CEB-1, 9/21/98 Presentation Name The NASA Electronic Parts and Packaging (NEPP) Program C. Barnes, K. LaBel * , P. Zulueta, D. Lakins, C. Lee, A. Johnston, and L. Galbraith Quality Leadership Forum GSFC July 19, 2001
Dec 25, 2015
CEB-1, 9/21/98Presentation Name
The NASA Electronic Parts and Packaging (NEPP) Program
C. Barnes, K. LaBel*, P. Zulueta, D. Lakins, C. Lee,
A. Johnston, and L. Galbraith
Quality Leadership Forum
GSFC
July 19, 2001
CEB-2, 9/21/98Presentation Name
Conferences
To provide forums for the exchange of information related to new and advanced electronic parts and packaging technologies for space and aeronautic
applications Identify and explore trends in electronic parts and packaging for space and
aeronautic applications in specific key technology areas.
Knowledge Acquisition and Dissemination
Through this effort the primary function will be to maintain and operate web-based system for
information distribution and archival. Administering users, maintaining the website, and “Mapping” the
contents of all the web sites where NEPP information currently resides.
System Upgrade
To provide users with a "central" archive with access to resources and information about NASA electronic parts, packaging and radiation activities with an emphasis on
space applications. The key aspects of the planned upgrade include: Enhancements to the User Interface, Enhanced search capability, More external interfaces,
Project support tools.
Standards
To maintain visibility in the working groups of the following organizations. The primary thrust for this activity is to attend at least six (6) conferences and meetings with the sole purpose of collecting standards information
and identifying external activities where the NEPP can leverage.
CEB-3, 9/21/98Presentation Name
Information Management & Dissemination Project Activities
RelatedResources
RadiationInformation
PartsInformation
PackagingInformation
One StopShopping!
IntegratedWWW System
http://nepp.nasa.govRADATA
(JPL)
SEU Rad Data(GSFC)
NPSL(GSFC)
ASAP/PSAP(GSFC)
EPIMS(GSFC)
EPINS(JPL)
EEE Links(GSFC)
NPPP(JPL)
Non-NEPPResources
PartsAnalysis
(GSFC)
CEB-4, 9/21/98Presentation Name
IMD Highlights – FY01
• Programmable Logic Application Notes
• Living with COTS-Industry Roadmap
• Getters for Reliable Hermetic Packages
• EPIMS 2.0. 4 Relay Failures Specific to Space Applications
• Electrostatic-Discharge (ESD) Failures in Thin-Film Resistors
• Nondestructive Detection of Cracks in Ceramics Using Vicinal Illumination
• Effects of Conformal Coat on Tin Whisker Growth
• Status of Military Specifications for Ceramic Switch Mode Power Supply (SMPS) Capacitors
• Evacuated FM08 Fuses Carry a Sustained Arc in a Bus over 75 VDC
• Jet Propulsion Laboratory Parts Analyses
• Goddard Space Flight Center Parts Analyses
Developed Proposal Handling and Tracking (PHAT) proposal submission, review and acceptance module for the NEPP Information System
Simplifies and automates the NEPP Program's annual proposal submission and review process
Signed agreement with CALCE for NEPP access to all CALCE resources
CALCE website includes over 10,000 documents pertaining to packaging, parts management, and failure physics for electronics systems and products
Scheduled NEPP Conference for Pasadena in Spring 2001
Conference will be combined with IMAPS and Extreme Environments Conferences
Completed Development of the Technical Publication (TPS) module for NEPP Information Portal
Completed revision and update of NEPP EEE Newsletter
Completed collecting information requirements from JPL and LaRC design engineers
Established agreement with Reliable Flight Hardware (RFH) organization for coordination of IT system development activities
CEB-5, 9/21/98Presentation Name
•Entire site averages 25,000 hits/week
•Average 400 users/weekday
•Home page averages 400 hits/day
•NPSL, most requested page, averages 500 hits/week
•ERC directory access averages 400 hits/week
•EPAR directory access averages 800 hits/week
•EPAC directory access averages 800 hits/week
•IMD directory access averages 4,500 hits/week
NEPP WEB SITE STATS FOR APRIL- JUNE 01 (provided by Sandy Aitken)
CEB-6, 9/21/98Presentation Name
IMD Migration to NEPP Portal
•Flat File Architecture•Static HTML Structure•No “Customized” User Views•Non-Interconnected Links to Databases
The Present:The Present:NEPP WWW SiteNEPP WWW Site
•Multi-Database/InteractiveInteractive Architecture•DynamicDynamic WWW Content•User Role-Based ViewsRole-Based Views
Customized Content (“My NEPP”)•Seamless AccessSeamless Access to Disparate Databases
The Future:The Future:NEPP PortalNEPP Portal
Complete development of Information Portal-8/15/01
Provide NEPP Information Flashes to broad audience of users - 3/31/01
Hold NEPP Conference- 5/01
