Page 1
Ord
Date In the issua And i
Follo
der in Petiti
CENT
of Hearing
e matter of Petition
nce of appr
in the matt
Everest P 1 Allian D2 Central 3 Ministry4 Power G5 Norther6 Ministry7 Himach8 H.P. Po9 Departm
owing were
1. Shri M2. Shri T3. Shri V4. Shri K
Prade5. Shri S6. Shri R7. Shri D8. Shri Ja9. Shri A10. Ms. R
ion No. 259
TRAL ELEC
Coram
g: 29.3.201
f
under Secropriate /ne
ter of
Power PrivaVs
Duhangan hElectricity
y of Power, Grid Corporn Regionaly of Power, hal Pradeshower Transmment of Fo
e present:
M.G.RamchTarun Johri,Vikas SinghKulbir Singhesh S. K. BhowmR.S.N.P. AcD. P. Sinha,aideep Lak
Ankur Guptaanjitha, EP
9/2010
CTRICITY NEW
Petition Nalo
IA No.4/2
m: Dr. Pram Shri S.J Shri V.S Shri M.D
1
ctions 60 ecessary di
ate Limited
hydro PoweAuthority, NNew Delhiration of Indl Load DespGovt. of H
h State Elecmission Coorest, Govt.
andran, Ad Advocate f, Senior Adh Chauhan
mick, EPPLchanta, EPP EPPL
khtakia, EPPa, EPPL
PPL
REGULAT
W DELHI
No. 259/20ongwith 2011 & 5/2
mod Deo, CJayaramanS.Verma, MDeena Day
and 79 ofrections to
er Limited, New Delhi
dia Ltd., Gpatch Cent
Himachal Prctricity Boarorporation L. of Himach
dvocate for for the petit
dvocate for , Dy. Distri
L PL
PL
TORY COM
009
011
Chairperson, MemberMember alan, Mem
Date
f the Electhe respon
… P
Noida
urgaon re radesh rd, Shimla
Ltd., Shimlahal Pradesh
the petitiontioner the Responict Attorney
Pa
MMISSION
on
mber
e of Order:
ctricity Actdents.
Petitioner
h, Shimla ..
Respo
ner
ndent No.1 y, Govt. of
age 1 of 27
1.6.2011
,2003 for
. ndents
Himachal
7
Page 2
Ord
engag
Hydro
Opera
Powe
imple
of Him
1 per
Resp
statio
prese
seeki
der in Petiti
11. Shri U12. Shri S13. Shri P14. Shri S15. Shri R16. Ms. Jy
The Petit
ged in exe
o Electric P
ate and Tr
er Limited is
ementation
machal Pra
rtains to th
ondent No.
on to the s
ent petition
ng direction
(a) Th
tra
the
Hy
(b) Th
an
ion No. 259
U. C. DubeySumit Garg,Praveen, ADS. Thulasi NR. C. Kaundyoti Prasad
ioner, Ever
ecuting, imp
Project in
ransfer bas
s another g
of 192 MW
adesh. The
he use of 2
. 1 by the p
ub-station
under Sect
ns/clarificat
e methodo
ansmission
e petitioner
ydro Electric
e methodo
d ADHPL f
9/2010
y, ADHPL ADHPL
DHPL Naik, ADHPdal, Govt. of, NRLDC
O
rest Power
plementing,
Kullu Distr
sis. The Re
enerating c
W Allain Duh
dispute be
220 kV D/C
petitioner fo
of PGCIL
tion 60 of th
tions on the
ology and
charges b
r and AD
c Project (A
ology of sh
for use of th
L f Himachal
RDER
Private Lim
, and deve
ict of Hima
espondent
company en
hangan Hyd
etween the
C ADHEP-
or evacuatio
at Nalagar
he Electricit
e following i
process
by the petiti
DHPL of 22
ADHEP)-Na
haring of e
he said line
Pradesh
mited, a ge
eloping a 2x
achal Prad
No.1, Alla
ngaged in t
dro Electric
Petitioner a
Nalagarh T
on of powe
rh. The pet
ty Act, 2003
issues:
for compu
oner and A
20 kV D/
alagarh tran
nergy loss
;
Pa
nerating co
x50 MW M
esh on Bu
in Duhang
he develop
c Project in
and Respon
Transmissio
er from its g
titioner has
3 (“the 2003
utation and
ADHPL, fo
/C Allian D
nsmission li
es by the
age 2 of 27
ompany is
Malana –II
uild, Own,
an Hydro
pment and
the State
ndent No.
on line of
generating
s filed the
3 Act”) for
d sharing
or use by
Duhangan
ine;
petitioner
7
Page 3
Ord
2. A
issue
limite
der in Petiti
(c) Th
de
(d) Th
pri
(e) Th
co
AD
is t
(f) Sc
Ma
of
(g) All
(TS
Co
sys
on
Sy
(h) A d
(i) An
the
After hearin
d notice to
d to the qu
ion No. 259
e method
termination
e method
ority of use
e operation
nstructed b
DHEP-Nala
to be LILOe
cheduling, m
alana-II HE
the respect
commerci
SA) betwe
ommission`
stem and s
the IEGC
ystem.
direction to
ny other ord
e facts and
ng the petit
o the respo
estion of ju
9/2010
and proc
n of the cap
and proce
e by the pet
n and cont
by the pet
garh transm
ed for evac
metering an
P and ADH
tive genera
al aspects
een ADHPL
s regulatio
scheduling
C and RLD
both partie
der that the
circumstan
ioner on 23
ondents. Th
urisdiction o
cess to be
pital cost o
ess to be
titioner and
trol of 132/
titioner and
mission line
uation of th
nd account
HEP by NR
ator;
of the Tra
L and EP
ns applicab
and opera
DC norms
es to conclu
e Commissi
nces of the
3.9.2010, w
he Respon
of the Comm
e adopted
of the said li
adopted f
ADHPL fo
220 kV su
d at which
e being con
he power by
ting of the
RLDC at the
ansmission
PL should
ble for inte
ational issue
for Inter
ude the TSA
ion may de
case.
we had adm
ndent No. 1
mission to e
Pa
for calcula
ine;
for ascerta
or the said
ub-station a
h point the
nstructed b
y Malana-II
power gen
e individual
Service A
be based
r-State tran
es should
State Tran
A within two
eem fit and
itted the pe
1 filed a s
entertain th
age 3 of 27
ation and
aining the
line;
at Chhaur
e 220 kV
by ADHPL
HEP;
erated by
periphery
Agreement
d on the
nsmission
be based
nsmission
o weeks.
proper in
etition and
hort reply
he petition
7
Page 4
Ord
under
Load
petitio
subm
includ
Hima
28.10
of tra
Resp
accor
regula
and s
Inter-
vide a
3.
No.1
the p
before
the q
Applic
No. 5
the IA
der in Petiti
r section 60
Despatch
oner as qu
mitted that
ding meterin
chal Prade
0.2010 has
ansmission
ondent No
rdance with
ations of C
sharing of
State Tran
affidavit dat
During the
submitted
petition sinc
e proceedin
uestion of j
cations, na
5/2011 seek
As on 8.3.2
ion No. 259
0 or 79 of t
Centre ha
uoted in s
all operat
ng and sch
esh Power
submitted
n corridors
o.1 should
h the bench
CERC conce
transmissio
smission S
ted 18.11.2
hearing on
that the Co
ce the tran
ng to the m
jurisdiction.
amely IA No
king interim
2011. Respo
9/2010
the 2003 A
as filed a r
sub-para (f
tional and
heduling etc
Transmissi
that keepin
s in Hima
d execute
hmarks and
erning dete
on charges
System (IST
2010.
n 7.12.2010
ommission
nsmission l
merits of the
. Subsequ
o. 4/2011 s
m reliefs. No
ondent No.
