Top Banner
CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 ‘This project was undertaken in connection with the settlement of an enforcement action taken by the Colorado Department of Public Health and Environment for violations of the Colorado Water Quality Control Act.’”
22

CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

Mar 29, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT WATER QUALITY PROGRAM

CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and

OVERVIEW10/2009

‘This project was undertaken in connection with the settlement of an enforcement action taken by the Colorado Department of Public Health and Environment for violations of the

Colorado Water Quality Control Act.’”

Page 2: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW

Project completion Oct 2009

Supplemental Environmental Project:

“ CDOT shall construct a BMP Field Training Facility (“BMP Facility”) on its property located at or near the corner of S. Colorado Boulevard and Louisiana Avenue in Denver and shall use the BMP Facility to train construction companies, contractors, consultants, municipalities, or other related organizations and individuals on the proper purpose, use, installation and maintenance of erosion and sediment control BMP’s…” Compliance Order on Consent 2009

Page 3: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramObjectives:Create a training venue for the construction industry to improve Stormwater Construction Permit compliance

Hands on training

Simulated real world applications

Promoting Green Government and SustainabilityComply with Consent Order between CDOT and CDPHE

Formal training to begin in Spring of 2010

Page 4: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.
Page 5: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality Program

Tire berm construction:

Promoting sustainability by using recycled materials

One ton compressed tire bales were used to create earth berm

Constructed slopes with sprinkler discharge allow students to see slope erosion occurring

Page 6: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality Program

Each compartment can be used for different erosion control application and simulated rainfall

Page 7: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality Program Slope construction and backfill

Page 8: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramCompleted berm for slope stabilization best management practice’s

Page 9: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality Program Water Quality Ponds

constructed to display various outlet control BMP’s, slope control and access options

Ponds capture stormwater from rain events and water used during training.

Page 10: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramOutlet control wall construction

Page 11: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramPond side slope stabilization using soil retention blankets

Page 12: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramFinal pond configuration and completed outlet controls

Page 13: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramRoadway template with

curb, gutter and curb inlets demonstrates the following:

Pavement runoff and adjacent soil runoff onto template

Type R drain and BMP’sDrainage to a Type C inlet

Page 14: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramRoadway template for curb and gutter, and shoulder bmp applicationsConcrete washout during construction and used in training

Page 15: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramConstructed roadway segment combined with curb and gutter and vegetated shoulder

Page 16: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramStudents can witness good and bad BMP application and installation issues

Page 17: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramFacility will be used to demonstrate effectiveness of various stabilization BMP’s

Page 18: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramConstructed ditches (2 and 5% slopes) used to simulate erosion in ditches and bmp applications

Page 19: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramTemp stream crossing with a durable road surface mat

Page 20: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

WQ Pond

SlopeDitch

Temp xing

Mulch

Soil retention

blanket

Slope & ditch reveg

Site Applications and BMP’s

Page 21: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramContact Rick Willard for scheduling and

questionsPhone: 303 757 9343Email: [email protected]

Page 22: CDOT WATER QUALITY PROGRAM CDOT WATER QUALITY BMP TRAINING FACILITY CONSTRUCTION PHASE and OVERVIEW 10/2009 This project was undertaken in connection with.

CDOT Water Quality ProgramFrom stormwater

inspection and bmp installation training to new bmp application and demonstration, the lab will be a beneficial stormwater quality improvement tool and asset for Colorado.