERN-CEA/Saclay-CIEMAT

• “Electron model of FFAG”, CERN (marginally) involved for LHC

accelerator complex upgrade: UK(CCLRC-Lancaster-Liverpool-Oxford)-CERN-CEA/Saclay