Act. Respo
reply with
f) of the p
commerc
c., shall be
ion Corpora
ng in view t
achal Prad
Transmis
d conditions
ermination o
s and loss
TS). The p
0, the learn
does not h
ine is a de
e case, the
uently, the p
seeking am
otices were
.1 filed its r
ondent No.5
response t
preceding
ial coordin
at Nalagarh
ation Limite
the need fo
desh, the
ssion Serv
s imposed
of tariff of t
es by vari
petitioner h
ed counse
ave the jur
edicated tra
Commissio
petitioner fi
mendment o
e issued to
reply to the
Pa
5, Northern
to the pray
paragraph
nation with
h. Respond
ed in its re
or optimum
petitioner
vice Agree
under the
the transmi
ous benefi
as filed its
l for the Re
risdiction to
ansmission
on should fi
led two Inte
of the petitio
the respon
IAs vide it
age 4 of 27
Regional
yer of the
and has
h NRLDC
dent No.8,
eply dated
utilization
and the
ement in
prevailing
ssion line
iciaries of
rejoinder
espondent
o entertain
n line and
rst decide
erlocutory
on and IA
ndents on
ts affidavit
7
Page 5
Ord
dated
on 29
4. Th
Electr
seeki
couns
sectio
the C
Act t
Proce
purpo
jurisd
try an
5. R
subm
Centr
1999
averre
has b
issue
Comm
Resp
under
der in Petiti
d 15.3.2011
9.3.2011 on
he petitione
ricity Regu
ng amendm
sel for the
on 60 of the
Commission
to entertain
eedings of t
ose of inc
iction unde
nd adjudicat
Responden
mitted that th
ral Electrici
(hereinafte
ed any def
been plead
raised in
mission has
ondent No.
r section 60
ion No. 259
and the P
n the mainta
er has filed
ulatory Com
ment to the
petitioner
e 2003 Act,
n has the ju
n the peti
the same d
corporating
er section 7
te the issue
t No.1, AD
he applicat
ty Regulato
er “Conduct
fect or erro
ded which
the petiti
s reserved
.1 has furth
0 of the 20
9/2010
etitioner ha
ainability of
d IA No.4/2
mmission(C
e cause title
submitted
he had arg
urisdiction u
tion which
ate. The pe
its conten
79(1)(c),(d)
e raised in t
DHPL in it
tion is not m
ory Commi
t of Busine
or in the pr
necessitate
ion and th
its order a
her submitte
003 Act whe
as filed its re
f the IAs an
2011 under
Conduct of
e and para
that thoug
gued during
under secti
h was also
etitioner ha
ntions in
and (f) and
the petition
ts reply da
maintainab
ssion (Con
ss Regulat
roceedings
e the amen
he applicat
after extens
ed that the
ereas by vi
ejoinder. Th
d on the m
Regulation
Business)
45 of the p
gh the petit
g the hearin
on 79(1)(c)
o recorded
s filed the I
respect of
d section 6
.
ated 15.3.2
le under R
nduct of Bu
tions”) as th
. Moreover
ndment for
tion has b
sively hear
petitioner
rtue of the
Pa
he matter w
erits of the
n 114 of th
) Regulatio
petition. Th
tion was fi
ng on 23.9.
) and (f) of
d in the R
IA No. 4/20
f the Com
60 of the 20
2011 to th
Regulation 1
siness) Re
he petitione
r, no new f
r adjudicati
been filed
ring the pa
had filed th
present ap
age 5 of 27
was heard
case.
he Central
ons, 1999
e learned
led under
.2010 that
f the 2003
Record of
011 for the
mmission’s
003 Act to
e IA has
114 of the
gulations,
er has not
fact/event
on of the
after the
rties. The
he petition
pplication,
7
Page 6
Ord
the pe
differe
basic
petitio
6. W
with r
7. Th
Howe
on 23
sectio
read
inter-
note
was i
short
12.11
reply
sectio
7.12.2
Comm
that t
79 o
Resp
der in Petiti
etitioner is
ent section
ally in the n
oner had no
We have co
regard to th
he petitione
ever, during
3.9.2010, th
on 60 of the
with sectio
State Trans
of the subm
ssued to th
reply con
.2010. It
that “the is
on 79 or se
2010, the
mission in w
the petition
f the Act.
ondent No
ion No. 259
invoking th
n viz. sect
nature of re
o case eithe
onsidered t
e admissib
er had initia
g the cours
he learned
e 2003 Act,
on 79(1)(c)o
smission Sy
missions of
he responde
nfined to th
has been a
ssues raised
ection 60 of
matter wa
which the l
was neith
Thus bot
.1 has argu
9/2010
he jurisdictio
tion 79(1)(
ejoinder to t
er under se
he submiss
bility of the I
lly filed the
e of argum
counsel fo
, the petitio
of the 2003
ystem as p
f the petitio
ents to file
he questio
averred by
d in the pre
f the 2003 A
as argued
learned cou
er maintain
th in the
ued on the
on of the C
(f) of the
the case of
ection 60 or
sion of the
IA for amen
petition un
ment at the
or the petiti
on was main
3 Act since
per the defin
oner, the pe
their replies
on of jurisd
the Respo
esent petitio
Act.” Durin
on the q
unsel for th
nable unde
written ple
question o
ommission
2003 Act.
f the Respo
r section 79
petitioner a
ndment of th
nder section
admission
oner subm
ntainable u
the transm
nition of IST
etition was
s. The Res
diction vide
ondent No.
on do not fa
g the heari
question of
he Respond
r section 6
eadings an
of maintaina
Pa
under an a
The appl
ondent No.
9 of the 200
and respond
he petition.
n 60 of the
stage of th
mitted that a
nder sectio
mission sys
TS in the Ac
admitted a
spondent No
e its affida
1 in para
all within the
ng of the p
f jurisdictio
dent No.1 s
60 nor unde
nd oral su
ability of th
age 6 of 27
altogether
ication is
1 that the
03 Act.
dent No.1
2003 Act.
he petition
apart from
on 79(1)(f)
tem is an
ct. Taking
and notice
o.1 filed a
avit dated
22 of the
e ambit of
petition on
on of the
submitted
er section
ubmission,
he petition
7
Page 7
Ord
under
seeks
record
in this
the s
petitio
60 of
No.1
as du
on 29
jurisd
amen
petitio
in the
8. B
decid
Electr
raised
Juris
9.
down
chron
der in Petiti
r section 7
s to amend
d its case u
s respect.
submission
on is maint
the 2003 A
has also ex
uring the he
9.3.2011.
iction in the
ndment of t
on under S
e petition. T
Before we c
ed is whet
ricity Act, 2
d in the pet
sdiction of
For decidin
the factua
nological se
ion No. 259
79 of the A
d the cause
under secti
In our vie
of the pe
ainable und
Act under w
xtensively d
earing of th
It is for
e matter an
the petition
ection 79 o
The IA No. 4
consider th
ther the Co
003 or the
tition.
the Comm
ng the que
al matrix as
equence of
9/2010
Act. By virt
e title and p
ion 79 of th
ew, the Com
etitioner du
der section
which the ap
dealt with s
he petition o
the Comm
nd if so, und
, the Comm
of the Act in
4 of 2011 is
he petition o
ommission
regulations
mission
stion of jur
s culled ou
events are
ue of filing
para 45 of t
he 2003 Ac
mmission ha
uring the h
n 79 of the
pplication h
section 79 in
on 7.12.20
mission to
der which p
mission is w
n addition S
s disposed
on merit, th
has the ne
s made ther
risdiction, w
ut from the
as under:
g IA No. 4/
the petition
ct and to ob
as already
hearing on
2003 Act i
has been file
n its reply to
10 and also
decide as
provision of
within its po
Section 60
of accordin
he first issue
ecessary ju
reunder to d
we conside
e pleadings
Pa
/2011, the
in order to
bviate any
taken cogn
23.9.2010
n addition t
ed. The Re
o the petitio
o during th
s to wheth
f law. Witho
ower to con
of the Act a
ngly.
