Page 2: Central Water Plant Installation

Project Name

Project LocationAtlanta, Georgia

Project Team

RetailMarkets

Owner: Oliver McMillanGeneral Contractor: Balfour Beatty ConstructionArchitects: Smallwood, Reynolds, Stewart, Stewart and Associates Inc. / Gensler / Papageorge Haymes Partners

Buckhead Atlanta CentralDistrict Water Plant

Engineer: Jordan & Skala EngineersContractor: McKenney’s, Inc.

Specializations

Pipe Shop PrefabSheet Metal Shop Prefab

Building Information Modeling

Mixed-use & MultifamilyCentral Plants

Page 3: Central Water Plant Installation

McKenney’s helped revive a multi-stage project—including a central district water plant—for the Buckhead Atlanta luxury destination.

Page 4: Central Water Plant Installation

The ChallengeAmong the many complexities involved with the project, the central water plant, ductwork and plumbing needed to serve three parcels spanning one-and-a-half blocks on a busy urban street, each with a different completion schedule. This was to be accomplished using equipment that had been stored for over three years.

The SolutionTo keep everything on track, McKenney’s enlisted Building Information Modeling technology for virtual construction, coordination and clash detection between the trades. The team then installed the water plant along with prefabricated plumbing and underground piping at various stages of the project to supply the infrastructure for the entire development. McKenney’s tested and evaluated the dormantequipment—and made updates and repairs—to return them to like-new performance.

The content of this document is not intended as an endorsement.

Page 5: Central Water Plant Installation

The ResultsDespite the change in owner and designs, staggered completion schedules and the multiple city blocks scope, the project isprogressing as scheduled, on budget and is operating per design expectations.

Page 6: Central Water Plant Installation

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com