CEB-7, 9/21/98Presentation Name
NEPP Information System Architecture
New Features Improved search capability Multiple ways to view information. Such as all tasks, experts,
publications, and events for an Area of Emphasis EMail notification of updated pages Authors and Principal Investigators can upload and maintain
their documents Locate experts within the NEPP community NEPP members can add events to the calendar
Web Server Windows Server 2000 Dual Pentium III 800 MHz Processors Two 36 G Hard Drives (Mirrored) 512 MB Memory Allaire Cold Fusion Enterprise 4.5 Allaire Spectra 1.5 Webinator NT w/PDF Plug-In RealServer 8.0 Open SSL/SSH
Data Base Server Windows Server 2000 Pentium III 800 MHz Processor 36 G Hard Drive 512 MB Memory MS SQL Server 2000
Search Capability
Public Data
ERC(Radiation Resources)
EPAC(Packaging Resources)
EPAR(Parts Resources)
Calendar of Events(CE)
Contact and Experts Listing (EL)
Program and Project Mission & Descriptions
System Change Log(SCL)
Feedback Mechanism(FM)
User AccountAdministration (UAA)
Access Control System
Parts Resources Radiation ResourcesPackaging Resources
Task Database(TD)
Proposal Handling & Tracking System (PhaT)
Technical PublicationsSystem (TPS)
Graphical User Interface (GUI)
NEPP Produced Data
Non-NEPP Produced Data
Cross Project Metadata
CEB-8, 9/21/98Presentation Name
Content ObjectDatabase
Content Management
CO
AP
I
Workflow & Process Automation
Roles-Based Security
Personalization
Business Intelligence
Syndication
Fra
mew
ork
Content Objects
External Systems
Portal TechnologyMacromedia Spectra
Framework for rapid development of a complex web site
Personalization Services Role-Based Security Content Management Workflow and Process Automation Syndication Business Intelligence
Flexible for future enhancements and upgrades
Platform Independent Modular Development
CEB-9, 9/21/98Presentation Name
Operations Concept
PHATTASK
DATABASE
TECHNICAL PUBLICATION
SYSTEM
EXPERTS LISTING
CALENDAR EXTERNAL DATABASES
Selected Proposals Task Plans
Updated Plan
AuthorExpert NEPP PI
Deliverables
ADMIN
CALCEPurdueRAC
EXTERNAL LINKS
Lessons LearnedNEPAGNPPPNPSLRADHOME RFH
ConferencesData SharingDocument Download Email notificationNEPP ExpertsNEPP Technologies and Research NewslettersSearch ToolsVideo Conferences
SecurityMetrics
Deliverables
PROJECT MANAGERS
Users
FundsReports (TBD)Schedules
Schedule of EventsAudit Calendar
SYNDICATEDCONTENTSTREAM
ChipComQuestLink
CEB-10, 9/21/98Presentation Name
Request an Account
User selects the ‘Request an Account’ button
User fills in the required information and submits the form
If the user is not affiliated with the NEPP Program then the NASA Sponsor information must be provided
An email is sent to and the request is routed to the appropriate NEPP Project Manager for approval
CEB-11, 9/21/98Presentation Name
Upload a Publication
The Admin interface allows Admin Users to upload various types of files to the file system on the web server, so that those documents and images can be stored and retrieved by the Spectra system.
The application does not have on-line image or document (.doc, .pdf) editing tools.
CEB-12, 9/21/98Presentation Name
Create A Task
Each Task is created by the Project Managers
Project Managers enter the Task Information
Area of Emphasis Principle Investigator(s) PI User Information
(Name and Contact information) Task Name Project Supported (EPAR, EPAC, ERC, IND) Fiscal Year of Task Initiation Task Description/Plan Deliverables Schedule Funding Requirements (Display of this data
restricted to the Project Manager) Keywords (Free text list of keywords)
CEB-13, 9/21/98Presentation Name
Add a Deliverable to a Task
Each Task has a Principle Investigator (PI) and may have co-PI’s. The PI can
Upload Deliverables to the system. Mark the Schedule to show that a
Deliverable has been uploaded. Set restriction access to any Document
uploaded. Any members of the specified group will be able to upload the Task-related documents.
Each Task records all upload and delete activities for Documents.
CEB-14, 9/21/98Presentation Name
Create a Page
Who may start this workflow Data_Entry Users may create a new
Page within the sections they are members.
Editor/Publisher Users may create a new Page within the sections they own.
Site Administrator may create a new Page anywhere on the NEPP site.
Workflow Process Locate the New Page Placement
The user chooses a page from the page hierarchy
Select the Page Template The user chooses the general
layout of the page.
CEB-15, 9/21/98Presentation Name
Create Content
Who may start this workflow Data_Entry Users create a new piece of
content. Editor/Publisher Users start a create
content workflow on any content. Site Administrator start a create content
workflow on any content on the NEPP site.