e which ne
urisdiction u
deal with th
r it necess
s of the pa
age 7 of 27
petitioner
o bring on
confusion
nizance of
0 that the
to section
espondent
on as well
e hearing
er it has
out formal
nsider the
as prayed
eeds to be
under the
he dispute
ary to lay
rties. The
7
Page 8
Ord
der in Petiti
(a) Evere
engaged in
II Hydro E
Own, Oper
(ADPHL)
implementa
Hydro Elec
Build, Own
(b) As per
Electricity A
public and
tributaries
ADHEP an
Power Grid
Power Grid
and Kol Da
(c) Centra
39 dated
underElect
Power Gri
adequacy
accordingly
pooling poi
ion No. 259
est Power
n executing
lectric Proj
rate and Tr
is also a
ation, deve
ctric Projec
n, Operate a
the power
Authority a
d private
of Beas Ri
nd Malana I
d at Panars
d for evacu
am HEP of
al Electricity
20.8.2002
tricity (Supp
id after de
of land
y, the decis
int instead o
9/2010
Private Li
, implemen
ject in Kull
ransfer bas
a generat
lopment an
ct(ADHEP)
and Transfe
r evacuatio
and Powerg
sector hy
ver in Kullu
I HEP were
sa/Banala w
uation of po
NTPC.
y Authority
accorded
ply) Act, 19
etailed rou
for constr
sion to take
of Allain Du
imited (EP
nting and de
u District o
is. Allain D
ting comp
nd operatio
in Kullu D
er basis.
on arrangem
grid Corpor
ydro powe
u Valley, se
e to termina
which was p
ower from P
in its letter
techno-ec
948. As pe
te survey
ruction of
e the line fr
uhangan to
PL) is a g
eveloping th
of Himacha
Duhangan H
pany enga
n of 2x96 M
istrict of H
ment envisa
ration of Ind
r projects
eparate tran
ate at 400 k
planned an
Parbati II a
File No.2/H
conomic cle
er para 4(v
was requ
Parbati
rom Allain D
Nalagarh w
Pa
generating
he 2x50 MW
al Pradesh
Hydro Powe
aged in e
MW Allain D
imachal Pr
aged by th
dia Limited
coming u
nsmission l
kV Pooling
d construct
nd III HEP
HP/18/96-P
earance to
vii) of the s
ired to co
pooling po
Duhangan t
was to be r
age 8 of 27
company
W Malana
on Build,
er Limited
execution,
Duhangan
radesh on
he Central
d for large
up in the
lines from
Station of
ted by the
of NHPC
PAC/8108-
o ADHEP
said letter,
onfirm the
oint, and
to Parbati
eviewed.
7
Page 9
Ord
der in Petiti
(d) On 1
long term o
commissio
commissio
No.1 appro
14.8.2006
Panarsa p
Responden
PGCIL gra
(e) Minis
accorded i
overhead
Governme
107/2007-F
termination
Electricity A
Power for
following co
(i) Wh
Nala
is ap
by P
ion No. 259
8.7.2005,
open acces
ning sche
ning of AD
oached Ce
informed P
pooling st
nt No.1 a
nted conne
stry of Pow
its approva
lines up t
nt of India
FC dated 1
n of the de
Authority w
grant of s
onditions to
hile finalizin
agarh 220 k
ppropriately
POWERGR
9/2010
Responden
ss. PGCIL
edule of P
DHEP. Con
entral Elect
PGCIL that i
tation, the
at Nalagar
ectivity to A
wer, Gover
al under se
to Nalagar
a accorded
5.4.2009 a
dicated tra
while recomm
sanction un
o be compli
ng the corr
kV D/C line
y co-ordina
RID for the
nt No.1 ma
in its lette
Panarsa w
nsequent t
tricity Auth
if there was
n connect
rgh inter-c
DHEP at N
nment of I
ection 68
h. Ministry
d forest c
nd No.8-10
nsmission
mending th
nder sectio
ied with by
ridor of the
e, ADHPL s
ated with re
e 400kV tr
de an appl
r dated 1.8
would not
o the said
ority who v
s any delay
tivity shou
onnection
Nalagarh.
ndia in its
of the Act
y of Enviro
clearance v
09/2008-FC
line at Nal
he case of A
on 68 of th
ADHPL:
e proposed
should ensu
espect to th
ransmission
Pa
lication to P
8.2005 info
coincide
d letter, Re
vide its let
y in commis
uld be gr
point. Ac
letter No.2
t for constr
onment an
vide letter
C dated 15.5
agarh. Th
ADHPL to M
he Act had
d Allain Du
ure that the
he corridor
n lines in
age 9 of 27
PGCIL for
rmed that
with the
espondent
tter dated
sioning of
ranted to
ccordingly,
21.8.2007
ruction of
d Forest,
Nos. 8-
5.2009 for
he Central
Ministry of
d put the
hangan –
ir corridor
identified
the area
7
Page 10
Ord
der in Petiti
plan
Kold
(ii) Ou
line, A
and t
made
Parba
(f) The pet
7.5.2005 w
be delivere
grid locate
Agreement
design sale
Term Open
kV bus of P
(g) The
access to
station of P
the Parbati
up the tran
A meeting
which was
EPPL and
ion No. 259
nned for the
dam HEPs.
ut of the tot
ADHPL wo
the balance
e available
ati/Beas val
titioner had
with PTC fo
ed at the pro
ed at Pan
t with Punj
eable energ
n Access fo
Parbati Poo
e petitioner
ADHEP be
Power Grid
i II HEP, ap
nsmission n
was conv
s attended
PTC and it
9/2010
e evacuatio
tal 400 MW
ould utilize
e spare tra
for evacua
lley viz, Ma
d entered i
or supply of
oposed 220
narsa/Bana
jab State E
gy from the
or injection
oling station
after comi
eyond the
at Nalagar
pproached
network for
vened by C
by the rep
t was decid
on of power
W transmiss
192 MW fo
ansmission
ation of po
alana – II (1
nto a Pow
f power fro
0/400 kV P
la. PTC h
Electricity B
e Malana II
of power f
n.
ng to know
power deli
rh due to sl
the Centra
evacuation
Central Ele
presentative
ed as unde
r from Parb
sion capaci
or evacuatio
capacity o
wer from o
00 MW) AN
er Purchas
om Malana
arbati Pool
has execu
Board for s
HEP. PTC
from Malan
w that PGC
very point
ippage in th
l Electricity
n of power f
ctricity Aut
es of PGCI
er:
Pag
bati II, Parb
ty of the 22
on of ADH
of the line
other projec
ND Sainj (1
se Agreem
II HEP wh
ling Station
ted a Pow
sale of the
C was gran
na II HEP a
IL had gran
of 400/220
he commis
y Authority f
from Malan
thority on 1
L, HPSEB
ge 10 of 27
bati III and
20kV D/C
PL power
would be
cts in the
00MW).
ent dated
ich would
of Power
wer Sale
complete
ted Long
at the 400
nted open
0 kV sub-
sioning of
for firming
na II HEP.
10.4.2008
, ADHPL,
7
Page 11
Ord
der in Petiti
“a.theto eb. AtheNalMac. sennotindHoevad. ADwel
(h) Minis
dated 17.6
as under:
“I aon theunder 132 kVwith 2constrChairmproceeline ofown ckV D/CAllain line w
(i) In pursu
CEA on 1
14.8.2008
power of M
line subjec
(j) In a m
Pradesh o
ion No. 259
. Malana-II weir power throestablish 220/ADHPL and E
e modalities folagarh line a
alana II HEP. If ADHPL
nt to CEA andt able to agre
dividual propowever, in anyacuation systeADHPL woul
DHEP-Nalagarll. CEA would
stry of Pow
6.2008 acco
am directed toe above subjesub-section (
V line for eva220 kV D/Cructing as 1man, CEA oed to tie up ef ADHPL. Th
cost on one cC line from MDuhangan-Nould be the d
uance of th
0.4.2008,
wherein A
Malana II H
t to comme
meeting ta
on 19.11.2
9/2010
without any furugh 220 kV A/132 s/s at thEPPL would or agreement and also its
and EPPL ad both partiesree on a proposal to CEA ay case, both pem in the reqld take up therh line with Ed extend all s
wer, Govern
orded appro
o refer to Eveect and to c(1) of sectionacuation of p
C Allain Duh132/220 kV sn 10.4.2008 evacuation o
hey would necircuit of the Malana II HENalagarh linededicated sy
e decision
the repres
ADHPL exp
HEP on AD
ercial settlem
ken by Ch
2008, it w
rther delay shADHEP-Nalageir own cost. have a joint
t on the sharinO & M char
rrive at an ags should procposal, both Aand a meetingparties shoulduired time fra
e issue with CEPPL for evacsupport to AD
nment of In
oval to EPP
erest Power convey prior an 68 of the Elower of Malahangan-Nalasubstation a
wherein it of their poweeed to establ
220 kV AllaiEP to the 220e. The 220/13ystem of the
in Minutes
sentatives o
pressed its
DPHL’s 220
ment and C
hief Secret
was agreed
hould proceedgarh line of A meeting on 2ng of the costrges for evac
greed proposeed accordin
ADHPL and Eg could be hd proceed to eame. CERC regardicuation of powHPL to obtain
ndia in its l
PL under s
Private Limiteapproval of tlectricity Act, ana II HEP aagarh line nas discussed
was decideer through 22lish 220/132 in Duhangan
0/132 kV sub32 kV sub-stagenerating c
of Meeting
of ADHPL
no objecti
kV Allain
CERC’s app
ary, Gover
d by ADH
Pag
d to tie up evDHPL. They
23rd April 200t for the 220 kcuation of th
sal, the samegly. HoweverEPPL shouldeld to resolveensure compl
ing sharing ofwer from Malan approval of
etter No.11
section 68 o
ed’s letters dthe Central G2003 for con
and its inter-cnear tower
in a meetind that Mala20 kV ADHEPkV sub-stati
n-Nalagarh lib-station on 2tation as welcompany.”
g taken by C
and EPPL
ion to eva
Duhangan-
proval.
rnment of
HPL that
ge 11 of 27
vacuation of would need
08 to decide kV ADHEP-e power of
e should be r, if they are d send their e the issue. letion of the
f the 220 kV ana HEP as CERC.”
1/4/07/PG
of the Act
dated 8.5.08 Government nstruction of connection no.159 by
ng taken by ana should P-Nalagarh ion at their ine and 132 220 kV D/C ll as 132 kV
Chairman,
L met on
cuate the
-Nalagarh
Himachal
after the
7
Page 12
Ord
der in Petiti
commissio
inject pow
Nalagarh w
conditions.
(k) Additio
Pradesh in
to Senior
Environme
favour of A
transmissio
recommen
“As theyou fointendei. AD Hthis 40to HPTx v. generaconditi
(l) Based
Environme
15.4.2009
(Conservat
transmissio
ion No. 259
ning of 40
er at Pana
would be ha
onal Chief
n its letter N
Asstt Insp
ent Govern
ADHPL for
on line from
ded:
e proposal ar consideratioed to pool anHydro shall in
00 kV pooling TCL on mutua x AD Hydro
ated by M/s Eions.”
d on the rec
ent and Fo
and 15.5.2
tion) Act, 1
on line from
9/2010
0 kV pooli
arsa poolin
anded over
Secretary (
No.FFE-B-
pector Gen
ment of In
diversion
m Pirni to N
ttracts the pron and approd reduce the nject its powpoint by PGC
ally agreed te x
o shall also cEverest Powe
commenda
orest, Gove
009 accord
980 for fo
m Pirni to Pa
ng point a
ng station
r to HPTCL
(Forests) to
F(2)-63/200
neral of Fo
ndia, has
of forest la
Nalagarh. I
rovisions of Foval subject tnumber of tra
wer at PanarsaCIL and line brms and cond x
carry/transmiter at Malana I
ations of the
ernment o
ded approva
rest cleara
anarsa to N
t Panarsa
and the lin
L on mutual
o the Gove
08 dated 9
orest, Minis
conveyed
and for lay
n the letter
FCA, 1980, thto the followiansmission coa pooling aftebeyond Panarditions. x
t on this tranII HEP on mu
e State Gov
of India vid
al under se
nce for lay
Nalagarh.
Pag
by PGCIL
ne from Pa
lly agreed t
ernment of
9.12.2008 a
stry of For
forest clea
ying the 22
r, the follow
he same is sing conditionsorridors in theer the commrsa shall be h
x smission line
utually agreed
vernment, M
de its lette
ection 2 of t
ying the 22
ge 12 of 27
, it would
anarsa to
terms and
Himachal
addressed
rests and
arance in
0 kV D/C
wing were
submitted to s which are e valley. issioning of
handed over
e the power d terms and
Ministry of
ers dated
the Forest
0 kV D/C
7
Page 13
Ord
der in Petiti
(m) In a m
3.9.2009, t
issues betw
“(i) Aportionerectin(ii) SincontrolEPPL. operat(iii) ThD/C liinstall(iv) Thdone a
(n) T
transmissio
pooling sta
HPPTCL w
Engineer (
HPPTCL a
termination
pooling sta
power sha
commercia
establishm
delivery po
pooling sta
these lines
ion No. 259
meeting tak
the followin
ween ADHP
ADHPL shall fn and the fong agency to Ence the propol/ownership oHowever, AD
tion. he transmissine will be sled generatiohe control/opeas per the inst
he questio
on system
ation of Po
was discus
(SP&PA) o
and put up
n of 220 Alla
ation, it wa
all be limite
al agreeme
ent of term
oint of Ma
ation. Both A
s.
9/2010
ken by Mem
g decisions
PL and EPP
furnish the deoundations anEPPL. The coosed 220/132of O&M of prDHPL also m
sion charges shared betw
on capacity.eration of 220tructions of S
on of ter
at Panars
ower Grid w
sed in a m
of CEA an
a proposa
ain Duhang
as decided
ed to Pana
ent betwe
mination of
lana would
ADHPL and
mber(PS),
s regarding
PL were tak
esign details nd also intimonstruction of2 kV Chhaur roposed 220/
may depute the
between theween ADHPL
0 kV circuit bSLDC.”
mination o
sa upon c
which has
meeting un
nd ADHPL
al to CEA
gan-Nalaga
that ADH
arsa poolin
een ADHP
Allain Nala
d get shifte
d EPPL agr
Central Ele
g the moda
ken:
of the dead mate the namf LILO portionS/S will be co/132 kV Chhaeir person for
e Allain DuhaL and EPPL
breakers for
of Allain
commission
been comm
der the ch
was advis
and PGCIL
arh transmis
HPL’s liabili
g station o
PL, HPPTC
agarh D/C
ed from N
reed to ente
Pag
ectricity Au
lities/solutio
end towers fme of the sun will be done onstructed byaur S/S will rr 220 kV S/S
angan NalagL in proport
regulating po
Duhangan-
ning of the
mitted by A
airmanship
sed to inte
L. As regar
ssion line a
ty to whee
of PGCIL s
CL and E
line at Pan
alagarh to
er into agre
ge 13 of 27
thority on
ons to the
for the LILO upplier and by EPPL.
y EPPL, the remain with control and
garh 220 kV tion to the
ower flow is
-Nalagarh
e 400 kV
ADHPL to
p of Chief
eract with
rds future
t Panarsa
el EPPL’s
subject to
EPPL for
narsa and
Panarsa
eement on
7
Page 14
Ord
der in Petiti
(o) In
ADHPL a
expeditious
connection
connection
(i) (ii) (iii)
(iv)
(v) (vi)
(p) Th
insistence
the prevaili
(q) On
meeting wh
“(i) Tconcexige (ii) Wthat thavinto. (iii) Wacco
ion No. 259
the meetin
and EEP
sly. Pursu
n agreemen
n agreemen
Return on
Cost of 22
Absolute by EPPL
Priority toADHEP-N
Schedulin
4% additMALANA
e inter-con
by ADHPL
ing norms.