Workflow Process Choose the Type of Content to Create
See Appendix A for the types of Content
Fill in the Content Properties Each type of Content has a it’s own
properties that will be filled in using an online form.
CEB-16, 9/21/98Presentation Name
Create Content (Continued)
Work Flow Process (continued) Check for ITAR Compliance
A form check-off prior to submission and prior to publishing indicating if the content has been checked and is ITAR compliant.
Publish the Content If the user has Publish rights, the Content
can be published live to the site. If the user does NOT have Publish rights,
the content will be saved and an e-mail note sent to the Admin user who can approve, and publish, the content to the site.
CEB-17, 9/21/98Presentation Name
Edit Content
Who may start this workflow Data_Entry Users that created a piece
of content. Editor/Publisher Users may edit any
content in their “section(s)”. Site Administrator edit any content on
the NEPP site. Workflow Process
Locate the Content to Edit Fill in the Content Properties
Each type of Content has a it’s own properties that will be filled in using an online form.
CEB-18, 9/21/98Presentation Name
Edit Content (Continued)
Workflow Process (Continued) Check for ITAR Compliance
A form check-off prior to submission and prior to publishing indicating if the content has been checked and is ITAR compliant.
Publish the Content If the user has Publish rights, the Content
can be published live to the site. If the user does NOT have Publish rights,
the content will be saved and an e-mail note sent to the Admin user who can approve, and publish, the content to the site.
CEB-19, 9/21/98Presentation Name
New Requirements
User Interest Owner Status
NEPP Management
Proposals NEPP PHaTTasks NEPP Phase 1/TDStatus NEPP Phase 1/TDReports NEPP Phase 1/TPSDeliverables NEPP Phase 1/TPS
Parts EngineersandPackaging Engineers
NEPP Technologies NEPP Phase 1/TPS and TDNASA Parts Selection List (NPSL) NEPP Phase 1Parts Lists Each Center NewSpecifications and Guidelines Each Center NewNASA Parts Inventory RFH NewAudit Schedule (QML/QPL) RFH NewReliability Tools and Validation NEPAG and RAC NewLessons Learned NewHeritage Information NewProcurement Management NewAssembly Tools NewParts Control Board (PCB) NewCALCE University of Maryland/CALCE Phase 1Projects Using/Used NEPP Technologies NEPP NewManufactures Information New
Radiation NEPP Technologies NEPP Phase 1/TPS and TDRadiation Data RadHome Phase 1
Designers
NEPP Technologies NEPP Phase 1/TPS and TDQualification Information NEPP and NEPAG NewProjects Using/Used NEPP Technologies NEPP NewNASA Parts Selection List (NPSL) NEPP Phase 1Parts Lists Each Center NewSpecifications and Guidelines Each Center NewNASA Parts Inventory RFH New
Project and Program ManagersNEPP Technologies NEPP Phase 1/TPS and TDQualification Information NEPP and NEPAG NewProjects Using/Used NEPP Technologies NEPP New
General NEPP Technologies NEPP Phase 1/TPS and TD
CEB-20, 9/21/98Presentation Name
New Requirements
NEPP Management: Status on current tasks. Evaluate proposals for future tasks.
Designers and Engineers what answers to the following questions: What does the validation data look like? Can I use this part? How do I qualify it? What other NASA projects have used it?
Site Wide: Bulletin Board Calendar EEE Links Newsletters, NEPP Papers, Reports E-Mail Notification Experts and Points of Contact Feedback Related Links/Sites Search
CEB-21, 9/21/98Presentation Name
Components & MappingBOM
Packages
Layout DataLogical Data
SchematicSymbols
. . . .Start_ff:BlockBEGIN
IF (reset = ´0´ ) THEN
send_ff <= ´0
´ ;
ELSIF . . . Functional Model
Logical Pin
Timing Model
Assembly maps
Unit maps
System maps
Thermal Model
Stress Model
PadsFootprint
LayoutSymbols
Behavior Model
Physical PinData sheet
Vendor/Distributor
Application Notes
Logistics
Comp
XYZ1234-5678Part number
Data Model
CEB-22, 9/21/98Presentation Name
User Interface
Query
QueryMatches
Classification/Catalogs
Sets of Characteristics
Characteristics
Selected component
CEB-23, 9/21/98Presentation Name
Contacts
NEPP Program Manager Chuck Barnes(818) [email protected]
Packaging Project Manager Phil Zulueta(818) [email protected]
ERC Project Manager Ken LaBel(301) [email protected]
Deputy ERC Project Manager Allan Johnston(818) [email protected]
Parts Project Manager Choon Lee(818) [email protected]
IMD Project Manager Darryl Lakins(301) [email protected]
IMD Deputy Project Manager Lissa Galbraith(818) 354-4617