n 12.5.2010
herein it wa
The issue of erned Load
encies in publ
With regard tothe sub-stationg a supervis
With regard tounts for third
9/2010
ng taken b
L should
ant theret
nt on 31.0
nt are as un
n Equity : 3
20 kV ADH
control of 1to remain w
o be with ANalgarh line
ng & dispatc
ional loss toII HEP.
nnection ag
L to enforce
0, Joint Se
as agreed a
right to use Dispatch Ce
lic interest.
o the control on belonged toor from ADHP
o sharing of td party inspe
by Director
finalize
to, ADHPL
03.2010. Th
nder:
% higher th
EP-Nalaga
32/220 kV with ADHPL
DHPL in cae.
ch of Malan
o be deduc
greement c
e its terms
ecretary, M
as under:
the transmisentre, which
over 220 kVo EPPL and tPL along with
transmission ection so tha
, HPPTCL
inter-conn
L furnishe
he main fe
han CERC
arh line: Rs.
Chhaur suL.
ase of outag
na-II HEP b
cted from ge
could not b
and condit
Ministry of
ssion capacitwould decid
V sub-station the solution sh the staff of E
charges, ADHat the transm
Pag
it was ag
nection a
ed the dr
eatures of
norms
. 2.2 crores
bstation es
ge of one c
by ADHPL.
eneration o
be conclude
tions in dis
Power con
ty should bede the priorit
at Chhaur, ituggested by EPPL should
HPL agreed tmission charg
ge 14 of 27
greed that
agreement
raft inter-
the inter
s per km.
stablished
circuit of
of
ed due to
sregard of
nducted a
e left to the ties on the
t was noted the CEA for be adhered
to show the ges can be
7
Page 15
Ord
10.
above
Sectio
for s
conne
the A
11. T
gener
enters
which
79 (1
transm
gener
der in Petiti
deterRLDC (iv) Tjoin CER
Against th
e, the petit
on 79 (1)(c
eeking ap
ection and
Act are extra
“Section 60The Approappropriategenerating or enters ineffect on co Section 79. (1) The Cen…… (c) to regula……. (f) to adjudilicensee in refer any di
Thus the C
rating com
s into agre
h has an ad
1)(c) confe
mission of
rating comp
ion No. 259
rmined in a reC’s in this reg
The CEO, POthe meeting C”
e factual
tioner has
c) read with
propriate d
other relief
acted as un
0. (Market doopriate Comme to a licenscompany entnto a combinompetition in e
Functions of
ntral Commis
ate the inter-S
icate upon diregard to m
ispute for arb
Commission
pany or a
eements or
dverse effe
ers the po
electricity
pany or tran
9/2010
ealistic manngard.
OSOCO who suggested t
matrix as
invoked th
Section 79
directions
fs. The prov
nder:
omination): mission maysee or a geters into any anation which electricity ind
f Central Com
ssion shall dis
State transmis
isputes involvatters connecitration;”
n has the p
licensee
r into comb
ect on the c
ower on t
and sectio
nsmission l
er, both the p
had also beethat the issu
discussed
he jurisdict
9(1)(f) of the
upon Res
visions prov
y issue suchenerating coagreement oris likely to c
dustry
mmission :
scharge the fo
ssion of elect
ving generatincted with cla
power to iss
if such lice
binations or
competition
the Comm
on 79(1)(f)
icensee.
parties can co
en requestedue of priority
in the fo
tion of the
e Act and S
pondent N
visions of s
h directions ompany if sur abuses its dcause or cau
ollowing functi
tricity ;
ng companiesuses (a) to (
sue approp
ensee or g
r abuses it
n in electric
ission to
to adjudica
Pag
onsult CEA ,
d by Ministry can be dete
oregoing pa
Commissi
Section 60
No.1 to gra
ections 60
as it considuch licensee
dominant posiuses an adve
ions, namely:
s or transmiss(d) above and
priate direc
generating
ts dominan
city industry
regulate in
ate dispute
ge 15 of 27
PGCIL and
of power to ermined by
aragraphs
ion under
of the Act
ant inter-
and 79 of
ders or ition erse
:-
sion d to
ctions to a
company
nt position
y. Section
nter-State
involving
7
Page 16
Ord
12. T
opera
case
raised
the A
Resp
gener
the te
mutua
that t
respe
Comm
60 of
Resp
domin
Comm
releva
such
in the
been
Resp
13.
docum
beyon
der in Petiti
The Respon
ation of Sec
as the Res
d in the pet
Act. It has
ondent No
rating statio
erms and
ally agreed
he parties
ect of use o
mission. Re
f the 2003
ondent wa
nant positi
mission sh
ant market,
dominant p
e relevant m
able to m
ondent No.
The petitio
ments and
nd doubt th
ion No. 259
ndent in its
ction 79 (1)
spondent n
tition falls w
been subm
o.1 can be
ons, namel
conditions
d through n
are within
of the dedic
espondent
Act, the C
as in a do
on is bein
all be req
, the domin
position by
market. Ac
make out a
. 1 for abus
oner in its r
minutes o
he fact that
9/2010
reply has
) (f) of the 2
o. 1 is neit
within the a
mitted that
e used as
y, that of t
for evacu
egotiations
their rights
cated transm
No.1 has f
Commission
ominant po
ng abused
uired to c
nant positio
Responde
ccording to
a case un
sing its dom
rejoinder ha
of the meet
t Responde
submitted
2003 Act ha
ther a trans
ambit of Se
the dedic
the dedica
he petitione
ation of po
s. Respond
s to negotia
mission line
further subm
n has to ar
sition in th
d by Resp
conduct an
on of the R
nt No.1 an
Responde
nder Sectio
minant posit
as submitte
ting held o
ent No.1 ha
that none
ave been fu
smission lic
ection 79 (1
cated trans
ated transm
er and Res
ower of th
ent No.1 h
ate the term
e without th
mitted that
rrive at the
he relevant
pondent No
investigat
espondent
d its impac
ent no.1, th
on 60 of t
ion.
ed that peru
over the las
as already
Pag
of the cond
ulfilled in th
censee nor
) (c) or 79
mission lin
mission line
spondent N
e petitione
as further
ms and con
he intervent
for invokin
conclusion
t market; a
o.1. For th
tion as reg
No. 1, the
ct on the co
he petitione
the Act ag
usal of vario
st three ye
been conf
ge 16 of 27
ditions for
he present
the issue
(1) (d) of
ne laid by
e for two
No. 1, and
er can be
submitted
nditions in
tion of the
g Section
n that the
and such
hese, the
gards the
abuse of
ompetition
er has not
gainst the
ous letters,
ears prove
ferred with
7
Page 17
Ord
the r
petitio
transm
Resp
utilize
area.
Electr
by LIL
14.
both p
Powe
the e
valley
CTU
accou
the tr
Powe
delay
evacu
under
transm
the c
plan f
der in Petiti
esponsibilit
oner which
mission lin
ondent No
ed for evac
The petitio
ricity Autho
LO of one c
On consi
petitioner a
er Grid were
vacuation r
y of the Sta
for injectin
unt of the d
ansmission
er Grid, it
yed. After a
uation plan
r Section
mission line
orridor con
for all gene
ion No. 259
ty of evac
h falls in
e cannot b
.1 and the
cuation of p
oner has fur
ority, the ev
circuit of All
deration of
and Respon
e planned t
requiremen
ate of Hima
ng power in
delay in the
n lines by C
was inform
a joint mee
, CEA reco
68 of the
e till Nalaga
nstraints in
erators in th
9/2010
uating the
the same
be treated
said line is
power bein
rther submi
vacuation o
lain Duhang
f the factua
ndent No.1,
to extend ti
nts of the g
achal Prad
n the poolin
e commissi
CTU was de
med that th
eting with P
ommended
Act to A
arh. Centra
the region
he region w
power ge
corridor/re
as a dedi
s dedicated
g generate
itted that as
of power fro
gan 220 kV
al matrix of
it emerges
ll Panarsa
generating s
desh. EPPL
ng station
oning of Pa
elayed. Wh
he pooling
Power Grid
to the Mini
ADHPL for
al Electricit
n and the n
ho are likel
enerated by
egion and
icated tran
d to the co
ed by other
s per the M
om Malana
V D/C line.
f the case
s that the t
pooling sta
stations co
L was gran
of Power G
arbati HEP
en ADHPL
station at
d and CEA
stry of Pow
constructio
y Authority
need for a
ly to be affe
Pag
y the proje
therefore,
smission li
orridor and
r projects in
Master Plan
II HEP is e
and subm
transmissio
ation in orde
oming up in
ted open a
Grid at Pan
P, the const
applied for
Panarsa
A, with rega
wer to grant
on of its d
being fully
back-up e
ected by th
ge 17 of 27
ect of the
the said
ine of the
should be
n the said
of Central
envisaged
issions of
on lines of
er to meet
n the Kulu
access by
narsa. On
truction of
r LTOA to
would be
ard to the
t approval
dedicated
y aware of
vacuation
e delay in
7
Page 18
Ord
const
ADHP
transm
Thus
in pla
till Pa
were
transm
line o
Thoug
Nalag
purpo
till Na
15.
projec
menti
dedic
perus
prove
der in Petiti
truction of t
PL for san
mission line
“(i) While fiD/C line, Arespect to the area plHEPs. (ii) Out of thutilize 192 capacity oprojects in
s the dedica
ace of the d
anarsa as p
taken into
mission line
of Respond
gh the 220
garh transm
ose of the l
alagarh whe
Respond
ct and subs
ion that tra
cated transm
sal of vario
e that the R
ion No. 259
the transmis
ction unde
e till Panars
finalizing the ADHPL shoulthe corridor ilanned for th
he total 400 MMW for evac
of the line won the Parbati/
ated transm
developmen
planned ear
o account
e till Panars
dent No.1 t
0 kV D/C
mission line
ine is to ev
ere it is con
dent No.1 h
sequent am
ansmission
mission line
us letters,
Responden
9/2010
ssion lines
er section 6
sa, had adv
corridor of thld ensure thaidentified by Pe evacuation
MW transmisscuation of ADHould be mad/Beas valley
mission line
nt of the in
rlier. All gen
by CEA
sa have bee
to evacuat
Allian Duh
has been d
vacuate pow
nnected to t
has submit
mendment
line to be
e. The pet
documents
t No.1 has
by CTU, w
68 of the
vised Minist
he proposed Aat their corridPOWERGRID of power fro
sion capacity HPL power a
de available fviz, Malana –
e has been
nter-state tr
nerators in
at the tim
en tied up w
te power f
angan Hy
developed
wer of all g
he transmis
tted that th
issued by t
constructe
itioner in it
s and mee
been conf
while recom
Act to con
try of Powe
Allain Duhandor is appropD for the 400om Parbati II,
of the 220kVand the balanfor evacuatio– II (100 MW)
n constructe
ransmission
the region
me of plann
with the ded
from their
ydro Electri
by Respon
enerating s
ssion syste
he original
the Central
ed for Resp
ts rejoinder
tings over
ferred with
Pag
mending th
nstruct its
er as under:
ngan – Nalagriately co-ord
0kV transmiss, Parbati III a
V D/C line, ADnce spare traon of power
W) AND Sainj
ed by one
n line by Po
whose requ
ning the in
dicated tran
generating
ic Project (
ndent No.1,
stations in t
em of CTU.
TEC appro
l Electricity
pondent No
r has subm
the last th
the respon
ge 18 of 27
he case of
dedicated
:
garh 220 kV dinated with sion lines in and Koldam
DHPL would ansmission from other (100MW).”
generator
ower Grid
uirements
nter-State
nsmission
g stations.
(ADHEP)-
, the main
the region
oval of its
Authority
o.1 was a
mitted that
ree years
nsibility of
7
Page 19
Ord
evacu
within
be tre
dedic
gener
that e
ADHP
Autho
the tr
includ
letter
powe
220 k
16.
No.1.
Electr
other
Since
India
LILO
Nalag
used
State
conve
der in Petiti
uating the
n the same
eated as a
cated to the
rated by ot
even prior
PL for the
ority had re
ransmission
ding Malana
dated 24.1
er from Mala
kV D/C line.
We have
There is n
ricity Autho
generator
e, the petitio
in its sanc
of one ci
garh sub-st
by EPPL b
transmiss
eyance with
ion No. 259
power gen
region/cor
a dedicate
e corridor a
her projects
to the gran
ir ADHPL-
ecommende
n lines shou
a II. More
10.2007 tha
ana II HEP
.
considered
no doubt th
ority, the tr
rs in the re
oner has b
ction letter
ircuit of A
tation of Po
becomes a
sion system
hin the Sta
9/2010
nerated by
ridor and th
d transmis
and would
s also in th
nt of appro
Nalagarh t
ed to MOP
uld be mad
over, Powe
at the mas
P by LILO o
d the subm
hat as per t
ransmission
egion till th
been permit
under sec
Allain Duha
ower Grid,
part of the
m” under
ate which is
the projec
herefore the
ssion line.
be utilised
he said area
oval under
transmissio
that the ba
de available
er Grid has
ster plan of
of one circu
missions of
the Master
n line is re
he Nalaga
tted by Min
ction 68 of
ngan-Nalag
the portion
inter-State
2(36) of t
s incidenta
ct of the p
e said trans
The said
for evacua
a. It has be
section 68
on line, the
alance tran
e to other p
s communic
CEA envis
it of Allain
the petition
Plan envis
equired to
rh sub-stat
nistry of Po
the Act to
garh trans
n of the tra
e transmiss
the 2003
l to inter-S
Pag
petitioner w
smission lin
transmissio
ation of pow
een further
8 of the 20
e Central
smission ca
projects in t
cated to EP
saged evac
Duhangan-
ner and Re
saged by th
wheel the
tion of Pow
ower, Gove
wheel its
mission lin
nsmission
ion system
Act which
State transm
ge 19 of 27
which falls
ne cannot
on line is
wer being
submitted
03 Act to
Electricity
apacity of
the region
PPL in its
cuation of
-Nalagarh
espondent
he Central
power of
wer Grid.
rnment of
power by
ne till the
line to be
as “inter-
includes
mission of
7
Page 20
Ord
electr
68 of
the sa
to AD
whos
CEA.
from
transm
Comm
State
of the
17. T
29.3.2
during
We a
reaso
stand
the tr
Resp
gener
requir
veste
under
powe
der in Petiti
ricity. More
the Act to
anction lett
DHPL is con
e generatin
Since the
the region
mission lin
mission wh
transmissi
e Act to reg
The learne
2011 that
g outage a
are not in a
on that the
ds superced
ransmission
ondent No
rators in the
re this line
ed with the
r a statutor
er and in dis
ion No. 259
eover, perm
use the tra
ter to ADHP
nditional to
ng stations
subject tra
for injection
ne is inci
hich has be
on has the
ulate transm
d Counsel
ADHPL ha
and it can s
agreement w
e redundan
ded as per
n line will be
o.1 has a
e region. B
e for wheel
power of r
y obligation
scharge of
9/2010
mission to E
ansmission
PL under s
wheeling th
were inclu
nsmission
n into the s
idental to
een vested
jurisdiction
mission on
for Respo
as created
share this r
with the su
ncy sanctio
the latest M
e used for
liability to
Besides EPP
ling their p
regulation o
n to regulat
the said fu
EPPL in th
line of AD
section 68 o
he power o
uded in the
line has be
sub-station
inter-State
d with the r
n to issue d
the subject
ondent No.1
a redund
redundancy
ubmission o
oned in the
Master Plan
other gene
o carry th
PL, there a
power. The
of inter-Sta
te and facil
nction, the
he sanction
HPL is dee
of the Act a
of other gen
e planning p
een planned
of Power G
e transmis
responsibili
irections un
t transmiss
1 argued d
ancy to w
y with othe
of the Resp
e Techno-e
n of CEA w
erators in th
e power g
are other ge
erefore, the
ate transmis
itate inter-S
Commissio
Pag
letter unde
emed to be
and such p
nerators in t
process of
d to evacua
Grid at Nala
ssion syst
ity to regu
nder sectio
ion line.
uring the h
heel its ow
rs on its ow
pondent No
economic
which envis
he region. T
generated
enerators w
e Commiss
ssion of ele
State transm
on is of the
ge 20 of 27
er section
read into
ermission
the region
CTU and
ate power
agarh, the
tem. The
late inter-
n 79(1)(c)
hearing of
wn power
wn terms.
o.1 for the
clearance
saged that
Therefore,
by other
who would
ion being
ectricity is
mission of
view that
7
Page 21
Ord
the a
statio
grante
CTU
sectio
EPPL
12%
from
Resp
shorta
regula
Comm
transm
appro
plann
18.
Comm
Act a
neces
19.
by the
inter-
der in Petiti
applicant ha
on which is
ed by CTU
has been s
on 68 of the
L will ultima
free power
the genera
ondent No
ages of ele
ate inter-S
mission is
mission sy
opriate direc
ned and dev
In view
mission’s ju
and in the
ssary invok
The next
e Commiss
State trans
ion No. 259
as made s
s ready for
U. Now the
shifted to th
e Act to the
ately go to
r to the Sta
ating station
o. 1 will b
ectricity. Th
State tran
required to
ystem and
ctions even
veloped for
of our fin
urisdiction t
facts and
ke our jurisd
question th
sion under t
smission of
9/2010
substantial
r commerc
liability for
he Respon
e applicant.
PSEB and
ate of Him
n on accou
e a huge
he Commis
smission
o ensure f
d for that
n in respect
inter-State
nding in th
to deal with
circumstan
diction unde
herefore ari
the facts an
electricity
investment
cial operatio
making ava
ndent No.1
The powe
the end co
achal Prad
unt of the d
national lo
ssion has b
of electric
free flow o
purpose,
t of dedicate
e transmissi
he precedi
h the matte
nces of this
er Section 6
ises as to w
nd circumst
on the sub
t for setting
on on the
ailable the
in terms of
r from the g
onsumers o
desh. Non-s
dispute bet
oss espec
been veste
city which
of electricity
the Com
ed transmis
ion of powe
ng paragra
er under se
s case, we
60 of the Ac
what directi
tance of the
bject transm
Pag
g up the g
basis of t
transmissio
f the appro
generating
of Punjab a
scheduling
tween appl
cially in the
d with the
h means
y on the in
mmission c
ssion lines
er.
aph with r
ection 79(1)
e do not c
ct.
ions could
e case to en
mission line
ge 21 of 27
generating
the LTOA
on line by
oval under
station of
apart from
of power
licant and
e present
power to
that the
nter-State
can issue
which are
regard to
)(c) of the
consider it
be issued
nsure that
does not
7
Page 22
Ord
suffer
Resp
Servic
idem
(i) (ii) (iii)rem (iv)Na (v)
(vi
20.
Resp
powe
direct
and c
der in Petiti
r on acco
ondent No
ce Agreem
on the term
Return on
Cost of 22
)Absolute cmain with A
) Priority to algarh line.
Scheduling
) 4% additi
In view of t
ondent No
er of Malan
ts the partie
control of ge
(a) Conn
220 k
(b) Capimutu
appro
expe
for si
ion No. 259
ount of p
. 1 with reg
ment (TSA).
ms and con
Equity : 3 %
0 kV ADHE
control of 13ADHPL.
be with AD
g & dispatc
onal loss to
the peculia
.1(ADHPL)
na-II HEP,
es to follow
enerating st
nectivity: T
kV ADHEP
ital cost: ually decide
oved proje
enditure of t
imilar line o
9/2010
ersistent d
gard to the
. The Petit
ditions of th
% higher tha
EP-Nalagar
32/220 kV C
DHPL in cas
ch of Malan
o be deduct
ar nature of
) to the pe
the Comm
w the follow
tations and
The ADHP
-Nalagarh t
The capita
ed by EPP
ect cost of
the transmi
of CTU.
difference
terms and
tioner and
he –TSA on
an CERC n
rh line: ` 2.2
Chhaur sub
se of outag
a-II HEP by
ted from ge
the case w
titioner (EP
mission afte
wing proce
d transmissi
PL shall pro
transmissio
al cost of
PL and AD
f the trans
ssion line,
between
conditions
Responden
n the follow
norms.
2 crores pe
bstation est
ge of one cir
y ADHPL.
eneration of
where refus
PPL) may
er detailed
dure for co
ion assets:
ovide conn
on line with
the transm
DHPL taking
smission lin
and the be
Pag
Petitioner
of the Tran
nt No. 1 a
wing aspects
er km.
ablished by
rcuit of ADH
f MALANA
sal of conne
result in b
deliberatio
oordinated
nectivity to
immediate
mission line
g into con
ne and the
nchmark ca
ge 22 of 27
and the
nsmission
re not ad
s:
y EPPL to
HEP-
II HEP.
ectivity by
bottling of
on hereby
operation
EPPL on
effect.
e shall be
sideration
e audited
apital cost
7
Page 23
Ord
der in Petiti
(c) Returate
Com
amen
there
(d) O&Mborne
(e) ContSubs
repre
(f) Lead
Com
Open
Regu
respo
(g) Cont
II HE
trans
form
inter-
this c
circu
this c
(h) Formto su
coord
SLDC
as a
ion No. 259
urn on Equof return
mission (T
nded from
eof.
M Expensee in proport
trol of Sustation will
esentative a
d Generatomission (C
n Access
ulations, 20
onsibility of
trol Area: T
EP and 220
smission lin
separate c
-connection
control are
it with Na
control area
mation of aub-Load di
dinate on b
C in all res
single use
9/2010
uity: Retur
n allowed
erms and C
time to
s: O&M ex
tion to the u
ub-stationl be with
at this subs
or: In acco
Connectivity
in inter-St
009 as ame
f lead gene
The area c
0 kV ADHE
ne alongwit
control area
n point at IS
ea and inte
lagarh sha
a .
a coordinatispatch ce
behalf of al
spects of co
er, paymen
n on Equit
under C
Conditions
time and
xpenses sh
use of the t
: The con
EPPL an
station for c
ordance with
y, Long-ter
tate Trans
ended from
rator.
comprising
P-Nalagarh
th 132/220
a. To furth
STS, all ele
rface point
all be cons
tion Centrentre shall
l the gener
ombined sc
nt of transm
ty shall be
Central Ele
of Tariff) R
any subs
all be calcu
transmissio
ntrol of 1
nd ADHPL
oordination
h Central E
rm Access
mission an
m time to tim
Allain Duha
h transmiss
0 kV substa
er clarify th
ectric elem
t of 220 kV
idered as t
e: A coordi
be estab
rators with
chedule, de
mission cha
Pag
on the ba
ectricity R
Regulations
equent am
ulated on a
on line.
32/220 kV
L may ap
n purposes.
Electricity R
s and Med
nd related
me, ADHPL
angan HEP
sion line, LI
ation at Ch
his, before
ents shall b
V ADHPP-
the interfac
nation cent
blished whi
respective
eviations, re
arges for IS
ge 23 of 27
sis of the
Regulatory
, 2009 as
mendment
actual and
V Chhuar
ppoint its
Regulatory
dium-term
matters)
L will take
P, Malana
LO of this
hhuar will
Nalagarh
be part of
-Nalaragh
ce point of
tre similar
ch would
RLDC or
egistration
STS/STS,
7
Page 24
Ord
der in Petiti
paym
areas
cons
opera
coord
conc
jointl
centr
gene
subs
maki
funct
(i) Resp
Cent
ion No. 259
ment of LD
s responsi
sultation w
ation and
dination ce
cerned RLD
y by both g
re shall b
erating capa
station or ge
ng arrange
tions of Loa
ponsibilitytre shall be
(i)Coordin
entire ele
point on a
(ii)Coordin
system op
iii)Repres
transmiss
Committe
(iv) Meter
outage c
accountin
(v) Paym
Reactive
9/2010
C charges
ibility in te
with conce
market ope
entre for su
DC/SLDC. T
generating
be borne
acity .If bot
enerating s
ement of Co
ad Despatc
y of the cresponsibl
nate with th
ectrical con
all matters o
nate with
peration an
sent whole c
sion system
ees.
ring, protec
coordination
ng within its
ment of Tra
energy c
etc. This w
erm of swi
erned RLD
eration issu
uch new co
This coordin
companies
by both p
th parties a
stations ma
ommunicat
h centre( L
coordinatioe for:
he concern
ntrol area
of system o
individual
d market o
control area
m) in vario
ction coordi
n, switchin
control are
ansmission
harges, LD
would also
tching and
DC/SLDC.
ues would
ontrol area
nation centr
s. The cost
parties in
agree, cont
ay be used
tions requir
DC).
on Centre
ned RLDC/
upto the c
operation an
generators
peration.
a (all gener
us forums
ination, shu
g instructio
ea.
charges,
DC fee a
Pag
o be take c
d security
Thus all
be handle
in coordina
re shall be
t of establis
proportion
trol room o
as control
red for perfo
e: The coo
/SLDC on
common c
nd market o
s on all m
rators and
of Region
utdown coo
on, schedu
losses, UI
nd charge
ge 24 of 27
care of its
issues in
l system
ed by this
ation with
managed
shing this
to their
of the one
centre by
orming all
ordination
behalf of
onnection
operation.
matters of
dedicated
nal Power
ordination,
uling and
charges,
es to the
7
Page 25
Ord
der in Petiti
(j) Proccentr
ion No. 259
concerned
entire con
(vi) Calcu
for indi
charges/lo
ISTS/STS
concerned
(vii) On-li
RLDC/SL
(viii) Off-li
(ix) Send
CTU/STU
cedures:Va
re/Lead coo
(i)Schedu
coordinat
as given i
has to tak
individual
computat
exchange
met.
(ii)Meterin
coordinat
area shou
code. Add
9/2010
d pool/aut
ntrol area.
ulation/exch
vidual de
osses for d
S portion
d RLDC/SL
ne commu
LDC
ne data ab
ding meter
U to RLDC/S
arious proce
ordinator:
uling: Time
ion centre a
in the conc
ke care of ‘
generat
ion to be d
e between
ng and Ac
ion centre f
uld be sim
ditional me
hority for
hange of i
eviation,
dedicated p
which w
LDC for ent
unication an
out various
r data of
SLDC.
edures to b
line for in
and RLDC/
cerned Grid
to and fro’
tors and
done at its
RLDC/SLD
ccounting: T
for metering
ilar to one
eters if req
ISTS/STS
ndividual s
computatio
portion as w
would be
tire control a
nd real-tim
s informatio
interface m
be adopted
nformation
/SLDC for t
Code. The
information
coordina
end so tha
DC and co
The princip
g and acco
notified in
uired for th
Pag
usages o
schedules,
on of
well apport
communic
area.
me data tele
n to RLDC/
meters ins
d by the coo
exchange
this activity
e coordinati
n exchange
ation cen
at above tim
oordination
ple adopte
ounting with
the conce
his purpose
ge 25 of 27
on behalf
accounts
individual
tioning for
cated by
emetry to
/SLDC
stalled by
ordination
between
would be
ion centre
e between
tre and
me line of
centre is
ed by the
hin control
erned grid
e may be
7
Page 26
Ord
der in Petitiion No. 259
installed.
at the co
agreed in
of clarity,
Computat
charges
framed by
the figure
with ISTS
(Iii)Compu
for within
transmiss
norms, in
load, wo
SERC/CE
and work
(b) above
installed c
(iv)Compu
shared de
transmiss
schedules
week’s ac
the actua
(v)Outage
enumerat
with Cent
Long-term
State Tra
9/2010
The specia
st of respe
the meetin
the meter
tion of dev
account sh
y the Com
es compute
S/STS.
utation and
n its contro
sion system
respect of
orking cap
ERC. The c
ed out as
e. Allocatio
capacity of
utation and
edicated se
sion losses
s. The est
ctual perce
l meter read
e handling
ted in the
tral Electric
m Access a
nsmission a
al energy m
ective gene
ng held on
ing arrange
viation ene
hall be d
mission an
ed by RLD
d apportion
ol area tra
m): The tar
return on e
pital etc,
capital cost
per the pri
on of this
the genera
d apportion
ection: The
s shall be
imation sh
ntage aver
dings.
and priorit
concerned
city Regulat
and Mediu
and related
meter shall
erating stati
3.9.2010 w
ement is sh
rgy accoun
done in ba
nd duly tak
DC/SLDC a
nment of tr
ansmission
riff may be
equity, dep
followed
shall be as
nciple enum
cost may
ation.
ment of tra
estimated
e applied
all be bas
age losses
ies shall b
grid code
tory Comm
m-term Op
d matters) R
Pag
be installed
ions as pe
with RLDC.
hown in An
nt, Reactiv
ased on re
ing into the
at its interf
ransmission
system (
e worked b
reciation, in
by the c
s per audite
merated in
in pro ra
ansmission
percentage
to the r
sed on the
s worked ou
e similar to
and in ac
mission (Con
pen Access
Regulations
ge 26 of 27
d by CTU
r scheme
For sake
nnexure-I.
ve Energy
egulations
e account
face point
n charges
dedicated
based on
nterest on
concerned
ed figures
sub-para
ta to the
losses in
e average
respective
previous
ut through
o the one
ccordance
nnectivity,
s in inter-
s, 2010 as
7
Page 27
Ord
21. I
22. P
(M.DE ME
der in Petiti
(k) All t
beforeha
RLDC/S
(l) Help
so that
impleme
IA No.5/201
etition No.2
Sd/- EENA DAYAEMBER
ion No. 259
amended
is envisag
eventualit
operator
system c
decision i
the above
and and c
SLDC under
of concern
above pr
ented by RL
11 has bec
259/2010 is
ALAN) (V.
9/2010
. Although
ged for pow
ty of tran
will decide
conditions
n this regar
procedure
copy may
r intimation
ed RLDC/S
rocedures
LDCs/SLDC
ome infruct
s disposed o
sd/-.S.VERMA) MEMBER
in normal
wer of both
smission
e schedule
and preva
rd shall be
es/ rules m
also be
to the Com
SLDC may
are in line
Cs.
tuous in vie
of accordin
sd/- (S.JAYA
MEMB
case no e
h ADHPL an
constraints
e of genera
iling hydro
final.
may be en
submitted
mmission.
be sought
e with con
ew of above
gly.
-RAMAN)
BER
Pag
vacuation
nd EPPL, i
, Regiona
ation depe
o condition
umerated
to the c
on the abo
ncerned re
e directions
sd(Dr. PRAMO CHAIRPE
ge 27 of 27
constraint
n case of
al system
ending on
n and his
in writing
concerned
ove issues
egulations
s.
d/- OD DEO) RSON
7